CN110459107A - A kind of combined intelligent building weak electricity system training apparatus - Google Patents
A kind of combined intelligent building weak electricity system training apparatus Download PDFInfo
- Publication number
- CN110459107A CN110459107A CN201910622001.2A CN201910622001A CN110459107A CN 110459107 A CN110459107 A CN 110459107A CN 201910622001 A CN201910622001 A CN 201910622001A CN 110459107 A CN110459107 A CN 110459107A
- Authority
- CN
- China
- Prior art keywords
- frame
- fixedly connected
- protective frame
- intelligent building
- training apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B5/00—Cleaning by methods involving the use of air flow or gas flow
- B08B5/04—Cleaning by suction, with or without auxiliary action
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B23/00—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
- G09B23/06—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics
- G09B23/18—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism
- G09B23/188—Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for physics for electricity or magnetism for motors; for generators; for power supplies; for power distribution
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/20—Modifications to facilitate cooling, ventilating, or heating
- H05K7/20009—Modifications to facilitate cooling, ventilating, or heating using a gaseous coolant in electronic enclosures
- H05K7/20136—Forced ventilation, e.g. by fans
- H05K7/20172—Fan mounting or fan specifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/20—Modifications to facilitate cooling, ventilating, or heating
- H05K7/20009—Modifications to facilitate cooling, ventilating, or heating using a gaseous coolant in electronic enclosures
- H05K7/20136—Forced ventilation, e.g. by fans
- H05K7/20181—Filters; Louvers
Abstract
The invention discloses a kind of combined intelligent building weak electricity system training apparatus, including practical traning platform and protective frame, two sides at the top of practical traning platform are fixedly connected to fixed frame, the front of the protective frame is fixedly connected with installing frame, and the inner wall of installing frame is fixedly connected with dust catcher, the front of protective frame and be located at installing frame bottom be fixedly connected with rectangle frame, the positive middle part of protective frame inner wall is fixedly connected with gas-distributing pipe by link block, the air inlet of the dust catcher is communicated with air inlet pipe, and the present invention relates to actual training device technical fields.The combined intelligent building weak electricity system training apparatus; the air inlet pipe runs through protective frame far from one end of dust catcher and extends to the inside of protective frame; it can be achieved to play certain protective effect to the operation equipment on the actual training device; the entrance of dust can be prevented when not in use; it can remove the fine dust in operation equipment gap simultaneously, create good condition for being normally carried out for subsequent real training work.
Description
Technical field
The present invention relates to actual training device technical field, specially a kind of combined intelligent building weak electricity system training apparatus.
Background technique
Many industries feature all high to operating personnel's skill requirement every year all can be to internal member in order to stablize and develop
Work carries out study, training and verification of professional technical ability etc. in vocational skills, due to being difficult to see various mistakes in actual operation
The phenomenon that mode of connection and generation and consequence, it is necessary to their the consistent trainings of progress and scene, in current training and learning,
If student is only learnt by the explanation of books or teacher, due to not intuitive, student is difficult to understand for and grasps, to improve study
Efficiency, present training, can be more by the practice operation of actual training device mostly using theory in such a way that real training combines
Intuitive and comprehensive learn.
Practice operation is often carried out come the electric system to building by actual training device at present, but is not using actual training device
When, exposure in air, is easy a large amount of dust of accumulation to the operation equipment on actual training device for a long time, due to operation equipment
Scrambling is cleaned and is very bothered, while can not play certain protective effect to operation equipment, to subsequent
Normal use causes trouble.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of combined intelligent building weak electricity system training apparatus, solutions
It has determined and has been not provided with safeguard structure on practical traning platform and is easy the more dust of accumulation, thus the problem of influencing subsequent normal use.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of combined intelligent building light current
System actual training device, including practical traning platform and protective frame, the two sides at the top of the practical traning platform are fixedly connected to fixed frame, described anti-
The front of shield frame is fixedly connected with installing frame, and the inner wall of installing frame is fixedly connected with dust catcher, the front of the protective frame and
It is fixedly connected with rectangle frame positioned at the bottom of installing frame, the positive middle part of protective frame inner wall is fixedly connected with by link block
Gas-distributing pipe, the air inlet of the dust catcher are communicated with air inlet pipe, and the air inlet pipe runs through protective frame simultaneously far from one end of dust catcher
The inside of protective frame is extended to, one end that the air inlet pipe extends to inside protective frame is connected with the front of gas-distributing pipe, described
The bottom and top of gas-distributing pipe surface two sides are communicated with connecting tube, and the two sides at the connecting tube back side are fixedly connected to air-breathing
Mouth, the gas outlet of the dust catcher are communicated with dust outlet tube, and the bottom end of the dust outlet tube sequentially passes through installing frame and rectangle frame and prolongs
The inside of rectangle frame is extended to, the positive two sides of protective frame offer fixing groove.
Preferably, the inside of the fixing groove is fixedly connected with fan, the inner wall of the fixing groove and is located at fan just
Face is fixedly connected with activated carbon adsorption net.
Preferably, vertical bar, and the surface sliding of vertical bar are fixedly connected between the top and bottom of the fixed frame inner wall
It is connected with sliding shoe, the side of the sliding shoe runs through fixed frame and extends to the outside of fixed frame, and the sliding shoe extends to
One end outside fixed frame is fixedly connected with the side of protective frame.
Preferably, the side of the fixed frame inner wall offers loose slot, and the inner wall of loose slot is fixedly connected with buffering
Spring, the buffer spring run through loose slot far from one end of loose slot and extend to the outside of loose slot, the buffer spring
The one end extended to outside loose slot is fixedly connected with clamping plate.
Preferably, it is fixedly connected to fixture block at the top and bottom of the clamping plate side, the fixture block is far from clamping plate
Side through sliding shoe and extend to the inside of sliding shoe, the top and bottom of the sliding shoe side offer and fixture block
Compatible card slot.
Preferably, the other side of the clamping plate is fixedly connected with quill, and the quill is far from clamping plate
One end runs through fixed frame and extends to the outside of fixed frame, and the internal whorl of the quill is connected with screw.
Preferably, one end of the screw runs through sliding shoe and extends to the inside of sliding shoe, the sliding shoe side
Middle part offers threaded hole compatible with screw.
Preferably, the basal sliding of the rectangle frame inner wall is connected with pulp-collecting box, and the front of the rectangle frame passes through hinge
It is hinged with dodge gate.
Beneficial effect
The present invention provides a kind of combined intelligent building weak electricity system training apparatus.Have it is following the utility model has the advantages that
(1), the combined intelligent building weak electricity system training apparatus is fixedly connected with installation by the front of protective frame
Frame, and the inner wall of installing frame is fixedly connected with dust catcher, the front of the protective frame and bottom for being located at installing frame is fixedly connected with square
Shape frame, the positive middle part of protective frame inner wall are fixedly connected with gas-distributing pipe by link block, and the air inlet of dust catcher is communicated with air inlet
Pipe, air inlet pipe run through protective frame far from one end of dust catcher and extend to the inside of protective frame, and air inlet pipe extends in protective frame
The one end in portion is connected with the front of gas-distributing pipe, and the bottom and top of gas-distributing pipe surface two sides are communicated with connecting tube, and connect
The two sides at the pipe back side are fixedly connected to vacuum noz(zle), and the gas outlet of dust catcher is communicated with dust outlet tube, and the bottom end of dust outlet tube is successively passed through
It wears installing frame and rectangle frame and extends to the inside of rectangle frame, be fixedly connected between the top and bottom of fixed frame inner wall perpendicular
Bar, and the surface of vertical bar slidably connects sliding shoe, the side of sliding shoe runs through fixed frame and extends to the outside of fixed frame, sliding
The side that motion block extends to outside fixed frame is fixedly connected with the side of protective frame, and the side of fixed frame inner wall offers activity
Slot, and the inner wall of loose slot is fixedly connected with buffer spring, the one end of buffer spring far from loose slot is through loose slot and extends
To the outside of loose slot, then by clamping plate, fixture block, card slot, quill, screw and threaded hole be equipped with, it can be achieved that
Certain protective effect is played to the operation equipment on the actual training device, the entrance of dust can be prevented when not in use, simultaneously
It can remove the fine dust in operation equipment gap, create good condition for being normally carried out for subsequent real training work.
(2), the combined intelligent building weak electricity system training apparatus is fixedly connected with fan by the inside of fixing groove,
The inner wall of fixing groove and be located at fan front be fixedly connected with activated carbon adsorption net, it can be achieved that protective frame plays when closed
Certain draught effect can avoid internal heat accumulation and excessively cause operation device fails to influence subsequent normal behaviour
The problem of making.
(3), the combined intelligent building weak electricity system training apparatus is connected with by the basal sliding of rectangle frame inner wall and is connect
Magazine, the front of rectangle frame are hinged with dodge gate, it can be achieved that the dust come out to dust catcher dispatch carries out unified receipts by hinge
Collection is provided convenience for the processing of follow-up work personnel.
Detailed description of the invention
Fig. 1 is the front view of structure of the invention;
Fig. 2 is the rearview of present invention protection mount structure;
Fig. 3 is the top view of protective frame internal structure of the present invention;
Fig. 4 is the front view of rectangular frame structure of the present invention;
Fig. 5 is the partial enlarged view in Fig. 1 of the present invention at A.
In figure: 1- practical traning platform, 2- protective frame, 3- fixed frame, 4- installing frame, 5- dust catcher, 6- rectangle frame, 7- gas-distributing pipe,
8- air inlet pipe, 9- connecting tube, 10- vacuum noz(zle), 11- dust outlet tube, 12- fixing groove, 13- fan, 14- activated carbon adsorption net, 15- are perpendicular
Bar, 16- sliding shoe, 17- loose slot, 18- buffer spring, 19- clamping plate, 20- fixture block, 21- card slot, 22- quill, 23-
Screw, 24- threaded hole, 25- pulp-collecting box, 26- dodge gate.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-5, the embodiment of the present invention provides a kind of technical solution: a kind of combined intelligent building weak electricity system is real
The two sides of training apparatus, including practical traning platform 1 and protective frame 2,1 top of practical traning platform are fixedly connected to fixed frame 3,3 inner wall of fixed frame
Side offer loose slot 17, and the inner wall of loose slot 17 is fixedly connected with buffer spring 18, and buffer spring 18 is far from activity
One end of slot 17 runs through loose slot 17 and extends to the outside of loose slot 17, and buffer spring 18 extends to one outside loose slot 17
End is fixedly connected with clamping plate 19, and the other side of clamping plate 19 is fixedly connected with quill 22, and quill 22 is far from clamping
One end of plate 19 runs through fixed frame 3 and extends to the outside of fixed frame 3, and the internal whorl of quill 22 is connected with screw 23,
One end of screw 23 is through sliding shoe 16 and extends to the inside of sliding shoe 16, offers in the middle part of 16 side of sliding shoe and screw
23 compatible threaded holes 24, are fixedly connected to fixture block 20 at the top and bottom of 19 side of clamping plate, and fixture block 20 is far from clamping
The side of plate 19 runs through sliding shoe 16 and extends to the inside of sliding shoe 16, and the top and bottom of 16 side of sliding shoe offer
Card slot 21 compatible with fixture block 20, is fixedly connected with vertical bar 15 between the top and bottom of 3 inner wall of fixed frame, and vertical bar 15
Surface slidably connects sliding shoe 16, and the side of sliding shoe 16 runs through fixed frame 3 and extends to the outside of fixed frame 3, sliding shoe
16 sides extended to outside fixed frame 3 are fixedly connected with the side of protective frame 2, and the front of protective frame 2 is fixedly connected with installation
Frame 4, and the inner wall of installing frame 4 is fixedly connected with dust catcher 5, the front of the protective frame 2 and bottom for being located at installing frame 4 is fixedly connected
There is rectangle frame 6, the basal sliding of 6 inner wall of rectangle frame is connected with pulp-collecting box 25, and pulp-collecting box 25, which can be realized, comes out 5 dispatch of dust catcher
Dust carry out unified collection, provide convenience for the processing of follow-up work personnel, the front of rectangle frame 6 is hinged with by hinge
Dodge gate 26, the positive middle part of 2 inner wall of protective frame are fixedly connected with gas-distributing pipe 7, the air inlet connection of dust catcher 5 by link block
There is air inlet pipe 8, air inlet pipe 8 runs through protective frame 2 far from one end of dust catcher 5 and extends to the inside of protective frame 2, and air inlet pipe 8 is prolonged
It extends to one end inside protective frame 2 to be connected with the front of gas-distributing pipe 7, the bottom and top of 7 surface two sides of gas-distributing pipe are connected to
There is connecting tube 9, and the two sides at 9 back side of connecting tube are fixedly connected to vacuum noz(zle) 10, the gas outlet of dust catcher 5 is communicated with dust outlet tube
11, the bottom end of dust outlet tube 11 sequentially passes through installing frame 4 and rectangle frame 6 and the inside for extending to rectangle frame 6, and protective frame 2 is positive
Two sides offer fixing groove 12, and the inside of fixing groove 12 is fixedly connected with fan 13, and fan 13 can realize that protective frame 2 is being closed
When play certain draught effect, can avoid internal heat accumulation excessively causes operation device fails to influence it is subsequent
The problem of normal operating, the inner wall of fixing groove 12 and the front for being located at fan 13 are fixedly connected with activated carbon adsorption net 14, activity
The setting of charcoal adsorption net 14 can avoid dust and be entered inside protective frame 2 by fixing groove 12.
In use, screw 23 is taken out, while quill 22 is pulled, protective frame 2 is moved upward to top, unclamped
Fixture block 20 can be inserted into sliding shoe by the cushion effect of buffer spring 18 by the clamping plate 19 of quill 22,22 one end of quill
Be fixed in card slot 21 on 16, then by screw 23 by quill 22 rotate in the threaded hole 24 on sliding shoe 16 into
Row is fixed, can prevent when in use protective frame 2 be easy to happen sliding, after real training works, protective frame 2 can be closed, starting
Dust catcher 5, dust catcher 5 can carry out the dust in operation equipment by air inlet pipe 8, gas-distributing pipe 7, connecting tube 9 and vacuum noz(zle) 10
It absorbs, then by dust outlet tube 11 by dust emissions to pulp-collecting box 25, fan 13 can be aerated, and this completes whole
A work.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (8)
1. a kind of combined intelligent building weak electricity system training apparatus, including practical traning platform (1) and protective frame (2), the practical traning platform
(1) two sides at the top of are fixedly connected to fixed frame (3), it is characterised in that: the front of the protective frame (2) is fixedly connected with peace
Frame up (4), and the inner wall of installing frame (4) is fixedly connected with dust catcher (5), the front of the protective frame (2) and be located at installing frame
(4) bottom is fixedly connected with rectangle frame (6), and the positive middle part of protective frame (2) inner wall is fixedly connected with by link block
The air inlet of gas-distributing pipe (7), the dust catcher (5) is communicated with air inlet pipe (8), and the one of the air inlet pipe (8) separate dust catcher (5)
End runs through protective frame (2) and extends to the inside of protective frame (2), and the air inlet pipe (8) extends to the internal one end of protective frame (2)
It is connected with the front of gas-distributing pipe (7), the bottom and top of gas-distributing pipe (7) the surface two sides are communicated with connecting tube (9), and
The two sides at connecting tube (9) back side are fixedly connected to vacuum noz(zle) (10), and the gas outlet of the dust catcher (5) is communicated with dust outlet tube
(11), the bottom end of the dust outlet tube (11) sequentially passes through installing frame (4) and rectangle frame (6) and the inside for extending to rectangle frame (6),
The positive two sides of the protective frame (2) offer fixing groove (12), solid between the top and bottom of fixed frame (3) inner wall
Surely it is connected with vertical bar (15), and the surface of vertical bar (15) slidably connects sliding shoe (16).
2. a kind of combined intelligent building weak electricity system training apparatus according to claim 1, it is characterised in that: described solid
The inside for determining slot (12) is fixedly connected with fan (13), the inner wall of the fixing groove (12) and the front fixation for being located at fan (13)
It is connected with activated carbon adsorption net (14).
3. a kind of combined intelligent building weak electricity system training apparatus according to claim 1, it is characterised in that: the cunning
The side of motion block (16) runs through fixed frame (3) and extends to the outside of fixed frame (3), and the sliding shoe (16) extends to fixed frame
(3) external side is fixedly connected with the side of protective frame (2).
4. a kind of combined intelligent building weak electricity system training apparatus according to claim 1, it is characterised in that: described solid
The side for determining frame (3) inner wall offers loose slot (17), and the inner wall of loose slot (17) is fixedly connected with buffer spring (18), institute
The one end of buffer spring (18) far from loose slot (17) is stated through loose slot (17) and extends to the outside of loose slot (17), it is described
Buffer spring (18) extends to the external one end of loose slot (17) and is fixedly connected with clamping plate (19).
5. a kind of combined intelligent building weak electricity system training apparatus according to claim 4, it is characterised in that: the folder
It is fixedly connected to fixture block (20) at the top and bottom of tight plate (19) side, side of the fixture block (20) far from clamping plate (19)
Through sliding shoe (16) and the inside of sliding shoe (16) is extended to, the top and bottom of sliding shoe (16) side offer
The compatible card slot (21) with fixture block (20).
6. a kind of combined intelligent building weak electricity system training apparatus according to claim 4, it is characterised in that: the folder
The other side of tight plate (19) is fixedly connected with quill (22), and the quill (22) is passed through far from the one end of clamping plate (19)
It wears fixed frame (3) and extends to the outside of fixed frame (3), the internal whorl of the quill (22) is connected with screw (23).
7. a kind of combined intelligent building weak electricity system training apparatus according to claim 6, it is characterised in that: the spiral shell
One end of nail (23) runs through sliding shoe (16) and extends to the inside of sliding shoe (16), opens in the middle part of sliding shoe (16) side
Equipped with threaded hole (24) compatible with screw (23).
8. a kind of combined intelligent building weak electricity system training apparatus according to claim 1, it is characterised in that: the square
The basal sliding of shape frame (6) inner wall is connected with pulp-collecting box (25), and the front of the rectangle frame (6) is hinged with dodge gate by hinge
(26)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910622001.2A CN110459107A (en) | 2019-07-10 | 2019-07-10 | A kind of combined intelligent building weak electricity system training apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910622001.2A CN110459107A (en) | 2019-07-10 | 2019-07-10 | A kind of combined intelligent building weak electricity system training apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110459107A true CN110459107A (en) | 2019-11-15 |
Family
ID=68482656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910622001.2A Pending CN110459107A (en) | 2019-07-10 | 2019-07-10 | A kind of combined intelligent building weak electricity system training apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110459107A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112908069A (en) * | 2020-09-16 | 2021-06-04 | 杭州职业技术学院 | PLC electromechanical experiment table |
CN113973455A (en) * | 2021-10-16 | 2022-01-25 | 深圳市奥金瑞科技有限公司 | Internet of things intelligent control platform wireless receiving device convenient to install |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006042663A1 (en) * | 2004-10-15 | 2006-04-27 | Daimlerchrysler Ag | Method for designing a cleaning system |
US20060210959A1 (en) * | 2000-10-06 | 2006-09-21 | Victor Krstec | System and method to simulate hemodynamics |
CN107578680A (en) * | 2017-10-16 | 2018-01-12 | 牡丹江师范学院 | A kind of experimental facilities for electromagnetics teaching |
CN207541816U (en) * | 2017-08-17 | 2018-06-26 | 庞胜宇 | A kind of Physical Experiment sample display equipment |
CN207637379U (en) * | 2017-08-04 | 2018-07-20 | 齐鲁师范学院 | A kind of teaching consuming energy work Electronic Training platform |
CN207731526U (en) * | 2017-10-20 | 2018-08-14 | 肯拓(天津)工业自动化技术有限公司 | intelligent sensing technology application platform |
CN207786657U (en) * | 2018-01-11 | 2018-08-31 | 张昊 | A kind of Physical Experiment resistance experiment device for teaching |
CN108682262A (en) * | 2018-05-22 | 2018-10-19 | 东莞理工学院 | A kind of dust mask analog demenstration machine facilitating clamping and sealing |
CN108817766A (en) * | 2018-08-29 | 2018-11-16 | 广东海翔教育科技有限公司 | A kind of college student Metalworking Practice Teaching welder |
CN108856232A (en) * | 2018-06-27 | 2018-11-23 | 安徽慕凡电子科技有限公司 | A kind of instrument dust guard |
CN208488898U (en) * | 2018-01-23 | 2019-02-12 | 宜春学院 | A kind of automotive control system teaching teaching apparatus being readily transported |
CN208622316U (en) * | 2018-03-30 | 2019-03-19 | 南京铁道职业技术学院 | A kind of traction substation of electric railway secondary failure simulation generator |
-
2019
- 2019-07-10 CN CN201910622001.2A patent/CN110459107A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060210959A1 (en) * | 2000-10-06 | 2006-09-21 | Victor Krstec | System and method to simulate hemodynamics |
WO2006042663A1 (en) * | 2004-10-15 | 2006-04-27 | Daimlerchrysler Ag | Method for designing a cleaning system |
CN207637379U (en) * | 2017-08-04 | 2018-07-20 | 齐鲁师范学院 | A kind of teaching consuming energy work Electronic Training platform |
CN207541816U (en) * | 2017-08-17 | 2018-06-26 | 庞胜宇 | A kind of Physical Experiment sample display equipment |
CN107578680A (en) * | 2017-10-16 | 2018-01-12 | 牡丹江师范学院 | A kind of experimental facilities for electromagnetics teaching |
CN207731526U (en) * | 2017-10-20 | 2018-08-14 | 肯拓(天津)工业自动化技术有限公司 | intelligent sensing technology application platform |
CN207786657U (en) * | 2018-01-11 | 2018-08-31 | 张昊 | A kind of Physical Experiment resistance experiment device for teaching |
CN208488898U (en) * | 2018-01-23 | 2019-02-12 | 宜春学院 | A kind of automotive control system teaching teaching apparatus being readily transported |
CN208622316U (en) * | 2018-03-30 | 2019-03-19 | 南京铁道职业技术学院 | A kind of traction substation of electric railway secondary failure simulation generator |
CN108682262A (en) * | 2018-05-22 | 2018-10-19 | 东莞理工学院 | A kind of dust mask analog demenstration machine facilitating clamping and sealing |
CN108856232A (en) * | 2018-06-27 | 2018-11-23 | 安徽慕凡电子科技有限公司 | A kind of instrument dust guard |
CN108817766A (en) * | 2018-08-29 | 2018-11-16 | 广东海翔教育科技有限公司 | A kind of college student Metalworking Practice Teaching welder |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112908069A (en) * | 2020-09-16 | 2021-06-04 | 杭州职业技术学院 | PLC electromechanical experiment table |
CN113973455A (en) * | 2021-10-16 | 2022-01-25 | 深圳市奥金瑞科技有限公司 | Internet of things intelligent control platform wireless receiving device convenient to install |
CN113973455B (en) * | 2021-10-16 | 2023-09-08 | 深圳市奥金瑞科技有限公司 | Wireless receiving device convenient to install and used for intelligent control platform of Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110459107A (en) | A kind of combined intelligent building weak electricity system training apparatus | |
CN105928078A (en) | Wall-mounted type air conditioner indoor unit | |
CN208381645U (en) | A kind of will report of college entrance guidance information displaying device | |
CN103680230A (en) | Multimedia teaching device | |
CN205564066U (en) | Computer distance learning system | |
CN206877526U (en) | A kind of multimedia teaching instrument based on computer technology | |
CN203375538U (en) | Wind pipe machine | |
CN109448451A (en) | A kind of multimedia teaching facility | |
CN106097796A (en) | A kind of Course Training checking system | |
CN213492835U (en) | Medical molecular sieve oxygen generating device with protective structure | |
CN205842860U (en) | A kind of wall-hanging indoor unit of air conditioner | |
CN204204223U (en) | Remote education terminal | |
CN209183009U (en) | A kind of College Accounting teaching multifunction teaching platform | |
CN207644397U (en) | Rooftop return air device and rail vehicle with it | |
CN209588352U (en) | A kind of new wind devices installation framework | |
CN215321650U (en) | Computer software engineering teaching display device | |
CN209197066U (en) | A kind of ventilation device for curtain wall | |
CN208251352U (en) | A kind of dust suction energy-saving fire proof board connecting equipment of integrated house | |
CN209543624U (en) | Smart home simulator | |
CN206348973U (en) | A kind of computer multimedia teaching equipment | |
CN206471038U (en) | A kind of new teaching animal gases experimental box | |
CN206170963U (en) | Novel dust free blackboard suitable for teaching of english specialty is used | |
CN109899951A (en) | Ducting assembly and air conditioner | |
CN206363406U (en) | A kind of meeting is registered timer with member | |
CN215302311U (en) | Poultry is bred with air circulation device who has intelligent ventilation angle modulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191115 |