CN110458334A - A kind of limiting short-circuit current method of operation aid decision-making method - Google Patents

A kind of limiting short-circuit current method of operation aid decision-making method Download PDF

Info

Publication number
CN110458334A
CN110458334A CN201910659442.XA CN201910659442A CN110458334A CN 110458334 A CN110458334 A CN 110458334A CN 201910659442 A CN201910659442 A CN 201910659442A CN 110458334 A CN110458334 A CN 110458334A
Authority
CN
China
Prior art keywords
short
circuit current
route
aid decision
calculation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910659442.XA
Other languages
Chinese (zh)
Other versions
CN110458334B (en
Inventor
刘映尚
鲍颜红
黄磊
杨君军
周剑
任先成
徐光虎
袁震
张建新
杨欢欢
涂旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN201910659442.XA priority Critical patent/CN110458334B/en
Publication of CN110458334A publication Critical patent/CN110458334A/en
Application granted granted Critical
Publication of CN110458334B publication Critical patent/CN110458334B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a kind of limiting short-circuit current method of operation aid decision-making methods, it is characterized in that, forming the Load flow calculation data of planned manner a few days ago based on generation schedule a few days ago, load prediction, maintenance plan data and the reactive voltage data of similar operation day and carrying out Load flow calculation;Calculation of short-circuit current based on each bus and route in Load flow calculation data and calculated result carry out system;Such as there is bus and route that short circuit current is more than short-circuiting device rated rupturing capacity, then carries out aid decision calculating, otherwise terminate this method;Consider the synthesis aid decision of multiclass measure and the out-of-limit bus of multiple short circuit currents and route and forms method of operation adjustable strategies;Safety and stability check is carried out to the method for operation adjusted, adjustable strategies is obtained if it can satisfy safety and stability and require, otherwise directly terminates this method.Advantage: can be effectively reduced short circuit current level, enhance the safety margin and power supply reliability of power grid, effectively improve the safety and economic operation level of power grid.

Description

A kind of limiting short-circuit current method of operation aid decision-making method
Technical field
The present invention relates to a kind of limiting short-circuit current method of operation aid decision-making methods, belong to power system automation technology Field.
Background technique
As power grid scale constantly expands, the tightness degree enhancing contacted between power grid, receiving end grid short circuit electric current is generally forced It is closely even more than breaker maximum rupturing capacity, is forced to take the measure for cut-offfing and jumping logical route for a long time, main grid structure structural integrity Property constantly weaken, the regulation of important power transmission section is difficult, and major network power supply capacity and section ability to transmit electricity are restricted.
When power grid operation personnel arrange the method for operation at present, the short circuit of each point is checked according to maximum short circuit current calculating principle Electric current proposes the scheme of limiting short-circuit current when discovery short circuit current is exceeded.The program calculates maximum according to most severe mode can The short circuit current of energy, the measures for limiting short-circuit current taken is overly conservative, and the safety margin and power supply for reducing operation of power networks can By property.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the deficiencies of existing technologies, a kind of limiting short-circuit current operation is provided Mode aid decision-making method is formed by operation plan mode a few days ago and is calculated based on data progress calculation of short-circuit current and aid decision It calculates, comprehensive coordination considers that the out-of-limit bus of multiple short circuit currents and multiclass measure obtain method of operation aid decision, can effectively drop Low short circuit current level enhances the safety margin and power supply reliability of power grid, effectively improves the safety and economical operation water of power grid It is flat.
In order to solve the above technical problems, the present invention provides a kind of limiting short-circuit current method of operation aid decision-making method, packet Include following steps:
Step 1: based on generation schedule a few days ago, load prediction, maintenance plan data and the similar reactive voltage data shape for running day At planned manner a few days ago Load flow calculation data and carry out Load flow calculation;
Step 2: the Load flow calculation data based on planned manner a few days ago form the calculating that calculation of short-circuit current and aid decision calculate Data, and the calculation of short-circuit current based on each bus and route in the calculating data and calculation of tidal current carry out system;
Step 3: such as exist short circuit current be more than short-circuiting device rated rupturing capacity bus and route, then be transferred to step 4 carry out it is auxiliary It helps decision to calculate, otherwise terminates this method;
Step 4: calculating highly resistance, stoppage in transit route, stoppage in transit generator, bus splitting and route the string operation control out of connecting that puts into operation Measure accounts for multiclass measure and multiple short circuit currents based on sensitivity to the short circuit current sensibility of out-of-limit bus and route The synthesis aid decision of out-of-limit bus and route simultaneously forms method of operation adjustable strategies;
Step 5: safety and stability check being carried out to the method for operation adjusted, exports operation if it can satisfy safety and stability and require Mode adjustable strategies, otherwise directly terminate this method.
Further, the step 1, specifically:
It is formed a few days ago based on generation schedule a few days ago, load prediction, maintenance plan data and the reactive voltage data of similar operation day The Load flow calculation data of 96 planned manners simultaneously carry out Load flow calculation.
Further, it is as follows that the calculating data method that calculation of short-circuit current and aid decision calculate is formed in the step 2:
The maximum mode of load is selected in 96 planned manners a few days ago as basic mode, maintenance plan is put into operation base in equipment The equipment that plinth mode does not put into operation all puts into operation, and calculates so as to form Load flow calculation data as calculation of short-circuit current and aid decision Calculating data.
Further, based on the calculation of short-circuit current for calculating each bus and route in data carry out system in the step 2 Method is as follows:
Using the short-circuit current calculation method for being not based on trend, voltage source voltage is taken as 96 planned manner Load flow calculation knots a few days ago Fruit median generatrix voltage max.
Further, consider that the synthesis of multiclass measure and the out-of-limit bus of multiple short circuit currents and route is auxiliary in the step 4 Help decision-making technique as follows:
Screen to the short circuit current sensibility of out-of-limit bus and route be greater than the control measure of threshold value as the out-of-limit bus and Effective control measure are ranked up, wherein same priority by effective control measure of route according to the priority defined in advance Inside is sorted according to short circuit current sensibility, effective control measure queue of each out-of-limit bus and route is obtained, according to control Queue sequence successively increases control measure, obtains the control program set of out-of-limit bus and route;
The combination of enumerating that control program is carried out between each out-of-limit bus and the control program set of route, obtains and considers multiclass The synthesis aid decision control program set of measure and the out-of-limit bus of multiple short circuit currents and route, to all controls in the set Scheme processed carries out calculation of short-circuit current using cluster Computing Platform parallel, obtains the calculation of short-circuit current knot under each control program Fruit, selection meets all short-circuiting device rupturing capacitys and requires and control the smallest calculated result of cost in all calculated results, then The corresponding control program of the result is method of operation adjustable strategies.
Further, the safety and stability is checked is checked using static and transient safe and stable.
Advantageous effects of the invention:
It is formed based on operation plan mode a few days ago and calculates data progress calculation of short-circuit current and aid decision calculating, it may be considered that not The variation for carrying out the method for operation carries out advanced decision, the frequent adjusting for avoiding actual schedule from operating;Calculating data generation and short circuit Conservatism is considered on current calculation method, it is ensured that the availability of calculated result;Consider that multiclass measure and multiple short circuit currents are got over The comprehensive coordination aid decision for limiting bus, improves the practicability of calculated result;Limiting short-circuit current operation proposed by the present invention Mode aid decision-making method, can be effectively reduced short circuit current level, enhance the safety margin and power supply reliability of power grid, effectively Improve the safety and economic operation level of power grid.
Detailed description of the invention
Fig. 1 is the flow diagram for inventing a kind of limiting short-circuit current method of operation aid decision-making method.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention Technical solution, and not intended to limit the protection scope of the present invention.
As shown in Figure 1, a kind of limiting short-circuit current method of operation aid decision-making method, includes the following steps:
Step 1: based on generation schedule a few days ago, load prediction, maintenance plan data and the similar reactive voltage data shape for running day At the Load flow calculation data of 96 planned manners a few days ago and carry out Load flow calculation;
Step 2: the Load flow calculation data based on planned manner a few days ago form the calculating that calculation of short-circuit current and aid decision calculate Data, and the calculation of short-circuit current based on each bus and route in the calculating data carry out system;
Step 3: such as exist short circuit current be more than short-circuiting device rated rupturing capacity bus and route, then be transferred to step 4 carry out it is auxiliary It helps decision to calculate, otherwise terminates this method;
Step 4: calculating highly resistance, stoppage in transit route, stoppage in transit generator, bus splitting and route the string operation control out of connecting that puts into operation Measure accounts for multiclass measure and multiple short circuit currents based on sensitivity to the short circuit current sensibility of out-of-limit bus and route The synthesis aid decision of out-of-limit bus and route simultaneously forms method of operation adjustable strategies;
Step 5: static and transient safe and stable being carried out to the method for operation adjusted and is checked, such as can satisfy safety and stability requirement Method of operation adjustable strategies are then exported, this method is otherwise directly terminated.
In the present embodiment, the calculating data method that formation calculation of short-circuit current and aid decision calculate in the step 2 is such as Under:
The maximum mode of load is selected in 96 planned manners a few days ago as basic mode, maintenance plan is put into operation base in equipment The equipment that plinth mode does not put into operation all puts into operation, and calculates so as to form Load flow calculation data as calculation of short-circuit current and aid decision Calculating data.
In the present embodiment, in the step 2 based on the short circuit current of each bus and route in calculating data carry out system Calculation method is as follows:
Using the short-circuit current calculation method for being not based on trend, voltage source voltage is taken as 96 planned manner Load flow calculation knots a few days ago Fruit median generatrix voltage max.
In the present embodiment, the synthesis of multiclass measure and multiple short circuit currents out-of-limit bus and route is considered in the step 4 Aid decision-making method is as follows:
Screen to the short circuit current sensibility of out-of-limit bus and route be greater than the control measure of threshold value as the out-of-limit bus and Effective control measure are ranked up, wherein same priority by effective control measure of route according to the priority defined in advance Inside is sorted according to short circuit current sensibility, effective control measure queue of each out-of-limit bus and route is obtained, according to control Queue sequence successively increases control measure, obtains the control program set of out-of-limit bus and route.
Control program is carried out between each out-of-limit bus and the control program set of route enumerates combination, is considered The synthesis aid decision control program set of multiclass measure and the out-of-limit bus of multiple short circuit currents and route, to the institute in the set There is control program to carry out calculation of short-circuit current parallel using cluster Computing Platform, obtains the short circuit current meter under each control program It calculates as a result, selection meets all short-circuiting device rupturing capacitys requirements and the smallest calculating knot of control cost in all calculated results Fruit, then the corresponding control program of the result is method of operation adjustable strategies to be asked.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (6)

1. a kind of limiting short-circuit current method of operation aid decision-making method, which comprises the steps of:
Step 1: based on generation schedule a few days ago, load prediction, maintenance plan data and the similar reactive voltage data shape for running day At planned manner a few days ago Load flow calculation data and carry out Load flow calculation;
Step 2: the Load flow calculation data based on planned manner a few days ago form the calculating that calculation of short-circuit current and aid decision calculate Data, and the calculation of short-circuit current based on each bus and route in the calculating data and calculation of tidal current carry out system;
Step 3: such as exist short circuit current be more than short-circuiting device rated rupturing capacity bus and route, then be transferred to step 4 carry out it is auxiliary It helps decision to calculate, otherwise terminates this method;
Step 4: calculating highly resistance, stoppage in transit route, stoppage in transit generator, bus splitting and route the string operation control out of connecting that puts into operation Measure accounts for multiclass measure and multiple short circuit currents based on sensitivity to the short circuit current sensibility of out-of-limit bus and route The synthesis aid decision of out-of-limit bus and route simultaneously forms method of operation adjustable strategies;
Step 5: safety and stability check being carried out to the method for operation adjusted, exports operation if it can satisfy safety and stability and require Mode adjustable strategies, otherwise directly terminate this method.
2. limiting short-circuit current method of operation aid decision-making method according to claim 1, which is characterized in that the step 1, specifically:
It is formed a few days ago based on generation schedule a few days ago, load prediction, maintenance plan data and the reactive voltage data of similar operation day The Load flow calculation data of 96 planned manners simultaneously carry out Load flow calculation.
3. limiting short-circuit current method of operation aid decision-making method according to claim 1, which is characterized in that the step It is as follows that the calculating data method that calculation of short-circuit current and aid decision calculate is formed in 2:
The maximum mode of load is selected in 96 planned manners a few days ago as basic mode, maintenance plan is put into operation base in equipment The equipment that plinth mode does not put into operation all puts into operation, and calculates so as to form Load flow calculation data as calculation of short-circuit current and aid decision Calculating data.
4. limiting short-circuit current method of operation aid decision-making method according to claim 1, which is characterized in that the step It is as follows based on the short-circuit current calculation method of each bus and route in data carry out system is calculated in 2:
Using the short-circuit current calculation method for being not based on trend, voltage source voltage is taken as 96 planned manner Load flow calculation knots a few days ago Fruit median generatrix voltage max.
5. limiting short-circuit current method of operation aid decision-making method according to claim 1, which is characterized in that the step Consider that the synthesis aid decision-making method of multiclass measure and the out-of-limit bus of multiple short circuit currents and route is as follows in 4:
Screen to the short circuit current sensibility of out-of-limit bus and route be greater than the control measure of threshold value as the out-of-limit bus and Effective control measure are ranked up, wherein same priority by effective control measure of route according to the priority defined in advance Inside is sorted according to short circuit current sensibility, effective control measure queue of each out-of-limit bus and route is obtained, according to control Queue sequence successively increases control measure, obtains the control program set of out-of-limit bus and route;
The combination of enumerating that control program is carried out between each out-of-limit bus and the control program set of route, obtains and considers multiclass The synthesis aid decision control program set of measure and the out-of-limit bus of multiple short circuit currents and route, to all controls in the set Scheme processed carries out calculation of short-circuit current using cluster Computing Platform parallel, obtains the calculation of short-circuit current knot under each control program Fruit, selection meets all short-circuiting device rupturing capacitys and requires and control the smallest calculated result of cost in all calculated results, then The corresponding control program of the result is method of operation adjustable strategies.
6. limiting short-circuit current method of operation aid decision-making method according to claim 1, which is characterized in that the safety Stability check is checked using static and transient safe and stable.
CN201910659442.XA 2019-07-22 2019-07-22 Auxiliary decision-making method for limiting short-circuit current operation mode Active CN110458334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910659442.XA CN110458334B (en) 2019-07-22 2019-07-22 Auxiliary decision-making method for limiting short-circuit current operation mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910659442.XA CN110458334B (en) 2019-07-22 2019-07-22 Auxiliary decision-making method for limiting short-circuit current operation mode

Publications (2)

Publication Number Publication Date
CN110458334A true CN110458334A (en) 2019-11-15
CN110458334B CN110458334B (en) 2022-12-20

Family

ID=68481633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910659442.XA Active CN110458334B (en) 2019-07-22 2019-07-22 Auxiliary decision-making method for limiting short-circuit current operation mode

Country Status (1)

Country Link
CN (1) CN110458334B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112383051A (en) * 2020-11-12 2021-02-19 国网江苏省电力有限公司电力科学研究院 Intelligent generation method for short-circuit current limiting measures
CN114069581A (en) * 2021-11-19 2022-02-18 国家电网有限公司 Power grid short-circuit current limiting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6549880B1 (en) * 1999-09-15 2003-04-15 Mcgraw Edison Company Reliability of electrical distribution networks
WO2013139392A1 (en) * 2012-03-21 2013-09-26 Abb Technology Ltd Switching system for a dc grid
CN104362678A (en) * 2014-11-21 2015-02-18 国家电网公司 Method for analyzing counter measures on influences of connection of wind power plant on partial electric network
CN104410065A (en) * 2014-10-31 2015-03-11 广东电网有限责任公司电力调度控制中心 Multi-target decision method for limiting short circuit currents in receiving-end electrical network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6549880B1 (en) * 1999-09-15 2003-04-15 Mcgraw Edison Company Reliability of electrical distribution networks
WO2013139392A1 (en) * 2012-03-21 2013-09-26 Abb Technology Ltd Switching system for a dc grid
CN104410065A (en) * 2014-10-31 2015-03-11 广东电网有限责任公司电力调度控制中心 Multi-target decision method for limiting short circuit currents in receiving-end electrical network
CN104362678A (en) * 2014-11-21 2015-02-18 国家电网公司 Method for analyzing counter measures on influences of connection of wind power plant on partial electric network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨冬 等: "基于灵敏度分析的限流方案优化决策方法", 《电力自动化设备》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112383051A (en) * 2020-11-12 2021-02-19 国网江苏省电力有限公司电力科学研究院 Intelligent generation method for short-circuit current limiting measures
CN114069581A (en) * 2021-11-19 2022-02-18 国家电网有限公司 Power grid short-circuit current limiting method

Also Published As

Publication number Publication date
CN110458334B (en) 2022-12-20

Similar Documents

Publication Publication Date Title
Liu et al. A multiagent system-based protection and control scheme for distribution system with distributed-generation integration
Zadkhast et al. Reliability evaluation of an HVDC transmission system tapped by a VSC station
US7908036B2 (en) Power production control system and method
CN107147107B (en) Phase modulator point distribution method for inhibiting multi-direct-current cascading commutation failure
CN104300574B (en) The converter control method and device of wind power generating set
CN104104102B (en) Voltage source converter type multi-terminal direct current transmission system steady operation point optimization method
CN101800426A (en) Safety level evaluation method of power grid
CN108493998B (en) Robust power transmission network planning method considering demand response and N-1 expected faults
CN105391050A (en) Checking method and system of high-cycle cutting machine configuration scheme
CN109066726A (en) A kind of urgent coordinating and optimizing control method of frequency security of comprehensive multiclass measure
CN108389002A (en) A kind of multiple failure generation method based on N-1 catastrophe failure collection
CN108155663A (en) The method for controlling distribution micro-capacitance sensor
CN110458334A (en) A kind of limiting short-circuit current method of operation aid decision-making method
CN105958528B (en) A kind of zero transition dynamic combination method of Wind turbines and device
Rajalwal et al. Recent trends in integrity protection of power system: A literature review
CN104578013A (en) Directional protection method for distribution network comprising DFIG based on current frequency difference
CN103117565B (en) A kind of analytical method studying alternating-current/interactiveent interactiveent influence mechanism
CN109787266A (en) Extra-high voltage direct-current complex fault on-line analysis decision-making technique and system
CN104158194B (en) Voltage stability control method using direct current inverter station as dynamic reactive power source
CN106972518B (en) Access mode selection method for direct-current (DC) delivery system of small local power grid and energy base
CN105743135B (en) A kind of receiving end power network extra-high voltage alternating current-direct current is optimal by electric ratio appraisal procedure
Adrees et al. The influence of location of distributed energy storage systems on primary frequency response of low inertia power systems
Wada et al. Frequency control using fast demand response in power system with a large penetration of renewable energy sources
CN104021268B (en) A kind of transmission cross-section economic electric transmission power based on risk analyses determines method online
CN106157170A (en) A kind of electric power system dispatching method of controlling operation thereof based on power supply reliability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant