CN110454976A - A kind of hot-water supply device of earth source heat pump unit and electric boiler combination - Google Patents

A kind of hot-water supply device of earth source heat pump unit and electric boiler combination Download PDF

Info

Publication number
CN110454976A
CN110454976A CN201910851160.XA CN201910851160A CN110454976A CN 110454976 A CN110454976 A CN 110454976A CN 201910851160 A CN201910851160 A CN 201910851160A CN 110454976 A CN110454976 A CN 110454976A
Authority
CN
China
Prior art keywords
electric boiler
baffle
adjustment housings
limbers
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910851160.XA
Other languages
Chinese (zh)
Other versions
CN110454976B (en
Inventor
穆世慧
赵曙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Min Li Energy Storage Technology Co Ltd
Original Assignee
Beijing Min Li Energy Storage Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Min Li Energy Storage Technology Co Ltd filed Critical Beijing Min Li Energy Storage Technology Co Ltd
Priority to CN201910851160.XA priority Critical patent/CN110454976B/en
Publication of CN110454976A publication Critical patent/CN110454976A/en
Application granted granted Critical
Publication of CN110454976B publication Critical patent/CN110454976B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/0018Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters using electric energy supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H4/00Fluid heaters characterised by the use of heat pumps
    • F24H4/02Water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/0005Details for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters

Abstract

The present invention relates to the hot-water supply devices that a kind of earth source heat pump unit and electric boiler combine, it includes, circulation pipe, sand cleaning machine, vaporization chamber, cold medium compressor, condensation chamber, thermoregulation mechanism, electric boiler, the sand cleaning machine, vaporization chamber, cold medium compressor, condensation chamber is installed on ground, the vaporization chamber, running water pipe is provided at the top of condensation chamber, the bottom of sand cleaning machine is provided with suction pump, the bottom of suction pump is provided with drinking-water pipe, drinking-water pipe stretches to subsurface, the sand cleaning machine and vaporization chamber, cold medium compressor, condensation chamber is sequentially communicated, it is connected between the end of the condensation chamber and electric boiler by thermoregulation mechanism, the thermoregulation mechanism includes regulation room, first regulating mechanism, second regulating mechanism, it is connected between the electric boiler and regulation room by water service pipe, the grill pan Also connecting on furnace has running water pipe.The hot water supply pattern that earth source heat pump electromechanics boiler is combined, can be energy saving.

Description

A kind of hot-water supply device of earth source heat pump unit and electric boiler combination
Technical field
The present invention relates to hot water provisioning technique fields, and in particular to a kind of hot water of earth source heat pump unit and electric boiler combination Feeding mechanism.
Background technique
Earth source heat pump unit is a kind of using circulating water in public pipeline, take out from well, lake or river The water taken or the water circulated in ground lower coil pipe are cold (heat) source, the equipment for producing cold (heat) or cold (heat) water, ground source heat Pumping system can heat, freeze, can also domestic hot-water supply, a tractor serves several purposes often tries out grill pan stove heating in life and supplies water, and electric boiler adds Heat need to consume a large amount of electric energy, be unfavorable for saving, and therefore, the hot water supply pattern that earth source heat pump electromechanics boiler is combined can It is energy saving.
Summary of the invention
To solve the deficiencies in the prior art, it is an object of the invention to provide the heat that a kind of earth source heat pump unit and electric boiler combine Water supply.
To realize the above-mentioned technical purpose, the technical solution adopted in the present invention is as follows.
A kind of hot-water supply device of earth source heat pump unit and electric boiler combination, characterized in that it comprises:
Circulation pipe, sand cleaning machine, vaporization chamber, cold medium compressor, condensation chamber, thermoregulation mechanism, electric boiler, described removes sand Device, vaporization chamber, cold medium compressor, condensation chamber are installed on ground, and the bottom of sand cleaning machine is provided with suction pump, the bottom of suction pump It is provided with drinking-water pipe, drinking-water pipe stretches to subsurface, and the sand cleaning machine successively connects with vaporization chamber, cold medium compressor, condensation chamber It is logical, it is connected between the end and electric boiler of the condensation chamber by thermoregulation mechanism;
The thermoregulation mechanism includes regulation room, the first regulating mechanism, the second regulating mechanism, the row of municipal water supply pipe Water end (W.E.) has been respectively communicated with the first communicating pipe, the second communicating pipe, third connecting pipe, the first communicating pipe is connected to municipal water supply Guan Yu electricity Between boiler, the second communicating pipe was connected between municipal water supply pipe and regulation room, third connecting pipe be connected to municipal water supply pipe with Between condensation chamber, tap water in municipal water supply pipeline by the first communicating pipe, the second communicating pipe and third connecting pipe respectively into Enter to electric boiler, regulation room and condensation chamber;
The regulation room include adjustment housings and for drive adjustment housings rotate driving plate, the first regulating mechanism, Second regulating mechanism is mounted in the adjustment housings of regulation room, and first regulating mechanism is used to supply from single earth source heat pump Heat arrives the adjusting of single electric boiler heat supply, and the second regulating mechanism is used to control the tap water of municipal water supply pipeline and electric boiler supplies The intake for the hot water given.
As a further improvement of the present invention, the adjustment housings are cylindrical tube structure, the top of adjustment housings Opening Matching installation has top cover, and the diameter of top cover is less than adjustment housings top surface diameter, and top cover is embedded at the top of adjustment housings just It in opening, is flexibly connected between adjustment housings and top cover, adjustment housings can be on the center rotating of top cover, the top cover It is provided with the first limbers, the second limbers, third limbers, first limbers is at the center of top cover, and second Limbers, third limbers be placed in the first limbers side and edge close to top cover, the driving plate is set to tune At the inner wall for saving shell, the bottom of adjustment housings is provided with the first shutter for blocking the second limbers, for blocking the Second shutter of three limbers, the arc length of the first shutter less than the second shutter arc length, when original state, First shutter blocks the second limbers, and the second shutter blocks third limbers, and described first is adjusted Mechanism, the second regulating mechanism are set to the top of adjustment housings.
As a further improvement of the present invention, first regulating mechanism includes the first mounting plate, first motor, silk Bar, pressing plate, the first guide rod, the second guide rod, first baffle, second baffle, third baffle, first mounting plate have The big horizontal panel in top, lower section lower horizontal plane plate and the vertical panel for connecting size horizontal panel, big horizontal panel are horizontally placed on Between condensation chamber and electric boiler, the first motor is installed on above the small horizontal panel of the first mounting plate, first motor Output shaft is arranged vertically upwards, and one end of the screw rod is fixedly connected with the output shaft of first motor, the other end passes through bearing It is connect with the first mounting plate, the second mounting plate is additionally provided between the condensation chamber and electric boiler, the second mounting plate is one Horizontal panel, the second mounting plate is parallel with the big horizontal panel of the first mounting plate, and the first guide rod, the second guide rod are set vertically It is placed on the second mounting plate, spring, the first baffle, is socketed on first guide rod, the second guide rod Two baffles are arranged vertically, and the top of first baffle is equipped with the first level extension board perpendicular to first baffle, the first level Extension board is equipped with the first special-shaped through-hole with the socket cooperation of the first guide rod, under spring force, the lower end of first baffle with The top slide of adjustment housings contacts, and the top of the second baffle is equipped with the second horizontal extension perpendicular to second baffle Plate, the second horizontal extension plate are equipped with the second irregularly-shaped hole with the socket cooperation of the second guide rod, under spring force, second gear The lower end of plate is contacted with the top slide of adjustment housings, be threadedly coupled between one end and screw rod of the pressing plate, the other end it is same When pivot bush unit on the first guide rod, the second guide rod, the top of the third baffle is fixedly connected with the second mounting plate And extend straight down, the lower end of third baffle is contacted with the top movable of adjustment housings, and adjustment housings top edge is equipped with Link block straight up, first baffle, second baffle, third baffle be in the top of adjustment housings and along its circumference according to Secondary arrangement, the distance of link block to adjustment housings axis are identical to adjustment housings axial line distance as three baffles.
As a further improvement of the present invention, second regulating mechanism include for adjust municipal water supply pipeline from The first of the intake of water adjusts the logical of the hot water of component, the tap water for controlling municipal water supply pipeline and electric boiler supply Enter the second of amount and adjust component, first, which adjusts component and second, adjusts component transmission connection.
As a further improvement of the present invention, the first adjusting component includes the second motor, first rotating shaft, keyway Axis, first gear, second gear, the second shaft, spline, second motor are installed on the first mounting plate, the second motor Output shaft straight down, first rotating shaft is fixedly connected on the output shaft end of the second motor, and first rotating shaft is arranged in shaft with key way End, the first gear are mounted on shaft with key way end, are arranged with spline on the shaft with key way, the middle part of spline be equipped with to The annular rib of outer extension, the spring being arranged on shaft with key way above the annular rib, ring is pushed down in the middle section of the pressing plate Shape rib makes it compress the spring, and the keyway to match with spline, the lower end of the second shaft are provided on the axis hole of first gear Across top cover and baffle is installed, which is close to top cover setting, and baffle is formed by track covering around with the rotation of the second shaft First limbers, second gear are fixedly mounted on the top of second gear and are sequentially connected with first gear.
The second adjusting component includes first bevel gear, second bevel gear, turntable, first connecting rod, the second connection Bar, first connecting rod, second connecting rod, the first block, the second block, the first bevel gear fixation are set on shaft with key way, the One bevel gear is equipped with the keyway mating with the spline, resists the first bevel gear, institute at the top of the spring on shaft with key way The second bevel gear stated be mounted on the first mounting plate by bracket and with first bevel gear be sequentially connected, the turntable with The disk of second bevel gear coaxial arrangement, one end of the first connecting rod and turntable is hinged, the first connecting rod other end Hinged with one end of the second connecting rod, the top cover that passes through of the second connecting rod extends in adjustment housings, second connecting rod The end horizontal extended in adjustment housings is provided with intermediate connecting rod, and the both ends of intermediate connecting rod connect with first connecting rod and second respectively The end of bar is hinged, and the other end of the first block and first connecting rod is hinged, the other end hinge of the second block and second connecting rod It connects, the gib block cooperated with the first block and the second block is equipped in top cover.
As a further improvement of the present invention, first block is close to third limbers c, and the second block is close to first Limbers a, and the distance between the second block and the first limbers a be greater than between the first block and third limbers c away from From.
As a further improvement of the present invention, it is provided between the bottom and electric boiler of the adjustment housings and pulls and supports group Part, the component that pulls and supports includes pulling and supporting bar, the first external step, the second external step, sleeve, the upper end for pulling and supporting bar Portion and the bottom of adjustment housings are hinged, and sleeve, which is socketed on, to be pulled and supported on bar, and the end for pulling and supporting bar is respectively arranged with outside first Step, the second external step are set, spring, the upper end of spring and set are socketed between the first external step, the second external step The inner wall of cylinder is fixed, and the elastic force for pulling and supporting component can exchange section shell and be resetted.
As a further improvement of the present invention, the end that component is connected with adjustment housings that pulls and supports is elastic rubber structure At.
Compared with prior art, the present invention the progress and advantage that obtain are in use process of the present invention, as user couple When required not high with the temperature requirement of water, earth source heat pump can be first used, when higher with the temperature of water needed for user, earth source heat pump It is energy saving with electric boiler hot-water supply simultaneously, and thermoregulation mechanism can control the temperature of water, and easily facilitating user makes With.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will make below to required in the embodiment of the present invention Attached drawing is briefly described.It should be evident that drawings described below is only some embodiments of the present invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is overall structure diagram of the invention.
Fig. 3 is overall structure diagram of the invention.
Fig. 4 is that thermoregulation mechanism and electric boiler of the invention cooperate schematic diagram.
Fig. 5 is thermoregulation mechanism schematic diagram of the invention.
Fig. 6 is thermoregulation mechanism schematic diagram of the invention.
Fig. 7 is thermoregulation mechanism schematic diagram of the invention.
Fig. 8 is regulation room and the first regulating mechanism of the invention, the second regulating mechanism cooperation schematic diagram.
Fig. 9 is the first regulating mechanism schematic diagram of the invention.
Figure 10 is the first regulating mechanism schematic diagram of the invention.
Figure 11 is the second regulating mechanism schematic diagram of the invention.
Figure 12 is the second regulating mechanism schematic diagram of the invention.
Figure 13 is that the second regulating mechanism and top cover of the invention cooperate schematic diagram.
Figure 14 is that the second regulating mechanism and top cover of the invention cooperate schematic diagram.
Figure 15 pulls and supports component structure diagram for of the invention.
It is denoted as in figure:
10, circulation pipe;
20, sand cleaning machine;
30, vaporization chamber;
40, cold medium compressor;
50, condensation chamber;
60, thermoregulation mechanism;610, regulation room;611, adjustment housings;612, driving plate;613, top cover;613a, first Limbers;613b, the second limbers;613c, third limbers;614, link block;620, the first regulating mechanism;621, the first peace Loading board;622, first motor;623, screw rod;624, pressing plate;625, the first guide rod;626, the second guide rod;627, first gear Plate;628, second baffle;629, third baffle;630, the second regulating mechanism;640, first component is adjusted;641, the second motor; 642, first rotating shaft;643, shaft with key way;644, first gear;645, second gear;646, the second shaft;647, baffle;648, Spline;650, second component is adjusted;651, first bevel gear;652, second bevel gear;653, turntable;654, first connecting rod; 655, the second connecting rod;656, first connecting rod;657, second connecting rod;658, the first block;659, the second block;
70, electric boiler;710, the first communicating pipe;720, the second communicating pipe;730, third connecting pipe;
80, component is pulled and supported;810, bar is pulled and supported;820, the first external step;830, the second external step;840, sleeve.
Specific embodiment
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
Wherein, the drawings are for illustrative purposes only and are merely schematic diagrams, rather than pictorial diagram, should not be understood as to this The limitation of patent;Embodiment in order to better illustrate the present invention, the certain components of attached drawing have omission, zoom in or out, not Represent the size of actual product;It will be understood by those skilled in the art that certain known features and its explanation may be omitted and be in attached drawing It is understood that.
The same or similar label correspond to the same or similar components in the attached drawing of the embodiment of the present invention;It is retouched in of the invention In stating, it is to be understood that closed if there is the orientation of the instructions such as term " on ", "lower", "left", "right", "inner", "outside" or position System is merely for convenience of description of the present invention and simplification of the description to be based on the orientation or positional relationship shown in the drawings, rather than indicates Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore retouch in attached drawing The term for stating positional relationship only for illustration, should not be understood as the limitation to this patent, for the common skill of this field For art personnel, the concrete meaning of above-mentioned term can be understood as the case may be.
In the description of the present invention unless specifically defined or limited otherwise, if there are the indicate indicators such as term " connection " Between connection relationship, which shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or at One;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection of two components interiors or the interaction relationship of two components.For those of ordinary skill in the art and Speech, can understand the concrete meaning of above-mentioned term in the present invention with concrete condition.
As shown in figures 1-15, the hot-water supply device that a kind of earth source heat pump unit and electric boiler combine comprising:
Circulation pipe 10, sand cleaning machine 20, vaporization chamber 30, cold medium compressor 40, condensation chamber 50, thermoregulation mechanism 60, grill pan Furnace 70, the sand cleaning machine 20, vaporization chamber 30, cold medium compressor 40, condensation chamber 50 are installed on ground, the bottom of sand cleaning machine 20 It is provided with suction pump, the bottom of suction pump is provided with drinking-water pipe, and drinking-water pipe stretches to subsurface, the sand cleaning machine 20 and evaporation Room 30, cold medium compressor 40, condensation chamber 50 are sequentially communicated, and pass through temperature between the end and electric boiler 70 of the condensation chamber 50 Regulating mechanism 60 is connected, and local source heat pump unit carries out hot water for seasonable in conjunction with electric boiler, and suction pump groundwater abstraction passes through After sand cleaning machine 20 removes sand, into vaporization chamber 30,30 evaporation endothermic of vaporization chamber, so that the heat of tap water is absorbed, it can be to originally Water cools down, and the running water pipe by connecting at the top of vaporization chamber needs hot water for seasonable convenient for summer user use when winter, Vaporization chamber 30 does not work, and subsurface flow enters condensation chamber 50 through vaporization chamber, cold medium compressor and discharges heat, thus to condensation chamber Tap water in the running water pipe of top is heated, and the water temperature provided by the heat pump unit cannot be satisfied with user and use When, water temperature can be adjusted in thermoregulation mechanism 60.
As Figure 4-Figure 6, the thermoregulation mechanism 60 includes regulation room 610, the first regulating mechanism 620, second tune Mechanism 630 is saved, passes through water service pipe (the first communicating pipe 710, third between the electric boiler 70 and condensation chamber and regulation room 610 Communicating pipe 730) it is connected, the discharge ends of municipal water supply pipe have been respectively communicated with the first communicating pipe 710, the second communicating pipe 720, third Communicating pipe 730, the first communicating pipe 710 are connected between municipal water supply pipe and electric boiler 70, and the second communicating pipe 720 was connected to municipal administration Between water supplying pipe and regulation room 610, third connecting pipe 730 is connected between municipal water supply pipe and condensation chamber 50, municipal water supply pipe Tap water in road by the first communicating pipe 710, the second communicating pipe 720 and third connecting pipe 730 have respectively entered electric boiler 70, Regulation room 610 and condensation chamber 50, the coolant-temperature gage into the tap water after condensation chamber 50 increases after condensation chamber is handled, into grill pan The coolant-temperature gage of tap water in furnace 70 increases under electric boiler effect, and the water being directly entered in regulation room 610 is normal temperature state, warp Water after regulation room 610 is adjusted is discharged through the outlet pipe of its bottom, uses for user.
As shown in Fig. 6-8, Figure 14, the regulation room 610 includes adjustment housings 611, driving plate 612, the adjusting Shell 611 is cylindrical tube structure, and the top opening Matching installation of adjustment housings 611 has top cover 613, the diameter of top cover 613 Less than adjustment housings top surface diameter, top cover 613 is embedded in just in the opening at 611 top of adjustment housings, adjustment housings 611 and top cover It is flexibly connected between 613, adjustment housings 611 can be provided on the center rotating of top cover 613, the top cover 613 One limbers 613a, the second limbers 613b, third limbers 613c, the first limbers 613a are in top cover 613 At center, the second limbers 613b, third limbers 613c be placed in the first limbers 613a side and close to top cover 613 Edge, the driving plate 612 are fixedly installed at the inner wall of adjustment housings 611, and driving plate 612 is provided with several and is in incline Tiltedly arrangement, the top of adjustment housings 611 be provided with arc for blocking the first shutter of the second limbers 613b, for hiding The second shutter (not marking in figure) of third limbers 613c is kept off, the arc length (arc length) of the first shutter hides less than second The arc length of baffle, when original state, the first shutter blocks the second limbers 613b, and the second shutter is to third water flowing Hole 613c is blocked, when tap water enters in regulation room 610 through the second communicating pipe 720, water impact driving plate 612, by In the inclined arrangement of driving plate 612, driving plate 612 drives adjustment housings 611 around the center of top cover 613 under the impact of water flow Rotation, in 611 rotation process of adjustment housings, the first shutter is gradually disengaged with the second limbers 613b, the second shutter and the Three limbers 613c are gradually disengaged, and the second limbers 613b, third limbers 613c are in an ON state.
As described and depicted in figs. 9-13, first regulating mechanism 620, the second regulating mechanism 630 are set to adjustment housings 611 Top, first regulating mechanism 620 include the first mounting plate 621, first motor 622, screw rod 623, pressing plate 624, first Guide rod 625, the second guide rod 626, first baffle 627, second baffle 628, third baffle 629, first mounting plate 621 with the big horizontal panel in top, lower section lower horizontal plane plate and the vertical panel for connecting size horizontal panel, big horizontal panel level It is set between condensation chamber 50 and electric boiler 70, the first motor 622 is installed on the small of the first mounting plate 621 by bracket The output shaft of the top of horizontal panel, first motor 622 is arranged vertically upwards, one end of the screw rod 623 and first motor 622 output shaft is fixedly connected, the other end is connect by bearing with the first mounting plate 621, the condensation chamber 50 and electric boiler It is additionally provided between 70 second mounting plate (not marked in figure), the second mounting plate is a horizontal panel, the second mounting plate and the The big horizontal panel of one mounting plate 621 is parallel, and the first guide rod 625, the second guide rod 626 are vertically arranged at the second mounting plate On, spring, the first baffle 627, second baffle are socketed on first guide rod 625, the second guide rod 626 628 are arranged vertically, and the top of first baffle 627 is equipped with the first level extension board perpendicular to first baffle 627, first water Flat extension board is equipped with the first special-shaped through-hole with the socket cooperation of the first guide rod 625, under spring force, first baffle 627 Lower end contacted with the top slide of adjustment housings 611, the top of the second baffle 628 is equipped with perpendicular to second baffle 628 the second horizontal extension plate, the second horizontal extension plate are equipped with the second irregularly-shaped hole with the socket cooperation of the second guide rod 626, Under spring force, the lower end of second baffle 628 is contacted with the top slide of adjustment housings 611, and the one of the pressing plate 624 End be threadedly coupled between screw rod 623, pivot bush unit is on the first guide rod 625, the second guide rod 626 simultaneously for the other end, institute The top for the third baffle 629 stated is fixedly connected with the second mounting plate and extends straight down, the lower end of third baffle 629 with The top movable of adjustment housings 611 contacts, and 611 top edge of adjustment housings is equipped with link block 614 straight up, first baffle 627, second baffle 628, third baffle 629 are in the top of adjustment housings 611 and are sequentially arranged along its circumference, link block 614 to 611 axis of adjustment housings distance it is identical to adjustment housings axial line distance as three baffles, enable link block 614 with The blocking of first baffle 627 is first subjected to during the rotation of adjustment housings 611;When first motor 622 drives 623 band of screw rod Dynamic pressure plate 624 moves upwards, and pressing plate 624 contacts with first baffle 627 and makes when being pressed by first level extension board to spring First baffle 627 moves upwards until when the no longer blocking of first baffle 627 and link block 624, adjustment housings 611 can be It is continued to rotate under the power that water impact driving plate 612 generates up to blocking of the link block 624 by second baffle 628, similarly, First motor 622 works on, and pressing plate 624 continues up, so that second baffle 628 moves upwards so that adjustment housings 611 are able to continue to rotate until blocking of the link block 624 by third baffle 629.That is the first regulating mechanism 620 mainly controls The angle that adjustment housings 611 are rotated under water impact effect, and then the position of the first shutter and the second shutter is controlled, It controls the second limbers 613b and third limbers 613c is that two contract fullies or one close one and opens also or two It is a to be switched on.More specifically when adjustment housings 611 turn to link block 614 by first baffle 627 stop when, the first shutter with Second limbers 613b separation, and the second shutter does not separate with third limbers 613c, therefore can preferentially use ground source heat The hot water of pump is supplied, when adjustment housings 611, which are continued to rotate to link block 614, to be stopped by second baffle 628, the second shutter with The shielded area of third limbers 613c becomes smaller, and the first shutter and the second limbers 613b form partial occlusion, at this time Source heat pump and electric boiler hot-water supply simultaneously are stopped when adjustment housings 611 continue to move to link block 614 by third baffle 629 When, the second shutter leads to 613c with third water flowing and is kept completely separate, and forms the single heat supply of electric boiler.Because of the heat supply of earth source heat pump Ability is significantly less than the heat capacity of electric boiler, therefore the first regulating mechanism 620 is mainly to realize to supply from single earth source heat pump Heat arrives the adjusting of single electric boiler heat supply.It can satisfy in the case that user needs in earth source heat pump heat supply preferentially using ground source Heat pump heat supply, in the hope of saving the consumption of electric energy.
Second regulating mechanism 630 includes that the first adjusting component 640, second adjusts component 650, and first adjusts component 640 and second adjust the transmission connection of component 650.
More perfect, it includes the second motor 641, first rotating shaft 642, shaft with key way that described first, which adjusts component 640, 643, first gear 644, second gear 645, the second shaft 646, spline 648, second motor 641 are installed on the first peace In loading board 621, straight down, first rotating shaft 642 is fixedly connected on the output of the second motor 641 to the output shaft of the second motor 641 The end of first rotating shaft 642 is arranged in shaft end, shaft with key way 643, and the first gear 644 is mounted on 643 end of shaft with key way, institute It is arranged with spline 648 on the shaft with key way 643 stated, the middle part of spline 648 annular rib with outward extension, on shaft with key way 643 It is arranged with the spring being located above the annular rib, annular rib is pushed down in the middle section of the pressing plate 624 makes it compress the spring, the The keyway to match with spline 648 is provided on the axis hole of one gear 644, the lower end of the second shaft 646 passes through top cover 613 and pacifies Equipped with baffle 647, which is close to top cover 613 and is arranged, and baffle 647 is covered around being formed by track with the rotation of the second shaft 646 The first limbers of lid 613a, second gear 645 are fixedly mounted on the top of second gear 645 and are driven with first gear 644 The second motor 641 is opened in connection, and the output shaft rotation of the second motor 641 drives first rotating shaft 642 around own axis, from And first gear 644 is driven to rotate, then drive second gear 645 to rotate, the rotation of second gear 645 drives the second shaft 646 Rotation hides the intermittence of the first limbers 613a so that baffle 647 be driven to be formed around the center axis thereof of the second shaft 646 Gear.The annular rib pressuring spring on spline 648 is driven to make first gear 644 and second gear when aforementioned platens 624 move When 645 separation, it can control baffle 647 and rest on fixed position, and then realize and the whole of the first limbers 613a is blocked, portion Divide and blocks or do not block completely.
More specifically, the second adjusting component 650 includes first bevel gear 651, second bevel gear 652, turntable 653, first connecting rod 654, the second connecting rod 655, first connecting rod 656, second connecting rod 657, the first block 658, the second block 659, the fixation of first bevel gear 651 is set on shaft with key way 643, and first bevel gear 651 is equipped with inserts with the spline 648 The keyway of cooperation is connect, the first bevel gear is resisted at the top of the spring on shaft with key way 643, the second bevel gear 652 passes through Bracket is mounted on the first mounting plate 621 and is sequentially connected with first bevel gear 651, the turntable 653 and the second cone tooth 652 coaxial arrangement of wheel, one end of the first connecting rod 654 and the disk of turntable 653 are hinged, first connecting rod 654 another One end and one end of the second connecting rod 655 are hinged, and the top cover 613 that passes through of the second connecting rod 655 extends in adjustment housings 611, The end horizontal that second connecting rod 655 extends in adjustment housings 611 is provided with intermediate connecting rod, the both ends of intermediate connecting rod Hinged with the end of first connecting rod 656 and second connecting rod 657 respectively, the other end of the first block 658 and first connecting rod 656 is cut with scissors It connects, the other end of the second block 659 and second connecting rod 657 is hinged, is equipped with and the first block 658 and second gear in top cover 613 The gib block that block 659 cooperates keeps spline 648 mobile and is inserted into when above-mentioned pressing plate 624 moves and oppresses annular rib In first bevel gear 651, first bevel gear 651 is rotated synchronously with spline 648, then turn of first bevel gear 651 Dynamic that second bevel gear 652 is driven to rotate, so that turntable 653 be driven to rotate, the rotation of turntable 653 drives first connecting rod 654 to move, To drive the second connecting rod 655 to move up and down, the second connecting rod 655 drives first connecting rod 656 and second connecting rod 657 mutually remote From, so that the first block 658 of driving and the second block 659 translate on gib block, and then realize to the first limbers 613a and Third limbers 613c's blocks, to further control the first limbers 613a and third limbers 613c in the on state Aperture.
More specifically, for first block 658 close to third limbers 613c, the second block 659 is logical close to first Water hole 613a, and the distance between the second block 659 and the first limbers 613a are greater than the first block 658 and third limbers The distance between 613c, therefore the adjusting of water flowing area can be first carried out to third limbers 613c, it first slowly reduces to enter and adjust The amount of the hot water in shell 611 is saved, then slowly adjusts the amount for entering normal-temperature water, water temperature can be controlled well, such as Fruit hot water amount is too many, then controls normal-temperature water, and temperature is not easy to lower.
It is more perfect, it is provided between the bottom and electric boiler 70 of the adjustment housings 611 and pulls and supports component 80, it is described Pull and support component 80 include pull and support bar 810, the first external step 820, the second external step 830, sleeve 840, described pulls and supports The upper end of bar 810 and the bottom of adjustment housings 611 are hinged, and sleeve 840, which is socketed on, to be pulled and supported on bar 810, and described pulls and supports bar 810 End be respectively arranged with the first external step 820, the second external step 830, the first external step 820, the second external step Spring is socketed between 830, the upper end of spring and the inner wall of sleeve 840 are fixed, the lower part of sleeve 840 and the outer wall of electric boiler Fixed, the elastic force for pulling and supporting component 80 can exchange section shell 611 and be resetted.
More specifically, the end that component 80 is connected with adjustment housings 611 that pulls and supports is constituted for elastic rubber, is convenient for Keep elastic force contrary with the rotary force of adjustment housings 611.
It is to be understood that above-mentioned specific embodiment is only that presently preferred embodiments of the present invention and institute's application technology are former Reason.It will be understood by those skilled in the art that various modifications, equivalent replacement, variation etc. can also be done to the present invention.But this A little transformation, all should be within protection scope of the present invention without departing from spirit of the invention.In addition, present specification and power Some terms used in sharp claim are not limitation, it is only for convenient for description.

Claims (9)

1. the hot-water supply device that a kind of earth source heat pump unit and electric boiler combine, characterized in that it comprises:
Circulation pipe, sand cleaning machine, vaporization chamber, cold medium compressor, condensation chamber, thermoregulation mechanism, electric boiler, the sand cleaning machine, Vaporization chamber, cold medium compressor, condensation chamber are installed on ground, and the bottom of sand cleaning machine is provided with suction pump, and the bottom of suction pump is set It is equipped with drinking-water pipe, drinking-water pipe stretches to subsurface, and the sand cleaning machine is sequentially communicated with vaporization chamber, cold medium compressor, condensation chamber, It is connected between the end of the condensation chamber and electric boiler by thermoregulation mechanism;
The thermoregulation mechanism includes regulation room, the first regulating mechanism, the second regulating mechanism, the discharge ends of municipal water supply pipe It has been respectively communicated with the first communicating pipe, the second communicating pipe, third connecting pipe, the first communicating pipe had been connected to municipal water supply pipe and electric boiler Between, the second communicating pipe was connected between municipal water supply pipe and regulation room, and third connecting pipe is connected to municipal water supply pipe and condensation Between room, the tap water in municipal water supply pipeline is had respectively entered by the first communicating pipe, the second communicating pipe and third connecting pipe Electric boiler, regulation room and condensation chamber;
The regulation room includes adjustment housings and the driving plate for driving adjustment housings to rotate, the first regulating mechanism, second Regulating mechanism is mounted in the adjustment housings of regulation room, first regulating mechanism be used for from single earth source heat pump heat supply to The adjusting of single electric boiler heat supply, tap water and electric boiler of second regulating mechanism for controlling municipal water supply pipeline supply The intake of hot water.
2. the hot-water supply device that a kind of earth source heat pump unit according to claim 1 and electric boiler combine, feature exist In the adjustment housings are cylindrical tube structure, and the top opening Matching installation of adjustment housings has top cover, the diameter of top cover Less than adjustment housings top surface diameter, top cover is embedded in just in the opening at the top of adjustment housings, movable between adjustment housings and top cover Connection, adjustment housings can be provided on the center rotating of top cover, the top cover the first limbers, the second limbers, Third limbers, first limbers are at the center of top cover, and the second limbers, third limbers are placed in first logical The side in water hole and edge close to top cover, the driving plate is set at the inner wall of adjustment housings, the bottom of adjustment housings It is provided with the first shutter for blocking the second limbers, the second shutter for blocking third limbers, first blocks The arc length of plate is less than the arc length of the second shutter, and when original state, the first shutter hides the second limbers Gear, the second shutter block third limbers, and first regulating mechanism, the second regulating mechanism are set to adjusting shell The top of body.
3. the hot-water supply device that a kind of earth source heat pump unit according to claim 2 and electric boiler combine, feature exist In, first regulating mechanism include the first mounting plate, first motor, screw rod, pressing plate, the first guide rod, the second guide rod, First baffle, second baffle, third baffle, first mounting plate have the big horizontal panel in top, lower section lower horizontal plane plate And the vertical panel of connection size horizontal panel, big horizontal panel are horizontally placed between condensation chamber and electric boiler, described first Motor is installed on above the small horizontal panel of the first mounting plate, and the output shaft of first motor is arranged vertically upwards, the screw rod One end be fixedly connected with the output shaft of first motor, the other end is connect by bearing with the first mounting plate, the condensation chamber The second mounting plate is additionally provided between electric boiler, the second mounting plate is a horizontal panel, the second mounting plate and the first installation The big horizontal panel of plate is parallel, and the first guide rod, the second guide rod are vertically arranged on the second mounting plate, and described first leads Spring is socketed on bar, the second guide rod, the first baffle, second baffle are arranged vertically, the top of first baffle End is equipped with the first level extension board perpendicular to first baffle, which, which is equipped with to be socketed with the first guide rod, cooperates The first special-shaped through-hole, under spring force, the lower end of first baffle is contacted with the top slide of adjustment housings, described the The top of two baffles is equipped with the second horizontal extension plate perpendicular to second baffle, which is equipped with and the second guiding Rod set connects the second irregularly-shaped hole of cooperation, and under spring force, the lower end of second baffle is contacted with the top slide of adjustment housings, Be threadedly coupled between one end of the pressing plate and screw rod, the other end simultaneously pivot bush unit in the first guide rod, the second guide rod On, the top of the third baffle is fixedly connected with the second mounting plate and extends straight down, the lower end of third baffle with The top movable of adjustment housings contacts, and adjustment housings top edge is equipped with link block straight up, first baffle, second gear Plate, third baffle are in the top of adjustment housings and are sequentially arranged along its circumference, link block to adjustment housings axis away from It is identical to adjustment housings axial line distance from three baffles.
4. the hot-water supply device that a kind of earth source heat pump unit according to claim 3 and electric boiler combine, feature exist In, second regulating mechanism include first of the intake for adjusting the tap water of municipal water supply pipeline adjust component, Second for controlling the intake of the tap water of municipal water supply pipeline and the hot water of electric boiler supply adjusts component, and first is adjusted Component and second adjusts component transmission connection.
5. the hot-water supply device that a kind of earth source heat pump unit according to claim 4 and electric boiler combine, feature exist In, described first adjust component include the second motor, first rotating shaft, shaft with key way, first gear, second gear, the second shaft, Spline, second motor are installed on the first mounting plate, and straight down, first rotating shaft is fixed to be connected the output shaft of the second motor It is connected to the output shaft end of the second motor, the end of first rotating shaft is arranged in shaft with key way, and the first gear is mounted on shaft with key way End, is arranged with spline on the shaft with key way, the middle part of spline annular rib with outward extension, is arranged on shaft with key way Spring above the annular rib, annular rib is pushed down in the middle section of the pressing plate makes it compress the spring, first gear The keyway to match with spline is provided on axis hole, the lower end of the second shaft passes through top cover and is equipped with baffle, which is close to Top cover setting, baffle cover the first limbers around being formed by track with the rotation of the second shaft, and second gear is fixedly mounted on the The top of two gears and with first gear be sequentially connected.
6. the hot-water supply device that a kind of earth source heat pump unit according to claim 4 and electric boiler combine, feature exist In, the described second adjusting component include first bevel gear, second bevel gear, turntable, first connecting rod, the second connecting rod, the One connecting rod, second connecting rod, the first block, the second block, the first bevel gear fixation are set on shaft with key way, the first cone tooth Wheel is equipped with the keyway mating with the spline, resists the first bevel gear at the top of the spring on shaft with key way, and described the Two bevel gears are mounted on the first mounting plate by bracket and are sequentially connected with first bevel gear, the turntable and the second cone The disk of gear coaxial arrangement, one end of the first connecting rod and turntable is hinged, the other end of first connecting rod and second One end of connecting rod is hinged, and the top cover that passes through of the second connecting rod extends in adjustment housings, and second connecting rod extends to End horizontal in adjustment housings is provided with intermediate connecting rod, the both ends of the intermediate connecting rod end with first connecting rod and second connecting rod respectively Portion is hinged, and the other end of the first block and first connecting rod is hinged, and the other end of the second block and second connecting rod is hinged, top cover It is interior to be equipped with the gib block cooperated with the first block and the second block.
7. the hot-water supply device that a kind of earth source heat pump unit according to claim 6 and electric boiler combine, feature exist In, first block close to third limbers, the second block is close to the first limbers, and the second block and the first water flowing The distance between hole is greater than the distance between the first block and third limbers.
8. the hot-water supply device that a kind of earth source heat pump unit according to claim 4 and electric boiler combine, feature exist In being provided between the bottom and electric boiler of the adjustment housings and pull and support component, the described component that pulls and supports includes pulling and supporting bar, the One external step, the second external step, sleeve.
9. the hot-water supply device that a kind of earth source heat pump unit according to claim 8 and electric boiler combine, feature exist In described pulls and supports the end that component is connected with adjustment housings as elastic rubber composition.
CN201910851160.XA 2019-09-10 2019-09-10 Hot water supply device combining ground source heat pump unit and electric boiler Active CN110454976B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910851160.XA CN110454976B (en) 2019-09-10 2019-09-10 Hot water supply device combining ground source heat pump unit and electric boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910851160.XA CN110454976B (en) 2019-09-10 2019-09-10 Hot water supply device combining ground source heat pump unit and electric boiler

Publications (2)

Publication Number Publication Date
CN110454976A true CN110454976A (en) 2019-11-15
CN110454976B CN110454976B (en) 2024-04-12

Family

ID=68491323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910851160.XA Active CN110454976B (en) 2019-09-10 2019-09-10 Hot water supply device combining ground source heat pump unit and electric boiler

Country Status (1)

Country Link
CN (1) CN110454976B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003214722A (en) * 2002-01-21 2003-07-30 Jmc Geothermal Engineering Co Ltd Air conditioning/hot water supply method and system using water heat source heat pump
KR200409887Y1 (en) * 2005-12-16 2006-03-03 공항시설관리 주식회사 Hot water generation device using heat pump
KR20130130263A (en) * 2012-05-21 2013-12-02 (주)귀뚜라미 Hybrid system combined boiler and heat pump
KR20130130264A (en) * 2012-05-21 2013-12-02 (주)귀뚜라미 Hybrid system combined boiler and heat pump
CN204943892U (en) * 2015-09-07 2016-01-06 重庆市地科润丰新能源投资有限公司 A kind of earth source heat pump GEOTHERMAL WATER temperature-increasing system
WO2016110191A1 (en) * 2015-01-07 2016-07-14 怡维怡橡胶研究院有限公司 Compression heating detector
JP2017116132A (en) * 2015-12-22 2017-06-29 クラフトワーク株式会社 Temperature control device
CN206398977U (en) * 2017-01-17 2017-08-11 挪信能源技术(上海)有限公司 The hot-water supply device that a kind of earth source heat pump unit is combined with boiler
CN108870506A (en) * 2017-05-14 2018-11-23 山西荣申达科技有限公司 A kind of air source heat pump couples heating system with electric boiler
CN210861710U (en) * 2019-09-10 2020-06-26 北京民利储能技术有限公司 Hot water supply device for coupling ground source heat pump unit and electric boiler

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003214722A (en) * 2002-01-21 2003-07-30 Jmc Geothermal Engineering Co Ltd Air conditioning/hot water supply method and system using water heat source heat pump
KR200409887Y1 (en) * 2005-12-16 2006-03-03 공항시설관리 주식회사 Hot water generation device using heat pump
KR20130130263A (en) * 2012-05-21 2013-12-02 (주)귀뚜라미 Hybrid system combined boiler and heat pump
KR20130130264A (en) * 2012-05-21 2013-12-02 (주)귀뚜라미 Hybrid system combined boiler and heat pump
WO2016110191A1 (en) * 2015-01-07 2016-07-14 怡维怡橡胶研究院有限公司 Compression heating detector
CN204943892U (en) * 2015-09-07 2016-01-06 重庆市地科润丰新能源投资有限公司 A kind of earth source heat pump GEOTHERMAL WATER temperature-increasing system
JP2017116132A (en) * 2015-12-22 2017-06-29 クラフトワーク株式会社 Temperature control device
CN206398977U (en) * 2017-01-17 2017-08-11 挪信能源技术(上海)有限公司 The hot-water supply device that a kind of earth source heat pump unit is combined with boiler
CN108870506A (en) * 2017-05-14 2018-11-23 山西荣申达科技有限公司 A kind of air source heat pump couples heating system with electric boiler
CN210861710U (en) * 2019-09-10 2020-06-26 北京民利储能技术有限公司 Hot water supply device for coupling ground source heat pump unit and electric boiler

Also Published As

Publication number Publication date
CN110454976B (en) 2024-04-12

Similar Documents

Publication Publication Date Title
KR101926095B1 (en) water purifier
CN206816470U (en) A kind of afterheat recovery unit of air compressor
CN110131885A (en) A kind of controllable warm type energy-saving water heater
CN110454976A (en) A kind of hot-water supply device of earth source heat pump unit and electric boiler combination
CN112354435B (en) Asphalt storage tank with integrated configuration is convenient for separate
KR20060110726A (en) Rotating type briquette boiler
CN105402823A (en) Air refreshing machine
CN210861710U (en) Hot water supply device for coupling ground source heat pump unit and electric boiler
CN110713011B (en) Constant temperature control device for storehouse pump
CN107381752A (en) A kind of alum processing unit for being used to purify contaminated water body
CN112781349A (en) Energy-saving high efficiency drying chamber
CN110986583A (en) Melting device for fly ash solidification
CN110450624A (en) A kind of vehicle radiator
CN109114631A (en) Geothermal heat pipeline auxiliary fixing device
CN109924874B (en) Energy-saving drinking machine
CN208487867U (en) A kind of heat pump with defrost pipe
CN2823935Y (en) Rotary drum type concentrating crushing vacuum drier
CN108799566A (en) A kind of Household water tap
CN218120472U (en) Drying device of bear gall powder
CN108443556A (en) One kind adjusts the temperature electronically tap
CN213016712U (en) Water pump station for cooling intermediate frequency electric furnace
KR102605371B1 (en) Heating system for circulating
CN110899708A (en) Powder piece stirring device for metal powder production
CN209260158U (en) A kind of leaf spring standing bracket for tempering
CN116678110A (en) Air conditioner and fan guiding mechanism thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant