CN110451441A - Restricted clearance inside aperture operation folds cage - Google Patents

Restricted clearance inside aperture operation folds cage Download PDF

Info

Publication number
CN110451441A
CN110451441A CN201810432531.6A CN201810432531A CN110451441A CN 110451441 A CN110451441 A CN 110451441A CN 201810432531 A CN201810432531 A CN 201810432531A CN 110451441 A CN110451441 A CN 110451441A
Authority
CN
China
Prior art keywords
side plate
connection sheet
cage
connecting rod
restricted clearance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810432531.6A
Other languages
Chinese (zh)
Other versions
CN110451441B (en
Inventor
蔡兴锋
陈华
何红博
潘中华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Baosteel Technology Services Co Ltd
Original Assignee
MCC Baosteel Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Baosteel Technology Services Co Ltd filed Critical MCC Baosteel Technology Services Co Ltd
Priority to CN201810432531.6A priority Critical patent/CN110451441B/en
Publication of CN110451441A publication Critical patent/CN110451441A/en
Application granted granted Critical
Publication of CN110451441B publication Critical patent/CN110451441B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F13/00Common constructional features or accessories

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Treating Waste Gases (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention provides a kind of restricted clearance inside aperture operation folding cage, including the first side plate disposed in parallel and the second side plate, first side plate and the second side plate are frame structure, first side plate and the second side plate are connected by the connecting rod of more parallelly distribute ons, one end of every connecting rod is equipped with the first connection sheet, the other end is equipped with the second connection sheet, each first connection sheet is bolted on the first side plate by least two first, and each second connection sheet is bolted on the second side plate by least two second;It further include bottom plate, bottom plate is connected in the connecting rod of bottom.The configuration of the present invention is simple, it is novel in design, disengaging absorption tower manhole door can be facilitated in such a way that cage folds, assembling is simple and convenient to be greatly reduced the upkeep operation time, and connection type is solid and reliable, it is ensured that the safety of upkeep operation personnel.

Description

Restricted clearance inside aperture operation folds cage
Technical field
The present invention relates to restricted clearance inner void upkeep operation fields, make more particularly to a kind of restricted clearance inside aperture Industry folds cage.
Background technique
Dry method circulating fluidized bed desulfurization technique is in iron and steel enterprise's flue gas desulfurization field using relatively wide, recirculating fluidized bed desulfurization Technique is recycled in cloth bag-ash bucket-absorption tower-cloth bag system using desulfurizing agent slaked lime powder, with the dioxy in flue gas Change reaction of Salmon-Saxl and is generated as Desulphurization dust.
Most important equipment first is that absorption tower system in Circulating Fluidized Bed Process.The untreated flue gas being discharged by boiler Enter from absorb the bottom of the tower.Absorb the bottom of the tower is a Venturi, and speed is accelerated after flue gas flows through Venturi tube, and herein It is mutually mixed with very thin absorbent powder, severe friction between gas and particle, forms fluidized bed.Spraying into uniform water mist drop Under conditions of low smoke temperature, absorbent is reacted with the sulfur dioxide in flue gas, and the flue gases of a large amount of solid particles is carried after desulfurization from suction Top of tower discharge is received, into recycling deduster, the particle being separated is returned through ash bucket, Recycle of material skewed slot to be absorbed Tower.
Venturi is made of 7 Venturi tubes in dry desulfurization absorbing tower system, and most enterprises application at present follows When circulation fluidized bed desulfurizing technology, it will appear absorption tower Venturi abrasion condition often, to ensure Venturi tube corrosive wear situation In controlled range, need periodically to carry out thickness measuring to Venturi tube ontology.It is subsidized if venturi serious wear need to carry out replacement.By In the Venturi tube risk that may cause personnel when entering venturi intraductal operation and fall higher from absorb the bottom of the tower.To ensure Flexibility need to use cage to be suspended in Venturi tube when the safety and operation of operating personnel, and operating personnel makees at station in cage Industry.Due to being limited by absorption tower manhole door size, it is suitble to the cage volume of venturi intraductal operation is excessive cannot be introduced into.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of restricted clearance inside aperture operations to fold cage, existing to overcome The drawbacks described above of technology.
To achieve the above object, the present invention provides a kind of restricted clearance inside aperture operation folding cage, including is arranged in parallel The first side plate and the second side plate, first side plate and second side plate are frame structure, first side plate and Two side plates are connected by the connecting rod of more parallelly distribute ons, and one end of every connecting rod is equipped with the first connection sheet, and the other end is equipped with Second connection sheet, first connection sheet is identical with the second connection chip architecture, and each first connection sheet is by extremely Few two first are bolted on first side plate, and each second connection sheet is bolted by least two second On second side plate;It further include bottom plate, the bottom plate is connected in the connecting rod of bottom.
Preferably, first connection sheet and/or second connection sheet include ontology, and the both ends of the ontology are set respectively There is an interconnecting piece, each interconnecting piece is equipped with a bolt hole.
Preferably, one end of the connecting rod is connected on the ontology of first connection sheet, and the other end is connected to described On the ontology of second connection sheet.
Preferably, one end of the connecting rod is welded in first connection sheet, and the other end is welded on described second and connects In contact pin.
Preferably, the bottom plate is grid-shaped.
Preferably, the position on first side plate close to top is equipped with the first bar, the both ends point of first bar It is not welded on adjacent two side of first side plate;Position on second side plate close to top is equipped with second gear Bar, the both ends of second bar are respectively welded on two adjacent sides of second side plate.
As described above, restricted clearance inside aperture operation of the present invention folds cage, this hair is had the advantages that Bright structure is simple, novel in design, and when passing in and out absorption tower manhole door, first bolt and the first side are reserved in the first connection sheet Plate connects, and second bolt and the connection of the second side plate are reserved in the second connection sheet, and cage folding then can be facilitated disengaging suction Tower manhole door is received, present invention assembling is simple and convenient to be greatly reduced the upkeep operation time, and connection type is solid and reliable, it is ensured that The safety of upkeep operation personnel.
Detailed description of the invention
Fig. 1 is the schematic perspective view of cage.
Fig. 2 is structural schematic diagram of the invention.
Fig. 3 is the structural schematic diagram of the first side plate.
Fig. 4 is the structural schematic diagram of the second side plate.
Fig. 5 is the top view of Fig. 2.
Fig. 6 is the structural schematic diagram of the first connection sheet or the second connection sheet.
Component label instructions
1 first side plate
11 first bars
110 first fixation holes
2 second side plates
21 second bars
210 second fixation holes
3 connecting rods
4 first connection sheets
41 first bolts
42 second bolts
43 ontologies
44 interconnecting pieces
441 bolts hole
5 second connection sheets
6 bottom plates
61 reinforcing rods
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily.
It should be clear that this specification structure depicted in this specification institute accompanying drawings, ratio, size etc., only to cooperate specification to be taken off The content shown is not intended to limit the invention enforceable qualifications so that those skilled in the art understands and reads, therefore Do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the present invention Under the effect of can be generated and the purpose that can reach, it should all still fall in disclosed technology contents and obtain the model that can cover In enclosing.Meanwhile in this specification cited such as "upper", "lower", "left", "right", " centre " term, be merely convenient to chat That states is illustrated, rather than to limit the scope of the invention, relativeness is altered or modified, and is changing skill without essence It is held in art, when being also considered as the enforceable scope of the present invention.
As shown in Figures 1 to 6, the present invention provides a kind of restricted clearance inside aperture operation folding cage, including is arranged in parallel The first side plate 1 and the second side plate 2, first side plate 1 and second side plate 2 are frame structure.First side plate 1 It is connected with the second side plate 2 by the connecting rod 3 of more parallelly distribute ons, one end of every connecting rod 3 is equipped with the first connection sheet 4, separately One end is equipped with the second connection sheet 5, and first connection sheet 4 is identical with 5 structure of the second connection sheet, and each described first connects Contact pin 4 is connected on first side plate 1 by least two first bolts 41, and each second connection sheet 5 is by least Two the second bolts 42 are connected on second side plate 2.It further includes bottom plate 6, institute that restricted clearance inside aperture operation, which folds cage, It states bottom plate 6 to be connected in the connecting rod 3 of bottom, when operation, cage will be folded and hung, operator stands on bottom plate 6 It can operation.When the present invention passes in and out absorption tower manhole door, first bolt 41 and the first side are reserved in each first connection sheet 4 Plate 1 connects, and the first connection sheet 4 and the first side plate 1 form hinged relationship, reserves second bolt in each second connection sheet 5 42 and second side plate 2 connect, the second connection sheet 5 and the second side plate 2 form hinged relationship, at this time from the first side plate 1 and second side The two sides of plate 2 apply active force, and the connecting rod 3 rotates, so that the first side plate 1 and the second side plate 2 are moved towards, it is entire to roll over The volume of folded cage becomes smaller, consequently facilitating will fold cage passes in and out absorption tower manhole;Cage operation is folded if you need to use, will be folded Cage expansion, and whole bolts hole in each first connection sheet 4 are connected to first side plate 1 by the first bolt 41 On, whole bolts hole in each second connection sheet 5 are connected on second side plate 2 by the second bolt 42, that is, can guarantee Cage will not loosen, convenient for operator's station operation in cage.In a kind of preferred embodiment, first side plate 1, described The length of two side plates 2 is 5 meters, width is 0.6 meter, and bottom plate is square, and its side length is 0.6 meter, the length of connecting rod 3 is 0.6 meter, it is arranged 6, is respectively set 3 in the two sides of the first side plate 1 and is connected respectively on the second side plate 2.
As shown in Figure 6, it is preferable that first connection sheet 4 and/or second connection sheet 5 include ontology 43, and described The both ends of body 43 are respectively equipped with an interconnecting piece 44, and each interconnecting piece 44 is equipped with a bolt hole 441, each bolt hole 441 It is bolted respectively with corresponding.Preferably, one end of the connecting rod 3 is connected on the ontology 43 of first connection sheet 4, The other end is connected on the ontology 43 of second connection sheet 5.Preferably, one end of the connecting rod 3 is welded on described first In connection sheet 4, the other end is welded in second connection sheet 5.
As shown in Figure 5, it is preferable that the bottom plate 6 is grid-shaped, and it is directly solderable to be located at undermost two connecting rods 3 There is reinforcing rod 61, the bottom plate 6 is shelved on the reinforcing rod 61, and the both sides of the bottom plate 6 are welded in the connecting rod 3.
As shown in Figure 3 and Figure 4, it is preferable that the position on first side plate 1 close to top is equipped with the first bar 11, institute The both ends for stating the first bar 11 are respectively welded on adjacent two side of first side plate 1, first bar 11 and The first fixation hole 110 of a right angled triangle, the setting of the first bar 11 two are formed between adjacent two side of side plate 1 A, correspondingly, first fixation hole 110 is arranged two;Position on second side plate 2 close to top is equipped with the second bar 21, the both ends of second bar 21 are respectively welded on two adjacent sides of second side plate 2, second bar 21 with The second fixation hole 210 of a right angled triangle is formed between adjacent two side of second side plate 2, second bar 21 is arranged Two, correspondingly, first fixation hole 210 is arranged two, passes through twoSteel pipe pass through corresponding first fixation hole 110 and second fixation hole 210, the cage frame is used in venturi nozzle, first bar 11 and second bar 21 In preventing cage from shaking.
The present invention uses in the venturi upkeep operation of Baosteel fourth phase desulfurization periodical repair absorption tower, until current effect is preferable, It can ensure the safety of upkeep operation personnel, shorten the upkeep operation time, improve construction efficiency, save construction cost.In In the environment of country increases environmental requirement, achieving the purpose that, which reduces downtime, reduces pollutant emission.
In conclusion the present invention effectively overcomes various shortcoming in the prior art and has high industrial utilization value.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should be covered by the claims of the present invention.

Claims (6)

1. a kind of restricted clearance inside aperture operation folds cage, including the first side plate disposed in parallel (1) and the second side plate (2), First side plate (1) and second side plate (2) are frame structure, which is characterized in that first side plate (1) and second Side plate (2) is connected by the connecting rod (3) of more parallelly distribute ons, and one end of every connecting rod (3) is equipped with the first connection sheet (4), The other end is equipped with the second connection sheet (5), and first connection sheet (4) is identical with the second connection sheet (5) structure, and each institute It states the first connection sheet (4) to be connected on first side plate (1) by least two first bolts (41), each described second connects Contact pin (5) is connected on second side plate (2) by least two second bolts (42);It further include bottom plate (6), the bottom plate (6) it is connected in the connecting rod (3) of bottom.
2. restricted clearance inside aperture operation according to claim 1 folds cage, it is characterised in that: first connection sheet (4) and/or second connection sheet (5) includes ontology (43), and the both ends of the ontology (43) are respectively equipped with an interconnecting piece (44), each interconnecting piece (44) is equipped with a bolt hole (441).
3. restricted clearance inside aperture operation according to claim 2 folds cage, it is characterised in that: the connecting rod (3) One end be connected on the ontology (43) of first connection sheet (4), the other end is connected to the ontology of second connection sheet (5) (43) on.
4. restricted clearance inside aperture operation according to claim 1 folds cage, it is characterised in that: the connecting rod (3) One end be welded on first connection sheet (4), the other end is welded on second connection sheet (5).
5. restricted clearance inside aperture operation according to claim 1 folds cage, it is characterised in that: the bottom plate (6) is in It is latticed.
6. restricted clearance inside aperture operation according to claim 1 folds cage, it is characterised in that: first side plate (1) position on close to top is equipped with the first bar (11), and the both ends of first bar (11) are respectively welded at described first On adjacent two side of side plate (1);Position on second side plate (2) close to top is equipped with the second bar (21), described The both ends of second bar (21) are respectively welded on two adjacent sides of second side plate (2).
CN201810432531.6A 2018-05-08 2018-05-08 Folding suspension cage for operation of inner hole in limited space Active CN110451441B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810432531.6A CN110451441B (en) 2018-05-08 2018-05-08 Folding suspension cage for operation of inner hole in limited space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810432531.6A CN110451441B (en) 2018-05-08 2018-05-08 Folding suspension cage for operation of inner hole in limited space

Publications (2)

Publication Number Publication Date
CN110451441A true CN110451441A (en) 2019-11-15
CN110451441B CN110451441B (en) 2021-03-02

Family

ID=68480455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810432531.6A Active CN110451441B (en) 2018-05-08 2018-05-08 Folding suspension cage for operation of inner hole in limited space

Country Status (1)

Country Link
CN (1) CN110451441B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0543162A (en) * 1991-08-20 1993-02-23 Hitachi Building Syst Eng & Service Co Ltd Rope replacement device for elevator
JP2001159233A (en) * 1999-12-02 2001-06-12 Hitachi Building Systems Co Ltd Working scaffold device for elevator
CN202773671U (en) * 2012-09-27 2013-03-13 江苏中恒宠物用品股份有限公司 Ejector rod type dual-folding bag support
CN105692403A (en) * 2014-12-10 2016-06-22 通力股份公司 Elevator car frame, a method for installing an elevator car frame, and an elevator
CN205906372U (en) * 2016-07-27 2017-01-25 佛山市高明金荣华乐金属制品有限公司 Novel collapsible box

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0543162A (en) * 1991-08-20 1993-02-23 Hitachi Building Syst Eng & Service Co Ltd Rope replacement device for elevator
JP2001159233A (en) * 1999-12-02 2001-06-12 Hitachi Building Systems Co Ltd Working scaffold device for elevator
CN202773671U (en) * 2012-09-27 2013-03-13 江苏中恒宠物用品股份有限公司 Ejector rod type dual-folding bag support
CN105692403A (en) * 2014-12-10 2016-06-22 通力股份公司 Elevator car frame, a method for installing an elevator car frame, and an elevator
CN205906372U (en) * 2016-07-27 2017-01-25 佛山市高明金荣华乐金属制品有限公司 Novel collapsible box

Also Published As

Publication number Publication date
CN110451441B (en) 2021-03-02

Similar Documents

Publication Publication Date Title
US9132391B2 (en) Air pollution control device
Srivastava et al. Nitrogen oxides emission control options for coal-fired electric utility boilers
Srivastava et al. Flue gas desulfurization: the state of the art
US9084965B2 (en) Air pollution control device and method for reducing amount of mercury in flue gas
CN109472406A (en) A kind of global optimization method of minimum discharge multi-pollutant cooperation-removal system
CN107300188B (en) A kind of smoke comprehensive energy-saving and emission-reduction system for taking into account low-temperature corrosion and UTILIZATION OF VESIDUAL HEAT IN
CN105879641A (en) Device and method for removing sulfur trioxide through alkali liquor jet atomization
CN105561776A (en) Industrial coal-fired boiler flue gas multi-pollutant ultra-low emission and removal cooperated system
DE2805671C2 (en)
CN110451441A (en) Restricted clearance inside aperture operation folds cage
CN108325747A (en) A kind of electrostatic precipitation system of heat pipe and the subregion humidification dry-wet-coupled based on desulfurization wastewater processing
CN106474886A (en) A kind of industrial waste-gas purifier of low temperature plasma joint two-stage dynamic wave
CN108043192B (en) System for removing pollutants from furnace
CN208809774U (en) A kind of ultra-clean purification system of flue gas
CN103223290B (en) Flue gas conditioning agent for flue gas mercury removal and composite flue gas purifying method thereof
CN105854567B (en) A kind of smoke processing system and method based on hydrogen peroxide
CN210079157U (en) High-efficient dust removal defogging device of rotor torrent
CN103657323A (en) Wet electrostatic reinforced apparatus and method for simultaneous removal of PM2.5, SO2 and Hg
CN207187462U (en) A kind of industrial waste-gas purifier of low temperature plasma combined power ripple
CN205461734U (en) Desulfurization and prevent scale deposit integration system
CN206492395U (en) A kind of flue gas pollutant joint removing system based on activity solid absorbent
CN112892081B (en) Single-tower five-zone waste heat recovery denitration desulfurization dust removal and white tail gas removal purification device
CN205379804U (en) High temperature removes dust and flue denitration reactor integrated device
CN108014632A (en) Flue gas pollutant joint removing system based on activity solid absorbent
CN209049219U (en) Double tower desulfurating dust-removing equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant