CN110448974A - A kind of construction site high efficiency spray dust-extraction unit - Google Patents
A kind of construction site high efficiency spray dust-extraction unit Download PDFInfo
- Publication number
- CN110448974A CN110448974A CN201910002120.8A CN201910002120A CN110448974A CN 110448974 A CN110448974 A CN 110448974A CN 201910002120 A CN201910002120 A CN 201910002120A CN 110448974 A CN110448974 A CN 110448974A
- Authority
- CN
- China
- Prior art keywords
- partition
- fixed
- water
- construction site
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D36/00—Filter circuits or combinations of filters with other separating devices
- B01D36/04—Combinations of filters with settling tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D47/00—Separating dispersed particles from gases, air or vapours by liquid as separating agent
- B01D47/06—Spray cleaning
Abstract
The present invention provides a kind of construction site high efficiency spray dust-extraction unit.The construction site high efficiency spray dust-extraction unit includes support frame;Stocking mechanism;Water intake mechanism;Spraying mechanism, the spraying mechanism are rotatablely connected the top of the water intake mechanism;Driving mechanism, the driving mechanism are connect with the side walls of the water intake mechanism;Position-limit mechanism, the position-limit mechanism are connect with the side walls of the driving mechanism;Mechanism is precipitated, the precipitating mechanism includes first partition, connection strap, strainer and second partition;Top at the internal edge of the stocking mechanism is symmetrically installed the first partition that side wall is arc, and the inner bottom of the stocking mechanism is symmetrically installed the second partition, and the strainer is installed in inclination between the adjacent first partition and the second partition;It is the semicircular connection strap that sectional area, which is mounted equidistant, in the inner bottom surface edge of the stocking mechanism.The effective fast dust-removing of construction site high efficiency spray dust-extraction unit provided by the invention.
Description
Technical field
The present invention relates to construction site technical field more particularly to a kind of construction site high efficiency spray dust-extraction units.
Background technique
Construction site refers to the building construction for carrying out industry and civilian projects, civil engineering, equipment installation, pipelining etc.
The place that construction activities, the construction site of approved occupancy and the mankind keep the safety in production, civilization work, build, including land,
Marine and all aerial are able to carry out the region of construction working.Project manager is responsible for the field management of work progress comprehensively,
Construction site management responsibility should be established, and organizes reality according to project scale, the concrete condition of technology complexity and construction site
It applies.
Construction site dust is excessive, needs to carry out spraying and dedusting, but the water source of construction site is vulnerable to pollution, dust easily into
The inside for entering water source makes to be unfavorable for people's health, and reduce dedusting effect originally containing a certain amount of impurity in the water spilt
Fruit.
Therefore, it is necessary to provide a kind of new construction site high efficiency spray dust-extraction unit solution above-mentioned technical problem.
Summary of the invention
The technical problem to be solved by the present invention is to provide a kind of construction site high efficiency spray dust-extraction units of effective fast dust-removing.
In order to solve the above technical problems, high efficiency spray dust-extraction unit in construction site provided by the invention includes: support frame;Storage
Mechanism is deposited, support frame as described above is installed in the top surface of the stocking mechanism;Water intake mechanism, the water intake mechanism are connected to the stocking mechanism
Inside, and the internal slide of the water intake mechanism and support frame as described above connect;Spraying mechanism, the spraying mechanism rotation connection
The top of the water intake mechanism;Driving mechanism, the inside of the driving mechanism rotation connection support frame as described above, and the driving machine
Structure is connect with the side walls of the water intake mechanism;Position-limit mechanism, the side walls of the position-limit mechanism and the driving mechanism
Connection;Precipitate mechanism, the precipitating mechanism is symmetrically fixed on the bottom inner portion of the stocking mechanism, and the precipitating mechanism includes the
One partition, connection strap, strainer and second partition;It is arc that top at the internal edge of the stocking mechanism, which is symmetrically installed side wall,
The first partition, the inner bottom of the stocking mechanism is symmetrically installed the second partition, the adjacent first partition
The strainer is installed in inclination between the second partition;Sectional area is mounted equidistant in the inner bottom surface edge of the stocking mechanism
For the semicircular connection strap.
Preferably, the stocking mechanism includes water inlet pipe, cabinet and water pump, and the support is installed in the top surface of the cabinet
The both ends side wall top process of frame, the cabinet installs the water inlet pipe, and the water is installed at the interior central of the cabinet
Pump.
Preferably, first partition described in the top internal symmetry of the cabinet, the cabinet bottom inner portion installation described in
The length of second partition, the first partition and the second partition is greater than the half of the box height, and the cabinet
The connection strap is mounted equidistant in inner bottom.
Preferably, the water intake mechanism includes fixed cylinder, support rod, fixed block and rubber ring, the top surface of the cabinet and
The fixed cylinder is installed in the inside of support frame as described above, and support frame as described above connects the support with the internal slide of the fixed cylinder
Bar;The rubber ring is installed in the bottom surface of the support rod, and the rubber ring and the inner sidewall of the fixed cylinder are slidably connected;It is described
The fixed block is mounted equidistant in the funnel shaped bottom end of support rod, and the fixed block is fixedly connected with the rubber ring.
Preferably, the spraying mechanism includes fixed link, spray head and mounting plate, and the top of the support rod is rotatablely connected institute
Fixed link is stated, it is mounting plate described in cambered top end, the side of the mounting plate that the top side wall of the fixed link, which is symmetrically installed side wall,
Wall installs the equally distributed spray head, and the spray head is connected to the fixed link.
Preferably, the driving mechanism includes rocking bar, connecting rod, fixed case, sawtooth and gear, the inside of support frame as described above
Place placed in the middle is fixedly connected with the fixed case, and the connection of the fixed case is connected to the inside of the fixed cylinder;The fixed case it is interior
Portion is slidably connected the support rod, and the sawtooth is mounted equidistant in the sidewall symmetry of the support rod;The inside pair of the fixed case
Claim to be rotatablely connected the gear, the gear engages the sawtooth;The inside of one gear is fixedly connected with the rocking bar, separately
The inside of one gear is fixedly connected with the connecting rod, and the rocking bar and the connecting rod and the fixed case and described
The inner rotation of support frame connects.
Preferably, the position-limit mechanism includes gag lever post, connection frame, ball, limit sleeve and sliding slot, the rocking bar and described
The side wall of connecting rod is respectively symmetrically equipped with the sliding slot, and the side wall of the rocking bar and the connecting rod is set with and is slidably connected
The limit sleeve;The internal symmetry of the limit sleeve installs the connection frame, and the side wall of the connection frame, which rolls, connects the rolling
Pearl, and the ball and the connection frame are connect with the internal slide of the sliding slot;It is installed at the sidewall edge of the limit sleeve
The side walls of the gag lever post being distributed in a ring, the gag lever post and support frame as described above connect.
Compared with the relevant technologies, high efficiency spray dust-extraction unit in construction site provided by the invention has following beneficial to effect
Fruit:
When needing to carry out water spray dedusting, water enters the inside of the stocking mechanism, and water is prior to described first that side wall is arc
Baffle contacts make water flow downward in the side wall of the first partition, slow down the speed that flows to of water, water flowing is then at described second
Baffle contacts, water slowly movement upwards between the first partition and the second partition, make water in the stocking mechanism
Internal sinuous movement, it is described under gravity, some contamination precipitations in water the stocking mechanism bottom inner portion, and
The strainer is installed in inclination between the first partition and the first partition, that is, water is facilitated to enter the storage through the strainer
It deposits at the interior central of mechanism, and the contaminant filter in water is made impurity in the side wall slide downward of the strainer by the strainer
It is deposited in the bottom end of the stocking mechanism;It is semicircular described that sectional area, which is mounted equidistant, in the bottom surface at the both ends of the stocking mechanism
Connection strap makes the contamination precipitation in water between the adjacent connection strap, and impurity is fixed on the storage by the connection strap
The bottom inner portion of mechanism, avoids impurity from being moved upwards by water drive, effectively removes the impurity in water, sprays the spraying mechanism
Water clean hygiene, the water mist that the spraying mechanism sprays quickly in conjunction with impurity in air, settles impurity quickly downwards.
Detailed description of the invention
Fig. 1 is a kind of structural representation of preferred embodiment of high efficiency spray dust-extraction unit in construction site provided by the invention
Figure;
Fig. 2 is water intake mechanism schematic diagram of internal structure shown in FIG. 1;
Fig. 3 is position-limit mechanism schematic diagram of internal structure shown in FIG. 1;
Fig. 4 is stocking mechanism schematic diagram of internal structure shown in FIG. 1.
Figure label: 1, support frame, 2, stocking mechanism, 21, water inlet pipe, 22, cabinet, 23, water pump, 3, position-limit mechanism, 31,
Gag lever post, 32, connection frame, 33, ball, 34, limit sleeve, 35, sliding slot, 4, driving mechanism, 41, rocking bar, 42, connecting rod, 43, solid
Determine case, 44, sawtooth, 45, gear, 5, water intake mechanism, 51, fixed cylinder, 52, support rod, 53, fixed block, 54, rubber ring, 6, spray
Spill mechanism, 61, fixed link, 62, spray head, 63, mounting plate, 7, precipitating mechanism, 71, first partition, 72, connection strap, 73, strainer,
74, second partition.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Please refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, wherein Fig. 1 is high efficiency spray dedusting in construction site provided by the invention
A kind of structural schematic diagram of preferred embodiment of device;Fig. 2 is elevating mechanism schematic diagram of internal structure shown in FIG. 1;Fig. 3 is figure
Position-limit mechanism schematic diagram of internal structure shown in 1;Fig. 4 is bindiny mechanism's schematic diagram of internal structure shown in Fig. 2.Construction site is high
Imitating spraying dedusting device includes: support frame 1;The top surface of stocking mechanism 2, the stocking mechanism 2 is installed by support frame as described above 1;Water inlet
Mechanism 5, the water intake mechanism 5 are connected to the inside of the stocking mechanism 2, and the inside of the water intake mechanism 5 and support frame as described above 1
It is slidably connected;Spraying mechanism 6, the spraying mechanism 6 are rotatablely connected the top of the water intake mechanism 5;Driving mechanism 4, the drive
Motivation structure 4 is rotatablely connected the inside of support frame as described above 1, and the side walls of the driving mechanism 4 and the water intake mechanism 5 connect
It connects;Position-limit mechanism 3, the position-limit mechanism 3 are connect with the side walls of the driving mechanism 4;Precipitate mechanism 7, the precipitation machine
Structure 7 is symmetrically fixed on the bottom inner portion of the stocking mechanism 2, and the precipitating mechanism 7 includes first partition 71, connection strap 72, filter
Net 73 and second partition 74;Top at the internal edge of the stocking mechanism 2 is symmetrically installed described first that side wall is arc
Partition 71, the inner bottom of the stocking mechanism 2 are symmetrically installed the second partition 74, the adjacent first partition 71 and institute
It states inclination between second partition 74 and the strainer 73 is installed;Section is mounted equidistant in the inner bottom surface edge of the stocking mechanism 2
Product is the semicircular connection strap 72.
The stocking mechanism 2 includes water inlet pipe 21, cabinet 22 and water pump 23, and the support is installed in the top surface of the cabinet 22
The both ends side wall top process of frame 1, the cabinet 22 installs the water inlet pipe 21, and installs at the interior central of the cabinet 22
The water pump 23, the inside of the cabinet 22 is entered in order to facilitate water by the water inlet pipe 21, and the water pump 23 is by the case
The internal water of body 22 is extracted out.
First partition 71 described in the top internal symmetry of the cabinet 22, the bottom inner portion installation described the of the cabinet 22
The length of two partitions 74, the first partition 71 and the second partition 74 is greater than the half of 22 height of cabinet, and described
The connection strap 72 is mounted equidistant in the inner bottom of cabinet 22, in order to facilitate water in the internal flow of the cabinet 22, water from
The both ends of the cabinet 22 are to flowing at the interior central of the cabinet 22, and water is in the first partition 71 and the second partition
Sinuous movement between 74 makes the contamination precipitation in water in the inner bottom of the cabinet 22.
The water intake mechanism 5 includes fixed cylinder 51, support rod 52, fixed block 53 and rubber ring 54, the top of the cabinet 22
The fixed cylinder 51 is installed in face and the inside of support frame as described above 1, and support frame as described above 1 is connected with the internal slide of the fixed cylinder 51
The support rod 52;The bottom surface of the support rod 52 is installed by the rubber ring 54, the rubber ring 54 and the fixed cylinder 51
Inner sidewall is slidably connected;The fixed block 53 is mounted equidistant in the funnel shaped bottom end of the support rod 52, and the fixed block 53 is fixed
The rubber ring 54 is connected, the water of the water pump 23 extraction enters the inside of the fixed cylinder 51 for convenience, and water is described solid
The rubber ring 54 of the moved upward inside of safety barrel 51,52 bottom end of support rod is close to the inner sidewall of the fixed cylinder 51,
The rubber ring 54 closes the inside of the fixed cylinder 51, and the internal water of the fixed cylinder 51 is made to enter the support rod 52
It is internal;Enter the inside of the support rod 52, the water impulsion rubber ring 54, the support in the internal water of the fixed cylinder 51
The fixed block 53 of 52 bottom end of bar is fixed by the rubber ring 54, and the rubber ring 54 is made to be close to the inside of the fixed cylinder 51
Wall.
The spraying mechanism 6 includes fixed link 61, spray head 62 and mounting plate 63, and the top of the support rod 52 is rotatablely connected
The fixed link 61, it is mounting plate 63 described in cambered top end, the peace that the top side wall of the fixed link 61, which is symmetrically installed side wall,
The side wall of loading board 63 installs the equally distributed spray head 62, and the spray head 62 is connected to the fixed link 61, described for convenience
52 internal water of support rod enters the inside of the fixed link 61, and the water inside the fixed link 61 enters the interior of the mounting plate 63
Portion, water get into the air after being atomized by the spray head 62, settle the dust in air.
The driving mechanism 4 includes rocking bar 41, connecting rod 42, fixed case 43, sawtooth 44 and gear 45, support frame as described above 1
Interior central at be fixedly connected with the fixed case 43, the connection of the fixed case 43 is connected to the inside of the fixed cylinder 51;Institute
The internal slide for stating fixed case 51 connects the support rod 52, and the sawtooth is mounted equidistant in the sidewall symmetry of the support rod 52
44;The internal symmetry of the fixed case 43 is rotatablely connected the gear 45, and the gear 45 engages the sawtooth 44;Described in one
The inside of gear 44 is fixedly connected with the rocking bar 41, and the inside of another gear 44 is fixedly connected with the connecting rod 42, and
The rocking bar 41 and the connecting rod 42 are connect with the inner rotation of the fixed case 43 and support frame as described above 1, are turned for convenience
The rocking bar 41 is moved, makes the rocking bar 41 that the gear 45 be driven to rotate, the gear 45 drives the support rod 52 1
The sawtooth 45 of end side wall moves, so that the gear 45 be made to push the support rod 52 on the inside of the fixed cylinder 51
Lower movement, to adjust the height of the spraying mechanism 6;And the support rod 52 by a gear 45 when being pushed, it is described
The sawtooth 44 of 52 other end side wall of support rod pushes another described gear 45 to rotate, and two gears 45 are by the branch
Strut 52 is fixed, is fixed on the support rod 52 between two support rods 52, makes the support rod 52 in the fixation
The internal vertical movement of cylinder 51.
The position-limit mechanism 3 includes gag lever post 31, connection frame 32, ball 33, limit sleeve 34 and sliding slot 35, the rocking bar 41
The sliding slot 35, the side wall difference of the rocking bar 41 and the connecting rod 42 are respectively symmetrically equipped with the side wall of the connecting rod 42
It is set with and the limit sleeve 34 that is slidably connected;The internal symmetry of the limit sleeve 34 installs the connection frame 32, the connection frame
32 side wall, which rolls, connects the ball 33, and the internal slide of the ball 33 and the connection frame 32 and the sliding slot 35 connects
It connects;The gag lever post 31 being distributed in a ring, the gag lever post 31 and the branch are installed at the sidewall edge of the limit sleeve 34
The side walls of support 1 connect, and slide the limit sleeve 34 for convenience, the limit sleeve 34 drives the gag lever post 31 from institute
The inside for stating support frame 1 skids off, and facilitates the rotation of the rocking bar 41 and the connecting rod 42, and work as rocking bar 41 and the connecting rod
42 when not rotating, and slides the limit sleeve 34, makes the limit sleeve 34 that the gag lever post 31 be driven to enter the interior of support frame as described above 1
Portion, and the limit sleeve 34 drives the connection frame 32 and the ball 33 in the internal slide of the sliding slot 35, when the limit
When position set 34 is fixed on the side wall of support frame as described above 1, the limit sleeve 34 is fixed by the connection frame 32 and the ball 33, institute
It states connection frame 32 and the ball 33 is located at the inside of rocking bar 41 or the connecting rod 42, by the rocking bar 41 and the connecting rod
42 maintain static dynamic, so that the gear 44 is fixed, keep the gear 44 that the support rod 52 is fixed, make the support rod
52 height is constant, and the connection frame 32 and the ball 33, in the internal slide of the sliding slot 35, the ball 33 exists
The roll inside of the sliding slot 35 reduces the frictional force between the ball 33 and the sliding slot 35, facilitates the limit sleeve 34
In the side walls of the rocking bar 41 and the connecting rod 42.
The working principle of high efficiency spray dust-extraction unit in construction site provided by the invention is as follows: sliding the rocking bar 41 and institute
The limit sleeve 34 of 42 side wall of connecting rod is stated, the limit sleeve 34 drives the gag lever post 31 from the inside of support frame as described above 1
It skids off;The rocking bar 41 is rotated, makes the rocking bar 41 that the gear 45 be driven to rotate, the gear 45 engages the support
The sawtooth 45 of 52 one end side wall of bar, the gear 45 drive the sawtooth 45 of 52 one end side wall of support rod to move,
To make the gear 45 that the support rod 52 be pushed to move up and down in the inside of the fixed cylinder 51, to adjust the sprinkling
The height of mechanism 6;And the support rod 52 is by a gear 45 when being pushed, 52 other end side wall of support rod it is described
Sawtooth 44 pushes another described gear 45 to rotate, and locating gear 45 drives the connecting rod 42 in the fixed case 43 and described
The inner rotation of support frame 1, two gears 45 are fixed by the support rod 52, and the support rod 52 is made to be fixed on two institutes
It states between support rod 52, moves the support rod 52 in the internal vertical of the fixed cylinder 51, the movement of support rod 52 pushes away
The movement of spraying mechanism 6 is moved, keeps the height of the spraying mechanism 6 suitable;Limit sleeve 34 described in reverse slide make the limit
Set 34 drives the gag lever post 31 into the inside of support frame as described above 1, and the limit sleeve 34 drives the connection frame 32 and institute
Ball 33 is stated in the internal slide of the sliding slot 35, when the limit sleeve 34 is fixed on the side wall of support frame as described above 1, the limit
Position set 34 is fixed by the connection frame 32 and the ball 33, and the connection frame 32 and the ball 33 are located at rocking bar 41 or described
The inside of connecting rod 42, the rocking bar 41 and the connecting rod 42 is maintained static dynamic, so that the gear 44 is fixed, makes institute
It states gear 44 support rod 52 is fixed, keeps the height of the support rod 52 constant, and the connection frame 32 and the ball
33 in the internal slide of the sliding slot 35, the ball 33 in the roll inside of the sliding slot 35, reduce the ball 33 with
Frictional force between the sliding slot 35 facilitates the limit sleeve 34 in the side walls of the rocking bar 41 and the connecting rod 42.
The present apparatus is moved to suitable position, institute's water pump 23 is powered on, water is connected into the water inlet pipe 21, water passes through the water inlet
Pipe 21 enters the inside of the cabinet 22, and water is contacted prior to the first partition 71 that side wall is arc, makes water described first
The side wall of partition 71 flows downward, and slows down the speed that flows to of water, and water flowing is contacted then at the second partition 74, makes water described
Slowly movement upwards between first partition 71 and the second partition 74, under gravity, some contamination precipitations in water
In the bottom inner portion of the cabinet 22, and between the first partition 71 and the first partition 74, the strainer is installed in inclination
73, make water at the interior central that the strainer 73 enters the cabinet 22, the water pump 23 works the cabinet 22
Water of the inside by filtering is pumped into the inside of the fixed cylinder 51;Impurity is deposited in institute in the side wall slide downward of the strainer 73
State the bottom end of cabinet 22;It is the semicircular connection strap 72 that sectional area, which is mounted equidistant, in the bottom surface at the both ends of the cabinet 22, is made
For contamination precipitation in water between the adjacent connection strap 72, impurity is fixed on the bottom of the cabinet 22 by the connection strap 72
End is internal, and impurity is avoided to be moved upwards by water drive, effectively removes the impurity in water.Water is upward in the inside of the fixed cylinder 51
Movement, the fixed rubber ring 54 of the fixed block 53 of 52 bottom end of support rod, makes the described of 52 bottom end of support rod
Rubber ring 54 is close to the inner sidewall of the fixed cylinder 51, and the rubber ring 54 closes the inside of the fixed cylinder 51, makes described
The internal water of fixed cylinder 51 enters the inside of the support rod 52;52 internal water of support rod enters the interior of the fixed link 61
Portion, the water inside the fixed link 61 enter the inside of the mounting plate 63, and water enters air after being atomized by the spray head 62
In, settle the dust in air.
Compared with the relevant technologies, high efficiency spray dust-extraction unit in construction site provided by the invention has following beneficial to effect
Fruit:
When needing to carry out water spray dedusting, water enters the inside of the stocking mechanism, and water is prior to described first that side wall is arc
Partition 71 contacts, and so that water is flowed downward in the side wall of the first partition 71, slows down the speed that flows to of water, water flowing is then at described
Second partition 74 contacts, and water slowly movement upwards between the first partition 71 and the second partition 74 makes water described
The inside sinuous movement of stocking mechanism 2, it is described under gravity, some contamination precipitations in water are in the stocking mechanism 2
Bottom inner portion, and the strainer 73 is installed in inclination between the first partition 71 and the first partition 74, that is, facilitates water to pass through
It wears the strainer 73 to enter at the interior central of the stocking mechanism 2, and the contaminant filter in water is made impurity by the strainer 73
The bottom end of the stocking mechanism 2 is deposited in the side wall slide downward of the strainer 73;The bottom surface at the both ends of the stocking mechanism 2
It is the semicircular connection strap 72 that sectional area, which is mounted equidistant, make contamination precipitation in water the adjacent connection strap 72 it
Between, impurity is fixed on the bottom inner portion of the stocking mechanism 2 by the connection strap 72, and avoid impurity from being moved upwards by water drive,
The impurity in water is effectively removed, the water mist of the water clean hygiene for spraying the spraying mechanism 6, the ejection of spraying mechanism 6 is fast
Speed settles impurity quickly downwards in conjunction with impurity in air.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (7)
1. a kind of construction site high efficiency spray dust-extraction unit characterized by comprising
Support frame;
The top surface of stocking mechanism, the stocking mechanism is installed by support frame as described above;
Water intake mechanism, the water intake mechanism are connected to the inside of the stocking mechanism, and the water intake mechanism and support frame as described above
Internal slide connection;
Spraying mechanism, the spraying mechanism are rotatablely connected the top of the water intake mechanism;
Driving mechanism, the inside of the driving mechanism rotation connection support frame as described above, and the driving mechanism and the water inlet machine
The side walls of structure connect;
Position-limit mechanism, the position-limit mechanism are connect with the side walls of the driving mechanism;
Precipitate mechanism, the precipitating mechanism is symmetrically fixed on the bottom inner portion of the stocking mechanism, and the precipitating mechanism includes the
One partition, connection strap, strainer and second partition;It is arc that top at the internal edge of the stocking mechanism, which is symmetrically installed side wall,
The first partition, the inner bottom of the stocking mechanism is symmetrically installed the second partition, the adjacent first partition
The strainer is installed in inclination between the second partition;Sectional area is mounted equidistant in the inner bottom surface edge of the stocking mechanism
For the semicircular connection strap.
2. high efficiency spray dust-extraction unit in construction site according to claim 1, which is characterized in that the stocking mechanism includes
Support frame as described above, the both ends side wall top process installation of the cabinet are installed in water inlet pipe, cabinet and water pump, the top surface of the cabinet
The water inlet pipe, and the water pump is installed at the interior central of the cabinet.
3. high efficiency spray dust-extraction unit in construction site according to claim 2, which is characterized in that in the top of the cabinet
Symmetrically the first partition, the bottom inner portion of the cabinet install the second partition, the first partition and described second in portion
The length of partition is greater than the half of the box height, and the connection strap is mounted equidistant in the inner bottom of the cabinet.
4. high efficiency spray dust-extraction unit in construction site according to claim 2, which is characterized in that the water intake mechanism includes
The fixed cylinder is installed in fixed cylinder, support rod, fixed block and rubber ring, the top surface of the cabinet and the inside of support frame as described above,
Support frame as described above connects the support rod with the internal slide of the fixed cylinder;The bottom surface of the support rod is installed by the rubber
Ring, the rubber ring and the inner sidewall of the fixed cylinder are slidably connected;The funnel shaped bottom end of support rod is mounted equidistant described
Fixed block, the fixed block are fixedly connected with the rubber ring.
5. high efficiency spray dust-extraction unit in construction site according to claim 4, which is characterized in that the spraying mechanism includes
The top of fixed link, spray head and mounting plate, the support rod is rotatablely connected the fixed link, the top side wall pair of the fixed link
Installation side wall is referred to as mounting plate described in cambered top end, and the side wall of the mounting plate installs the equally distributed spray head, the spray
Head is connected to the fixed link.
6. high efficiency spray dust-extraction unit in construction site according to claim 4, which is characterized in that the driving mechanism includes
Rocking bar, connecting rod, fixed case, sawtooth and gear are fixedly connected with the fixed case at the interior central of support frame as described above, described solid
The connection for determining case is connected to the inside of the fixed cylinder;The internal slide of the fixed case connects the support rod, the support rod
Sidewall symmetry the sawtooth is mounted equidistant;The internal symmetry of the fixed case is rotatablely connected the gear, the gear engagement
The sawtooth;The inside of one gear is fixedly connected with the rocking bar, and the inside of another gear is fixedly connected described
Connecting rod, and the rocking bar and the connecting rod are connect with the inner rotation of the fixed case and support frame as described above.
7. high efficiency spray dust-extraction unit in construction site according to claim 6, which is characterized in that the position-limit mechanism includes
The side wall of gag lever post, connection frame, ball, limit sleeve and sliding slot, the rocking bar and the connecting rod is respectively symmetrically equipped with the cunning
The side wall of slot, the rocking bar and the connecting rod is set with and the limit sleeve that is slidably connected;The inside pair of the limit sleeve
Claim that the connection frame is installed, the side wall of the connection frame, which rolls, connects the ball, and the ball and the connection frame and institute
State the internal slide connection of sliding slot;The gag lever post being distributed in a ring, the limit are installed at the sidewall edge of the limit sleeve
The side walls of position bar and support frame as described above connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910002120.8A CN110448974A (en) | 2019-01-02 | 2019-01-02 | A kind of construction site high efficiency spray dust-extraction unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910002120.8A CN110448974A (en) | 2019-01-02 | 2019-01-02 | A kind of construction site high efficiency spray dust-extraction unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110448974A true CN110448974A (en) | 2019-11-15 |
Family
ID=68480555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910002120.8A Pending CN110448974A (en) | 2019-01-02 | 2019-01-02 | A kind of construction site high efficiency spray dust-extraction unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110448974A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112221786A (en) * | 2020-10-12 | 2021-01-15 | 杨尚 | Environmental protection and energy saving spraying dust fall equipment of building engineering construction |
CN114622540A (en) * | 2022-03-11 | 2022-06-14 | 浙江新盛建设集团有限公司 | Die-cut construction equipment of shaping constructional column top high pressure |
CN114622540B (en) * | 2022-03-11 | 2024-04-19 | 浙江新盛建设集团有限公司 | High-pressure punching construction device for top of forming constructional column |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204973410U (en) * | 2015-06-25 | 2016-01-20 | 中建八局第二建设有限公司 | Building site dust collector |
CN205127480U (en) * | 2015-11-13 | 2016-04-06 | 长沙鸿源水处理技术开发有限公司 | Sedimentation tank |
CN106178616A (en) * | 2016-08-31 | 2016-12-07 | 珠海市玛斯特五金塑胶制品有限公司 | A kind of electroplating effluent precipitation treatment device of good separation |
CN207169321U (en) * | 2017-09-06 | 2018-04-03 | 王民杰 | A kind of environment-friendly type spraying system for improving atmosphere pollution |
CN207445844U (en) * | 2017-11-08 | 2018-06-05 | 甘肃第一安装工程有限公司 | A kind of construction site dust falling device |
CN207478198U (en) * | 2017-09-22 | 2018-06-12 | 天津市弘亚润滑粉制造有限公司 | A kind of powdered lubricant workshop dust-extraction unit |
CN207576021U (en) * | 2017-11-20 | 2018-07-06 | 天津市石建工程建设监理有限责任公司 | A kind of construction site multifunctional mobile spray dust remover |
CN208201756U (en) * | 2018-03-28 | 2018-12-07 | 青岛中建联合建设工程有限公司 | A kind of novel building building site depositing dust sprinkling truck |
CN109052202A (en) * | 2018-08-31 | 2018-12-21 | 新沂城北新区城市建设发展有限公司 | A kind of parallel lifting device of industry manufacture chain-type |
CN208302496U (en) * | 2018-04-27 | 2019-01-01 | 马鞍山金安环境科技有限公司 | A kind of flue-gas dust-removing and desulfurization denitrification system |
-
2019
- 2019-01-02 CN CN201910002120.8A patent/CN110448974A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204973410U (en) * | 2015-06-25 | 2016-01-20 | 中建八局第二建设有限公司 | Building site dust collector |
CN205127480U (en) * | 2015-11-13 | 2016-04-06 | 长沙鸿源水处理技术开发有限公司 | Sedimentation tank |
CN106178616A (en) * | 2016-08-31 | 2016-12-07 | 珠海市玛斯特五金塑胶制品有限公司 | A kind of electroplating effluent precipitation treatment device of good separation |
CN207169321U (en) * | 2017-09-06 | 2018-04-03 | 王民杰 | A kind of environment-friendly type spraying system for improving atmosphere pollution |
CN207478198U (en) * | 2017-09-22 | 2018-06-12 | 天津市弘亚润滑粉制造有限公司 | A kind of powdered lubricant workshop dust-extraction unit |
CN207445844U (en) * | 2017-11-08 | 2018-06-05 | 甘肃第一安装工程有限公司 | A kind of construction site dust falling device |
CN207576021U (en) * | 2017-11-20 | 2018-07-06 | 天津市石建工程建设监理有限责任公司 | A kind of construction site multifunctional mobile spray dust remover |
CN208201756U (en) * | 2018-03-28 | 2018-12-07 | 青岛中建联合建设工程有限公司 | A kind of novel building building site depositing dust sprinkling truck |
CN208302496U (en) * | 2018-04-27 | 2019-01-01 | 马鞍山金安环境科技有限公司 | A kind of flue-gas dust-removing and desulfurization denitrification system |
CN109052202A (en) * | 2018-08-31 | 2018-12-21 | 新沂城北新区城市建设发展有限公司 | A kind of parallel lifting device of industry manufacture chain-type |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112221786A (en) * | 2020-10-12 | 2021-01-15 | 杨尚 | Environmental protection and energy saving spraying dust fall equipment of building engineering construction |
CN114622540A (en) * | 2022-03-11 | 2022-06-14 | 浙江新盛建设集团有限公司 | Die-cut construction equipment of shaping constructional column top high pressure |
CN114622540B (en) * | 2022-03-11 | 2024-04-19 | 浙江新盛建设集团有限公司 | High-pressure punching construction device for top of forming constructional column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106179668B (en) | A kind of quick grinding device of medical treatment pediatric drugs product | |
CN109381945A (en) | High effect dust cleaner is used in a kind of construction protection | |
CN209331148U (en) | A kind of red hayberry wine processing red bayberry cleaning equipment | |
CN209564771U (en) | A kind of live device for reducing dust of green construction | |
CN107649369A (en) | A kind of agricultural uses Chinese chestnut screening plant | |
WO2013053200A1 (en) | Apparatus for rapid cake discharge and filter cloth cleaning of filter press | |
CN113440958A (en) | Watering dust-settling device for highway construction and application method thereof | |
CN106362921B (en) | Method for treating surface of bag cage framework | |
CN208199585U (en) | A kind of conveying device from tensioning | |
CN110448974A (en) | A kind of construction site high efficiency spray dust-extraction unit | |
CN2902463Y (en) | Full automatic iron eliminator | |
CN105724190B (en) | A kind of forestry operation spray equipment | |
CN107185931A (en) | A kind of copper pipe material frame bottom automatic flushing device | |
CN218610934U (en) | Workshop dust removal humidification device | |
CN208823978U (en) | A kind of Bioexperiment vegetation water extraction element | |
CN207694485U (en) | A kind of automatic cleaning apparatus of filter screen | |
CN206405036U (en) | A kind of Sand screen for building | |
CN207259172U (en) | A kind of mobile sewage treatment apparatus | |
CN110919087B (en) | Numerical control sawing machine for forging steel | |
CN113457283A (en) | Filter screen cylinder cleaning device for hydraulic equipment | |
CN209501164U (en) | A kind of coal yard spraying trolley | |
CN206304435U (en) | Enter formula vertical metal film microfilter device outside a kind of | |
CN217229137U (en) | Conveyor is used in production of safe type air entrainment brick | |
CN110508607A (en) | A kind of underground water multiphase extracting prosthetic device | |
CN107308703A (en) | Filter the adjustable equipment for separating liquid from solid of sieve aperture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191115 |
|
RJ01 | Rejection of invention patent application after publication |