CN110446026A - A kind of method and system of electric performance test equipment integrated test - Google Patents

A kind of method and system of electric performance test equipment integrated test Download PDF

Info

Publication number
CN110446026A
CN110446026A CN201910594635.1A CN201910594635A CN110446026A CN 110446026 A CN110446026 A CN 110446026A CN 201910594635 A CN201910594635 A CN 201910594635A CN 110446026 A CN110446026 A CN 110446026A
Authority
CN
China
Prior art keywords
test
equipment
test equipment
item
parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910594635.1A
Other languages
Chinese (zh)
Inventor
刘翔章
李新林
孙思凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Skyworth RGB Electronics Co Ltd
Shenzhen Chuangwei RGB Electronics Co Ltd
Original Assignee
Shenzhen Chuangwei RGB Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Chuangwei RGB Electronics Co Ltd filed Critical Shenzhen Chuangwei RGB Electronics Co Ltd
Priority to CN201910594635.1A priority Critical patent/CN110446026A/en
Publication of CN110446026A publication Critical patent/CN110446026A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N17/00Diagnosis, testing or measuring for television systems or their details
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N17/00Diagnosis, testing or measuring for television systems or their details
    • H04N17/04Diagnosis, testing or measuring for television systems or their details for receivers

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention discloses a kind of method and system of electric performance test equipment integrated test, it is characterized in that, the described method includes: searching the corresponding several test equipments of test item and several test parameters with the corresponding relationship of test equipment and test parameter according to preset test item when receiving the test item of electrical property project to be tested;The corresponding test parameter of each test equipment is sent to each test equipment, so that each test equipment carries out parameter configuration;After all test equipment configuration successfuls, the test assignment of the test item is opened.The present invention is when tester directly selects a test item, automatically each test equipment and test parameter that the test item needs to use are searched, after the parameter configuration success of each test equipment, tester can be notified directly to open test assignment, shorten the rectification time to developer while quickly improving work efficiency to the present invention, promotes the quality of complete product.

Description

A kind of method and system of electric performance test equipment integrated test
Technical field
The present invention relates to digital TV technology, in particular to the method for a kind of electric performance test equipment integrated test and System.
Background technique
Currently, most DTV requires in the R & D design stage by electric performance test, and national quality Center also can random inspection TV performance indexes it is whether qualified.Therefore television set is just needed in development phase every electricity Production could be imported after testing performance index is qualified.Existing test method is that tester is first directed to need project to be tested, First debugging, which sets this test assignment, needs corresponding equipment to be used, and often one project needs of test use multiple signals Occurrence of equipment, time-consuming for test process, and working efficiency cannot be improved effectively.
Thus the prior art could be improved and improve.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the deficiencies of the prior art, providing a kind of electric performance test equipment The method and system of integrated test, with solution, time-consuming for test process in the prior art, ineffective problem.
In order to solve the above-mentioned technical problem, the technical solution adopted in the present invention is as follows:
A kind of method of electric performance test equipment integrated test comprising:
When receiving the test item of electrical property project to be tested, according to preset test item and test equipment and test parameter Corresponding relationship searches the corresponding several test equipments of test item and several test parameters;
The corresponding test parameter of each test equipment is sent to each test equipment, so that each test equipment carries out parameter configuration;
After all test equipment configuration successfuls, the test assignment of the test item is opened.
The method of the electric performance test equipment integrated test, further includes:
The corresponding relationship of test item Yu test equipment and test parameter is stored in advance.
The method of the electric performance test equipment integrated test, wherein the test item and test equipment and test parameter Corresponding relationship specifically:
The test item corresponds to several test equipments and several test parameters, wherein the test equipment and test parameter are one by one It is corresponding.
The method of the electric performance test equipment integrated test, wherein it is described after all test equipment configuration successfuls, it opens The test assignment for opening the test item specifically includes:
After all test equipment configuration successfuls, display interface display parameters configuration successful, and open the test of the test item Task.
The method of the electric performance test equipment integrated test, further include:
When there are test equipment configuration error, the corresponding test equipment of test parameter configuration failure is shown by display interface;
The prompt tone of test parameter configuration failure is generated, and prompts the configuration of tester's test parameter to lose by the prompt tone It loses.
The method of the electric performance test equipment integrated test, further include:
Tester is reminded to check whether the corresponding test equipment of the test parameter configuration failure is powered;
When confirming that the test equipment is powered, whether the communication interface for detecting the test equipment has correctly connected.
The method of the electric performance test equipment integrated test, wherein the test electrical property project includes several tests , the corresponding test assignment of each test item, each test assignment successively carries out.
A kind of system of electric performance test equipment integrated test, comprising: main IC and memory;It is stored on the memory The computer-readable program that can be executed by the main IC;The main IC realizes as above any when executing the computer-readable program Step in the method for one electric performance test equipment integrated test.
A kind of computer storage media, wherein the computer-readable recording medium storage has one or more program, institute Stating one or more program can be executed by one or more main IC, to realize that electric performance test described in any one as above is set Step in the method for standby integrated test.
The utility model has the advantages that compared with prior art, the present invention provides a kind of methods of electric performance test equipment integrated test And system, which comprises when receiving the test item of electrical property project to be tested, according to preset test item and test The corresponding relationship of equipment and test parameter searches the corresponding several test equipments of test item and several test parameters;By each survey The corresponding test parameter of examination equipment is sent to each test equipment, so that each test equipment carries out parameter configuration;When all tests After device configuration success, the test assignment of the test item is opened.The present invention when tester directly selects a test item, Automatically each test equipment and test parameter that the test item needs to use are searched, when each test equipment parameter configuration at After function, tester can be notified directly to open test assignment, to give while the present invention quickly improves work efficiency Developer shortens the rectification time, promotes the quality of complete product.
Detailed description of the invention
Fig. 1 is a kind of flow chart of the method preferred embodiment of electric performance test equipment integrated test provided by the invention.
Fig. 2 is test equipment parameter setting abnormality processing flow chart provided by the invention.
Fig. 3 is a kind of structural principle of the system preferred embodiment of electric performance test equipment integrated test provided by the invention Figure.
Specific embodiment
The present invention provides a kind of method and system of electric performance test equipment integrated test, to make the purpose of the present invention, skill Art scheme and effect are clearer, clear, and the present invention is described in more detail as follows in conjunction with drawings and embodiments.It should manage Solution, described herein specific examples are only used to explain the present invention, is not intended to limit the present invention.
Those skilled in the art of the present technique are appreciated that unless expressly stated, singular " one " used herein, " one It is a ", " described " and "the" may also comprise plural form.It is to be further understood that being arranged used in specification of the invention Diction " comprising " refer to that there are the feature, integer, step, operation, element and/or component, but it is not excluded that in the presence of or addition Other one or more features, integer, step, operation, element, component and/or their group.It should be understood that when we claim member Part is " connected " or when " coupled " to another element, it can be directly connected or coupled to other elements, or there may also be Intermediary element.In addition, " connection " used herein or " coupling " may include being wirelessly connected or wirelessly coupling.It is used herein to arrange Diction "and/or" includes one or more associated wholes for listing item or any cell and all combinations.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein (including technology art Language and scientific term), there is meaning identical with the general understanding of those of ordinary skill in fields of the present invention.Should also Understand, those terms such as defined in the general dictionary, it should be understood that have in the context of the prior art The consistent meaning of meaning, and unless idealization or meaning too formal otherwise will not be used by specific definitions as here To explain.
With reference to the accompanying drawing, by the description of the embodiment, further explanation of the contents of the invention are made.
Fig. 1 is please referred to, Fig. 1 is a kind of method preferred embodiment of electric performance test equipment integrated test provided by the invention Flow chart.The described method includes:
S100, when receiving the test item of electrical property project to be tested, according to preset test item and test equipment and test The corresponding relationship of parameter searches the corresponding several test equipments of test item and several test parameters.
Specifically, most DTV requires in the R & D design stage by electric performance test, and national matter Amount center also can random inspection TV indices it is whether qualified.Therefore television set is just needed in development phase every electrical Production can could be imported after index test qualification.Existing test method is that tester is first directed to the project to be tested that needs, first Debugging, which sets this test assignment, needs corresponding equipment to be used, and often one project needs of test use multiple signals to send out Generating apparatus, so as to cause test process, time-consuming, and working efficiency cannot be improved effectively.
Therefore system provided by the invention is able to achieve after tester directly selects a test item, by this system from Each equipment that dynamic setting test item needs to use, direct output signal is supplied to tester can be directly using survey Examination promotes the quality of complete product so that returning developer while quickly improving work efficiency shortens the rectification time.
Specifically, the system of electric performance test equipment integrated test provided by the present invention includes display interface, display Every electrical property list of TV, user, which can choose, needs test item (for example, signal sensitivity test) to be tested, connects Again include multiple test items (for example, signal sensitivity tests frequency point A, signal sensitivity test frequency under selected test item Point B) it can be selected that user can successively select each test item according to demand, and test assignment is opened to each test item.That is, The test electrical property project includes several test items, the corresponding test assignment of each test item, each test assignment according to Secondary progress.
In the present embodiment, when the system and device booting of electric performance test equipment collection test, first by preset storage It is shown in each electrical property item menu to be tested of system by display interface, tester is waited to select electricity to be tested The key-press input of performance project, so that it is determined that current project to be tested, according to current project to be tested, tester is again Test item to be tested is selected, to open the test assignment of each test item.Correspondingly, when receiving electrical property project to be tested Test item when, it is corresponding that the test item is searched according to preset test item and the corresponding relationship of test equipment and test parameter Several test equipments and several test parameters, specifically: correspondence is obtained according to the key-press input of tester and is stored in system Several test equipments of interior current test item and several test parameters, so that following communication interface and the test item need Parameter setting communication is carried out using several test equipments arrived.
Further, described when receiving the test item of electrical property project to be tested, according to preset test item and test The corresponding relationship of equipment and test parameter is gone back before searching the corresponding several test equipments of test item and several test parameters It include: the corresponding relationship that test item Yu test equipment and test parameter is stored in advance, specifically: the test item corresponds to several Test equipment and several test parameters, wherein the test equipment and test parameter correspond.That is, the present invention is pre- First having stored up each test item in Installed System Memory needs equipment to be tested to be used, and is configured with corresponding test ginseng for each test equipment Number is no longer needed in this way by manually carrying out parameter configuration to each equipment, as long as parameter can be realized by a key selection Unified configuration, improve work efficiency, at the same decrease accidentally be arranged due to equipment caused by mistake cause test not conform to The problem of lattice.
In the present embodiment, each test item needs test equipment to be used different.Such as when selection test item (signal Sensitivity test) when, include the test for being directed to frequency point A in signal sensitivity test item, needs to be arranged the parameter of test equipment 1 It is aa, the parameter of test equipment 2 is bb;For the test of frequency point B, to need the parameter of test equipment 1 be cc, the ginseng of test equipment 2 Number is dd.By automatically adjusting parameter to test multiple frequency points, can check whether picture is normal.On that is, It states frequency point A test and frequency point B test is the included test item of signal sensitivity test, that is, each test item needs make Test equipment is not identical, to correspond to corresponding test parameter for different test item and test equipment.
S200, the corresponding test parameter of each test equipment is sent to each test equipment, so that each test equipment carries out Parameter configuration.
Specifically, the present invention is by prestoring in systems the test parameter of each test equipment, in this way when test item needs When testing, the corresponding test parameter of each test equipment is sent to each test equipment, so that each test equipment carries out parameter Configuration.The time of tester can be reduced in this way, improve working efficiency.Secondly, can also reduce since equipment is accidentally set It sets and leads to the underproof situation of test item.Thus the method for electric performance test equipment integrated test provided by the present invention, The objectivity that manual operation can be reduced improves the quality stability of product.
S300, after all test equipment configuration successfuls, open the test assignment of the test item.
Specifically, as shown in Fig. 2, described after all test equipment configuration successfuls, the test for opening the test item is appointed Business specifically includes:
S301, after all test equipment configuration successfuls, display interface display parameters configuration successful, and open the test item Test assignment.
Specifically, since a test item needs to generate test signal using the combination of at least one test equipment, It can start to test.Correspondingly, correctly test signal could be generated only after all test signal generating apparatus configuration successfuls To the TV that needs are to be tested.After all test equipment configuration successfuls of only current test item, test could be opened and appointed Business.
In addition, the test signal generating apparatus that each test assignment uses has juxtaposition, therefore a test signal Generating equipment can be required in multiple test assignments.When executing next test assignment, need to corresponding to new task The parameter of test equipment reconfigures.
S302, when there are test equipment configuration error, by display interface show test parameter configuration failure it is corresponding Test equipment;
S303, the prompt tone for generating test parameter configuration failure, and prompt tester's test parameter to match by the prompt tone It sets unsuccessfully.
Specifically, when there are test equipment configuration error (for example, the cable that communication uses is not connected), by showing boundary Face shows the corresponding test equipment of test parameter configuration failure, and generates the prompt tone of test parameter configuration failure, and pass through institute State prompt tone prompt tester's test parameter configuration failure, wherein the prompt tone can realize by loudspeaker, here not It is specifically limited.
Further, when there are test equipment configuration error, further includes: tester is reminded to check that the test parameter is matched Set unsuccessfully whether corresponding test equipment is powered;
When confirming that the test equipment is powered, whether the communication interface for detecting the test equipment has correctly connected.
Specifically, as shown in Figure 2, when occurring overtime or unresponsive when test equipment is in parameter configuration, inspection can be passed through The equipment whether normal power-up, and be powered when, whether the communication interface for detecting the test equipment correctly connects, thus side Just user's remover apparatus failure, to guarantee being normally carried out for test assignment.
Based on the method for above-mentioned electric performance test equipment integrated test, the present invention also provides be based on above-mentioned electric performance test The system of equipment integrated test, as shown in Figure 3 comprising at least one main IC(processor) S1;Display interface S3;Storage Device (memory);Key-press input S4;And loudspeaker S5, can also include communication interface (Communications Interface) S2 and bus.Wherein, main IC, display interface S3, memory, key-press input S4, loudspeaker S5 and communication interface S2 can be by total Line completes mutual communication.Display interface S3 is set as preset user in display initial setting mode and guides interface, can be with It shows electrical property project to be tested selected by user and test item, is also used for when all test equipment configuration successfuls after, display Interface display parameter configuration successful.Loudspeaker are used to prompt tester's parameter to match by loudspeaker when mistake occurs for configuration parameter It sets unsuccessfully.Communication interface S2 can transmit information.Key-press input S4, user can choose electrical property project to be tested and test .Main IC can call the logical order in memory, to execute the method in above-described embodiment.
In addition, the logical order in above-mentioned memory can be realized and as independence by way of SFU software functional unit Product when selling or using, can store in a computer readable storage medium.
Memory may be configured as storage software program, journey can be performed in computer as a kind of computer readable storage medium Sequence, such as the corresponding program instruction of method or module in the embodiment of the present disclosure.Main IC is stored in memory soft by running Part program, instruction or module, thereby executing functional application and data processing, i.e. method in realization above-described embodiment.
Memory may include storing program area and storage data area, wherein storing program area can storage program area, at least Application program needed for one function;Storage data area, which can be stored, uses created data etc. according to terminal device.In addition, Memory may include high-speed random access memory, can also include nonvolatile memory.For example, USB flash disk, mobile hard disk, Read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic A variety of media that can store program code such as dish or CD, are also possible to transitory memory medium.
Based on the method for above-mentioned electric performance test equipment integrated test, the present invention also provides a kind of computer-readable storages Medium, the computer-readable recording medium storage have one or more program, and one or more of programs can be by one A or multiple main IC are executed, to realize the step in the method for electric performance test equipment integrated test described in above-described embodiment Suddenly.
In addition, the main IC of a plurality of instruction in above-mentioned terminal device and storage medium is loaded and the detailed process that executes is upper It states in method and has been described in detail, just no longer state one by one herein.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (9)

1. a kind of method of electric performance test equipment integrated test, characterized in that it comprises:
When receiving the test item of electrical property project to be tested, according to preset test item and test equipment and test parameter Corresponding relationship searches the corresponding several test equipments of test item and several test parameters;
The corresponding test parameter of each test equipment is sent to each test equipment, so that each test equipment carries out parameter configuration;
After all test equipment configuration successfuls, the test assignment of the test item is opened.
2. the method for electric performance test equipment integrated test according to claim 1, which is characterized in that further include:
The corresponding relationship of test item Yu test equipment and test parameter is stored in advance.
3. the method for electric performance test equipment integrated test according to claim 2, which is characterized in that the test item and survey Try the corresponding relationship of equipment and test parameter specifically:
The test item corresponds to several test equipments and several test parameters, wherein the test equipment and test parameter are one by one It is corresponding.
4. the method for electric performance test equipment integrated test according to claim 1, which is characterized in that described to work as all tests After device configuration success, the test assignment for opening the test item is specifically included:
After all test equipment configuration successfuls, display interface display parameters configuration successful, and open the test of the test item Task.
5. the method for electric performance test equipment integrated test according to claim 1, which is characterized in that further include:
When there are test equipment configuration error, the corresponding test equipment of test parameter configuration failure is shown by display interface;
The prompt tone of test parameter configuration failure is generated, and prompts the configuration of tester's test parameter to lose by the prompt tone It loses.
6. the method for electric performance test equipment integrated test according to claim 5, which is characterized in that further include:
Tester is reminded to check whether the corresponding test equipment of the test parameter configuration failure is powered;
When confirming that the test equipment is powered, whether the communication interface for detecting the test equipment has correctly connected.
7. the method for electric performance test equipment integrated test according to claim 1, which is characterized in that the test electrical property Project includes several test items, and the corresponding test assignment of each test item, each test assignment successively carries out.
8. a kind of system of electric performance test equipment integrated test characterized by comprising main IC and memory;The storage The computer-readable program that can be executed by the main IC is stored on device;The main IC executes real when the computer-readable program The now step as described in claim 1~7 any one in the method for electric performance test equipment integrated test.
9. a kind of computer storage media, which is characterized in that the computer-readable recording medium storage has one or more journey Sequence, one or more of programs can be executed by one or more main IC, to realize such as claim 1~7 any one Step in the method for the electric performance test equipment integrated test.
CN201910594635.1A 2019-07-03 2019-07-03 A kind of method and system of electric performance test equipment integrated test Pending CN110446026A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910594635.1A CN110446026A (en) 2019-07-03 2019-07-03 A kind of method and system of electric performance test equipment integrated test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910594635.1A CN110446026A (en) 2019-07-03 2019-07-03 A kind of method and system of electric performance test equipment integrated test

Publications (1)

Publication Number Publication Date
CN110446026A true CN110446026A (en) 2019-11-12

Family

ID=68429364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910594635.1A Pending CN110446026A (en) 2019-07-03 2019-07-03 A kind of method and system of electric performance test equipment integrated test

Country Status (1)

Country Link
CN (1) CN110446026A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112629576A (en) * 2020-11-30 2021-04-09 潍坊歌尔微电子有限公司 Temperature and pressure sensor testing method, equipment, device and storage medium
CN112770108A (en) * 2020-12-22 2021-05-07 深圳创维-Rgb电子有限公司 Performance test method, device and system and computer readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102685543A (en) * 2011-03-09 2012-09-19 神讯电脑(昆山)有限公司 Video signal testing system and video signal testing method
CN104133096A (en) * 2014-07-30 2014-11-05 北京铁路信号有限公司 Method and device for testing coil device
CN206341230U (en) * 2016-12-27 2017-07-18 深圳信息通信研究院 A kind of New-type radio-frequency performance testing device
CN206696311U (en) * 2017-04-11 2017-12-01 工业和信息化部电信研究院 The test system and test fixture of a kind of quick charger
CN208607296U (en) * 2018-08-01 2019-03-15 国网青海省电力公司海东供电公司 Lead aggregate device and test macro

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102685543A (en) * 2011-03-09 2012-09-19 神讯电脑(昆山)有限公司 Video signal testing system and video signal testing method
CN104133096A (en) * 2014-07-30 2014-11-05 北京铁路信号有限公司 Method and device for testing coil device
CN206341230U (en) * 2016-12-27 2017-07-18 深圳信息通信研究院 A kind of New-type radio-frequency performance testing device
CN206696311U (en) * 2017-04-11 2017-12-01 工业和信息化部电信研究院 The test system and test fixture of a kind of quick charger
CN208607296U (en) * 2018-08-01 2019-03-15 国网青海省电力公司海东供电公司 Lead aggregate device and test macro

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112629576A (en) * 2020-11-30 2021-04-09 潍坊歌尔微电子有限公司 Temperature and pressure sensor testing method, equipment, device and storage medium
CN112629576B (en) * 2020-11-30 2023-04-25 潍坊歌尔微电子有限公司 Temperature and pressure sensor testing method, equipment, device and storage medium
CN112770108A (en) * 2020-12-22 2021-05-07 深圳创维-Rgb电子有限公司 Performance test method, device and system and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN111078482B (en) Communication navigation equipment test system, method, equipment and readable storage medium
CN111522734B (en) Software function testing method and device, electronic equipment and storage medium
MX2011004185A (en) Battery testing method.
CN105094783A (en) Method and device for testing Android application stability
MX2011004184A (en) Battery testing system.
CN104881343B (en) A kind of method of testing and test system
CN108959678B (en) Method and apparatus for testing the design of satellite wiring harnesses and signal processing units
CN111881022A (en) Method, device and equipment for generating test case based on test scene
CN114064208A (en) Method and device for detecting application service state, electronic equipment and storage medium
CN110446026A (en) A kind of method and system of electric performance test equipment integrated test
CN109977012B (en) Joint debugging test method, device, equipment and computer readable storage medium of system
CN106598834A (en) UI (User Interface) testing method and device
CN110569194A (en) interface testing method and device, electronic equipment and storage medium
CN113568833A (en) Test case determination method and device, computer equipment and readable storage medium
US11663113B2 (en) Real time fault localization using combinatorial test design techniques and test case priority selection
CN114579379A (en) Test method and device, electronic equipment and storage medium
CN113138937A (en) Test method and device
CN114238081A (en) Method and system suitable for small satellite batch test
CN110659204A (en) Code detection method, device and medium
CN114385493A (en) Performance test method and device, electronic equipment and storage medium
CN110297754A (en) A kind of test information feedback method and system
CN112380118A (en) Unit testing method, unit testing device, medium and electronic equipment
CN112566005A (en) Audio chip testing method and device, electronic equipment and storage medium
CN110502429A (en) Management method, device, equipment and the storage medium of test macro
CN112199270A (en) Program testing method, device, equipment and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112