CN110440450A - Hot water supply system, the control method of hot water supply system and bathroom cabinet - Google Patents

Hot water supply system, the control method of hot water supply system and bathroom cabinet Download PDF

Info

Publication number
CN110440450A
CN110440450A CN201910656444.3A CN201910656444A CN110440450A CN 110440450 A CN110440450 A CN 110440450A CN 201910656444 A CN201910656444 A CN 201910656444A CN 110440450 A CN110440450 A CN 110440450A
Authority
CN
China
Prior art keywords
water
temperature
hot
supply system
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910656444.3A
Other languages
Chinese (zh)
Inventor
袁伟龙
宋瑞伦
舒春明
魏中科
全永兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Shunde Midea Washing Appliances Manufacturing Co Ltd
Original Assignee
Foshan Shunde Midea Washing Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Shunde Midea Washing Appliances Manufacturing Co Ltd filed Critical Foshan Shunde Midea Washing Appliances Manufacturing Co Ltd
Priority to CN201910656444.3A priority Critical patent/CN110440450A/en
Publication of CN110440450A publication Critical patent/CN110440450A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2021Storage heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The present invention provides a kind of hot water supply systems, the control method and bathroom cabinet of hot water supply system, hot water supply system includes the liner component for heating water, for detecting the first temperature sensor of the temperature of liner component, water and normal-temperature water for flowing out liner component are mixed into the thermostatic assembly of thermostatted water, for heating the i.e. hot cup of the water via thermostatic assembly outflow, for detecting the second temperature sensor of the water temperature of i.e. hot cup outflow and for controlling liner component, the controller of i.e. hot cup and thermostatic assembly, thermostatic assembly, i.e. hot cup and second temperature sensor are set gradually along water (flow) direction.The control method and bathroom cabinet of hot water supply system provided by the invention, hot water supply system, it is hot cup by setting, increase the whole heating power of the water heater, guarantee the water yield of water heater, in this way, water heater can use smaller liner, reduce the volume of water heater, be also convenient for the integrated and installation of water heater.

Description

Hot water supply system, the control method of hot water supply system and bathroom cabinet
Technical field
The invention belongs to technical field of water heaters, are to be related to a kind of hot water supply system, hot water supply system more specifically The control method and bathroom cabinet of system.
Background technique
Electric heater is generally mounted in bathroom, and the bathroom space of general family is smaller, can make to bathe after installing electric heater Room is more crowded.Especially storage-type electric water heater meets user in temperature lower season to guarantee enough water yields It is used with area, the liner of electric heater is larger, causes overall volume larger.Especially electric heater is integrated in bathroom cabinet When, the finite volume of bathroom cabinet can not be integrated and be installed if the volume of electric heater is excessive.
Summary of the invention
The purpose of the present invention is to provide a kind of hot water supply systems, to solve electric hot water body existing in the prior art The excessive technical problem of product.
To achieve the above object, the technical solution adopted by the present invention is that: a kind of hot water supply system is provided, including for plus The liner component of hot water, the first temperature sensor of temperature for detecting the liner component, for by the liner component The water and normal-temperature water of outflow are mixed into the thermostatic assembly of thermostatted water, the i.e. heat for heating the water via thermostatic assembly outflow Cup, the second temperature sensor for detecting the water temperature that the i.e. hot cup flows out and for controlling the liner component, described The controller of i.e. hot cup and the thermostatic assembly, the thermostatic assembly, i.e. hot cup and the second temperature sensor are along water Stream direction is set gradually.
Further, the hot water supply system further includes for detecting whether the water flow detector for having water flow to pass through, institute It states water flow detector and the controller communicates to connect.
Further, the hot water supply system further includes triple valve, and the first end of the triple valve connects the constant temperature The water outlet of valve, the water intake end of the second end connection of the triple valve i.e. hot cup, the third end of the triple valve passes through pipe The water outlet of the road connection i.e. hot cup.
Further, the hot water supply system further includes the third temperature for detecting the water temperature at triple valve third end Sensor is spent, the third temperature sensor is set on the pipeline.
Further, the liner component include liner, water lines and heat exchanger and be filled in inside the liner and For the heat-storing material of heat exchange to occur with the heat exchanger and the water lines, first temperature sensor is for detecting institute The temperature of heat-storing material is stated, the water lines and the heat exchanger are set to inside the liner, the water outlet of the water lines It is connected to the water intake end of the thermostatic valve.
Further, the hot water supply system further includes the input panel for setting output water temperature, the input face Plate is electrically connected with the controller.
Further, the hot water supply system further includes the input panel for setting output water temperature, the input face Plate is electrically connected with the controller.
Further, the thermostatic assembly is thermostatic valve, and the thermostatic valve is equipped with first input end, the second input terminal and defeated Outlet, the water outlet of the first input end connection normal-temperature water, second input terminal connect the water outlet of the liner component, The output end connection i.e. hot cup.
The present invention also provides a kind of control methods of hot water supply system, are implemented based on above-mentioned hot water supply system, should Control method the following steps are included:
Under the unused water state of user, the internal temperature T of liner component is obtained by the first temperature sensor0If T0≥ TS0, then control liner component and stop heating, if T0<TS0, then it controls liner component and continues to heat, the TS0For liner component Set temperature;
Under user's water state, control liner component stops heating and i.e. hot cup is made to begin heat to going out for user setting Coolant-temperature gage.
Further, under user's water state, liner component stopping heating being controlled by controller and opens i.e. hot cup The step of being heated to the leaving water temperature of user setting beginning includes:
Obtain the set temperature T of liner componentS0And the leaving water temperature T of user settingS2
According to TS0And TS2The leaving water temperature of thermostatic valve and the heating power of i.e. hot cup are set, and makes i.e. hot cup in setting It works under heating power.
The present invention also provides a kind of bathroom cabinets, including cabinet body and above-mentioned hot water supply system, the hot water supply system In the cabinet body.
Hot water supply system, the control method of hot water supply system and the beneficial effect of bathroom cabinet provided by the invention exist In: compared with prior art, hot water supply system of the present invention includes liner component, the first temperature sensor, thermostatic assembly, i.e. heat The water that liner component flows out and thermostatted water are mixed into thermostatted water by cup, second temperature sensor and controller, thermostatic assembly, permanent The water of warm component output can meet the hot water of user demand by i.e. hot cup heating, output.Controller can obtain the first temperature biography The temperature value of sensor and second temperature sensor, and the working condition of liner component and i.e. hot cup is controlled, guarantee leaving water temperature.It is logical The i.e. hot cup of setting is crossed, the whole heating power of the water heater is increased.Water heater is in its one timing of output water temperature, by being hot cup Make up liner reduce when heating power reduce defect, guarantee the water yield of water heater, in this way, water heater can use it is smaller Liner reduces the volume of water heater, is also convenient for the integrated and installation of water heater.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the configuration schematic diagram one of hot water supply system provided in an embodiment of the present invention;
Fig. 2 is the configuration schematic diagram two of hot water supply system provided in an embodiment of the present invention.
Wherein, each appended drawing reference in figure:
The total water inlet of 011-;The total water outlet of 012-;1- liner component;11- liner;12- heat exchanger;The first temperature of 13- passes Sensor;14- shell;15- thermal insulation material;16- water lines;17- heat-storing material;2- thermostatic valve;3-, that is, hot cup;4- second temperature passes Sensor;5- triple valve;6- third temperature sensor.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
It should be noted that it can be directly another when element is referred to as " being fixed on " or " being set to " another element On one element or indirectly on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on the figure or position are closed System, is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must have Specific orientation is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.In the description of the present invention, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
Referring to Fig. 1, existing be illustrated hot water supply system provided in an embodiment of the present invention.One embodiment wherein In, hot water supply system includes liner component 1, the first temperature sensor 13, thermostatic assembly, i.e., hot cup 3, second temperature sensor 4 and controller, thermostatic assembly, i.e., hot cup 3 and second temperature sensor 4 set gradually along water (flow) direction.Hot water supply system tool There are total water inlet 011 and total water outlet 012.Total water inlet 011 is connect with the water tank of tap water or storage water, makes tap water etc. Normal-temperature water enters water heater by total water inlet 011, and total water outlet 012 exports hot water after heating and for users to use, Total water outlet 012 can be connect with discharging devices such as shower, taps.Liner component 1 and i.e. hot cup 3 are used to heating water.When with When the water of family, the normal-temperature water that the water and total water inlet 011 heated by liner component 1 inputs is mixed via thermostatic assembly, is exported Temperature is T1Thermostatted water, at this point, T1Numerical value be greater than normal-temperature water water temperature, temperature T1Water through being hot cup 3 continue to heat Afterwards, output temperature T2Water, temperature T2Water by total water outlet 012 flow out, for users to use.
Wherein, the first temperature sensor 13, liner component 1, thermostatic assembly, i.e., hot cup 3, second temperature sensor 4 with Controller connection.When water heater is not used in user, controller obtains the inside of liner component 1 by the first temperature sensor 13 Temperature T0If: T0Less than the set temperature T of liner component 1S0, then controller makes liner component 1 enter heated condition;If T0≥ TS0, then controller makes liner component 1 stop heating.When user uses water heater, controller controls liner component 1 and stops work Make, avoid liner component 1 and i.e. hot cup 3 from working at the same time and cause heating power it is excessively high, occur safety accident, while controller lead to It crosses second temperature sensor 4 and obtains the water temperature T after i.e. hot cup 3 heats2If: T2Less than the leaving water temperature T of settingS2, then control Device increase processed is the heating power of hot cup 3;If T2≥TS2, then controller reduces the heating power of i.e. hot cup 3.Leaving water temperature TS2Root It is set according to the demand of user.For example, the i.e. hot cup 3 of 7000W can realize 20 DEG C of temperature rise, i.e., by being the water after hot cup 3 heats Temperature can increase 20 DEG C, if the water temperature T after thermostatic assembly is converted1It is 20 DEG C, the temperature of the water after being hot cup 3 can Rise to 40 DEG C.In this way, the outlet water temperature of water heater T of settingS2At=40 DEG C, the temperature of normal-temperature water is greater than or equal to 20 DEG C, the heat Hydrophone can unlimited hot-water supply;The water when temperature of normal-temperature water is less than 20 DEG C, after being heated by thermostatic assembly mixing liner component 1 After normal-temperature water, is heated using i.e. hot cup 3, be also capable of providing the water yield more much bigger than 11 volume of liner.Certainly, if liner Component 1 and i.e. hot cup 3 work at the same time be not in safety accident, water heater power supply circuit when being able to bear biggish electric current, Controller can also make liner component 1 work on.
Thermostatic assembly is the thermostatic valve 2 for mixing normal-temperature water and hot water in one of the embodiments, and thermostatic valve 2 is set There are first input end, the second input terminal and an output end, first input end connects the water outlet of normal-temperature water, in the connection of the second input terminal The water outlet of gallbladder component 1, output end connection are hot cup 3.It specifically, can after water and normal-temperature water after liner component 1 heats mix Can occur water temperature is uneven, neglect it is cold neglect cold phenomenon, and mixing temperature is also difficult to control.The setting of thermostatic valve 2 can make to mix Even water temperature after conjunction, and the leaving water temperature of thermostatic valve 2 can be set, make to determine by the temperature rise of the water of i.e. hot cup 3, thus The power that i.e. hot cup 3 can be controlled according to required temperature rise, reaches required output water temperature.
More specifically, thermostatic valve 2 is electrically connected with the controller, controller can be according to the outlet water temperature of water heater T of settingS2Setting Or change the leaving water temperature of thermostatic valve 2.Specifically, according to TS2Lower 2 leaving water temperature of thermostatic valve is set, i.e. hot cup 3 is protected It holds higher heating power work and increases the heat as much as possible in such manner, it is possible to extend the use time of the water in liner component 1 The water yield of hydrophone.For example, the leaving water temperature T of the water heater of settingS2=40 DEG C, the water outlet temperature setting of thermostatic valve 2 is 20 DEG C, The output power of i.e. hot cup 3 be 7000W when, can water heater leaving water temperature T2Reach 40 DEG C;And the water temperature in liner component 1 It is 75 DEG C, 20 DEG C of water can be mixed to form with larger amount of normal-temperature water.Further, 2 temperature of thermostatic valve and i.e. hot cup 3 is defeated Out after power setting, controller obtains the leaving water temperature T of water heater by second temperature sensor 42If T2Less than going out for setting Coolant-temperature gage TS2, then controller increase is the heating power of hot cup 3;If T2≥TS2, then controller reduces the heating function of i.e. hot cup 3 Rate.
Optionally, thermostatic valve 2 is electronic thermostatic valve, is equipped with highly sensitive memorial alloy spiral shell in the water outlet of electronic thermostatic valve Rotating temperature sensitive probe, probe temperature-sensitive and the temperature for making water outlet by the flow of inlet water that the elongation of itself or contraction directly control hot and cold water Degree consistently achieves the temperature of setting.If water heater is in use, when liner component 1 is cut off the water supply or normal-temperature water is cut off the water supply, energy Enough moments are automatically stopped, and prevent scald user or user is made to catch a cold, the cooling water inlet and hot water inlet of electronic thermostatic valve are all provided with It is equipped with check valve, the situation that hot and cold water is mutually gone here and there and cold water flows backward in liner component 1 is effectively prevent to occur.
Hot water supply system further includes the input panel for setting output water temperature, user in one of the embodiments, The leaving water temperature T of water heater can be inputted by input panel according to demandS2.Input panel is electrically connected with the controller, and controller can Obtain the leaving water temperature T of settingS2, and according to TS2Numerical value setting thermostatic valve 2 leaving water temperature and i.e. hot cup 3 heating power.
Referring to Fig. 1, hot water supply system further includes for detecting whether there is the water of water flow in one of the embodiments, Current sensor, water flow detector and controller communicate to connect.Controller judges to use by the testing result of acquisition water flow detector Whether family is using water heater.Specifically, when water flow detector exports water-flow signal, water heater is used in user, works as water When the non-output signal of current sensor, water flow detector is not used in user.For user when water heater is not used, controller passes through first The internal temperature T of the acquisition liner component 1 of temperature sensor 130If: T0Less than the set temperature T of liner component 1S0, then controller Liner component 1 is set to enter heated condition;If T0≥TS0, then controller makes liner component 1 stop heating;Water heater is used in user When, controller control liner component 1 stops working, i.e., hot cup 3 is started to work, and liner component 1 and i.e. hot cup 3 is avoided to work at the same time And cause heating power it is excessively high, occur safety accident.
Wherein, water flow detector can be set to any position of water flow of water heater pipeline, i.e., when user uses water heater, have The place that water flow is passed through.
Optionally, water flow detector is Hall water flow detector.Hall water flow sensing unit, will after getting water-flow signal Water-flow signal is changed into current signal and is transmitted to controller.It is provided with Hall switch and impeller in Hall water flow sensing unit, is had When water flow passes through, one group of signal is transmitted to Hall switch in water jet propulsion wheel rotation, impeller per revolution side, and Hall switch is then Exporting corresponding pulse signal, then Hall switch exports a pulse signal to controller to impeller per revolution, and water flow is faster, The velocity of rotation of impeller is also faster, and the output frequency of pulse signal is also higher.
Referring to Fig. 2, hot water supply system further includes triple valve 5 in one of the embodiments, the first of triple valve 5 The water outlet of end connection thermostatic valve 2, the second end connection of triple valve 5 are the water intake end of hot cup 3, and the third end of triple valve 5 passes through Piping connection, that is, hot cup 3 water outlet.When the temperature of normal-temperature water is higher, user can control triple valve 5 by external switch, make The water outlet of the water outlet of thermostatic valve 2 and i.e. hot cup 3, i.e. total water outlet 012 are connected to, in this way, water flow is by being not hot cup 3, directly It connects and is flowed out again from total water outlet 012 after thermostatic valve 2.At this point, the leaving water temperature of thermostatic valve 2 is the setting water outlet of water heater Temperature TS2.In this embodiment, user can voluntarily select whether water flow heats by i.e. hot cup 3, when room temperature coolant-temperature gage is higher, It can be heated without using i.e. hot cup 3, save water heater electricity consumption.In another embodiment, hot water supply system does not include triple valve 5, it is directly the switch of hot cup 3 by external switch control, when external switch makes i.e. hot cup 3 stop heating, even if T2<TS2 When, i.e., hot cup 3 also remains off, with using electricity wisely.
Further, hot water supply system further includes that the third temperature for detecting the water temperature at 5 third end of triple valve passes Sensor 6, third temperature sensor 6 are set on the pipeline between detection 5 third end of triple valve and the water outlet of i.e. hot cup 3.When When the water outlet of thermostatic valve 2 is connected to the water outlet of i.e. hot cup 3, controller obtains the numerical value that third temperature sensor 6 detects: If third temperature sensor 6, which detects obtained water temperature, is less than TS2, then increase the water yield of liner component 1;If third temperature sensing Device 6 detects obtained water temperature and is greater than or equal to TS2, then keep the water yield of liner component 1 or reduce the water outlet of liner component 1 Amount.
Referring to Fig. 1, in one of the embodiments, liner component 1 include liner 11, water lines 16, heat exchanger 12 with And heat-storing material 17.Water lines 16 and heat exchanger 12 are set to the inside of liner 11, and heat-storing material 17 is filled in the interior of liner 11 Portion, water lines 16 and heat exchanger 12 are contacted with heat-storing material 17.When 12 heat release of heat exchanger, heat storage is in heat-storing material In 17, heat-storing material 17 transfers heat to water lines 16 again, thus the water in heating pipe road 16, the water outlet of water lines 16 It is connected to the water intake end of thermostatic valve 2, the water after making heating flows into thermostatic valve 2.Heat-storing material 17 is chosen as phase-change material, phase transformation material Expect the characteristic for having heat storage capacity strong, biggish heat can be stored in the phase-change material of limited bulk.First temperature sensing Device 13 is set in heat-storing material, for detecting the temperature of heat-storing material.
Optionally, the periphery of liner 11 is equipped with shell 14, and thermal insulation material 15 is provided between shell 14 and liner 11, reduces The heat losses of liner component 1.Thermal insulation material 15 is chosen as foamed material, and foamed material has preferable thermal insulation property.
Optionally, heat exchanger 12 is condensing heat exchanger 12, forms heat pump with compressor, evaporator combinations, passes through compressor Refrigerant, refrigerant liquefaction heat release are conveyed to condensing heat exchanger 12, heat-storing material absorbs the heat released, the refrigerant after liquefaction Compressor is come back to after returning to evaporator gasification.
Referring to Fig. 1, be in one of the embodiments, that hot cup 3 includes cup body and is set to the intracorporal electric heating tube of cup, it is electric Heating tube is electrically connected with the controller, and controller can control the switch and its heating power of electric heating tube.The power of electric heating tube compared with Height, can when water flow is by being hot cup 3 quick flow heated water.The temperature for the water that thermostatic valve 2 flows out is higher than normal-temperature water, makes the reality The i.e. hot cup 3 applied in example can guarantee water yield and leaving water temperature without biggish power.
The present invention also provides a kind of water heater control methods, applied to the hot water supply system in any of the above-described embodiment In, which includes the water flow detector for detecting water flow, water heater control method the following steps are included:
Under user's water state, the internal temperature T of liner component 1 is obtained by the first temperature sensor0If T0≥ TS0, then control liner component 1 and stop heating, if T0<TS0, then control liner component 1 and continue to heat, wherein TS0For liner component 1 Set temperature;
If user is being stopped heating and is made i.e. hot cup 3 begin heat to user to set under water state, controlling liner component 1 The leaving water temperature set.
Wherein, controller can judge whether user uses water by the testing result of water flow detector, and according to user whether Liner component 1 and i.e. heat should be controlled by 3 with water phase.In order to guarantee safety, avoid the heating power of water heater excessively high, i.e., hot cup 3 It cannot be worked at the same time with liner component 1, then controller closes liner component 1 while opening is hot cup 3.TS0Go out in water heater Controller adjust automatically is set or can passed through when factory.
Further, under user's water state, liner component stopping heating being controlled by controller and makes i.e. hot cup The step of beginning heat to the leaving water temperature of user setting: the set temperature T of liner component 1 is obtainedS0And the water outlet of user setting Temperature TS2, according to TS0And TS2The leaving water temperature of thermostatic valve 2 and the heating power of i.e. hot cup 3 are set, and is setting i.e. hot cup 3 Heating power under work.For example, TS0=75 DEG C, TS2=40 DEG C, controller can set 20 for the leaving water temperature of thermostatic valve 2 DEG C, i.e., the heating power of hot cup 3 is 7000W, and the output water that water temperature is 40 DEG C can be obtained.
Wherein, leaving water temperature T set by userS2It can adjust according to the demand of user, user can be set by input panel The leaving water temperature T of water heaterS2
Moreover, the second temperature can be obtained after the leaving water temperature of controller setting thermostatic valve 2 and the heating temperature of i.e. hot cup 3 Spend the water temperature T that sensor 4 detects2If T2Less than the leaving water temperature T of settingS2, then controller increase is the heating power of hot cup 3; T2≥TS2, then controller reduces the heating power of i.e. hot cup 3.
The present invention also provides a kind of bathroom cabinet, bathroom cabinet includes the hot water supply system in cabinet body and any of the above-described embodiment System.Hot water supply system is set to the inside of cabinet body, and the water and normal-temperature water flow out due to hot water supply system in liner component 1 is mixed It is heated again by i.e. hot cup 3 afterwards, then in the case where guaranteeing water yield and leaving water temperature, can suitably reduce the volume of liner 11, Lesser 11 moisture storage capacity of liner also can satisfy the demand of user.The overall volume of hot water supply system is smaller, is more convenient it It integrates and is installed in bathroom cabinet, in order to avoid occupy other spaces in bathroom.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (11)

1. hot water supply system, it is characterised in that: including for heating water liner component, for detecting the liner component First temperature sensor of temperature, water and normal-temperature water for flowing out the liner component are mixed into the constant temperature group of thermostatted water Part, the i.e. hot cup for heating the water via thermostatic assembly outflow, for detecting water temperature that the i.e. hot cup flows out Two temperature sensors and controller for controlling the liner component, i.e., the hot cup and the thermostatic assembly, the perseverance Warm component, i.e. hot cup and the second temperature sensor are set gradually along water (flow) direction.
2. hot water supply system as described in claim 1, it is characterised in that: the hot water supply system further includes for detecting The water flow detector for whether having water flow to pass through, the water flow detector and the controller communicate to connect.
3. hot water supply system as described in claim 1, it is characterised in that: the hot water supply system further includes triple valve, The first end of the triple valve connects the water outlet of the thermostatic valve, and the second end connection i.e. hot cup of the triple valve enters Water end (W.E.), the third end of the triple valve pass through the i.e. water outlet of hot cup described in piping connection.
4. hot water supply system as claimed in claim 3, it is characterised in that: the hot water supply system further includes for detecting The third temperature sensor of the water temperature at triple valve third end, the third temperature sensor are set on the pipeline.
5. hot water supply system as described in claim 1, it is characterised in that: the liner component include liner, water lines and Heat exchanger and the accumulation of heat material for being filled in inside the liner and be used to occur with the heat exchanger and the water lines heat exchange Material, first temperature sensor are used to detect the temperature of the heat-storing material, and the water lines and the heat exchanger are set to Inside the liner, the water outlet of the water lines is connected to the water intake end of the thermostatic valve.
6. hot water supply system as described in claim 1, it is characterised in that: i.e. the hot cup includes cup body and is set to described The intracorporal electric heating tube of cup, the electric heating tube are electrically connected with the controller.
7. hot water supply system as described in claim 1, it is characterised in that: the hot water supply system further includes for setting The input panel of output water temperature, the input panel are electrically connected with the controller.
8. such as the described in any item hot water supply systems of claim 1-7, which is characterized in that the thermostatic assembly is thermostatic valve, The thermostatic valve is equipped with first input end, the second input terminal and output end, and the first input end connects the water outlet of normal-temperature water, Second input terminal connects the water outlet of the liner component, the output end connection i.e. hot cup.
9. the control method of hot water supply system is implemented based on the described in any item hot water supply systems of claim 1-8, special Sign is, comprising the following steps:
Under the unused water state of user, the internal temperature T of liner component is obtained by the first temperature sensor0If T0≥TS0, then It controls liner component and stops heating, if T0<TS0, then it controls liner component and continues to heat, the TS0For the setting temperature of liner component Degree;
Under user's water state, control liner component stops the water temperature out for heating and i.e. hot cup being made to begin heat to user setting Degree.
10. the control method of hot water supply system as claimed in claim 9, which is characterized in that under user's water state, lead to Controller control liner component is crossed to stop heating and include: the step of so that i.e. hot cup is begun heat to the leaving water temperature of user setting
Obtain the set temperature T of liner componentS0And the leaving water temperature T of user settingS2
According to TS0And TS2The leaving water temperature of thermostatic valve and the heating power of i.e. hot cup are set, and makes i.e. hot cup in the heating function of setting It works under rate.
11. bathroom cabinet, it is characterised in that: including cabinet body and the described in any item hot water supply systems of claim 1-8, the heat Water supply system is set in the cabinet body.
CN201910656444.3A 2019-07-19 2019-07-19 Hot water supply system, the control method of hot water supply system and bathroom cabinet Pending CN110440450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910656444.3A CN110440450A (en) 2019-07-19 2019-07-19 Hot water supply system, the control method of hot water supply system and bathroom cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910656444.3A CN110440450A (en) 2019-07-19 2019-07-19 Hot water supply system, the control method of hot water supply system and bathroom cabinet

Publications (1)

Publication Number Publication Date
CN110440450A true CN110440450A (en) 2019-11-12

Family

ID=68431077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910656444.3A Pending CN110440450A (en) 2019-07-19 2019-07-19 Hot water supply system, the control method of hot water supply system and bathroom cabinet

Country Status (1)

Country Link
CN (1) CN110440450A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009210150A (en) * 2008-02-29 2009-09-17 Panasonic Electric Works Co Ltd Hot water supply system
CN203731656U (en) * 2014-02-28 2014-07-23 芜湖美的厨卫电器制造有限公司 Electric water heater
KR20140110285A (en) * 2013-03-07 2014-09-17 서울과학기술대학교 산학협력단 The water heater with hot spot type
CN104807173A (en) * 2015-05-04 2015-07-29 广东众辰科技有限公司 Constant-temperature constant-flow water heating system
CN206739599U (en) * 2017-05-16 2017-12-12 广东爱尼智能家电制造有限公司 A kind of increase-volume storage-type electric water heater
CN207035459U (en) * 2017-08-12 2018-02-23 张振权 A kind of intelligent thermostatic electric water heater

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009210150A (en) * 2008-02-29 2009-09-17 Panasonic Electric Works Co Ltd Hot water supply system
KR20140110285A (en) * 2013-03-07 2014-09-17 서울과학기술대학교 산학협력단 The water heater with hot spot type
CN203731656U (en) * 2014-02-28 2014-07-23 芜湖美的厨卫电器制造有限公司 Electric water heater
CN104807173A (en) * 2015-05-04 2015-07-29 广东众辰科技有限公司 Constant-temperature constant-flow water heating system
CN206739599U (en) * 2017-05-16 2017-12-12 广东爱尼智能家电制造有限公司 A kind of increase-volume storage-type electric water heater
CN207035459U (en) * 2017-08-12 2018-02-23 张振权 A kind of intelligent thermostatic electric water heater

Similar Documents

Publication Publication Date Title
CN103884105B (en) A kind of constant-temperature bathing system
JP5305714B2 (en) Hot water heating system
EP2153136A1 (en) Hot water supplying system
JP5109300B2 (en) Hot water storage hot water heater
JP2007198708A (en) Hybrid hot water supply system
KR20150092160A (en) Heat pump heat supply system
EP3594589B1 (en) Heat pump device
JP3778106B2 (en) Heat pump water heater
CN110440450A (en) Hot water supply system, the control method of hot water supply system and bathroom cabinet
CN104748356B (en) Gallbladder-heat energy reaction cabin speed heat electric heater and its control method in double courages
CN101625156A (en) Heat-pump water-heater water tank
JP5303165B2 (en) Hot water system
CN212988656U (en) Constant-pressure water supply device for calorimeter calibrating device
AU2009216245B2 (en) Hot-water storage type hot-water supply device
JP2009174773A (en) Cogeneration system
CN210540197U (en) Cabin type intelligent water heating bed
JP2002147870A (en) Solar water heater
JP3034389B2 (en) Electric water heater
JP6094363B2 (en) Water heater
JP3868924B2 (en) Hot water storage water heater
JP2005147557A (en) Hot water supply apparatus
JP2004226011A (en) Storage type water heater
US11221149B2 (en) Pump device, industrial water system, method for operating an industrial water system, and self-teaching method for a delivery pump in an industrial water system
JP2004226010A (en) Storage water heater
JP2008008563A (en) Storage type hot-water supply method and storage type hot-water supply device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112

RJ01 Rejection of invention patent application after publication