CN110440407A - Region control method and device - Google Patents

Region control method and device Download PDF

Info

Publication number
CN110440407A
CN110440407A CN201910727465.XA CN201910727465A CN110440407A CN 110440407 A CN110440407 A CN 110440407A CN 201910727465 A CN201910727465 A CN 201910727465A CN 110440407 A CN110440407 A CN 110440407A
Authority
CN
China
Prior art keywords
unit
region
control system
energized
area control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910727465.XA
Other languages
Chinese (zh)
Other versions
CN110440407B (en
Inventor
刘鹏
吴学伟
杨华生
邹宏亮
谢金桂
陈毛毛
陈良庆
陈嘉亮
罗家磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201910727465.XA priority Critical patent/CN110440407B/en
Publication of CN110440407A publication Critical patent/CN110440407A/en
Application granted granted Critical
Publication of CN110440407B publication Critical patent/CN110440407B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices

Abstract

The present invention provides a kind of region control method and devices, wherein this method comprises: determining first quantity in region to be energized;According to first quantity in region to be energized, the second quantity of the unit that determination need to open;Opening the second quantity unit in area control system is the region energy supply to be energized.It can solve existing the technical issues of waste energy consumption caused by some or the mode of several units energy supply is fixed as using a unit through the above way, reached the technical effect for reducing energy consumption, improving unit efficiency.

Description

Region control method and device
Technical field
The present invention relates to equipment control technology fields, in particular to a kind of region control method and device.
Background technique
With the continuous improvement of people's living standards, the use scope of air-conditioning is more and more wider.Currently, air-conditioning system has been got over Be used in the places such as villa, factory more.For office space, factory etc., it is normally divided into one one A zonule, area control system are namely based on this demand and generate.General area control system is the machine in one-to-one Increase wind valve controller, the mode of region controlling terminal on the basis of group to realize, wind can be controlled by region controlling terminal The independent control of valve switched to realize multiple zonules.
However, it is contemplated that if by the way of one region of a unit allocation, it will the waste of resource is caused, if By the way of the fixed several regions of unit allocation, the waste of resource is also led to.
For the energy consumption for how reducing area control system, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides a kind of region control method and devices, to reduce air-conditioning system under area control system Energy consumption.
On the one hand, a kind of region control method is provided, comprising:
Determine first quantity in region to be energized;
According to first quantity in region to be energized, the second quantity of the unit that determination need to open;
Opening the second quantity unit in area control system is the region energy supply to be energized.
In one embodiment, each unit collective effect of the area control system is in same air supply duct.
In one embodiment, the second quantity unit is that the region to be energized supplies in opening area control system After energy, comprising:
Obtain wind file gear set by user;
Determine whether wind file gear set by user exceeds the maximum gear that the second quantity unit can be provided;
In the case where the maximum gear that can be provided beyond the second quantity unit, region control system is opened The inner blower of unit is shut down in system.
In one embodiment, in the case where the maximum gear that can be provided beyond the second quantity unit, Open the inner blower that unit is shut down in the area control system, comprising:
Determine the third quantity for reaching and shutting down unit needed for the wind file gear set by user;
The inner blower that third quantity in the area control system shuts down unit is opened, with the second quantity unit Carry out linkage energy supply.
In one embodiment, the energy supply includes: refrigeration control and/or heating control.
On the other hand, a kind of zone control is provided, comprising:
First determining module, for determining first quantity in region to be energized;
Second determining module, for the first quantity according to region to be energized, the second quantity of the unit that determination need to open;
First opening module is that the region to be energized supplies for opening the second quantity unit in area control system Energy.
In one embodiment, above-mentioned apparatus further include:
Obtain module, for open area control system in the second quantity unit be described in region to be energized energize it Afterwards, wind file gear set by user is obtained;
Third determining module can be provided for determining whether wind file gear set by user exceeds the second quantity unit Maximum gear;
Second opening module, in the case where the maximum gear that can be provided beyond the second quantity unit, Open the inner blower that unit is shut down in the area control system.
On the other hand, a kind of air-conditioning system is provided, comprising: above-mentioned zone control.
Another aspect provides a kind of network equipment, comprising: memory, processor and storage are on a memory and can be The step of computer program run on processor, the processor realizes the above method when executing the computer program.
Another aspect provides a kind of non-volatile computer readable storage medium storing program for executing, is stored thereon with computer program, institute State the step of above method is realized when computer program is executed by processor.
In the above-described embodiments, then the quantity for the unit that need to be opened according to the quantity in region to be energized, determination is based on The unit that the quantity for the unit that determining need are opened is opened in area control system is energized, rather than uses a unit solid It is set to the mode of some or the energy supply of several units, can solve one unit of existing use through the above way and be fixed as The technical issues of waste energy consumption caused by the mode of some or the energy supply of several units, reduction energy consumption, raising machine are reached The technical effect of group efficiency.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the method flow diagram of region control method according to an embodiment of the present invention;
Fig. 2 is the area control system architecture diagram according to an embodiment of the present invention for air-conditioner control system;
Fig. 3 is the logical flow diagram of region control method according to an embodiment of the present invention;
Fig. 4 is the structural block diagram of zone control according to an embodiment of the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, right below with reference to embodiment and attached drawing The present invention is described in further details.Here, exemplary embodiment and its explanation of the invention is used to explain the present invention, but simultaneously It is not as a limitation of the invention.
In view of in area control system, unit needs to carry out refrigerating/heating, the system of single unit to multiple regions The region quantity that cold/heating capacity is met by is limited.If being equipped with more units but disagglutinating action, efficiency meeting It decreases.
For example, a unit is able to satisfy the refrigeration requirement in 2 rooms, if the region has 4 in area control system Room, it is necessary to two units (being denoted as A unit and B unit) is installed, if two units are not carried out modularity control, that , when needing to freeze to certain two room, and refrigeration is responsible for by A unit and B unit respectively in the two rooms, then, A Unit and B unit require to open, i.e., have but opened two units to two room refrigeration.
For this purpose, a kind of region control method is provided in this example, as shown in Figure 1, may include steps of:
Step 101: determining first quantity in region to be energized;
Step 102: according to first quantity in region to be energized, the second quantity of the unit that determination need to open;
Step 103: opening the second quantity unit in area control system is the region energy supply to be energized.
That is, according to the quantity in region to be energized then the quantity for the unit that determination need to open needs to open based on determining Unit quantity open area control system in unit energized, rather than using a unit be fixed as some or The mode of person's several units energy supply, can solve through the above way it is existing using a unit be fixed as some or it is several The technical issues of waste energy consumption caused by the mode of a unit energy supply, the technology for reducing energy consumption, improving unit efficiency is reached Effect.
By the above-mentioned means, if there is above situation, that is, when freezing if necessary to certain two room, just only It needs to open A unit or B unit, therefore, can effectively improve the service efficiency of unit.
Each unit of above-mentioned zone control system can be collective effect in same air supply duct, in this way, each unit institute The wind of generation may be sent to each region.
In view of in area control system, each room distances unit be it is unfixed, air quantity by long pipeline into Row flowing.By shutting down the inner blower of unit, linkage effect is carried out with the inner blower for having been switched on unit, adjustable wind speed can be improved Gear accelerates the air quantity flowing in pipeline, to accelerate to freeze or heat.For this purpose, in this example, opening area control system In the second quantity unit be available wind file gear set by user after the region energy supply to be energized;Determine user Whether the wind file gear of setting exceeds the maximum gear that the second quantity unit can be provided;Exceeding the second quantity machine In the case where the maximum gear that group can be provided, the inner blower that unit is shut down in the area control system is opened, so as to Adjustable wind-speed gear is improved, the air quantity flowing in pipeline is accelerated.
Specifically, opening the area in the case where the maximum gear that can be provided beyond the second quantity unit The inner blower that unit is shut down in the control system of domain may include: to determine to reach to stop needed for the wind file gear set by user The third quantity of machine unit;The inner blower that third quantity in the area control system shuts down unit is opened, with described second Quantity unit carries out linkage energy supply.
Such as: unit can be divided into inner blower and outer blower, and when carrying out interior circulation, only inner blower is being acted on.One The wind file grade of unit is up to N1, then the wind file grade under two unit collective effects is up to N2.Certainly, modularization machine It needs can to set wind file after group according to practical capacity determination and is up to N grades, such as: N=N1+N2, that is, user's maximum can be by wind file tune To N1+N2 grades.When having unit at work, selectively the inner blower of unit is shut down in starting, then can accelerate in pipeline Wind speed flowing.
Above-mentioned energy supply may include: refrigeration control and/or heating control.
The above method is illustrated below with reference to a specific embodiment, however, it is worth noting that, the specific implementation Example does not constitute an undue limitation on the present application merely to the application is better described.
In area control system as shown in Figure 2, unit needs to carry out refrigerating/heating to multiple regions, single unit The region quantity that refrigerating/heating amount is met by is limited.If being equipped with more units but disagglutinating action, efficiency It can decrease.
For example, a unit is able to satisfy the refrigeration requirement in 2 rooms, if the region has 4 in area control system Room, it is necessary to two units (being denoted as A unit and B unit) is installed, if two units are not carried out modularity control, that , when needing to freeze to certain two room, and refrigeration is responsible for by A unit and B unit respectively in the two rooms, then, A Unit and B unit require to open, i.e., have but opened two units to two room refrigeration.If realizing modularity control, that It just only needs to open A unit or B unit, therefore, the service efficiency of unit can be improved by modularity control.
Further, in area control system, each room distances unit is unfixed, the air quantity pipeline long by length It is flowed.By shutting down the inner blower of unit, linkage effect is carried out with the inner blower for having been switched on unit, wind adjustable can be improved Fast gear accelerates the air quantity flowing in pipeline, to accelerate to freeze.
I.e., it is possible to carry out modularity control, the inner blower of each unit of linkage, to improve wind-speed gear to air-conditioner set And accelerate refrigerating/heating effect.
Above-mentioned modularity control can be understood as more unit collective effects in same air supply duct, above-mentioned linkage inner blower It can be understood as opening the inner blower for shutting down unit while having unit booting work, accelerate the air quantity flowing of interior circulation, reach To the effect of fast-refrigerating, it is equivalent to and provides the user with a very fast refrigerating/heating mode.
It is described as follows with specific example, in an area control system, according to user demand, installs more in engineering Unit is the corresponding area control system of a unit originally, these units is now carried out modularization, multiple units are made jointly It is attached for an area control system, and by the ventilation shaft of each unit, that is, the inner blower of more units passes through simultaneously One pipeline blows to the area rooms of each dispersion.
If 1 unit can energize two rooms, 4 rooms just need two units.If each machine Group is only responsible for the region of oneself, then, refrigerating/heating actually is needed there are two room, but this two rooms are not respectively by It is responsible for unit, then two units will be opened.It is exactly from result: to two room refrigerating/heatings, but needs out Two units are opened, for energy saving, opening a unit is preferably mode, it is therefore possible to use modularity control, more Unit collective effect is in same air supply duct, in this way when needing to energize there are two room, it is only necessary to a unit is opened, That is, reaching the room for having demand to cold wind/hot wind is sent in pipeline by a unit.
As shown in figure 3, unit can be divided into inner blower and outer blower, when carrying out interior circulation, only inner blower is being acted on. The wind file grade of one unit is up to N1, then the wind file grade under two unit collective effects is up to N2.Certainly, module Changing, which needs can to set wind file after unit according to practical capacity determination, is up to N grades, such as: N=N1+N2, that is, user's maximum can be by wind Shelves are transferred to N1+N2 grades.When having unit at work, selectively the inner blower of unit is shut down in starting, then can accelerate pipeline Interior wind speed flowing.
If there is a unit is in running order, remaining unit is in shutdown status, then user can be set it is very fast When refrigerating/heating mode or selection wind file are more than the wind file upper limit N1 an of unit, the inner blower for shutting down unit is opened, to mention The high tap position upper limit.Such as: the wind file of a unit can set the upper limit as 3 grades, then can open one when user setting is 4 grades The inner blower for shutting down unit is blown, and the inner blower of the inner blower and a shutdown unit that just have a booting unit at this time exists Work, under the collective effect of two units, wind file can achieve 4 grades of requirements.Further, if the very fast outlet air of user setting Wind speed is transferred to maximum then the inner blower that can open all units accelerates interior circulation by mode.If only a unit exists Refrigeration, then from refrigerating/heating unit to there is energy supply demand room to might have very long pipeline distance, when being sent in air supply duct After wind velocity is accelerated, refrigerating capacity can be rapidly achieved each room area for having demand.
Based on the same inventive concept, a kind of zone control is additionally provided in the embodiment of the present invention, such as following implementation Described in example.Since the principle that zone control solves the problems, such as is similar to region control method, the reality of zone control The implementation that may refer to region control method is applied, overlaps will not be repeated.It is used below, term " unit " or " mould The combination of the software and/or hardware of predetermined function may be implemented in block ".Although device described in following embodiment is preferably with soft Part is realized, but the realization of the combination of hardware or software and hardware is also that may and be contemplated.Fig. 4 is of the invention real A kind of structural block diagram of the zone control of example is applied, as shown in figure 4, may include: that the first determining module 401, second determines Module 402 and the first opening module 403, are below illustrated the structure.
First determining module 401, for determining first quantity in region to be energized;
Second determining module 402, for the first quantity according to region to be energized, the second number of the unit that determination need to open Amount;
First opening module 403 is the region to be energized for opening the second quantity unit in area control system Energy supply.
In one embodiment, above-mentioned zone control system can also include: acquisition module, for opening region control After second quantity unit is the region energy supply to be energized in system processed, wind file gear set by user is obtained;Third is true Cover half block, for determining whether wind file gear set by user exceeds the maximum gear that the second quantity unit can be provided;The Two opening modules, for opening the area in the case where the maximum gear that can be provided beyond the second quantity unit The inner blower of unit is shut down in the control system of domain.
In one embodiment, each unit of above-mentioned zone control system can be with collective effect in same air supply duct.
In one embodiment, above-mentioned second opening module, which can specifically determine, reaches the wind file shelves set by user The third quantity of shutdown unit needed for position;The inner blower that third quantity in the area control system shuts down unit is opened, Linkage energy supply is carried out with the second quantity unit.
In one embodiment, above-mentioned energy supply may include: refrigeration control and/or heating control.
In another embodiment, a kind of software is additionally provided, the software is for executing above-described embodiment and preferred reality Apply technical solution described in mode.
In another embodiment, a kind of storage medium is additionally provided, above-mentioned software is stored in the storage medium, it should Storage medium includes but is not limited to: CD, floppy disk, hard disk, scratch pad memory etc..
It can be seen from the above description that the embodiment of the present invention realizes following technical effect: according to region to be energized Quantity, then the quantity for the unit that determination need to open opens region control system based on the quantity for the unit that determining need are opened Unit in system is energized, rather than the mode of some or the energy supply of several units is fixed as using a unit, is passed through Aforesaid way can solve one unit of existing use and be fixed as caused by some or the mode of several units energy supply The technical issues of wasting energy consumption has reached the technical effect for reducing energy consumption.
Although mentioning different specific embodiments in teachings herein, the application is not limited to be industry Situation described in standard or embodiment etc., certain professional standards or the implementation base described using customized mode or embodiment On plinth embodiment modified slightly also may be implemented above-described embodiment it is identical, it is equivalent or it is close or deformation after it is anticipated that Implementation result.It, still can be with using these modifications or the embodiment of deformed data acquisition, processing, output, judgment mode etc. Belong within the scope of the optional embodiment of the application.
Although this application provides the method operating procedure as described in embodiment or flow chart, based on conventional or noninvasive The means for the property made may include more or less operating procedure.The step of enumerating in embodiment sequence is only numerous steps One of execution sequence mode, does not represent and unique executes sequence.It, can when device or client production in practice executes To execute or parallel execute (such as at parallel processor or multithreading according to embodiment or method shown in the drawings sequence The environment of reason, even distributed data processing environment).The terms "include", "comprise" or its any other variant are intended to contain Lid non-exclusive inclusion, so that process, method, product or equipment including a series of elements are not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, product or equipment Intrinsic element.In the absence of more restrictions, be not precluded include the process, method of the element, product or There is also other identical or equivalent elements in person's equipment.
Device that above-described embodiment illustrates or module etc. can specifically realize by computer chip or entity, or by having There is the product of certain function to realize.For convenience of description, it is divided into various modules when description apparatus above with function to retouch respectively It states.Certainly, the function of each module can be realized in the same or multiple software and or hardware when implementing the application, The module for realizing same function can be realized by the combination of multiple submodule etc..Installation practice described above is only Schematically, for example, the division of the module, only a kind of logical function partition, can there is other draw in actual implementation The mode of dividing, such as multiple module or components can be combined or can be integrated into another system, or some features can be ignored, Or it does not execute.
It is also known in the art that other than realizing controller in a manner of pure computer readable program code, it is complete Entirely can by by method and step carry out programming in logic come so that controller with logic gate, switch, specific integrated circuit, programmable Logic controller realizes identical function with the form for being embedded in microcontroller etc..Therefore this controller is considered one kind Hardware component, and the structure that the device for realizing various functions that its inside includes can also be considered as in hardware component.Or Person even, can will be considered as realizing the device of various functions either the software module of implementation method can be hardware again Structure in component.
The application can describe in the general context of computer-executable instructions executed by a computer, such as program Module.Generally, program module includes routines performing specific tasks or implementing specific abstract data types, programs, objects, group Part, data structure, class etc..The application can also be practiced in a distributed computing environment, in these distributed computing environments, By executing task by the connected remote processing devices of communication network.In a distributed computing environment, program module can To be located in the local and remote computer storage media including storage equipment.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can It realizes by means of software and necessary general hardware platform.Based on this understanding, the technical solution essence of the application On in other words the part that contributes to existing technology can be embodied in the form of software products, the computer software product It can store in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that a computer equipment (can be personal computer, mobile terminal, server or the network equipment etc.) executes each embodiment of the application or implementation Method described in certain parts of example.
Each embodiment in this specification is described in a progressive manner, the same or similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.The application can be used for crowd In mostly general or special purpose computing system environments or configuration.Such as: personal computer, server computer, handheld device or Portable device, laptop device, multicomputer system, microprocessor-based system, set top box, programmable electronics set Standby, network PC, minicomputer, mainframe computer, distributed computing environment including any of the above system or equipment etc..
Although depicting the application by embodiment, it will be appreciated by the skilled addressee that the application there are many deformation and Variation is without departing from spirit herein, it is desirable to which appended embodiment includes these deformations and changes without departing from the application.

Claims (10)

1. a kind of region control method characterized by comprising
Determine first quantity in region to be energized;
According to first quantity in region to be energized, the second quantity of the unit that determination need to open;
Opening the second quantity unit in area control system is the region energy supply to be energized.
2. the method according to claim 1, wherein each unit collective effect of the area control system is in same One air supply duct.
3. the method according to claim 1, wherein the second quantity unit is in opening area control system After the region energy supply to be energized, comprising:
Obtain wind file gear set by user;
Determine whether wind file gear set by user exceeds the maximum gear that the second quantity unit can be provided;
In the case where the maximum gear that can be provided beyond the second quantity unit, open in the area control system Shut down the inner blower of unit.
4. according to the method described in claim 3, it is characterized in that, can be provided most beyond the second quantity unit In the case where big gear, the inner blower that unit is shut down in the area control system is opened, comprising:
Determine the third quantity for reaching and shutting down unit needed for the wind file gear set by user;
The inner blower that third quantity in the area control system shuts down unit is opened, is carried out with the second quantity unit Linkage energy supply.
5. the method according to claim 1, wherein the energy supply includes: refrigeration control and/or heating control.
6. a kind of zone control characterized by comprising
First determining module, for determining first quantity in region to be energized;
Second determining module, for the first quantity according to region to be energized, the second quantity of the unit that determination need to open;
First opening module is the region energy supply to be energized for opening the second quantity unit in area control system.
7. device according to claim 6, which is characterized in that further include:
Module is obtained, after the second quantity unit energizes in opening area control system for the region to be energized, Obtain wind file gear set by user;
Third determining module can be provided most for determining whether wind file gear set by user exceeds the second quantity unit Big gear;
Second opening module, for opening in the case where the maximum gear that can be provided beyond the second quantity unit The inner blower of unit is shut down in the area control system.
8. a kind of air-conditioning system, comprising: zone control described in claim 6 or 7.
9. a kind of network equipment, comprising: memory, processor and storage are on a memory and the calculating that can run on a processor Machine program, which is characterized in that the processor is realized described in any one of claims 1 to 5 when executing the computer program The step of method.
10. a kind of non-volatile computer readable storage medium storing program for executing, is stored thereon with computer program, which is characterized in that the meter The step of calculation machine program realizes any one of claims 1 to 5 the method when being executed by processor.
CN201910727465.XA 2019-08-07 2019-08-07 Area control method and device Active CN110440407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910727465.XA CN110440407B (en) 2019-08-07 2019-08-07 Area control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910727465.XA CN110440407B (en) 2019-08-07 2019-08-07 Area control method and device

Publications (2)

Publication Number Publication Date
CN110440407A true CN110440407A (en) 2019-11-12
CN110440407B CN110440407B (en) 2020-10-02

Family

ID=68433943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910727465.XA Active CN110440407B (en) 2019-08-07 2019-08-07 Area control method and device

Country Status (1)

Country Link
CN (1) CN110440407B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113339958A (en) * 2021-06-10 2021-09-03 珠海格力电器股份有限公司 Multi-air-conditioning system and area control method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1734197A (en) * 2004-08-13 2006-02-15 周洪英 Air conditioner with one outdoor unit and multiple indoor units
CN103512154A (en) * 2013-08-19 2014-01-15 南京天加空调设备有限公司 Modular multiple on-line control method
CN103542500A (en) * 2012-07-11 2014-01-29 诸城福田汽车科技开发有限公司 Air conditioner air supply system and control method
CN103912957A (en) * 2014-03-25 2014-07-09 珠海格力电器股份有限公司 Air conditioning unit and control method and control device thereof
CN105451504A (en) * 2014-08-19 2016-03-30 阿里巴巴集团控股有限公司 Machine room, data center, and data center system
CN106196431A (en) * 2016-07-04 2016-12-07 珠海格力电器股份有限公司 Air conditioning wind pipe machine control system, method and apparatus
CN106382723A (en) * 2016-08-31 2017-02-08 广东美的制冷设备有限公司 Air duct type air conditioner control device and method and air conditioner
CN107152769A (en) * 2017-07-21 2017-09-12 长沙稻冰工程技术有限公司 Central air-conditioner control method, central air-conditioning and computer-readable recording medium
WO2018152811A1 (en) * 2017-02-25 2018-08-30 深圳益强信息科技有限公司 Wireless internet-of-things control system and method for air conditioner
JP2019120434A (en) * 2017-12-28 2019-07-22 三菱重工サーマルシステムズ株式会社 Air conditioner and controlling method of the same

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1734197A (en) * 2004-08-13 2006-02-15 周洪英 Air conditioner with one outdoor unit and multiple indoor units
CN103542500A (en) * 2012-07-11 2014-01-29 诸城福田汽车科技开发有限公司 Air conditioner air supply system and control method
CN103512154A (en) * 2013-08-19 2014-01-15 南京天加空调设备有限公司 Modular multiple on-line control method
CN103912957A (en) * 2014-03-25 2014-07-09 珠海格力电器股份有限公司 Air conditioning unit and control method and control device thereof
CN105451504A (en) * 2014-08-19 2016-03-30 阿里巴巴集团控股有限公司 Machine room, data center, and data center system
CN106196431A (en) * 2016-07-04 2016-12-07 珠海格力电器股份有限公司 Air conditioning wind pipe machine control system, method and apparatus
CN106382723A (en) * 2016-08-31 2017-02-08 广东美的制冷设备有限公司 Air duct type air conditioner control device and method and air conditioner
WO2018152811A1 (en) * 2017-02-25 2018-08-30 深圳益强信息科技有限公司 Wireless internet-of-things control system and method for air conditioner
CN107152769A (en) * 2017-07-21 2017-09-12 长沙稻冰工程技术有限公司 Central air-conditioner control method, central air-conditioning and computer-readable recording medium
JP2019120434A (en) * 2017-12-28 2019-07-22 三菱重工サーマルシステムズ株式会社 Air conditioner and controlling method of the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113339958A (en) * 2021-06-10 2021-09-03 珠海格力电器股份有限公司 Multi-air-conditioning system and area control method thereof
CN113339958B (en) * 2021-06-10 2022-03-18 珠海格力电器股份有限公司 Multi-air-conditioning system and area control method thereof

Also Published As

Publication number Publication date
CN110440407B (en) 2020-10-02

Similar Documents

Publication Publication Date Title
US11002457B2 (en) Variable refrigerant flow, room air conditioner, and packaged air conditioner control systems with cost target optimization
US20210148592A1 (en) Building cooling systems with energy optimization and model predictive control
CN109405162B (en) Temperature control method and device, the air-conditioner set of unit
CN109269046A (en) Air-conditioning adjusting method and device
US10900686B2 (en) Central plant control system with time dependent deferred load
CN103912957B (en) Air conditioning unit control method, control device and air conditioning unit
CN109556236A (en) Energy efficiency controlling method and device
CN104121666B (en) For central air-conditioning wind system by time frequency conversion air feed system and control method
WO2019210807A1 (en) Method, device, and system for controlling cold-water main unit of central air conditioning system
US10948884B2 (en) Building control based on uneven load distribution
CN108151250B (en) Variable frequency air conditioner control method and device
CN106679088B (en) A kind of air conditioner and its control method and device
CN105953369A (en) Control method and device for variable-frequency air conditioner
CN110440408A (en) Region control method and device
US20200218233A1 (en) Systems and methods for prediction model update scheduling for building equipment
Ahamed et al. Fuzzy logic controller design for intelligent air-conditioning system
CN104913445A (en) Fan tap position control method, fan tap position control system and air conditioner
Koor et al. Optimal pump count prediction algorithm for identical pumps working in parallel mode
CN110878986B (en) Variable refrigerant flow system with capacity restriction
CN106765912B (en) Fixed frequency air conditioner halt control method
CN106196441B (en) Realize the method and device of air conditioner refrigerating control
JP2016125771A (en) Power force optimization system
CN110440407A (en) Region control method and device
CN203928297U (en) For central air-conditioning wind system by time frequency conversion air feed system
CN104728998A (en) Control method and device of photovoltaically-powered air conditioning unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant