CN110439298A - A kind of band through-hole prefabricated panel alignment tool and its application method - Google Patents
A kind of band through-hole prefabricated panel alignment tool and its application method Download PDFInfo
- Publication number
- CN110439298A CN110439298A CN201910779526.7A CN201910779526A CN110439298A CN 110439298 A CN110439298 A CN 110439298A CN 201910779526 A CN201910779526 A CN 201910779526A CN 110439298 A CN110439298 A CN 110439298A
- Authority
- CN
- China
- Prior art keywords
- prefabricated panel
- connecting support
- hole
- band
- length adjustable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of band through-hole prefabricated panel alignment tool and its application method, the present invention relates to engineering construction technology fields, and in particular to a kind of band through-hole prefabricated panel alignment tool and its application method.The present invention is to solve existing, and the through-hole with through-hole prefabricated panel is influenced with the pre-buried of otic placode built-in fitting anchor bar, and then influences to adjust the verticality with through-hole prefabricated panel and the problem fixed with the through-hole prefabricated panel construction stage by diagonal brace.Including length Adjustable bracing bar, top connecting support and lower part connecting support;The length Adjustable bracing bar includes upper pole segments, threaded rod and lower pole segments;The top connecting support includes outside plate and inside steel plate;Plate of picking up the ears is provided on the outside of the inside steel plate;The upper end of the lower part connecting support is provided with bottom otic placode.The present invention can adjust the plan-position with through-hole prefabricated panel and verticality simultaneously, can quick and precisely realize that the installation with through-hole prefabricated panel is in place.The present invention is used for the straightening with through-hole prefabricated panel.
Description
Technical field
The present invention relates to engineering construction technology fields, and in particular to a kind of band through-hole prefabricated panel alignment tool and its
Application method.
Background technique
Before prefabricated panel lifting is in place, it need to be fixed with bearing diagonal and adjust Precasting perpendicularity.Prefabricated panel
Frequently with the inclined support bar of adjustable length, bearing diagonal top is connected by the pre-buried connector of bolt and prefabricated panel for straightening in place
It connects, bearing diagonal bottom is connect by beating expansion bolt with ground (or floor), forms the support system of triangle, this system pair
The bearing capacity of support two sides fixing end has certain requirement.But due to the through-hole with through-hole prefabricated panel affect band otic placode it is pre-buried
Part anchor bar it is pre-buried, and then influence through diagonal brace verticality of the adjustment with through-hole prefabricated panel and apply with through-hole prefabricated panel
The fixation in work stage.
Summary of the invention
The invention aims to solve the existing through-hole with through-hole prefabricated panel to influence band otic placode built-in fitting anchor bar
It is pre-buried, and then influence through diagonal brace verticality of the adjustment with through-hole prefabricated panel and fix with the through-hole prefabricated panel construction stage
The problem of, and a kind of band through-hole prefabricated panel alignment tool and its application method are provided.
A kind of band through-hole prefabricated panel alignment tool of the present invention includes length Adjustable bracing bar, top connecting support and lower part
Connecting support;The length Adjustable bracing bar includes upper pole segments, threaded rod and lower pole segments;The middle part of the threaded rod is arranged
There is the spanner for adjustment length adjustable supports pole length;The lower end of upper pole segments and the threaded upper ends of threaded rod connect, lower part
The upper end of rod piece and the lower thread of threaded rod connect;The upper end of upper pole segments is provided with the upper ear plate in band connection hole, lower pole
The lower end of part is provided with the lower ear plate in band connection hole;The top connecting support includes outside plate and inside steel plate, described outer
Side steel plate and inside steel plate are fixed by perforative screw rod and nut, are provided with plate of picking up the ears on the outside of the inside steel plate;It is described
The upper end of lower part connecting support is provided with bottom otic placode, and ground is fixed on by anchoring piece in the lower end of the lower part connecting support;
The upper end of the length Adjustable bracing bar and top connecting support are hinged, and the lower end of the length Adjustable bracing bar is connect with lower part
Support is hinged.
The above-mentioned application method with through-hole prefabricated panel alignment tool specifically sequentially includes the following steps:
One, it will transport with through-hole prefabricated panel to after construction site, in the outer surface with through-hole prefabricated panel by up and down
Level installs top connecting support, the band through-hole prefabricated panel for being fixed with top connecting support is lifted into designated position, then
Lower part connecting support is installed on ground;
Two, the upper end of length Adjustable bracing bar and top connecting support is hinged, the lower end of length Adjustable bracing bar is under
Portion's connecting support is realized hinged;
Three, the spanner on the length Adjustable bracing bar being connected with lower layer top connecting support is rotated, is adjusted prefabricated with through-hole
The plan-position of wallboard meets design requirement;Rotate pulling on the length Adjustable bracing bar being connected with upper layer top connecting support
Hand, it is ensured that the verticality with through-hole prefabricated panel meets design requirement.
Beneficial effects of the present invention:
The configuration of the present invention is simple is easy to construct, economical and practical, can adjust the plan-position with through-hole prefabricated panel simultaneously
And verticality, it can fast and accurately realize that the installation with through-hole prefabricated panel is in place.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram with through-hole prefabricated panel alignment tool;
Fig. 2 is the structural schematic diagram of length Adjustable bracing bar;
Fig. 3 is the structural schematic diagram of top connecting support;
Fig. 4 is the structural schematic diagram of lower part connecting support;
Fig. 5 is top connecting support and the connection schematic diagram with through-hole prefabricated panel;
Fig. 6 is the connection schematic diagram of length Adjustable bracing bar Yu top connecting support;
Fig. 7 is the connection schematic diagram of length Adjustable bracing bar Yu lower part connecting support.
Specific embodiment
Specific embodiment 1: illustrating present embodiment, a kind of band through-hole prefabricated panel of present embodiment in conjunction with Fig. 1~7
Alignment tool includes length Adjustable bracing bar 1, top connecting support 8 and lower part connecting support 12;The length Adjustable bracing bar 1
Including upper pole segments 2, threaded rod 3 and lower pole segments 4;The middle part of the threaded rod 3 is provided with for adjustment length adjustable supports
The spanner 5 of 1 length of bar;The lower end of upper pole segments 2 is connect with the threaded upper ends of threaded rod 3, the upper end of lower pole segments 4 and threaded rod
3 lower thread connection;The upper end of upper pole segments 2 is provided with the upper ear plate 6 in band connection hole, and the lower end of lower pole segments 4 is provided with
The lower ear plate 7 in band connection hole;The top connecting support 8 includes outside plate 9 and inside steel plate 10,9 He of outside plate
Inside steel plate 10 is fixed by perforative screw rod and nut, and the outside of the inside steel plate 10 is provided with plate 11 of picking up the ears;Under described
The upper end of portion's connecting support 12 is provided with bottom otic placode 13, and ground is fixed on by anchoring piece in the lower end of the lower part connecting support 12
Face;The upper end of the length Adjustable bracing bar 1 and top connecting support 8 are hinged, and the lower end of the length Adjustable bracing bar 1 is under
Portion's connecting support 12 is hinged.
Specific embodiment 2: the present embodiment is different from the first embodiment in that: the both ends of the threaded rod 3 are set
It is equipped with oppositely oriented screw thread.Other are same as the specific embodiment one.
Specific embodiment 3: the present embodiment is different from the first and the second embodiment in that: the length adjustable supporting
The upper end of strut 1 and top connecting support 8 are hingedly by the band connection hole of 2 upper end of upper pole segments of length Adjustable bracing bar 1
Upper ear plate 6 is Chong Die with the plate 11 of picking up the ears of top connecting support 8, runs through lug plate holes with pin shaft.Other with specific embodiment one or
Two is identical.
Specific embodiment 4: unlike one of present embodiment and specific embodiment one to three: the length can
The lower end and lower part connecting support 12 for adjusting support rod 1 are hingedly by the band connection of 4 lower end of lower pole segments of length Adjustable bracing bar 1
The lower ear plate 7 in hole and the bottom otic placode 13 of lower part connecting support 12 are Chong Die, run through lug plate holes with pin shaft.Other and specific embodiment party
One of formula one to three is identical.
Specific embodiment 5: a kind of application method with through-hole prefabricated panel alignment tool of present embodiment specifically press with
Lower step carries out:
One, it will transport with through-hole prefabricated panel to after construction site, in the outer surface with through-hole prefabricated panel by up and down
Level installs top connecting support 8, the band through-hole prefabricated panel for being fixed with top connecting support 8 is lifted into designated position, so
Lower part connecting support 12 is installed on ground afterwards;
Two, the upper end of length Adjustable bracing bar 1 and top connecting support 8 is hinged, the lower end of length Adjustable bracing bar 1 with
Lower part connecting support 12 is realized hingedly;
Three, the spanner 5 on the length Adjustable bracing bar 1 being connected with lower layer top connecting support 8 is rotated, is adjusted pre- with through-hole
The plan-position of wallboard processed meets design requirement;It rotates on the length Adjustable bracing bar 1 being connected with upper layer top connecting support 8
Spanner 5, it is ensured that the verticality with through-hole prefabricated panel meets design requirement.
Present embodiment determination of horizontal space when described longer with through-hole prefabricated panel should ensure that band through-hole dry wall
Plate alignment tool is not destroyed with through-hole prefabricated panel junction, and general no less than two.The mounting arrangements of this support can
It requires to carry out according to the mounting arrangements generally supported, meets normal operation entails.In this way, guarantee band through-hole dry wall
The accurate installation of plate is in place, and guarantee does not damage.
Specific embodiment 6: present embodiment is unlike specific embodiment five: the upper layer top connection branch
Distance of the seat 8 apart from ground is less than 2/3 with through-hole prefabricated panel height, and greater than 1/2 with through-hole prefabricated panel height.Its
He is identical as specific embodiment five.
Beneficial effects of the present invention are verified using following embodiment:
Embodiment one: a kind of application method with through-hole prefabricated panel alignment tool specifically sequentially includes the following steps:
One, it will transport with through-hole prefabricated panel to after construction site, in the outer surface with through-hole prefabricated panel by up and down
Level installs top connecting support 8, the band through-hole prefabricated panel for being fixed with top connecting support 8 is lifted into designated position, so
Lower part connecting support 12 is installed on ground afterwards;
Two, the upper end of length Adjustable bracing bar 1 and top connecting support 8 is hinged, the lower end of length Adjustable bracing bar 1 with
Lower part connecting support 12 is realized hingedly;
Three, the spanner 5 on the length Adjustable bracing bar 1 being connected with lower layer top connecting support 8 is rotated, is adjusted pre- with through-hole
The plan-position of wallboard processed meets design requirement;It rotates on the length Adjustable bracing bar 1 being connected with upper layer top connecting support 8
Spanner 5, it is ensured that the verticality with through-hole prefabricated panel meets design requirement.
The present embodiment structure is simple, is easy to construct, economical and practical, can adjust the plane position with through-hole prefabricated panel simultaneously
It sets and verticality, can fast and accurately realize that the installation with through-hole prefabricated panel is in place.
Claims (6)
1. a kind of band through-hole prefabricated panel alignment tool, it is characterised in that band through-hole prefabricated panel alignment tool includes that length is adjustable
Support rod (1), top connecting support (8) and lower part connecting support (12);The length Adjustable bracing bar (1) includes upper pole segments
(2), threaded rod (3) and lower pole segments (4);It is provided in the middle part of the threaded rod (3) for adjustment length Adjustable bracing bar (1)
The spanner (5) of length;The lower end of upper pole segments (2) is connect with the threaded upper ends of threaded rod (3), the upper end of lower pole segments (4) with
The lower thread of threaded rod (3) connects;The upper end of upper pole segments (2) is provided with the upper ear plate (6) in band connection hole, lower pole segments
(4) lower end is provided with the lower ear plate (7) in band connection hole;The top connecting support (8) includes outside plate (9) and inside steel
Plate (10), the outside plate (9) and inside steel plate (10) are fixed by perforative screw rod and nut, the inside steel plate (10)
Outside be provided with plate of picking up the ears (11);The upper end of the lower part connecting support (12) is provided with bottom otic placode (13), the lower part
Ground is fixed on by anchoring piece in the lower end of connecting support (12);The upper end of the length Adjustable bracing bar (1) is connect with top
Hingedly, the lower end and lower part connecting support (12) of the length Adjustable bracing bar (1) are hinged for support (8).
2. a kind of band through-hole prefabricated panel alignment tool according to claim 1, it is characterised in that the threaded rod (3)
Both ends are provided with oppositely oriented screw thread.
3. a kind of band through-hole prefabricated panel alignment tool according to claim 1, it is characterised in that the length adjustable supporting
The upper end and top connecting support (8) of strut (1) are hingedly by the band of upper pole segments (2) upper end of length Adjustable bracing bar (1)
The upper ear plate (6) of connecting hole is Chong Die with plate of picking up the ears (11) of top connecting support (8), runs through lug plate holes with pin shaft.
4. a kind of band through-hole prefabricated panel alignment tool according to claim 1, it is characterised in that the length adjustable supporting
The lower end and lower part connecting support (12) of strut (1) are hingedly by the band of lower pole segments (4) lower end of length Adjustable bracing bar (1)
The lower ear plate (7) of connecting hole is Chong Die with bottom otic placode (13) of lower part connecting support (12), runs through lug plate holes with pin shaft.
5. a kind of application method with through-hole prefabricated panel alignment tool as described in claim 1 specifically according to the following steps into
Row:
One, it will transport with through-hole prefabricated panel to after construction site, and press upper and lower level in the outer surface with through-hole prefabricated panel
It installs top connecting support (8), the band through-hole prefabricated panel for being fixed with top connecting support (8) is lifted into designated position, so
Lower part connecting support (12) are installed on ground afterwards;
Two, hingedly by the upper end of length Adjustable bracing bar (1) and top connecting support (8), the lower end of length Adjustable bracing bar (1)
It is realized with lower part connecting support (12) hinged;
Three, the spanner (5) on the length Adjustable bracing bar (1) that rotation is connected with lower layer's top connecting support (8), adjustment band through-hole
The plan-position of prefabricated panel meets design requirement;Rotate the length Adjustable bracing bar being connected with upper layer top connecting support (8)
(1) spanner (5) on, it is ensured that the verticality with through-hole prefabricated panel meets design requirement.
6. a kind of application method with through-hole prefabricated panel alignment tool according to claim 5, it is characterised in that described
Distance of the upper layer top connecting support (8) apart from ground is less than 2/3 with through-hole prefabricated panel height, and it is prefabricated to be greater than band through-hole
The 1/2 of wall-plate level.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910779526.7A CN110439298A (en) | 2019-08-22 | 2019-08-22 | A kind of band through-hole prefabricated panel alignment tool and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910779526.7A CN110439298A (en) | 2019-08-22 | 2019-08-22 | A kind of band through-hole prefabricated panel alignment tool and its application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110439298A true CN110439298A (en) | 2019-11-12 |
Family
ID=68437212
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910779526.7A Pending CN110439298A (en) | 2019-08-22 | 2019-08-22 | A kind of band through-hole prefabricated panel alignment tool and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439298A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5114127A (en) * | 1990-08-29 | 1992-05-19 | Everhart Alvie E | Plumb-align device |
CN202012203U (en) * | 2010-12-20 | 2011-10-19 | 北京市建筑工程研究院有限责任公司 | Prefabricated vertical member mounting tool type support |
CN206784972U (en) * | 2017-05-18 | 2017-12-22 | 北京首钢建设集团有限公司 | A kind of prefabricated panel support meanss |
CN207363264U (en) * | 2017-10-27 | 2018-05-15 | 北京城建北方建设有限责任公司 | Adjustable square steel template system wall form diagonal brace |
CN108204143A (en) * | 2018-03-01 | 2018-06-26 | 山东大学 | For assisting the bearing diagonal and its application method of prefabricated wallboard installation |
CN208202621U (en) * | 2018-04-18 | 2018-12-07 | 天元建设集团有限公司 | A kind of universal assembled wall installation tool |
-
2019
- 2019-08-22 CN CN201910779526.7A patent/CN110439298A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5114127A (en) * | 1990-08-29 | 1992-05-19 | Everhart Alvie E | Plumb-align device |
CN202012203U (en) * | 2010-12-20 | 2011-10-19 | 北京市建筑工程研究院有限责任公司 | Prefabricated vertical member mounting tool type support |
CN206784972U (en) * | 2017-05-18 | 2017-12-22 | 北京首钢建设集团有限公司 | A kind of prefabricated panel support meanss |
CN207363264U (en) * | 2017-10-27 | 2018-05-15 | 北京城建北方建设有限责任公司 | Adjustable square steel template system wall form diagonal brace |
CN108204143A (en) * | 2018-03-01 | 2018-06-26 | 山东大学 | For assisting the bearing diagonal and its application method of prefabricated wallboard installation |
CN208202621U (en) * | 2018-04-18 | 2018-12-07 | 天元建设集团有限公司 | A kind of universal assembled wall installation tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8887451B2 (en) | Pivoting bracket for foundation support system | |
CN112523495B (en) | Support capable of supporting wall formwork on single side | |
CN212613769U (en) | Outer wall formwork reinforcing bracket at connecting position of shear wall floors | |
CN111472538B (en) | Aluminum alloy template installation structure of exempting from to plaster | |
CN102926554B (en) | Steel hanging seat shuttering supporting and construction method thereof | |
CN208456111U (en) | Adjustable receipts face mould plate supporting device | |
CN110439298A (en) | A kind of band through-hole prefabricated panel alignment tool and its application method | |
CN113047666A (en) | Limiting device is supported in installation of assembled PC wall | |
CN209874484U (en) | Aluminum alloy template bracing device | |
CN219491722U (en) | Reinforcing device for K plate of aluminum alloy template | |
CN208586899U (en) | A kind of support frame with oblique jacking | |
CN214575849U (en) | Support for installing and positioning steel structural member | |
CN208633584U (en) | A kind of prefabricated mounting of roof plate supporting frame of wall-attached | |
CN206530077U (en) | A kind of support frame | |
CN207004072U (en) | A kind of wall-panels supports device and wall-panels supports structure | |
CN208167781U (en) | A kind of levelling mounting structure of backing plate | |
CN208073012U (en) | A kind of foundation bolt location centralizing device | |
CN106638184B (en) | Multi-working-condition movable type traveling rail supporting device and using method | |
CN217630443U (en) | Door type steel frame upright post mounting and fixing device | |
CN209083010U (en) | A kind of floor construction elevation control device of quick spacing | |
CN220667076U (en) | Building structure reinforcing apparatus | |
CN111502254A (en) | Hanging type formwork support-free frame for construction of beam system steel structure floor slab | |
CN215249200U (en) | Hoist device for assembly type building construction | |
CN214834668U (en) | Ultra-long support device of all-steel climbing frame | |
CN215516447U (en) | Tower crane fixed support leg balancing stand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191112 |