CN110439199A - A kind of indoor wall green covering with paint construction technology - Google Patents

A kind of indoor wall green covering with paint construction technology Download PDF

Info

Publication number
CN110439199A
CN110439199A CN201910770901.1A CN201910770901A CN110439199A CN 110439199 A CN110439199 A CN 110439199A CN 201910770901 A CN201910770901 A CN 201910770901A CN 110439199 A CN110439199 A CN 110439199A
Authority
CN
China
Prior art keywords
paint
putty
frame
lacquer
covering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910770901.1A
Other languages
Chinese (zh)
Other versions
CN110439199B (en
Inventor
黄河春
严宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tianyuan Shijie Decoration Co Ltd
Original Assignee
Zhejiang Tianyuan Shijie Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tianyuan Shijie Decoration Co Ltd filed Critical Zhejiang Tianyuan Shijie Decoration Co Ltd
Priority to CN201910770901.1A priority Critical patent/CN110439199B/en
Publication of CN110439199A publication Critical patent/CN110439199A/en
Application granted granted Critical
Publication of CN110439199B publication Critical patent/CN110439199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a kind of indoor wall greens to cover with paint, lacquer, colour wash, etc. construction technology, and the indoor wall for solving the problems, such as at this stage needs to knock out entire metope when going mouldy causes waste of material.Its key points of the technical solution are that a kind of indoor wall green covers with paint, lacquer, colour wash, etc. construction technology, by the way that frame member is arranged, basal plane is separated into multiple covering with paint regions, and the application of the blade coating and investment precoat of putty is successively carried out to covering with paint region, due to successively being covered with paint, lacquer, colour wash, etc. multiple covering with paint regions, it is able to ascend the covering with paint construction efficiency of entire metope, and when above-mentioned metope goes mouldy, it only needs to be knocked out the corresponding paint topcoat for covering with paint, lacquer, colour wash, etc. region and putty layer, greatly reduce the material quantity expended when repairing to mildew metope, realize the effect of green fitting, and it only needs to repair single region of covering with paint, lacquer, colour wash, etc., also reduce the subsequent time repaired and expended, achieve the purpose that subsequent efficiently to repair.

Description

A kind of indoor wall green covering with paint construction technology
Technical field
The present invention relates to a kind of fitting-out works of building, cover with paint, lacquer, colour wash, etc. construction technology more particularly to a kind of indoor wall.
Background technique
Traditional wall coating technique is the technique decorated using coating to metope.Generally comprise following steps: 1, Basal plane processing is carried out to foundation wall metope;2, the pit on basal plane, gap are carried out using water gypsum levelling;If 3, being scraped on basal plane Dried layer putty forms putty layer;4, several layers investment precoat is applied in putty layer, forms dope layer.Wherein, putty layer and coating Layer i.e. combination forms wall coating layer.
Traditional wall coating technique is usually to cover with paint, lacquer, colour wash, etc. whole face wall, close to lavatory, kitchen and the wall on doorway Face region is higher compared with the probability for contacting steam for the metope in other regions, and the metope in the region is caused to be easy to happen mildew.In After metope goes mouldy, common practice is exactly to knock out the coatings of whole face wall, causes a large amount of waste of material.
Summary of the invention
The object of the present invention is to provide a kind of indoor wall greens to cover with paint, lacquer, colour wash, etc. construction technology, is applied using above-mentioned indoor wall green For the metope that decorations construction technology is covered with paint, lacquer, colour wash, etc. when generation mildew needs to repair, the repair materials of consuming are less, and repair time-consuming lower.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of indoor wall green is covered with paint, lacquer, colour wash, etc. Construction technology includes the following steps:
Step 1: carrying out field survey according to the metope to be carried out green and cover with paint, lacquer, colour wash, etc. construction, and production is adapted to corresponding metope Frame member;
The frame member includes the perpendicular bone that skeleton framework, the horizontally disposed transversum of at least one and at least one are arranged vertically; The both ends of the transversum are connected to the left and right inner sidewall of the skeleton framework, and the both ends of the perpendicular bone are connected to described The inner sidewall up and down of skeleton framework;
Step 2: the protrusion on basal plane being subjected to chipping, the epidermis of loosening and bulge are purged;Using water gypsum by basal plane On pit and gap fill and lead up respectively, smoothed out after to be dried using sand paper;Remove the floating dust on basal plane;
Step 3: the frame member being mounted on the basal plane, the basal plane is multiple through being separated to form for the frame member Cover with paint, lacquer, colour wash, etc. region;The blade coating of putty is carried out in the covering with paint region and forms putty layer;
Step 4: applying investment precoat in the outer surface of the putty layer and form paint topcoat, the appearance of the paint topcoat Face and the outer surface of the frame member are located on same perpendicular.
By using above-mentioned technical proposal, above-mentioned indoor wall green covers with paint, lacquer, colour wash, etc. the metope of construction technology covering with paint through frame member Be separated to form multiple covering with paint regions, each covering with paint region all has putty layer and paint topcoat, and adjacent covering with paint region is through bone The separation of frame member, the adjacent putty layer covered with paint, lacquer, colour wash, etc. in region and paint topcoat are non-interference, and when the partial region of metope, generation is mould When change, it is only necessary to knock out the corresponding paint topcoat for covering with paint, lacquer, colour wash, etc. region and putty layer, greatly reduce to mildew wall The material quantity expended when face is repaired, and only need to repair single region of covering with paint, lacquer, colour wash, etc., it also reduces reparation and expends Time, realize the requirement of green fitting.
Meanwhile above-mentioned construction technology is the covering with paint carried out to multiple covering with paint regions successively, when the covering with paint area of the last one After the completion of the putty layer blade coating in domain, the putty layer in first covering with paint region has been able to drying, enables finishing personnel The covering with paint that the investment precoat of next step is carried out in dried putty layer improves the construction effect that indoor wall green covers with paint, lacquer, colour wash, etc. construction Rate realizes the requirement for efficiently covering with paint, lacquer, colour wash, etc. construction.
As a further improvement of the present invention, the frame member includes the inner frame successively stacked and outer skeleton;It is described Inner frame includes internal frame body, interior transversum and interior perpendicular bone;The outer skeleton includes outer frame body, outer transversum and outer perpendicular bone;The skeleton Framework is combined and is formed by the internal frame body and the outer frame body;The transversum combines shape by the interior transversum and the outer transversum At;The perpendicular bone is combined and is formed by the interior perpendicular bone and the outer perpendicular bone;The step 3 is specific further include: by the inner frame It is mounted on the basal plane and forms the covering with paint region;The blade coating of putty is carried out in the covering with paint region and forms the putty The outer surface of layer, the outer surface of the putty layer and the inner frame is on same perpendicular;When applying investment precoat The outer skeleton is first mounted on to the outer surface of the inner frame.
By using above-mentioned technical proposal, frame member includes inner frame and outer skeleton, and inner frame is first mounted on basal plane On, blade coating putty then is carried out to each covering with paint region, helps so that the outer surface of putty layer and the outer surface of inner frame In on same perpendicular, promoting the blade coating quality of putty layer, it is adsorbed in putty layer to facilitate subsequent paint topcoat.
As a further improvement of the present invention, the frame member further includes separating correspondingly with the covering with paint region Frame, the thickness of the separation frame are equal to the thickness of the inner frame, and the outer surface of each edge frame of the separation frame, which is equipped with, to be taken Put screw hole;The step 3 further include: after inner frame is mounted on basal plane, the separation frame is mounted on corresponding covering with paint region Afterwards, then the blade coating of putty is carried out, and fills the pick-and-place screw hole using putty;When applying investment precoat, applied using surface layer Material also applies the lateral surface for separating frame.
By using above-mentioned technical proposal, separates frame and be embedded in investment precoat or less and be surrounded putty layer, when After above-mentioned metope goes mouldy, it can be struck off by the paint topcoat of the separation arch in the covering with paint region that will be gone mouldy, because For outer skeleton setting so that during striking off paint topcoat will not to it is adjacent cover with paint, lacquer, colour wash, etc. region paint topcoat damage, Cooperated later using bolt and pick-and-place screw hole, by entire separation frame from the periphery taking-up of putty layer, to facilitate the region Putty layer is removed.
As a further improvement of the present invention, the separation frame is offered in its inner ring side wall through the broken of the separation frame Broken through-hole;The step 3 further include: when carrying out the blade coating of putty, fill putty in the broken through-hole
By using above-mentioned technical proposal, when broken through-hole makes the subsequent frame taking-up by separation, enable to be located in separation frame The putty layer of circle is destroyed, so that the putty layer by mouldy region be facilitated to be removed.
As a further improvement of the present invention, the inner frame is additionally provided with moisture-proof in the side wall opposite with the covering with paint region Slot, the inner frame are equipped with moisture-proof filler material in moisture-proof slot;It is described broken when the separation frame is mounted on the covering with paint region Broken through-hole is opposite with the moisture-proof slot.
By using above-mentioned technical proposal, the moisture-proof filler material in moisture-proof slot can adsorb the steam in putty layer, and water Vapour is the main reason for causing metope to go mouldy, so as to reduce the probability that metope goes mouldy.Due to broken through-hole and moisture-proof Slot is opposite, and putty is filled in broken through-hole, enables the steam in putty preferably by the moisture-proof filling in moisture-proof slot Material is adsorbed.
Above-mentioned design is so that when metope goes mouldy, and after frame will be isolated and take out, the personnel of reparation can be to moisture-proof slot Interior moisture-proof filler material is replaced, and the ability that the moistureproof and mildewproof of the metope after repairing becomes is further strengthened.
As a further improvement of the present invention, the blade coating of putty specifically includes in the step 3: lateral using rubber scraper plate First layer putty is scratched, after first layer putty is dry, uses sand paper to be polished so that first layer putty outer surface is smooth;Make It is vertically applied with rubber scraper plate and scrapes second layer putty, after second layer putty is dry, use sand paper to be polished so that the second layer is greasy Sub- outer surface is smooth;Using rubber scraper plate spot putting, and make the outer surface of putty layer and the outer surface position of the inner frame In on same vertical plane, and the putty on inner frame is struck off.
The quality of putty layer is able to ascend using the doctor blade process of above-mentioned putty by using above-mentioned technical proposal, is reduced Broken probability occurs for putty layer, it helps keeps the flatness of putty layer outer surface.
As a further improvement of the present invention, the thickness of the first layer putty in the step 3 is broken logical no more than described Hole to the basal plane minimum range.
By using above-mentioned technical proposal, so that putty will not enter broken logical when scratching first layer putty In hole, when scratching the putty of the second layer, it is filled by broken through-hole, to help to promote the putty in broken through-hole Integrality, will be isolated frame take out during so that isolation frame inner ring putty can be easier to be taken out of simultaneously, thus side Just to the removing of mouldy putty layer.
As a further improvement of the present invention, the internal frame body is equipped with installation counterbore in its each edge frame;The step 3 Further include: it is punched on basal plane according to the position for installing counterbore on internal frame body, and is implanted into the wooden muscle in hole, pass through peace using screw Dress counterbore is simultaneously threadedly engaged the installation for realizing the inner frame on basal plane with the wooden muscle.
It by using above-mentioned technical proposal, realizes and internal frame body is mounted on basal plane, and structure is simple, it is easy for installation.
As a further improvement of the present invention, the outer surface of the internal frame body offers at least two location holes, described outer The inner surface of ore body is equipped with the positioning inserting column cooperated with the location hole;Outer frame body is mounted on internal frame body in the step 3 Shown in specific step is as follows: smearing one layer of fixed glue in the outer surface of internal frame body, and by positioning inserting column and location hole Outer frame body is fixed on internal frame body by cooperation.
It by using above-mentioned technical proposal, realizes and outer frame body is fixed on internal frame body, and above-mentioned fixed form structure Simply, simple installation.
As a further improvement of the present invention, the proportion of the use of the putty are as follows: polyvinyl acetate emulsion: cement: water= 1:5:1。
By using above-mentioned technical proposal, the anti-mildew energy of putty layer moisture resistance is able to ascend using the proportion of above-mentioned putty Power.
In conclusion the invention has the following advantages:
1, a kind of indoor wall green covers with paint, lacquer, colour wash, etc. construction technology, and by setting frame member, basal plane is separated into multiple covering with paint regions, And the application for successively carrying out the blade coating and investment precoat of putty to covering with paint region is able to ascend entire indoor wall green and covers with paint, lacquer, colour wash, etc. The efficiency of construction, and in above-mentioned metope when going mouldy, it is only necessary to by the corresponding paint topcoat and putty for covering with paint, lacquer, colour wash, etc. region Layer is knocked out, and greatly reduces the material quantity expended when repairing to mildew metope, and only need to single It covers with paint, lacquer, colour wash, etc. region to be repaired, also reduces the time repaired and expended;
2, frame member is arranged to inner frame and outer skeleton, makes when scratching putty outer surface and the inner frame of putty layer Outer surface keeps flushing, thus the control of the convenient flatness to putty layer outer surface;
3, spacing frame is embedded between inner frame and putty layer, when metope goes mouldy, mine will be separated and taken out, so that putty Gap is formed between layer and frame member, so that convenient knock out the putty layer gone mouldy.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of middle skeleton component of the present invention;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 is the structural schematic diagram that frame is separated in the present invention;
Fig. 4 is the structural schematic diagram of China and foreign countries' skeleton of the present invention;
Fig. 5 is the diagrammatic cross-section of middle skeleton component of the present invention and foundation wall at installation counterbore;
Fig. 6 is the enlarged drawing in Fig. 5 at B;
Fig. 7 is middle skeleton component of the present invention and foundation wall in the schematic diagram of the section structure for covering with paint, lacquer, colour wash, etc. region.
In figure: 1, frame member;11, inner frame;111, internal frame body;112, interior transversum;113, interior perpendicular bone;114, installation is heavy Hole;115, location hole;116, moisture-proof slot;12, outer skeleton;121, outer frame body;122, outer transversum;123, outer perpendicular bone;124, it positions Inserting column;13, unit is covered with paint, lacquer, colour wash, etc.;14, moisture-proof filler material;15, frame is separated;151, it is crushed through-hole;152, screw hole is picked and placed;2, foundation wall;21, Basal plane;3, putty layer;31, first layer putty;32, second layer putty;4, paint topcoat;5, the wooden muscle;.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Refering to attached drawing 1, a kind of frame member 1 is applied to indoor wall green and covers with paint, lacquer, colour wash, etc. construction technology, including what is successively stacked Inner frame 11 and outer skeleton 12.
Inner frame 11 includes that bone 113 is erected in an internal frame body 111, two interior transversums 112 and two.Internal frame body 111 is length Square frame.Two interior transversums 112 are horizontally disposed, and the both ends of every interior transversum 112 are connected to the inner ring of internal frame body 111 Left and right sidewall.The vertical arrangement of bone 113 is erected in two, and the both ends that bone 113 is erected in every are connected to internal frame body 111 On the top and bottom sidewall of inner ring.The cross section of internal frame body 111, interior transversum 112 and interior perpendicular bone 113 is in square, and square Side length is 15mm.
Internal frame body 111 installs counterbore 114 there are four being all provided in the lateral wall of its four edges frame, and installs counterbore 114 along interior The length direction of the frame of framework 111 is evenly arranged.The lateral wall of the four edges frame of internal frame body 111 is in adjacent installation counterbore 114 Between be additionally provided with location hole 115.
Refering to attached drawing 1 and attached drawing 2,113 groups of internal frame body 111, interior transversum 112 and interior perpendicular bone are shaped to nine rectangular coverings with paint Unit 13 offers moisture-proof slot 116 in the inner sidewall where each covering with paint unit 13, and is additionally provided in moisture-proof slot 116 anti- Damp filler material 14.In the present embodiment, moisture-proof filler material 14 is using fiber desiccant.
Refering to attached drawing 1 and attached drawing 4, outer skeleton 12 include the outer frame body that is correspondingly arranged with internal frame body 111 121, two with it is interior The one-to-one outer transversum of transversum 112 122, two are erected bone 123 outside correspondingly with interior perpendicular bone 113.The thickness of outer skeleton 12 For 5mm.Outer frame body 121 is equipped in the inner sidewall of its four edges frame and positions inserting column 124 correspondingly with location hole 115.
When outer skeleton 12 stacks the lateral wall for being installed on inner frame 11, internal frame body 111 and outer frame body 121, interior transversum 112 It is mutually bonded with outer transversum 122, interior perpendicular bone 113 and outer perpendicular bone 123, internal frame body 111 and the combination of outer frame body 121 form skeleton structure The skeleton framework of part 1;Interior transversum 112 and outer transversum 122 combine the transversum for forming frame member 1;Interior perpendicular bone 113 and outer perpendicular bone 123 combinations form the perpendicular bone of frame member 1.
Refering to attached drawing 1 and attached drawing 3, frame member 1 further includes separating correspondingly with the covering with paint unit 13 of inner frame 11 Frame 15.Separation frame 15 is installed in the covering with paint unit 13 of inner frame 11, and the thickness of the thickness and inner frame 11 that separate frame 15 is kept Unanimously, it so that separation frame 15 is mounted on when covering with paint, lacquer, colour wash, etc. in unit 13, separates the outer ring side wall of frame 15 and covers with paint, lacquer, colour wash, etc. the inner sidewall of unit 13 It is bonded to each other.
Separation frame 15 is offered in its inner ring side wall with through the broken through-hole 151 for separating frame 15, is divided in the present embodiment Broken through-hole 151 there are three being opened up on each side wall of its inner ring from frame 15.Unit 13 is covered with paint, lacquer, colour wash, etc. when separation frame 15 is mounted on When middle, it is opposite with moisture-proof slot 116 to be crushed through-hole 151.It separates frame 15 and is provided with pick-and-place screw hole in the lateral wall of its each edge frame 152。
In conjunction with attached drawing 1 to attached drawing 7, a kind of indoor wall green covering with paint construction technology includes the following steps:
Step 1: covering with paint, lacquer, colour wash, etc. the progress field survey of foundation wall 2 of construction according to be carried out green, and make and be adapted to corresponding foundation wall 2 Frame member 1, frame member 1 is covered entire metope;
Step 2:
S2.1, the protrusion on the basal plane 21 of foundation wall 2 is subjected to chipping, the epidermis of loosening and bulge is purged;
S2.2, using water gypsum by basal plane 21 pit and gap fill and lead up respectively, carried out after water gypsum is dry using sand paper It smoothes out;
S2.3, the floating dust removed on basal plane 21 facilitate the attachment of subsequent putty layer 3 so that floating dust is not present on basal plane 21;
Step 3:
S3.1, refering to attached drawing 5 and attached drawing 6, it is enterprising in the basal plane 21 of metope according to the position for installing counterbore 114 on inner frame 11 Row punching, and it is implanted into the wooden muscle 5;
S3.2, the installation counterbore 114 of inner frame 11 is passed through using screw and is threadedly engaged with the wooden muscle 5 inner frame is pressed on foundation wall On 2 basal plane 21, it is formed on basal plane 21 and covers with paint, lacquer, colour wash, etc. the covering with paint region correspondingly of unit 13;
S3.3, allotment putty, the proportion of the use of putty are as follows: polyvinyl acetate emulsion: cement: water=1:5:1;
S3.4, refering to attached drawing 7, repair the gap between inner frame 11 and basal plane 21 using putty, and separation frame 15 is mounted on It covers with paint, lacquer, colour wash, etc. in unit 13;
S3.5, using rubber scraper plate, laterally blade coating first layer putty 31 makes after first layer putty 31 is dry in covering with paint, lacquer, colour wash, etc. region It is polished with sand paper so that 31 outer surface of first layer putty is smooth, wherein the thickness that 31 layer 3 of first layer putty is equal to separation frame The minimum range of through-hole 151 to basal plane 21 is crushed in 15;
S3.6, broken through-hole 151 is filled using putty, and is vertically applied using rubber scraper plate and scrapes second layer putty 32, to the second layer After putty 32 is dry, sand paper is used to be polished so that 32 outer surface of second layer putty is smooth;
S3.7, using rubber scraper plate spot putting, and it is same that the outer surface of the outer surface of putty layer 3 and inner frame 11 is located at On vertical plane, and the putty on inner frame 11 is struck off;Along from left to right, direction from top to bottom is successively to covering with paint area The blade coating of domain progress putty layer 3;
S3.8, lateral surface one layer of fixed glue of smearing in inner frame 11, by positioning the positioning of inserting column 124 and location hole 115, by Outer skeleton 12 is mounted on the lateral wall of inner frame 11;
Step 4:
Investment precoat is applied in the outer surface of putty layer 3 and forms paint topcoat 4, the outer surface of paint topcoat 4 and skeleton structure The outer surface of part 1 is located on same perpendicular.Paint topcoat 4 in the present embodiment is using lotion thin coat.
When being gone mouldy using the metope that above-mentioned indoor wall green covering with paint construction technology is made, needing will be corresponding The paint topcoat 4 for covering with paint, lacquer, colour wash, etc. the edge in region is knocked out, so that the pick-and-place screw hole 152 on separation frame 15 reveals, is used Bolt is mounted on separation frame 15, and entire separation frame 15 is removed from covering with paint, lacquer, colour wash, etc. in region, at this time frame member 1 and greasy There are gaps between sublayer 3, paint topcoat 4, convenient to remove to the putty layer 3 and paint topcoat 4 in the covering with paint region.
After the putty layer 3 and paint topcoat 4 in the covering with paint region wait go mouldy are removed, the moisture-proof filling in moisture-proof slot 116 is replaced Material 14, repeat the above steps 3 and step 4 later, completes the putty layer 3 in the covering with paint region of mildew and the reparation of paint topcoat 4.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (10)

1. a kind of indoor wall green covers with paint, lacquer, colour wash, etc. construction technology, which comprises the steps of:
Step 1: foundation to be carried out foundation wall (2) the progress field survey that green covers with paint, lacquer, colour wash, etc. construction, and production and corresponding foundation wall (2) The frame member (1) of adaptation;The frame member (1) includes skeleton framework, the horizontally disposed transversum of at least one and at least one The perpendicular bone that root is arranged vertically;The both ends of the transversum are connected to the left and right inner sidewall of the skeleton framework, the perpendicular bone Both ends are connected to the inner sidewall up and down of the skeleton framework;
Step 2: the protrusion on the basal plane (21) of foundation wall (2) being subjected to chipping, the epidermis of loosening and bulge are purged;It uses Water gypsum by basal plane (21) pit and gap fill and lead up respectively, smoothed out after to be dried using sand paper;It removes basal plane (21) On floating dust;
Step 3: the frame member (1) being mounted on the basal plane (21), the basal plane (21) is through the frame member (1) Be separated to form multiple covering with paint regions;The blade coating of putty is carried out in the covering with paint region and forms putty layer (3);
Step 4: applying investment precoat in the outer surface of the putty layer (3) and form paint topcoat (4), the paint topcoat (4) outer surface of outer surface and the frame member (1) is located on same perpendicular.
2. a kind of indoor wall green according to claim 1 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that the frame member It (1) include the inner frame (11) and outer skeleton (12) successively stacked;The inner frame (11) includes internal frame body (111), interior transversum (112) and interior perpendicular bone (113);The outer skeleton (12) includes outer frame body (121), outer transversum (122) and outer perpendicular bone (123);Institute Skeleton framework is stated to be formed by the internal frame body (111) and the outer frame body (121) combination;The transversum is by the interior transversum (112) it is formed with the outer transversum (122) combination;The perpendicular bone is combined by the interior perpendicular bone (113) and the outer perpendicular bone (123) It is formed;
The step 3 is specific further include: the inner frame (11) is mounted on the basal plane (21) and forms the covering with paint area Domain;The blade coating of putty is carried out in the covering with paint region and is formed the putty layer (3), the outer surface of the putty layer (3) and institute The outer surface of inner frame (11) is stated on same perpendicular;First the outer skeleton (12) is installed when applying investment precoat In the outer surface of the inner frame (11).
3. a kind of indoor wall green according to claim 2 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that the frame member It (1) further include being separated correspondingly frame (15) with the covering with paint region, the thickness of separation frame (15) is equal to the in-seam The thickness of frame (11), the outer surface of each edge frame of separation frame (15), which is equipped with, picks and places screw hole (152);
The step 3 further include: after inner frame (11) is mounted on basal plane (21), the separation frame (15) is mounted on corresponding After covering with paint, lacquer, colour wash, etc. region, then the blade coating of putty is carried out, and fill the pick-and-place screw hole (152) using putty;Applying investment precoat When, the lateral surface for separating frame (15) is also applied using investment precoat.
4. a kind of indoor wall green according to claim 3 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that the separation frame (15) the broken through-hole (151) through separation frame (15) is offered in its inner ring side wall;
The step 3 further include: when carrying out the blade coating of putty, putty is filled in the broken through-hole (151).
5. a kind of indoor wall green according to claim 4 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that the inner frame exists The side wall opposite with the covering with paint region is additionally provided with moisture-proof slot (116), and the inner frame is equipped with moisture-proof fill out in moisture-proof slot (116) Charge (14);When the separation frame (15) is mounted on the covering with paint region, the broken through-hole (151) and the moisture-proof slot (116) opposite.
6. a kind of indoor wall green according to claim 5 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that in the step 3 The blade coating of putty specifically includes: first layer putty (31) laterally are scratched using rubber scraper plate, after first layer putty (31) are dry, Sand paper is used to be polished so that first layer putty (31) outer surface is smooth;It is vertically applied using rubber scraper plate and scrapes second layer putty (32), after second layer putty (32) are dry, sand paper is used to be polished so that second layer putty (32) outer surface is smooth;It uses Rubber scraper plate spot putting, and the outer surface of putty layer (3) and the outer surface of the inner frame are located on same vertical plane, And the putty on inner frame is struck off.
7. a kind of indoor wall green according to claim 6 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that in the step 3 First layer putty (31) thickness no more than the broken through-hole (151) to the basal plane (21) minimum range.
8. a kind of indoor wall green according to claim 2 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that the internal frame body (111) installation counterbore (114) is equipped in its each edge frame;
The step 3 further include: it is punched on basal plane (21) according to the position for installing counterbore (114) on internal frame body (111), and Hole is implanted into the wooden muscle (5), is passed through installation counterbore (114) using screw and is threadedly engaged with the wooden muscle (5) and realizes that the inner frame exists Installation on basal plane (21).
9. a kind of indoor wall green according to claim 8 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that the internal frame body (111) outer surface offers at least two location holes (115), and the inner surface of the outer ore body is equipped with and the location hole (115) the positioning inserting column (124) cooperated;
Outer frame body (121) is mounted on internal frame body (111) shown in specific step is as follows in the step 3: in internal frame body (111) outer surface smears one layer of fixed glue, and passes through positioning inserting column (124) and the cooperation of location hole (115) for outer frame body (121) it is fixed on internal frame body (111).
10. a kind of indoor wall green according to claim 1 covers with paint, lacquer, colour wash, etc. construction technology, which is characterized in that the putty The proportion of use are as follows: polyvinyl acetate emulsion: cement: water=1:5:1.
CN201910770901.1A 2019-08-20 2019-08-20 Green coating construction process for indoor wall surface Active CN110439199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910770901.1A CN110439199B (en) 2019-08-20 2019-08-20 Green coating construction process for indoor wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910770901.1A CN110439199B (en) 2019-08-20 2019-08-20 Green coating construction process for indoor wall surface

Publications (2)

Publication Number Publication Date
CN110439199A true CN110439199A (en) 2019-11-12
CN110439199B CN110439199B (en) 2020-10-27

Family

ID=68436743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910770901.1A Active CN110439199B (en) 2019-08-20 2019-08-20 Green coating construction process for indoor wall surface

Country Status (1)

Country Link
CN (1) CN110439199B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314978A (en) * 2008-06-02 2008-12-03 南通华汇建筑工程有限公司 Construction method for thermal insulation wall of exterior wall
KR20100001725U (en) * 2008-08-08 2010-02-18 이성균 Structure and method for cunstructing loessial wall
JP2012219480A (en) * 2011-04-07 2012-11-12 Watanabe Kogyo Kk As-cast concrete finish construction method
CN108589961A (en) * 2018-04-27 2018-09-28 上海恪耐新材料科技有限公司 Light gauge cold-formed steel shape composite gypsum mortar thermal insulation board outer wall body constructs and application
CN108729603A (en) * 2017-04-25 2018-11-02 中国二十冶集团有限公司 It is segmented grid type wall plastering method
CN109339365A (en) * 2018-11-27 2019-02-15 陕西鼎盛装饰工程有限责任公司 A kind of inner wall surface seam lattice structure and construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314978A (en) * 2008-06-02 2008-12-03 南通华汇建筑工程有限公司 Construction method for thermal insulation wall of exterior wall
KR20100001725U (en) * 2008-08-08 2010-02-18 이성균 Structure and method for cunstructing loessial wall
JP2012219480A (en) * 2011-04-07 2012-11-12 Watanabe Kogyo Kk As-cast concrete finish construction method
CN108729603A (en) * 2017-04-25 2018-11-02 中国二十冶集团有限公司 It is segmented grid type wall plastering method
CN108589961A (en) * 2018-04-27 2018-09-28 上海恪耐新材料科技有限公司 Light gauge cold-formed steel shape composite gypsum mortar thermal insulation board outer wall body constructs and application
CN109339365A (en) * 2018-11-27 2019-02-15 陕西鼎盛装饰工程有限责任公司 A kind of inner wall surface seam lattice structure and construction method

Also Published As

Publication number Publication date
CN110439199B (en) 2020-10-27

Similar Documents

Publication Publication Date Title
CN103938764B (en) The rapid constructing method of indoor secondary light partition wall and this partition wall
BR0113509A (en) Extremely scratch resistant finish
US3678887A (en) Template-mash
CN106760599A (en) Sloughing of exterior wall restorative procedure
CN205976334U (en) From receipts limit timber apron of taking skirting line
CN201665978U (en) Inlaying-pressure lock-type elastic base material board
CN104453011B (en) A kind of lightweight external wall structure and its construction method
CN110439199A (en) A kind of indoor wall green covering with paint construction technology
CN204081199U (en) A kind of plaster tablet suspended ceiling of novel crack resistence
CN206829401U (en) A kind of 3D printing prefabricated buildings window
CN201614705U (en) Structure of heat-preservation sound-insulation wall
CN104405092A (en) Mould-transferring construction method for natural stone paint of outer wall
CN113482390A (en) Wall surface repairing method
US20150064443A1 (en) Light roofing system
CN210636717U (en) Moisture-proof wood veneer
CN203891376U (en) Fluorocarbon metallic paint coating structure
CN106761172B (en) The double-deck fire resistant doorsets crack structure and its construction technology
CN101592006A (en) A kind of window impaired method in construction that prevents
CN109723232A (en) A kind of roofing anti-leakage treatment method
CN104532719A (en) Polyurethane compression-tolerant floor structure and construction method thereof
CN211229258U (en) Wet environment wall paper is spread and is pasted structure
CN205986301U (en) Marble raw and other materials are moisturized and are placed storage shed
CN212099005U (en) Transfer device is used in plank processing
CN212104695U (en) Decorative wallboard structure for indoor design
CN107905497A (en) A kind of threshold closes up with floor and its manufacture craft

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant