CN110430231B - Management method and system for ubiquitous power Internet of things intelligent terminal APP - Google Patents

Management method and system for ubiquitous power Internet of things intelligent terminal APP Download PDF

Info

Publication number
CN110430231B
CN110430231B CN201910552904.8A CN201910552904A CN110430231B CN 110430231 B CN110430231 B CN 110430231B CN 201910552904 A CN201910552904 A CN 201910552904A CN 110430231 B CN110430231 B CN 110430231B
Authority
CN
China
Prior art keywords
intelligent terminal
power internet
things intelligent
ubiquitous
app
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910552904.8A
Other languages
Chinese (zh)
Other versions
CN110430231A (en
Inventor
刘海涛
王鹏
张治明
张冀川
郭屾
林佳颖
张明宇
孙浩洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201910552904.8A priority Critical patent/CN110430231B/en
Publication of CN110430231A publication Critical patent/CN110430231A/en
Application granted granted Critical
Publication of CN110430231B publication Critical patent/CN110430231B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/06Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network
    • H04L67/1095Replication or mirroring of data, e.g. scheduling or transport for data synchronisation between network nodes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • H04L67/125Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network

Abstract

The invention discloses a method and a system for managing ubiquitous power Internet of things intelligent terminals (APP), which comprise the following steps: the primary center detects the submitted ubiquitous power Internet of things intelligent terminal APP and issues the detected ubiquitous power Internet of things intelligent terminal APP; the secondary sub-center synchronizes ubiquitous power Internet of things intelligent terminals APP of the primary center; and the ubiquitous power Internet of things intelligent terminal downloads the ubiquitous power Internet of things intelligent terminal APP from the secondary branch center. The intelligent distribution transformer terminal APP management and deployment method solves the problem of management and deployment of massive ubiquitous power Internet of things intelligent terminals APP, reduces operation and maintenance cost and improves operation and maintenance efficiency through a management mode of two-stage centers, meanwhile, the participation of the one-stage centers ensures the safety and reliability of APP application, improves the running stability of the intelligent distribution transformer terminal APP, and reduces the risk of the whole system.

Description

Management method and system for ubiquitous power Internet of things intelligent terminal APP
Technical Field
The invention relates to the field of ubiquitous power Internet of things, in particular to a management method and system for a ubiquitous power Internet of things intelligent terminal APP.
Background
In order to realize the combination of various information sensing devices and communication information resources (Internet, telecommunication network and even electric power communication private network), a physical entity with self-identification, perception and intelligent processing is formed; the entities cooperate and interact with each other, so that related objects are mutually sensed and feedback-controlled to form a more intelligent power production and living system, and a ubiquitous intelligent power grid-communication-technology-based full-service ubiquitous power internet of things-ubiquitous power internet of things concept is derived. Can be simply understood as: all links of traditional power production, transmission and consumption are informationized, and the links can be called ubiquitous power Internet of things.
Along with extensive popularization and application of ubiquitous electric power thing networking intelligent terminal (edge thing allies oneself with agent), the APP that magnanimity was based on ubiquitous electric power thing networking intelligent terminal development will come into operation, carry out operations such as field installation, debugging one-to-one to all APPs, and work load is huge, the task is heavy, need consume a large amount of manpower and materials, in addition the developer numerous, lack unified management, it is big to lead to fortune dimension pressure, the field personnel are not enough to satisfy ubiquitous electric power thing networking intelligent terminal APP and maintain the demand, information security also can not be ensured in addition.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides a method and a system for managing a ubiquitous power Internet of things intelligent terminal APP.
The technical scheme provided by the invention is as follows: a management method for an intelligent terminal APP of a ubiquitous power Internet of things comprises the following steps:
the primary center detects the submitted ubiquitous power Internet of things intelligent terminal APP and issues the detected ubiquitous power Internet of things intelligent terminal APP;
the secondary sub-center synchronizes ubiquitous power Internet of things intelligent terminals APP of the primary center;
and the ubiquitous power Internet of things intelligent terminal downloads the ubiquitous power Internet of things intelligent terminal APP from the secondary branch center.
Preferably, the one-level center detects the ubiquitous electric power thing networking intelligent terminal APP who submits, include:
the primary center detects the submitted ubiquitous power Internet of things intelligent terminal APP based on set conditions;
and the primary center monitors the qualified ubiquitous electric power Internet of things intelligent terminal APP in the whole life cycle.
Preferably, the one-level center carries out full life cycle monitoring to detecting qualified ubiquitous electric power thing networking intelligent terminal APP, include:
the first-level center sets up the validity period for detecting qualified ubiquitous electric power thing networking intelligent terminal APP, and based on the operation that the validity period was released, was updated and was gone off the production line to corresponding ubiquitous electric power thing networking intelligent terminal APP.
Preferably, based on the validity period, corresponding ubiquitous power internet of things intelligent terminal APP is released, including:
the primary center checks all information to be issued in the ubiquitous electric power Internet of things intelligent terminal APP, and issues the ubiquitous electric power Internet of things intelligent terminal APP passing the check and the set valid period together.
Preferably, the second grade divides the central synchronization the ubiquitous electric power thing networking intelligent terminal APP at first grade center includes:
and the secondary branch center synchronizes all information of the ubiquitous electric power Internet of things intelligent terminal APP in the primary center and stores the information to the secondary branch center through an interface arranged between the secondary branch center and the primary center.
Preferably, the ubiquitous power thing networking intelligent terminal follows the second grade divides the center to download ubiquitous power thing networking intelligent terminal APP after, include:
and the ubiquitous power Internet of things intelligent terminal carries out life cycle management and running state feedback on the ubiquitous power Internet of things intelligent terminal APP.
Preferably, ubiquitous electric power thing networking intelligent terminal is to ubiquitous electric power thing networking intelligent terminal APP carries out the life cycle management, include:
the ubiquitous power Internet of things intelligent terminal conducts validity period check on the configuration file in the ubiquitous power Internet of things intelligent terminal APP;
when the ubiquitous power Internet of things intelligent terminal detects when the ubiquitous power Internet of things intelligent terminal APP is overdue, the ubiquitous power Internet of things intelligent terminal APP is unloaded, and unloading information is sent to the secondary branch center.
Preferably, ubiquitous electric power thing networking intelligent terminal is to ubiquitous electric power thing networking intelligent terminal APP carries out running state feedback, include:
the ubiquitous power Internet of things intelligent terminal feeds back the state of a ubiquitous power Internet of things intelligent terminal APP arranged on the ubiquitous power Internet of things intelligent terminal to a secondary branch center through an AC controller;
wherein the state comprises: installed, uninstalled, in-installation, start, stop, uninstall, and update.
Based on the same invention concept, the invention also provides a management system for the ubiquitous power Internet of things intelligent terminal APP, which comprises the following steps:
the primary center module is used for detecting the submitted ubiquitous power Internet of things intelligent terminal APP by the primary center and releasing the detected ubiquitous power Internet of things intelligent terminal APP;
the secondary sub-center module is used for synchronizing ubiquitous power Internet of things intelligent terminals APP of the primary center;
and the ubiquitous power Internet of things intelligent terminal downloads the ubiquitous power Internet of things intelligent terminal APP from the secondary branch center.
Preferably, the primary center module includes:
the detection unit is used for detecting the submitted ubiquitous power Internet of things intelligent terminal APP by the primary center based on set conditions;
and the life cycle management unit is used for carrying out full life cycle monitoring on the ubiquitous electric power Internet of things intelligent terminal APP qualified for detection by the primary center.
Compared with the prior art, the invention has the beneficial effects that:
according to the technical scheme provided by the invention, the primary center detects the submitted ubiquitous power Internet of things intelligent terminal APP and releases the detected ubiquitous power Internet of things intelligent terminal APP; the secondary sub-center synchronizes ubiquitous power Internet of things intelligent terminals APP of the primary center; wherein, ubiquitous electric power thing networking intelligent terminal follows the second grade divides the center to download ubiquitous electric power thing networking intelligent terminal APP, through the management of two-stage center mass ubiquitous electric power thing networking intelligent terminal APP has been solved to the installation that realizes long-range zero contact through the AC controller ubiquitous electric power thing networking intelligent terminal APP, the fortune dimension cost has been reduced, fortune dimension efficiency has been improved, the participation that has the one-level center simultaneously has ensured the safety and the reliability that the APP was used, the stability of ubiquitous electric power thing networking intelligent terminal APP operation has been improved, entire system's risk has been reduced.
According to the technical scheme provided by the invention, a primary center carries out unified management such as detection, release and offline on a ubiquitous power Internet of things intelligent terminal APP, a secondary sub-center carries out services such as downloading, selective issuing, updating and unloading on the ubiquitous power Internet of things intelligent terminal APP, the APP standardized management is realized, and flexible and reliable customized deployment of the APP in each distribution area is realized in a remote zero-contact mode.
According to the technical scheme provided by the invention, the management system requirements of 'unified management, hierarchical statistical analysis and diversified demand fusion' on the ubiquitous power Internet of things intelligent terminal APP are met, and standardized management of detection, release, installation, update, offline and the like of the ubiquitous power Internet of things intelligent terminal APP is realized.
According to the technical scheme, the method for hierarchical management of the ubiquitous power Internet of things intelligent terminal APP is provided, the overall management level of the ubiquitous power Internet of things intelligent terminal APP is improved, and a foundation is laid for building a ubiquitous power Internet of things intelligent terminal APP ecological system.
Drawings
FIG. 1 is a two-stage hub architecture diagram of the present invention;
FIG. 2 is a diagram of the data interaction architecture of the present invention;
FIG. 3 is a flow chart of a management method of the present invention;
wherein, 1 is a DB database, 2 is a resource cloud service, 3 is an application management service, 4 is a monitoring service, 5 is a verification service, 6 is a system service, 7 is a Web UI,8 is an application interface service, 9 is a REST, 10 is a micro service, 11 is a service integration, 12 is a page integration, 13 is other platform or system, 14 is an API Gateway,15 is a distribution Internet of things micro application management and control system (primary center), 16 is a distribution Internet of things micro application management and control system (secondary center), 17 is a secondary center 1, 18 is a secondary center 2, 19 is a secondary center n, 20 is an independent support service, 21 is a resource cloud service, 22 is an application management service, 23 is a monitoring service, 24 is a system service, 25 is a Web UI,26 is an application interface service, 27 is secondary center data, 28 is a user of the secondary center 1, 29 is a user of the secondary center 2, the user at the level two center n is 30, the page access is 31, and the interface access is 32.
Detailed Description
For a better understanding of the present invention, reference is made to the following description taken in conjunction with the accompanying drawings and examples.
Example 1
In order to solve the problem that massive ubiquitous power Internet of things intelligent terminals APP are lack of unified management and deployment, the ubiquitous power Internet of things intelligent terminal APP management system is based on a two-stage center framework, and through data stream interaction of two stages of centers, full-life cycle management in aspects of detection, release, management, operation and maintenance and the like of the ubiquitous power Internet of things intelligent terminals is achieved, so that users using the ubiquitous power Internet of things intelligent terminals can achieve flexible and reliable customized deployment of the ubiquitous power Internet of things intelligent terminals through a remote zero-contact mode according to actual APP application requirements of each power distribution area, and operation and maintenance efficiency is improved. Therefore, the user can flexibly and reliably perform customized deployment of the APP according to the requirement of each distribution area.
As shown in fig. 3, in order to achieve the above object, the technical solution adopted by the present invention is a method for managing a ubiquitous power internet of things intelligent terminal APP, including:
step S1, the primary center detects the submitted ubiquitous power Internet of things intelligent terminal APP and issues the detected ubiquitous power Internet of things intelligent terminal APP;
and S2, the secondary sub-center synchronizes the ubiquitous power Internet of things intelligent terminal APP of the primary center.
A two-stage central architecture management mode is adopted, and the architecture is respectively as follows from top to bottom: the system comprises a first-level center, a second-level branch center, an AC controller and a ubiquitous power Internet of things intelligent terminal, and is of a four-layer structure.
Wherein one-level center mainly includes: the APP micro-application monitoring system comprises functional modules for full-life cycle monitoring, resource cloud service, monitoring service, system management, service support and the like of APP micro-applications;
the secondary branch center is mainly responsible for synchronizing the APP authorized by the primary center to the secondary branch center in real time, so that the full-scale application and the full-scale data synchronous updating of the secondary branch center and the primary center are realized, and the secondary branch center can independently support the application of the ubiquitous power Internet of things intelligent terminal when the primary center fails;
the AC controller on the third layer is mainly responsible for connecting and communicating various districts, namely a ubiquitous power Internet of things intelligent terminal, downloading the APP of the secondary branch center to the AC controller, and then remotely installing the APP on the ubiquitous power Internet of things intelligent terminal in a zero-contact manner;
the fourth layer is a physical layer composed of ubiquitous power internet of things intelligent terminals and mainly responsible for acquiring and monitoring power grid monitoring data according to the task needs of the APP;
zero contact means need not go to on-the-spot installation APP, and direct issuing installation order through the system just can accomplish the installation work. The method mainly aims at the management architecture of the secondary branch center to realize the management of the ubiquitous power Internet of things intelligent terminal APP and the research of data flow, so that the third layer and the fourth layer are combined and subjected to data processing.
The design of the two-stage center for data interaction processing mainly aims at the management and interaction of APP application, and data are uniformly managed in a centralized mode by the one-stage center.
Step S1, the primary center detects the ubiquitous electric power thing networking intelligent terminal APP that submits to publish through the ubiquitous electric power thing networking intelligent terminal APP that detects, include:
the primary center performs unified full-life-cycle management on detection, release, update, offline and the like of the submitted ubiquitous power Internet of things intelligent terminal APP, and the APP is released by the primary center after being detected to be qualified;
step S2, the second-level sub-center synchronizes the ubiquitous power Internet of things intelligent terminal APP of the first-level center, and the method comprises the following steps:
after the APP is on line, the secondary branch center actively acquires the APP through the RESTful interface, and all data of the APP in the primary center are synchronized.
And then the AC controller downloads the APP of the secondary branch center according to different service requirements, and the APP is installed on the ubiquitous power Internet of things intelligent terminal in a zero-contact mode for service data acquisition.
And the ubiquitous power Internet of things intelligent terminal carries out life cycle management and running state feedback on the ubiquitous power Internet of things intelligent terminal APP.
Wherein, ubiquitous electric power thing networking intelligent terminal is to ubiquitous electric power thing networking intelligent terminal APP carries out the life cycle management, include:
the ubiquitous power Internet of things intelligent terminal conducts validity period check on the configuration file in the ubiquitous power Internet of things intelligent terminal APP;
when the ubiquitous power Internet of things intelligent terminal detects when the ubiquitous power Internet of things intelligent terminal APP is overdue, the ubiquitous power Internet of things intelligent terminal APP is unloaded, and unloading information is sent to the secondary branch center through the AC controller.
Further, ubiquitous electric power thing networking intelligent terminal pair ubiquitous electric power thing networking intelligent terminal APP carries out running state feedback, include:
the ubiquitous power Internet of things intelligent terminal feeds back the state of a ubiquitous power Internet of things intelligent terminal APP arranged on the ubiquitous power Internet of things intelligent terminal to a secondary branch center through an AC controller; the AC controller can synchronously transmit archive data, state data, operation data and the like of the ubiquitous power Internet of things intelligent terminal back to the secondary branch center and the primary center, and the service flow and unified management of cooperative monitoring are completed.
Wherein the state comprises: installed, uninstalled, in-installation, start, stop, uninstall, and update.
The basis for constructing the second-level central management framework in the invention is as follows: the levels of management mechanisms in the power grid field are sequentially divided downwards, China is taken as an example but not limited to China in the embodiment, a power distribution internet of things micro-application management and control system in a China electric academy is taken as a primary center, a power distribution internet of things management system of each province is taken as a secondary center, a person in charge under each province management center is a user, and the user determines to download and install the ubiquitous power internet of things intelligent terminal APP according to the requirement of the ubiquitous power internet of things intelligent terminal under jurisdiction.
Taking Jiangsu as an example in the practical process, firstly, an AC sampling APP is developed by Jiangsu Changzhou APP manufacturer, and the AC sampling APP is detected, registered, issued and authorized to be checked through a distribution Internet of things micro-application management and control system serving as a primary center;
secondly, the released APP is used as data of a primary center of a Hezhou company in Jiangsu province of a secondary branch center for real-time synchronization;
then, a professional (user) of the running inspection department of the Changzhou city bureau issues instructions of installation, uninstallation, updating and the like to the AC controller through a new generation of distribution automation master station system according to the requirements of the ubiquitous power Internet of things intelligent terminals under jurisdiction, the AC controller inquires and downloads ubiquitous power Internet of things intelligent terminals APP in the secondary sub-center through a management channel, and APP operation of all transformer areas of the Jiangsu Changzhou is achieved.
This embodiment further explains APP installation control:
APP developer passes through the detection back of china electric academy of sciences APP, carries out the signature authorization at distribution thing networking micro application management and control system one-level center to set up the validity period of this APP, carry out the setting of expiration time to the configuration file of APP promptly, for example configuration file content expiration time: 2019-05-28, verifying the APP after signature authentication and authorization, if the APP passes the verification, issuing the APP and the corresponding signature authentication and authorization file together, and synchronizing all data after the secondary sub-center inquires that the update exists;
the new generation distribution automation master station system of the secondary distribution center sends installation, unloading and APP updating instructions to the AC controller, the AC controller downloads and sends the instructions to a ubiquitous power Internet of things intelligent terminal (edge Internet of things agent) according to business requirements, the ubiquitous power Internet of things intelligent terminal (edge Internet of things agent) system conducts validity period check on APP configuration file contents, if the ubiquitous power Internet of things intelligent terminal (edge Internet of things agent) detects that the APP contains the expiration time information, the ubiquitous power Internet of things intelligent terminal can be compared with local time, an alarm is sent when the APP expires, and the software is automatically unloaded.
Example 2
Based on the same inventive concept, the embodiment of the invention also provides a management system for the ubiquitous power internet of things intelligent terminal APP, which comprises the following steps:
the primary center module is used for detecting the submitted ubiquitous power Internet of things intelligent terminal APP by the primary center and releasing the detected ubiquitous power Internet of things intelligent terminal APP;
the secondary sub-center module is used for synchronizing ubiquitous power Internet of things intelligent terminals APP of the primary center;
and the ubiquitous power Internet of things intelligent terminal downloads the ubiquitous power Internet of things intelligent terminal APP from the secondary branch center.
In an embodiment, the primary central module includes:
the detection unit is used for detecting the submitted ubiquitous power Internet of things intelligent terminal APP by the primary center based on set conditions;
and the life cycle management unit is used for carrying out full life cycle monitoring on the ubiquitous electric power Internet of things intelligent terminal APP qualified for detection by the primary center.
As will be appreciated by one skilled in the art, embodiments of the present application may be provided as a method, system, or computer program product. Accordingly, the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present application is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
The present invention is not limited to the above embodiments, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention are included in the scope of the claims of the present invention which are filed as the application.

Claims (9)

1. A management method for an intelligent terminal APP of a ubiquitous power Internet of things is characterized by comprising the following steps:
the primary center detects the submitted ubiquitous power Internet of things intelligent terminal APP and issues the detected ubiquitous power Internet of things intelligent terminal APP;
the secondary sub-center synchronizes ubiquitous power Internet of things intelligent terminals APP of the primary center;
the AC controller downloads the ubiquitous power Internet of things intelligent terminal APP in the secondary branch center based on business requirements, and remotely installs the ubiquitous power Internet of things intelligent terminal APP on the power Internet of things intelligent terminal in a zero-contact manner;
and the ubiquitous power Internet of things intelligent terminal carries out life cycle management and running state feedback on the ubiquitous power Internet of things intelligent terminal APP.
2. The method of claim 1, wherein the detection of the submitted ubiquitous power internet of things intelligent terminal (APP) by the primary center comprises:
the primary center detects the submitted ubiquitous power Internet of things intelligent terminal APP based on set conditions;
and the primary center monitors the qualified ubiquitous electric power Internet of things intelligent terminal APP in the whole life cycle.
3. The method of claim 2, wherein the full-life-cycle monitoring of the ubiquitous power internet of things intelligent terminal APP qualified for detection by the primary center comprises:
the first-level center sets up the validity period for detecting qualified ubiquitous electric power thing networking intelligent terminal APP, and based on the operation that the validity period was released, was updated and was gone off the production line to corresponding ubiquitous electric power thing networking intelligent terminal APP.
4. The method of claim 3, wherein the issuing of the corresponding ubiquitous power Internet of things intelligent terminal (APP) based on the validity period comprises:
the primary center checks all information to be issued in the ubiquitous electric power Internet of things intelligent terminal APP, and issues the ubiquitous electric power Internet of things intelligent terminal APP passing the check and the set valid period together.
5. The method of claim 1, wherein the secondary branch center synchronizing ubiquitous power internet of things intelligent terminals (APPs) of the primary center comprises:
and the secondary branch center synchronizes all information of the ubiquitous electric power Internet of things intelligent terminal APP in the primary center and stores the information to the secondary branch center through an interface arranged between the secondary branch center and the primary center.
6. The method of claim 1, wherein the life cycle management of the ubiquitous power internet of things smart terminal APP is performed on the ubiquitous power internet of things smart terminal APP and comprises the following steps:
the ubiquitous power Internet of things intelligent terminal conducts validity period check on the configuration file in the ubiquitous power Internet of things intelligent terminal APP;
when the ubiquitous power Internet of things intelligent terminal detects when the ubiquitous power Internet of things intelligent terminal APP is overdue, the ubiquitous power Internet of things intelligent terminal APP is unloaded, and unloading information is sent to the secondary branch center through the AC controller.
7. The method of claim 1, wherein the running state feedback of the ubiquitous power internet of things intelligent terminal APP is performed by the ubiquitous power internet of things intelligent terminal APP and comprises the following steps:
the ubiquitous power Internet of things intelligent terminal feeds back the state of a ubiquitous power Internet of things intelligent terminal APP arranged on the ubiquitous power Internet of things intelligent terminal to a secondary branch center through an AC controller;
wherein the state comprises: installed, uninstalled, in-installation, start, stop, uninstall, and update.
8. The utility model provides a management system to ubiquitous electric power thing networking intelligent terminal APP which characterized in that includes:
the primary center module is used for detecting the submitted ubiquitous power Internet of things intelligent terminal APP by the primary center and releasing the detected ubiquitous power Internet of things intelligent terminal APP;
the secondary sub-center module is used for synchronizing ubiquitous power Internet of things intelligent terminals APP of the primary center;
the AC controller is used for downloading the ubiquitous power Internet of things intelligent terminal APP in the secondary branch center based on business requirements and installing the ubiquitous power Internet of things intelligent terminal APP on the power Internet of things intelligent terminal in a remote zero-contact mode;
and the ubiquitous power Internet of things intelligent terminal is used for carrying out life cycle management and running state feedback on the ubiquitous power Internet of things intelligent terminal APP.
9. The system of claim 8, wherein the primary hub module comprises:
the detection unit is used for detecting the submitted ubiquitous power Internet of things intelligent terminal APP by the primary center based on set conditions;
and the life cycle management unit is used for carrying out full life cycle monitoring on the ubiquitous electric power Internet of things intelligent terminal APP qualified for detection by the primary center.
CN201910552904.8A 2019-06-24 2019-06-24 Management method and system for ubiquitous power Internet of things intelligent terminal APP Active CN110430231B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910552904.8A CN110430231B (en) 2019-06-24 2019-06-24 Management method and system for ubiquitous power Internet of things intelligent terminal APP

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910552904.8A CN110430231B (en) 2019-06-24 2019-06-24 Management method and system for ubiquitous power Internet of things intelligent terminal APP

Publications (2)

Publication Number Publication Date
CN110430231A CN110430231A (en) 2019-11-08
CN110430231B true CN110430231B (en) 2021-07-02

Family

ID=68409557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910552904.8A Active CN110430231B (en) 2019-06-24 2019-06-24 Management method and system for ubiquitous power Internet of things intelligent terminal APP

Country Status (1)

Country Link
CN (1) CN110430231B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111258679B (en) * 2020-01-20 2023-09-26 杭州海兴电力科技股份有限公司 APP life cycle management method applied to intelligent electric meter
CN113282303A (en) * 2021-04-27 2021-08-20 南方电网数字电网研究院有限公司 Application management method and device based on double-core intelligent electric meter and computer equipment

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103676798A (en) * 2012-09-10 2014-03-26 任伟 United monitoring platform
CN104394366A (en) * 2014-11-26 2015-03-04 东南大学 Distributed video streaming media transcoding access control method and system
CN104881746A (en) * 2015-06-01 2015-09-02 北京圆通慧达管理软件开发有限公司 Platform-as-a-service Paas platform architecture in management information system
CN105187223A (en) * 2014-06-16 2015-12-23 国家电网公司 Planning and designing system based on OTN network
CN105207222A (en) * 2015-09-17 2015-12-30 国网天津市电力公司 Intelligent electrical load distribution system and method
CN105653329A (en) * 2015-12-30 2016-06-08 国网信息通信产业集团有限公司 Application management method, apparatus and system
CN105871069A (en) * 2016-05-30 2016-08-17 中国电力科学研究院 Power distribution network information interoperation business verification method
US9819741B1 (en) * 2014-06-26 2017-11-14 Sudhir Pendse Device for sensor simulation using constrained application protocol
CN107425567A (en) * 2017-06-30 2017-12-01 吕青青 A kind of interactive intelligent charging system based on network control
CN107829582A (en) * 2017-12-15 2018-03-23 天津市中环富士智能设备有限公司 A kind of information-based multi-functional intelligent bus booth
WO2018078658A1 (en) * 2016-10-28 2018-05-03 Wisig Networks Private Limited Method and system for wireless communication between user equipment and base station for narrow-band iot
CN108845817A (en) * 2018-06-25 2018-11-20 宁波三星医疗电气股份有限公司 A kind of method of managing software for electric power acquisition terminal
CN109375594A (en) * 2018-10-10 2019-02-22 杭州润缘信息科技有限公司 Urban safety wisdom control platform and managing and control system
CN109410090A (en) * 2018-09-13 2019-03-01 张继升 A kind of Intelligent life service platform of function high integrity
CN109447048A (en) * 2018-12-25 2019-03-08 苏州闪驰数控系统集成有限公司 A kind of artificial intelligence early warning system

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103676798A (en) * 2012-09-10 2014-03-26 任伟 United monitoring platform
CN105187223A (en) * 2014-06-16 2015-12-23 国家电网公司 Planning and designing system based on OTN network
US9819741B1 (en) * 2014-06-26 2017-11-14 Sudhir Pendse Device for sensor simulation using constrained application protocol
CN104394366A (en) * 2014-11-26 2015-03-04 东南大学 Distributed video streaming media transcoding access control method and system
CN104881746A (en) * 2015-06-01 2015-09-02 北京圆通慧达管理软件开发有限公司 Platform-as-a-service Paas platform architecture in management information system
CN105207222A (en) * 2015-09-17 2015-12-30 国网天津市电力公司 Intelligent electrical load distribution system and method
CN105653329A (en) * 2015-12-30 2016-06-08 国网信息通信产业集团有限公司 Application management method, apparatus and system
CN105871069A (en) * 2016-05-30 2016-08-17 中国电力科学研究院 Power distribution network information interoperation business verification method
WO2018078658A1 (en) * 2016-10-28 2018-05-03 Wisig Networks Private Limited Method and system for wireless communication between user equipment and base station for narrow-band iot
CN107425567A (en) * 2017-06-30 2017-12-01 吕青青 A kind of interactive intelligent charging system based on network control
CN107829582A (en) * 2017-12-15 2018-03-23 天津市中环富士智能设备有限公司 A kind of information-based multi-functional intelligent bus booth
CN108845817A (en) * 2018-06-25 2018-11-20 宁波三星医疗电气股份有限公司 A kind of method of managing software for electric power acquisition terminal
CN109410090A (en) * 2018-09-13 2019-03-01 张继升 A kind of Intelligent life service platform of function high integrity
CN109375594A (en) * 2018-10-10 2019-02-22 杭州润缘信息科技有限公司 Urban safety wisdom control platform and managing and control system
CN109447048A (en) * 2018-12-25 2019-03-08 苏州闪驰数控系统集成有限公司 A kind of artificial intelligence early warning system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
5G通信与泛在电力物联网的融合:应用分析与研究展望;王毅;《电网技术》;20190531;全文 *
APP软件产品质量属性度量方法的研究与实现;刘莉芳;《中国优秀硕士学位论文数据库信息科技辑》;20180131;全文 *
多能互补综合能源电力系统的建设模式初探;王鹏;《电力科学与技术学报》;20190331;全文 *
泛在电力物联网发展建议及关键技术展望;胡畔;《湖北电力》;20190228;全文 *

Also Published As

Publication number Publication date
CN110430231A (en) 2019-11-08

Similar Documents

Publication Publication Date Title
CN106487589B (en) Terminal automatic access and configuration management method
CN109980776B (en) Intelligent distribution and transformation system and application method thereof
CN110430231B (en) Management method and system for ubiquitous power Internet of things intelligent terminal APP
CN109587242A (en) Platform of internet of things system and its cloud platform and local terminal
CN103051469B (en) Centralized configuring management method under cloud environment
CN106161644B (en) Distributed system for data processing and data processing method thereof
CN105577475A (en) Automatic performance test system and method
CN106095494B (en) The automatic updating system and method for elevator peripheral hardware program
CN110247981A (en) A kind of electric power scheduling automatization system application micro services remodeling method
CN105959363A (en) Big data cluster deployment method capable of adapting to hardware configuration
CN104881746A (en) Platform-as-a-service Paas platform architecture in management information system
CN103237077A (en) Cloud computing technology-based unified maintenance and on-demand sharing method for power grid models
CN103678007B (en) A kind of batch dispositions method of software and system
CN108052371A (en) Railway TDCS/CTC systems and its application based on virtualization technology
CN101895154B (en) Main and distribution network model splicing method and system in distribution network automation system
CN105045601A (en) Product publishing and deploying system based on cloud platform
CN108337256A (en) The method and system of Protocol Instantiation
CN110333909B (en) Modeling method for automatic configuration of automatic secondary equipment model
CN113515267A (en) PaaS platform based on industrial Internet of things
CN109389328A (en) A kind of card Product development process management method and system
CN105912565A (en) Monitoring information synchronization method applied to power industry
CN111190392A (en) Intelligent building management method and system based on block chain
CN113824801B (en) Intelligent integration terminal unified access management component system
CN114500530B (en) Automatic adjustment method for civil edge information system
CN106850806B (en) Data exchange method and device of intelligent building and energy efficiency monitoring system based on Internet of things

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant