CN110429531A - It is a kind of that there is the porous cable testing bridge built convenient for assembling integration is internal - Google Patents
It is a kind of that there is the porous cable testing bridge built convenient for assembling integration is internal Download PDFInfo
- Publication number
- CN110429531A CN110429531A CN201910649709.7A CN201910649709A CN110429531A CN 110429531 A CN110429531 A CN 110429531A CN 201910649709 A CN201910649709 A CN 201910649709A CN 110429531 A CN110429531 A CN 110429531A
- Authority
- CN
- China
- Prior art keywords
- frame side
- cable
- testing bridge
- support plate
- convenient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/04—Protective tubing or conduits, e.g. cable ladders or cable troughs
- H02G3/0437—Channels
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/30—Installations of cables or lines on walls, floors or ceilings
- H02G3/34—Installations of cables or lines on walls, floors or ceilings using separate protective tubing
Abstract
There is the porous cable testing bridge built convenient for assembling integration is internal the invention discloses a kind of, including fixed platform sling, frame side and metallic channel, hanger is connected with below the fixed platform sling, and the middle-end of hanger is connected with attachment base, the attachment base is internally provided with perforation, and slide cover is connected with below attachment base, the frame side is set to the one end of screw close to attachment base, and the upper end of frame side is provided with link slot, the frame side is internally connected with cable support plate, and the cable that is internally provided with of cable support plate connects hole, connection wall is provided with above the left and right sides of the cable support plate, and it is provided on the outside of the left and right ends appearance wall of cable support plate and takes slot, the lower end of the frame side is provided with detent slot.This convenient for assembling integration is internal there is the porous cable testing bridge built to be provided with slide cover, when needing to carry more cable, it is only necessary to change the slide cover of different model size, then can reach higher carrying range in connection frame side.
Description
Technical field
It is specially a kind of that there is porous build convenient for assembling integration is internal the present invention relates to cable bridge device technical field
Cable testing bridge.
Background technique
Cable testing bridge is widely used in cable work, manufacture cable testing bridge used by material include various metals and
Nonmetallic materials, such as mild steel, stainless steel, aluminium alloy and engineering plastics, cable testing bridge are divided into slot type, pellet type and ladder
The structures such as formula, grid type are made of bracket, trailing arm and installation attachment etc., and gantry can independently be set up in building, can also be applied
It is located on various buildings or structures and piping lane bracket, Ying Tixian structure is simple, handsome in appearance, configuration is flexible and easy to maintenance etc. special
Point, whole parts are both needed to carry out zinc-plated processing, are mounted on gantry outdoor outside building.
Cable testing bridge in the market assembling with install when due to part for fixing it is seldom, so installing very numb
It is tired, need more people to assist, and internal structure is simple, the low problem of cable bearing capacity, for this purpose, it is proposed that a kind of convenient for assembling
Integration is internal to have the porous cable testing bridge built.
Summary of the invention
There is the porous cable testing bridge built convenient for assembling integration is internal the purpose of the present invention is to provide a kind of, to solve
Cable testing bridge mentioned above in the background art assembling with install when due to part for fixing it is seldom, so installing
It is pretty troublesome, need more people to assist, and internal structure is simple, the low problem of cable bearing capacity.
To achieve the above object, the invention provides the following technical scheme: a kind of have porous take convenient for assembling integration is internal
The cable testing bridge built, including fixed platform sling, frame side and metallic channel, are connected with hanger below the fixed platform sling, and hanger
Middle-end is connected with attachment base, and the attachment base is internally provided with perforation, and slide cover is connected with below attachment base, described
It is provided with threaded hole at left and right sides of slide cover, and threaded hole is internally connected with screw, the frame side is set to screw and leans on
One end of nearly attachment base, and the upper end of frame side is provided with link slot, the frame side is internally connected with cable support plate, and cable carries
The cable that is internally provided with of plate connects hole, is provided with connection wall above the left and right sides of the cable support plate.
Preferably, there are two the fixed platform sling is arranged altogether, and the vertical central axes pair between fixed platform sling about hanger
Claim.
Preferably, the inside of the attachment base is in hollow form structure, the internal shape of the perforation and hanger it is outer
Portion's shape and structure matches.
Preferably, to be flexibly connected between the slide cover and frame side, and about the vertical of slide cover between frame side
Central axes are symmetrical.
Preferably, there are two the frame side is arranged altogether, and the cross section of frame side is in "eight" shape structure.
Preferably, there are two the cable support plate is arranged altogether, and the inside of cable support plate is in hollow form structure.
Preferably, the metallic channel is set to the top of cable support plate.
Preferably, the lower end of the frame side is provided with detent slot.
Preferably, it is provided on the outside of the left and right ends appearance wall of the cable support plate and takes slot.
Compared with prior art, the beneficial effects of the present invention are:
1. should have the porous cable testing bridge built to be provided with fixed platform sling convenient for assembling integration is internal, currently on the market
Industrial cable testing bridge is generally built to be had reached beautiful with effect that is saving land occupation on roof, and this is novel in order to reach stable
Suspension, there are two fixed platform slings for setting, and are distributed in the both ends of hanger, to guarantee that cable testing bridge will not tilt, city
Mounting structure used is usually and directly cable testing bridge is wrapped on hanger on field, although such structure stability is high,
Waste material, and height is lower, and this it is novel be connected using hanger perforation perforation with attachment base have reached stable hang
Less material can be used in structure in structure in this way, and can achieve same stablizing effect;
2. being when cable testing bridge needs to assemble to constitute slide construction by link slot between slide cover and frame side
It needs the both ends of slide cover are corresponding with the position of link slot and then slide cover is pushed into frame side, it then will by screw
Slide cover is connect with the threaded hole in frame side, that is, may make up stable portal structure, and is provided on slide cover more
Threaded hole, slide cover can be used for the junction between frame side, play the effect of link block, and connection effect is steady
It is fixed;
3. there are two frame side is arranged altogether, and being connected to the left and right ends of slide cover, cable currently on the market
Gantry is the structure for the formula of being fixed as one, and such structure greatly limits the ability of cable testing bridge carrying cable, this is novel
There are two frame side settings and is flexibly connected with slide cover, when needing to carry more cable, it is only necessary to change difference
Then the slide cover of model size can reach higher carrying range in connection frame side, production cable bridge be greatly saved
Material required for frame, and the structure of bottom "eight" shape can prevent droplet from entering inside cable testing bridge, reduce cable
Service life, the inside of frame side can carry two pieces of cable support plates, and cable testing bridge currently on the market can only carry one layer of cable,
Such structure limits the bearing capacity of cable testing bridge, and the new internal is provided with and takes slot, can carry two pieces of cables and carry
Cable can be divided into two layers by plate, have reached the effect for expanding bearing capacity.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is left view structural representation of the present invention;
Fig. 3 is cable carrying board structure schematic diagram of the present invention;
Fig. 4 is enlarged structure schematic diagram at A in Fig. 1 of the present invention.
In figure: 1, fixed platform sling;2, hanger;3, attachment base;4, it perforates;5, slide cover;6, threaded hole;7, screw;8,
Frame side;9, link slot;10, cable support plate;11, cable connects hole;12, connection wall;13, slot is taken;14, metallic channel;15, detent slot.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, the present invention provides a kind of technical solution: a kind of that there is porous build convenient for assembling integration is internal
Cable testing bridge, including fixed platform sling 1, hanger 2, attachment base 3, perforation 4, slide cover 5, threaded hole 6, screw 7, frame side 8, connection
Slot 9, cable support plate 10, cable connect hole 11, connection wall 12, take slot 13, metallic channel 14 and detent slot 15, the lower section of fixed platform sling 1
Be connected with hanger 2, and the middle-end of hanger 2 is connected with attachment base 3, fixed platform sling 1 is altogether there are two settings, and fixed platform sling 1 it
Between about hanger 2 vertical central axes it is symmetrical, should internal that there is the porous cable testing bridge built to be provided be solid convenient for assembling integration
Determine platform sling 1, industrial cable testing bridge currently on the market, which is generally built, has reached the beautiful effect with saving land occupation on roof,
And this is novel in order to reach stable suspension, there are two fixed platform slings 1 for setting, and are distributed in the both ends of hanger 2, to protect
Card cable testing bridge will not tilt, and attachment base 3 is internally provided with perforation 4, and the lower section of attachment base 3 is connected with slide cover 5,
The inside of attachment base 3 is in hollow form structure, and 4 internal shape of perforating matches with the outer shape structure of hanger 2, market
Upper mounting structure used is usually that directly cable testing bridge is wrapped on hanger 2, although such structure stability is high,
Waste material, and height is lower, and this it is novel be connected using the perforation of hanger 2 perforation 4 with attachment base 3 have reached stable hang
Less material can be used in structure in structure in this way, and can achieve same stablizing effect, slide cover 5 or so
Two sides are provided with threaded hole 6, and threaded hole 6 is internally connected with screw 7, and frame side 8 is set to screw 7 close to attachment base 3
One end, and the upper end of frame side 8 is provided with link slot 9, is flexibly connected between slide cover 5 and frame side 8, and close between frame side 8
It is symmetrical in the vertical central axes of slide cover 5, by link slot 9 to constitute slide construction between slide cover 5 and frame side 8, when
When cable testing bridge needs to assemble, be need the both ends of slide cover 5 are corresponding with the position of link slot 9 then by slide cover 5
It is pushed into frame side 8, slide cover 5 is connect by screw 7 with the threaded hole 6 in frame side 8 then, that is, may make up stable bridge
Frame structure, and more threaded hole 6 is provided on slide cover 5, the connection that slide cover 5 can be used between frame side 8
The effect of link block is played at place, and connection effect is stablized;
There are two frame side 8 is arranged altogether, and the cross section of frame side 8 is in "eight" shape structure, and there are two the total settings of frame side 8, and
And the left and right ends of slide cover 5 are connected to, cable testing bridge currently on the market is the structure for the formula of being fixed as one, in this way
Structure greatly limit the ability of cable testing bridge carrying cable, the novel setting of frame side 8 there are two and and slide lid
Plate 5 is flexibly connected, when needing to carry more cable, it is only necessary to the slide cover 5 of different model size is changed, then even
Edge fit frame 8 can reach higher carrying range, and material required for production cable testing bridge, and bottom " eight " are greatly saved
The structure of font can prevent droplet from entering inside cable testing bridge, reduce the service life of cable, and frame side 8 is internally connected with
Cable support plate 10, and the cable that is internally provided with of cable support plate 10 connects hole 11, there are two the total settings of cable support plate 10, and cable carries
The inside of plate 10 is in hollow form structure, and the inside of frame side 8 can carry two pieces of cable support plates 10, cable testing bridge currently on the market
One layer of cable can only be carried, such structure limits the bearing capacity of cable testing bridge, and the new internal is provided with and takes slot 13,
Two pieces of cable support plates 10 can be carried, cable can be divided into two layers, the effect for expanding bearing capacity, cable support plate 10 are had reached
The left and right sides above be provided with connection wall 12, and be provided on the outside of the left and right ends appearance wall of cable support plate 10 and take slot 13,
Metallic channel 14 is set to the top of cable support plate 10, and the lower end of frame side 8 is provided with detent slot 15.
Working principle: there is the porous cable testing bridge built convenient for assembling integration is internal for this kind of, first by hanger 2
Rock-steady structure is constituted by perforation 4 and attachment base 3, then connect slide cover 5 with screw 7 with frame side 8 by threaded hole 6,
Cable support plate 10 is promoted in frame side 8 by taking slot 13, then completes to connect by screw 7 and connection wall 12, according to cable
Width determines whether cable support plate 10 needs to carry two pieces with quantity, and after the completion of entire cable testing bridge is fixed, cable is passed through
Cable on cable support plate 10 connects hole 11 and is connected in cable support plate 10, and secures the cable in metallic channel 14, then logical
It crosses fixed platform sling 1 and the cable testing bridge for being equipped with cable is fixed on wall top, the junction between fixed platform sling 1 and wall top should determine
Phase checks whether there is unstable factor, is hurted sb.'s feelings with preventing cable testing bridge from falling, when cable testing bridge needs to remove, according to above-mentioned stream
Journey removes cable testing bridge, then piles up frame side 8 together, finally by rope by detent slot 15 and other frame side 8
Rope fixation can be such that 8 stacked structure of frame side stablizes, and complete entirely have the porous electricity built convenient for assembling integration is internal like this
The use process of cable gantry.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (9)
1. a kind of have the porous cable testing bridge built convenient for assembling integration is internal, including fixes platform sling (1), frame side (8) and lead
Wire casing (14), it is characterised in that: be connected with hanger (2) below the fixed platform sling (1), and the middle-end of hanger (2) is connected with
Attachment base (3), the attachment base (3) is internally provided with perforation (4), and is connected with slide cover below attachment base (3)
(5), it is provided with threaded hole (6) at left and right sides of the slide cover (5), and threaded hole (6) is internally connected with screw (7),
The frame side (8) is set to the one end of screw (7) close to attachment base (3), and the upper end of frame side (8) is provided with link slot (9), institute
Being internally connected with cable support plate (10) for frame side (8) is stated, and the cable that is internally provided with of cable support plate (10) connects hole (11), it is described
Connection wall (12) are provided with above the left and right sides of cable support plate (10).
2. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: there are two the fixed platform sling (1) is arranged altogether, and the vertical central axes between fixed platform sling (1) about hanger (2) are symmetrical.
3. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: the inside of the attachment base (3) is in hollow form structure, the internal shape of the perforation (4) and the external shape of hanger (2)
Shape structure matches.
4. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: to be flexibly connected between the slide cover (5) and frame side (8), and about the vertical of slide cover (5) between frame side (8)
Central axes are symmetrical.
5. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: there are two the frame side (8) is arranged altogether, and the cross section of frame side (8) is in "eight" shape structure.
6. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: there are two the cable support plate (10) is arranged altogether, and the inside of cable support plate (10) is in hollow form structure.
7. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: the metallic channel (14) is set to the top of cable support plate (10).
8. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: the lower end of the frame side (8) is provided with detent slot (15).
9. according to claim 1 a kind of convenient for assembling integration inside with the porous cable testing bridge built, feature exists
In: it is provided on the outside of the left and right ends appearance wall of the cable support plate (10) and takes slot (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910649709.7A CN110429531A (en) | 2019-07-18 | 2019-07-18 | It is a kind of that there is the porous cable testing bridge built convenient for assembling integration is internal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910649709.7A CN110429531A (en) | 2019-07-18 | 2019-07-18 | It is a kind of that there is the porous cable testing bridge built convenient for assembling integration is internal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110429531A true CN110429531A (en) | 2019-11-08 |
Family
ID=68410981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910649709.7A Pending CN110429531A (en) | 2019-07-18 | 2019-07-18 | It is a kind of that there is the porous cable testing bridge built convenient for assembling integration is internal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110429531A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204333828U (en) * | 2014-12-22 | 2015-05-13 | 安徽坤和电气有限公司 | A kind of groove-splitting cable testing bridge |
CN205429615U (en) * | 2016-01-06 | 2016-08-03 | 宁夏回族自治区电力设计院 | Hoist and mount type cable crane span structure |
CN207098502U (en) * | 2017-07-21 | 2018-03-13 | 江苏易元新材料科技有限公司 | A kind of Novel cable bridge |
CN209071993U (en) * | 2018-12-19 | 2019-07-05 | 天长市福骏金属制品有限公司 | A kind of cable testing bridge hanging box and the gantry component using the hanging box |
-
2019
- 2019-07-18 CN CN201910649709.7A patent/CN110429531A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204333828U (en) * | 2014-12-22 | 2015-05-13 | 安徽坤和电气有限公司 | A kind of groove-splitting cable testing bridge |
CN205429615U (en) * | 2016-01-06 | 2016-08-03 | 宁夏回族自治区电力设计院 | Hoist and mount type cable crane span structure |
CN207098502U (en) * | 2017-07-21 | 2018-03-13 | 江苏易元新材料科技有限公司 | A kind of Novel cable bridge |
CN209071993U (en) * | 2018-12-19 | 2019-07-05 | 天长市福骏金属制品有限公司 | A kind of cable testing bridge hanging box and the gantry component using the hanging box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205677106U (en) | Frame mesh wall anti-side structure | |
CN110429531A (en) | It is a kind of that there is the porous cable testing bridge built convenient for assembling integration is internal | |
CN204370836U (en) | Pin-connected panel human settlements honeycomb | |
CN108649503A (en) | A kind of steel cable bridge suitable for a variety of occasions | |
CN210767444U (en) | Novel steel construction for construction | |
CN207998973U (en) | Pendant and ceiling joist component | |
CN205259928U (en) | Perpendicular cat ladder of suspension type | |
CN209134010U (en) | A kind of cable testing bridge of deformation resistant | |
CN204983608U (en) | Hanging flower basket is used in installation | |
CN211473438U (en) | Light steel structure hanging beam suspension device | |
CN212078933U (en) | Combined partition plate device in building | |
CN216305337U (en) | Lifting type operation platform for assembly type building stairwell | |
CN215174860U (en) | High altitude lamps and lanterns installing support | |
CN206917599U (en) | A kind of working climb of builder helps device | |
CN205276146U (en) | Airborne platform | |
CN201845852U (en) | Single-person portable bias-feed satellite antenna | |
CN220379574U (en) | Lamp mounting structure for metal curtain wall | |
CN107945653A (en) | A kind of electric power tower Sign Board fixing bracket | |
CN217630468U (en) | Glass dome with deformed steel structure | |
CN204626263U (en) | A kind of outrigger structure for installing steel box-girder | |
CN215977965U (en) | Energy-saving curtain wall for architectural decoration | |
CN202273340U (en) | Curtain wall plate for suspended curtain wall | |
CN211063913U (en) | Hanging case convenient to height-adjusting | |
CN210658858U (en) | Curtain wall panel corner connecting piece | |
CN211475580U (en) | Fast-mounting line lamp without fastening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191108 |
|
RJ01 | Rejection of invention patent application after publication |