CN110428222A - Finishing project management-control method and system - Google Patents
Finishing project management-control method and system Download PDFInfo
- Publication number
- CN110428222A CN110428222A CN201910666370.1A CN201910666370A CN110428222A CN 110428222 A CN110428222 A CN 110428222A CN 201910666370 A CN201910666370 A CN 201910666370A CN 110428222 A CN110428222 A CN 110428222A
- Authority
- CN
- China
- Prior art keywords
- information
- finishing project
- current
- duration
- control method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
Abstract
The present invention relates to interior decoration fields, disclose a kind of finishing project management-control method, including, obtain the corresponding estimated duration information of current finishing project;Obtain the actual construction time information of current finishing project;It compares estimated duration information and actual construction time information and obtains duration comparing result information, according to duration comparing result information inquire preset duration comparing result information corresponding to prompting mode information, actual construction time information is highlighted according to prompting mode information and feeds back to current owner;Obtain the corresponding predetermined selection information of current finishing project;Obtain the practical selection information of current finishing project;Reservation selection information and practical selection information are shown and feed back to current owner.The present invention has the effect of that owner is facilitated to exercise supervision fitment process.
Description
Technical field
The present invention relates to the technical fields of interior decoration, more particularly, to a kind of finishing project management-control method and system.
Background technique
Finishing is also known as decorate or is decorated at present.Refer to and carried out in certain area and range, including Hydroelectric Project Construction, wall
What body, floor, ceiling, landscape etc. were realized, a whole set of arrangement and method for construction formed according to certain design concept and beautiful rule
And design scheme.
Existing, owner often gives the process entirely fitted up to decoration company and carries out when fitting up to house
It is responsible for, to mitigate the burden of oneself.
Prior art among the above has the following deficiencies: but in entire fitment process, and decoration company often will be each
A finishing node subpackage gives other people, and decoration company is difficult to carry out entire fitment process more effective control, leads to responsibility
Excessively disperse, management is in disorder, and owner can not timely get the information of the progress of finishing and the material of actual use, can not be right
Fitment process exercises supervision, and finally makes decoration cost excessively high, decoration quality is poor.
Summary of the invention
In view of the deficienciess of the prior art, having the invention reside in a kind of finishing project management-control method and system is provided
The effect for facilitating owner to exercise supervision fitment process.
To achieve the above object, the present invention provides the following technical scheme that a kind of finishing project management-control method, including,
Obtain the corresponding estimated duration information of current finishing project;
Obtain the actual construction time information of current finishing project;
It compares estimated duration information and actual construction time information and obtains duration comparing result information, according to duration comparing result information
Prompting mode information corresponding to preset duration comparing result information is inquired, according to prompting mode information to actual construction time information
It is highlighted and feeds back to current owner;
Obtain the corresponding predetermined selection information of current finishing project;
Obtain the practical selection information of current finishing project;
Reservation selection information and practical selection information are shown and feed back to current owner.
By using above-mentioned technical proposal, estimated duration information is established, and obtains actual construction time information, to estimated duration letter
Breath and actual construction time information compare and generate comparing result, determine prompting mode information according to comparing result, and according to mentioning
Show that mode information highlights actual construction time information and feeds back at owner, to keep owner relatively clear
The case where solution is to the actual construction time, owner is facilitated to exercise supervision fitment process.
The present invention is further arranged to: obtaining the corresponding estimated duration information of current finishing project includes,
Obtain area information corresponding to current finishing project;
Obtain type of house information corresponding to current finishing project;
Information and type of house information according to area, from preset area information, type of house information with it is expected that duration information
Default duration information is determined in corresponding relationship.
By using above-mentioned technical proposal, area information and type of house information are obtained, according to area information and house class
Type information determines corresponding default duration information, to formulate the preset duration so that owner and actual construction time compare.
The present invention is further arranged to: obtaining the corresponding predetermined selection information of current finishing project includes,
Obtain budget information corresponding to current finishing project;
Obtain design style information corresponding to current finishing project;
Obtain supplier information corresponding to current finishing project;
It is determined according to budget information, design style information and supplier information and subscribes selection information.
By using above-mentioned technical proposal, determined in advance according to budget information, design style information and supplier information are comprehensive
Selection information is ordered, so that owner be made to can determine the selection for enabling oneself be satisfied with, the later period is also facilitated to compare with practical selection.
The present invention is further arranged to: obtaining design style information corresponding to current finishing project includes,
Obtain the corresponding design style name information of current finishing project;
The corresponding design style information of the design style name information is inquired according to design style name information;
The design style information includes material category, material quantity and images of materials.
By using above-mentioned technical proposal, material type, the material of actual use are determined according to design style name information
Quantity and images of materials make material meet the requirement of oneself to recognize material type used in work progress.
The present invention is further arranged to: the actual construction time information includes construction time information and project under construction information.
By using above-mentioned technical proposal, actual construction time information and project under construction are recorded, to make industry
Master can timely recognize the progress of construction and situation slack in work whether occurs.
The present invention is further arranged to: the practical selection information includes material arrival time, material category, material supply
Quotient, material price, material quantity and images of materials.
By using above-mentioned technical proposal, by obtaining material arrival time, material category, material supplier, material valence
Lattice, material quantity and images of materials enable owner to recognize whether the entry time of material is to be consistent the construction time, can
To recognize whether the material chosen is identical as the material subscribed before, and whether material flaw occurs during transportation, thus
Facilitate control of the owner to construction.
The present invention is further arranged to: being shown to reservation selection information and practical selection information and is fed back to current industry
Master includes,
It is shown side by side to material information and practical selection information is subscribed;
Material information and real material information are subscribed in comparison, are determined the difference subscribed material information from real material information and are dashed forward
It shows out.
By using above-mentioned technical proposal, the display arranged side by side of material information and real material information is subscribed, enables owner
It is enough that more intuitively reservation material information and practical selection information are compared, difference is highlighted, so that industry
Master can be relatively clear the difference both recognized, to quickly judge.
The present invention is further arranged to: further include,
Obtain the image information on the spot of current finishing project;
Feedback on the spot image information to current owner.
By using above-mentioned technical proposal, condition of construction can be recognized by obtaining image information, owner on the spot, thus
Determine that construction personnel with the presence or absence of situation slack in work, facilitates owner to exercise supervision condition of construction.
The present invention is further arranged to: the prompting mode information includes that engineering extension prompting message and engineering indicate in advance
Information.
By using above-mentioned technical proposal, prompt information includes that engineering extension prompting message and engineering indicate information in advance,
To enable owner explicitly to recognize duration situation
To achieve the above object, the present invention provides the following technical scheme that a kind of finishing project management control system, including,
Actual construction time acquiring unit, for inputting actual construction time information;
It is expected that duration acquiring unit, for obtaining area information and type of house information and generating default duration information;
Selection information acquisition unit is subscribed, for obtaining budget information, design style information and supplier information, and generates reservation
Selection information;Practical selection information acquisition unit, for obtaining practical selection information;
Construction image acquisition unit, for obtaining construction site image information;
Background process storage unit is obtained for receiving actual construction time acquiring unit, estimated duration acquiring unit, subscribing selection information
Take unit, practical selection information acquisition unit and construction image acquisition unit transmission data and carry out processing storage;
Feedback unit, for obtaining the data of background process storage unit output and being shown.
By using above-mentioned technical proposal, background process storage unit obtains actual construction time acquiring unit, estimated duration
Unit, subscribe selection information acquisition unit, practical selection information acquisition unit and construction image acquisition unit transmit data into
Row receives and processes, and is then shown by feedback unit, so that owner be facilitated to exercise supervision fitment process.
In conclusion the invention has the following advantages:
By the acquisition to actual construction time information, the acquisition to practical selection, to realize estimated duration information and actual construction time
The comparison of information subscribes the comparison of selection information and practical selection information, so that owner be enable to form preferably fitment process
Supervision.
Detailed description of the invention
Fig. 1 is step figure of the invention;
Fig. 2 is system block diagram of the invention.
Appended drawing reference: 1, actual construction time acquiring unit;2, estimated duration acquiring unit;3, selection acquisition of information list is subscribed
Member;4, practical selection information acquisition unit;5, construction image acquisition unit;6, background process storage unit;7, feedback unit.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Fig.1, is a kind of finishing project management-control method disclosed by the invention, including,
S1: the corresponding estimated duration information of current finishing project is obtained, obtains area information corresponding to current finishing project, so
Type of house information corresponding to current finishing project is obtained afterwards, according to area information and type of house information, from preset face
Product information, type of house information preset duration information with it is expected that determining in the corresponding relationship of duration information.If the area in house is believed
Breath is 120 square meters, and type of house information is new house, then in preset area information, type of house information and it is expected that duration information
Corresponding relationship find default duration information corresponding with 120 square meters and new house.
S2: the actual construction time information of current finishing project is obtained, decoration company personnel are according to practice of construction situation, to construction
Temporal information and project under construction information are inputted.
S3: comparing estimated duration information and actual construction time information and obtains duration comparing result information, is compared according to the duration
Result information inquires prompting mode information corresponding to preset duration comparing result information, according to prompting mode information to reality
Duration information is highlighted and is fed back to current owner, and prompt information includes that engineering extension prompting message and engineering refer in advance
Show information, if the estimated duration information on March 15 is furring tile laying, actual construction time information is wall surface leveling, is recognized after comparison
Determining wall surface leveling is the preamble work that furring tile is laid with, then duration comparing result information is engineering extension, is compared according to the duration
Result information finds prompting mode information corresponding with engineering extension, and according to prompting mode information to actual construction time information into
Row highlight, if prompting mode information be display engineering extension and mark it is red, in this way to Practical Project information carry out
It highlights, keeps owner visible in detail.
S4: the corresponding predetermined selection information of current finishing project is obtained, the letter of budget corresponding to current finishing project is obtained
Breath obtains the corresponding design style name information of current finishing project, inquires the design style according to design style name information
The corresponding design style information of name information, obtains supplier information corresponding to current finishing project, according to budget information, sets
It counts style information and supplier information determines and subscribes selection information.Owner first selects budget information, and then owner is to design style
Name information is selected, and the selection of supplier information is finally carried out, such as owner has first selected 100,000 budgets, then owner couple
Mediterranean formula style has been selected, finally supplier has been selected, the total price of material provided by the supplier is less than or equal to
100,000 budgets of owner, while also material category, material quantity, material price and images of materials are shown.
S5: the practical selection information of current finishing project is obtained, when practical selection reaches construction site, to practical selection
Material arrival time, material category, material supplier, material price, material quantity and images of materials recorded.
S6: current owner is shown and is fed back to selection information and practical selection information is subscribed, is believed material is subscribed
Breath and practical selection information are shown that material information and real material information are subscribed in comparison side by side, are determined and are subscribed material information
Difference from real material information simultaneously highlights.If some ceramic tile reaches construction site, obtaining for practical selection information is carried out
After taking, by the arrival time for the ceramic tile being actually reached, material category, material supplier, material price, material quantity and material figure
As being shown, while material category, material supplier, material price, material quantity and the material for subscribing ceramic tile are also shown side by side
Expect image, and the difference of the two is highlighted.
Further include:
Obtain the image information on the spot of current finishing project, feedback on the spot image information to current owner.Obtain decorating house
Image information on the spot, and image information will feed back at owner on the spot, the condition of construction of worker can be observed in owner.
It is a kind of finishing project management control system disclosed by the invention referring to Fig. 2, including actual construction time acquiring unit 1, estimated
Duration acquiring unit 2, subscribe selection information acquisition unit 3, practical selection information acquisition unit 4, construct image acquisition unit 5,
Background process storage unit 6 and feedback unit 7, actual construction time acquiring unit 1, subscribe selection information at estimated duration acquiring unit 2
Acquiring unit 3, practical selection information acquisition unit 4, construction image acquisition unit 5 and feedback unit 7 are stored with background process
Unit 6 is electrically connected.Actual construction time acquiring unit 1, estimated duration acquiring unit 2 and reservation selection information acquisition unit 3 are electricity
The physical keyboard of the dummy keyboard or mobile terminal of brain keyboard or mobile terminal, practical selection information acquisition unit 4 are mobile whole
The camera at end, construction image acquisition unit 5 are camera, and background process storage unit 6 is server, and feedback unit 7 is electricity
The display screen of brain display screen or mobile terminal.By actual construction time acquiring unit 1, estimated duration acquiring unit 2, subscribe selection letter
It ceases acquiring unit 3 and practical selection information acquisition unit 4 carries out the input of data, background process storage unit 6 carries out data
Processing storage, and shown by feedback unit 7.Construction site image is obtained by construction image acquisition unit 5, is deposited from the background
Storage processing unit handle to image information and be shown by feedback unit 7.
The implementation principle of the present embodiment are as follows: it is expected that duration acquiring unit 2 obtains the area information and house class of owner's input
Type information, and default duration information is generated, and default duration information is transmitted to background process storage unit 6 and is stored, it is real
Border duration acquiring unit 1 obtains the input actual construction time information of decoration company, and is transmitted to background process storage unit 6 and is deposited
Storage.Budget information, design style information and supplier information that selection information acquisition unit 3 obtains owner's input are subscribed, and raw
It at selection information is subscribed, is transmitted to background process storage unit 6 and is stored, practical selection information acquisition unit 4 obtains construction
The practical selection information of personnel's input, and be transmitted to background process storage unit 6 and stored, construction image acquisition unit 5 obtains
It takes construction site image information and is transmitted to background process storage unit 6 and stored.6 pairs of background process storage unit storage
Data are called processing, and are transmitted at feedback unit 7 and are shown, so that owner be enable more to get information about reality
Border construction speed and material actually transport to quality, conveniently exercise supervision to whole process.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (10)
1. a kind of finishing project management-control method, it is characterized in that: include,
Obtain the corresponding estimated duration information of current finishing project;
Obtain the actual construction time information of current finishing project;
It compares estimated duration information and actual construction time information and obtains duration comparing result information, according to duration comparing result information
Prompting mode information corresponding to preset duration comparing result information is inquired, according to prompting mode information to actual construction time information
It is highlighted and feeds back to current owner;
Obtain the corresponding predetermined selection information of current finishing project;
Obtain the practical selection information of current finishing project;
Reservation selection information and practical selection information are shown and feed back to current owner.
2. finishing project management-control method according to claim 1, it is characterized in that: it is corresponding estimated to obtain current finishing project
Duration information includes,
Obtain area information corresponding to current finishing project;
Obtain type of house information corresponding to current finishing project;
Information and type of house information according to area, from preset area information, type of house information with it is expected that duration information
Default duration information is determined in corresponding relationship.
3. finishing project management-control method according to claim 1, it is characterized in that: it is corresponding predetermined to obtain current finishing project
Selection information includes,
Obtain budget information corresponding to current finishing project;
Obtain design style information corresponding to current finishing project;
Obtain supplier information corresponding to current finishing project;
It is determined according to budget information, design style information and supplier information and subscribes selection information.
4. finishing project management-control method according to claim 3 is set corresponding to current finishing project it is characterized in that: obtaining
Counting style information includes,
Obtain the corresponding design style name information of current finishing project;
The corresponding design style information of the design style name information is inquired according to design style name information;
The design style information includes material category, material quantity and images of materials.
5. finishing project management-control method according to claim 1, it is characterized in that: when the actual construction time information includes construction
Between information and project under construction information.
6. finishing project management-control method according to claim 1, it is characterized in that: the practical selection information includes that material arrives
Up to time, material category, material supplier, material price, material quantity and images of materials.
7. finishing project management-control method according to claim 1, it is characterized in that: to selection information and practical selection letter is subscribed
Breath, which is shown and feeds back to current owner, includes,
It is shown side by side to material information and practical selection information is subscribed;
Material information and real material information are subscribed in comparison, are determined the difference subscribed material information from real material information and are dashed forward
It shows out.
8. finishing project management-control method according to claim 1, it is characterized in that: further include,
Obtain the image information on the spot of current finishing project;
Feedback on the spot image information to current owner.
9. finishing project management-control method according to claim 1, it is characterized in that: the prompting mode information includes that engineering is prolonged
Phase prompting message and engineering indicate information in advance.
10. a kind of finishing project management control system, it is characterized in that: include,
Actual construction time acquiring unit (1), for inputting actual construction time information;
It is expected that duration acquiring unit (2), for obtaining area information and type of house information and generating default duration information;
It subscribes selection information acquisition unit (3), for obtaining budget information, design style information and supplier information, and generates
Subscribe selection information;Practical selection information acquisition unit (4), for obtaining practical selection information;
It constructs image acquisition unit (5), for obtaining construction site image information;
Background process storage unit (6), for receiving actual construction time acquiring unit (1), estimated duration acquiring unit (2), subscribing
The data of selection information acquisition unit (3), practical selection information acquisition unit (4) and construction image acquisition unit (5) transmission are simultaneously
Carry out processing storage;
Feedback unit (7), for obtaining the data of background process storage unit (6) output and being shown.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910666370.1A CN110428222A (en) | 2019-07-23 | 2019-07-23 | Finishing project management-control method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910666370.1A CN110428222A (en) | 2019-07-23 | 2019-07-23 | Finishing project management-control method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110428222A true CN110428222A (en) | 2019-11-08 |
Family
ID=68411976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910666370.1A Pending CN110428222A (en) | 2019-07-23 | 2019-07-23 | Finishing project management-control method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110428222A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111639851A (en) * | 2020-05-27 | 2020-09-08 | 重庆沃伟思科技有限公司 | Decoration construction management method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040249694A1 (en) * | 2003-06-06 | 2004-12-09 | Luo Sheng Chi | Project management method and system |
CN106408187A (en) * | 2016-09-13 | 2017-02-15 | 安徽广行物联科技有限公司 | Transparent regulation system for interior decoration design and construction |
CN108009758A (en) * | 2018-01-09 | 2018-05-08 | 中建七局安装工程有限公司 | A kind of site operation material intelligent management based on BIM |
CN108959672A (en) * | 2017-05-27 | 2018-12-07 | 中国二十冶集团有限公司 | A kind of finishing management method based on virtual technology |
CN109242319A (en) * | 2018-09-15 | 2019-01-18 | 广东麟辉建设工程有限公司 | A kind of intelligence finishing management system |
CN109359125A (en) * | 2018-08-27 | 2019-02-19 | 中铁建工集团有限公司 | A kind of progress fine-grained management method and its system for construction project |
CN109472426A (en) * | 2017-09-07 | 2019-03-15 | 上海嘉实(集团)有限公司 | Material cost management method, system, storage medium and the terminal device of live project |
-
2019
- 2019-07-23 CN CN201910666370.1A patent/CN110428222A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040249694A1 (en) * | 2003-06-06 | 2004-12-09 | Luo Sheng Chi | Project management method and system |
CN106408187A (en) * | 2016-09-13 | 2017-02-15 | 安徽广行物联科技有限公司 | Transparent regulation system for interior decoration design and construction |
CN108959672A (en) * | 2017-05-27 | 2018-12-07 | 中国二十冶集团有限公司 | A kind of finishing management method based on virtual technology |
CN109472426A (en) * | 2017-09-07 | 2019-03-15 | 上海嘉实(集团)有限公司 | Material cost management method, system, storage medium and the terminal device of live project |
CN108009758A (en) * | 2018-01-09 | 2018-05-08 | 中建七局安装工程有限公司 | A kind of site operation material intelligent management based on BIM |
CN109359125A (en) * | 2018-08-27 | 2019-02-19 | 中铁建工集团有限公司 | A kind of progress fine-grained management method and its system for construction project |
CN109242319A (en) * | 2018-09-15 | 2019-01-18 | 广东麟辉建设工程有限公司 | A kind of intelligence finishing management system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111639851A (en) * | 2020-05-27 | 2020-09-08 | 重庆沃伟思科技有限公司 | Decoration construction management method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109377066A (en) | A kind of live Schedule monitoring system and method based on threedimensional model | |
JP4876214B2 (en) | Mixer control system | |
CN106600711A (en) | Virtual decoration method, apparatus, and system | |
CN106651678A (en) | Novel home decoration supervision process management method and system | |
CN107368967A (en) | Engineering safety quality inspection intelligent management based on internet | |
CN110428222A (en) | Finishing project management-control method and system | |
JP6003116B2 (en) | Joint work setting support device, program, and joint work setting support system | |
WO2017071593A1 (en) | Video conference control method and apparatus | |
CN109146433A (en) | A kind of intelligence recruitment methods and system | |
CN105765474B (en) | Electric power consumption control system and method | |
CN103310277A (en) | Conference room management method, central controller and conference room management system | |
CN107116910A (en) | Wall spraying and painting system and method | |
CN206441237U (en) | A kind of caliberating device of three-dimensional camera module | |
CN106851177A (en) | A kind of method and system for automatically creating video conference | |
CN103679588A (en) | Self-service travel grouping method | |
CN108544856A (en) | A kind of chromatic printing machine | |
CN109063576A (en) | Management method and device for flight movement node | |
CN105635629A (en) | Video conference device and method | |
TW201721576A (en) | Transport system and method | |
CN110232740A (en) | Control system and method based on BIM Building Information Model | |
CN110188434A (en) | A kind of framework method of Distribution system design platform | |
CN107844102A (en) | Production plan management method and system | |
CN107679340B (en) | Method and system for determining decoration scheme | |
CN105955040A (en) | Intelligent household system according to real-time video picture visual control and control method thereof | |
CN108170931A (en) | Surface material paving face design system, its method and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191108 |
|
RJ01 | Rejection of invention patent application after publication |