CN110428222A - Finishing project management-control method and system - Google Patents

Finishing project management-control method and system Download PDF

Info

Publication number
CN110428222A
CN110428222A CN201910666370.1A CN201910666370A CN110428222A CN 110428222 A CN110428222 A CN 110428222A CN 201910666370 A CN201910666370 A CN 201910666370A CN 110428222 A CN110428222 A CN 110428222A
Authority
CN
China
Prior art keywords
information
finishing project
current
duration
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910666370.1A
Other languages
Chinese (zh)
Inventor
王远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Mokchuen Building Space Design Co ltd
Original Assignee
Shenzhen Mokchuen Building Space Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Mokchuen Building Space Design Co ltd filed Critical Shenzhen Mokchuen Building Space Design Co ltd
Priority to CN201910666370.1A priority Critical patent/CN110428222A/en
Publication of CN110428222A publication Critical patent/CN110428222A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate

Abstract

The present invention relates to interior decoration fields, disclose a kind of finishing project management-control method, including, obtain the corresponding estimated duration information of current finishing project;Obtain the actual construction time information of current finishing project;It compares estimated duration information and actual construction time information and obtains duration comparing result information, according to duration comparing result information inquire preset duration comparing result information corresponding to prompting mode information, actual construction time information is highlighted according to prompting mode information and feeds back to current owner;Obtain the corresponding predetermined selection information of current finishing project;Obtain the practical selection information of current finishing project;Reservation selection information and practical selection information are shown and feed back to current owner.The present invention has the effect of that owner is facilitated to exercise supervision fitment process.

Description

Finishing project management-control method and system
Technical field
The present invention relates to the technical fields of interior decoration, more particularly, to a kind of finishing project management-control method and system.
Background technique
Finishing is also known as decorate or is decorated at present.Refer to and carried out in certain area and range, including Hydroelectric Project Construction, wall What body, floor, ceiling, landscape etc. were realized, a whole set of arrangement and method for construction formed according to certain design concept and beautiful rule And design scheme.
Existing, owner often gives the process entirely fitted up to decoration company and carries out when fitting up to house It is responsible for, to mitigate the burden of oneself.
Prior art among the above has the following deficiencies: but in entire fitment process, and decoration company often will be each A finishing node subpackage gives other people, and decoration company is difficult to carry out entire fitment process more effective control, leads to responsibility Excessively disperse, management is in disorder, and owner can not timely get the information of the progress of finishing and the material of actual use, can not be right Fitment process exercises supervision, and finally makes decoration cost excessively high, decoration quality is poor.
Summary of the invention
In view of the deficienciess of the prior art, having the invention reside in a kind of finishing project management-control method and system is provided The effect for facilitating owner to exercise supervision fitment process.
To achieve the above object, the present invention provides the following technical scheme that a kind of finishing project management-control method, including,
Obtain the corresponding estimated duration information of current finishing project;
Obtain the actual construction time information of current finishing project;
It compares estimated duration information and actual construction time information and obtains duration comparing result information, according to duration comparing result information Prompting mode information corresponding to preset duration comparing result information is inquired, according to prompting mode information to actual construction time information It is highlighted and feeds back to current owner;
Obtain the corresponding predetermined selection information of current finishing project;
Obtain the practical selection information of current finishing project;
Reservation selection information and practical selection information are shown and feed back to current owner.
By using above-mentioned technical proposal, estimated duration information is established, and obtains actual construction time information, to estimated duration letter Breath and actual construction time information compare and generate comparing result, determine prompting mode information according to comparing result, and according to mentioning Show that mode information highlights actual construction time information and feeds back at owner, to keep owner relatively clear The case where solution is to the actual construction time, owner is facilitated to exercise supervision fitment process.
The present invention is further arranged to: obtaining the corresponding estimated duration information of current finishing project includes,
Obtain area information corresponding to current finishing project;
Obtain type of house information corresponding to current finishing project;
Information and type of house information according to area, from preset area information, type of house information with it is expected that duration information Default duration information is determined in corresponding relationship.
By using above-mentioned technical proposal, area information and type of house information are obtained, according to area information and house class Type information determines corresponding default duration information, to formulate the preset duration so that owner and actual construction time compare.
The present invention is further arranged to: obtaining the corresponding predetermined selection information of current finishing project includes,
Obtain budget information corresponding to current finishing project;
Obtain design style information corresponding to current finishing project;
Obtain supplier information corresponding to current finishing project;
It is determined according to budget information, design style information and supplier information and subscribes selection information.
By using above-mentioned technical proposal, determined in advance according to budget information, design style information and supplier information are comprehensive Selection information is ordered, so that owner be made to can determine the selection for enabling oneself be satisfied with, the later period is also facilitated to compare with practical selection.
The present invention is further arranged to: obtaining design style information corresponding to current finishing project includes,
Obtain the corresponding design style name information of current finishing project;
The corresponding design style information of the design style name information is inquired according to design style name information;
The design style information includes material category, material quantity and images of materials.
By using above-mentioned technical proposal, material type, the material of actual use are determined according to design style name information Quantity and images of materials make material meet the requirement of oneself to recognize material type used in work progress.
The present invention is further arranged to: the actual construction time information includes construction time information and project under construction information.
By using above-mentioned technical proposal, actual construction time information and project under construction are recorded, to make industry Master can timely recognize the progress of construction and situation slack in work whether occurs.
The present invention is further arranged to: the practical selection information includes material arrival time, material category, material supply Quotient, material price, material quantity and images of materials.
By using above-mentioned technical proposal, by obtaining material arrival time, material category, material supplier, material valence Lattice, material quantity and images of materials enable owner to recognize whether the entry time of material is to be consistent the construction time, can To recognize whether the material chosen is identical as the material subscribed before, and whether material flaw occurs during transportation, thus Facilitate control of the owner to construction.
The present invention is further arranged to: being shown to reservation selection information and practical selection information and is fed back to current industry Master includes,
It is shown side by side to material information and practical selection information is subscribed;
Material information and real material information are subscribed in comparison, are determined the difference subscribed material information from real material information and are dashed forward It shows out.
By using above-mentioned technical proposal, the display arranged side by side of material information and real material information is subscribed, enables owner It is enough that more intuitively reservation material information and practical selection information are compared, difference is highlighted, so that industry Master can be relatively clear the difference both recognized, to quickly judge.
The present invention is further arranged to: further include,
Obtain the image information on the spot of current finishing project;
Feedback on the spot image information to current owner.
By using above-mentioned technical proposal, condition of construction can be recognized by obtaining image information, owner on the spot, thus Determine that construction personnel with the presence or absence of situation slack in work, facilitates owner to exercise supervision condition of construction.
The present invention is further arranged to: the prompting mode information includes that engineering extension prompting message and engineering indicate in advance Information.
By using above-mentioned technical proposal, prompt information includes that engineering extension prompting message and engineering indicate information in advance, To enable owner explicitly to recognize duration situation
To achieve the above object, the present invention provides the following technical scheme that a kind of finishing project management control system, including,
Actual construction time acquiring unit, for inputting actual construction time information;
It is expected that duration acquiring unit, for obtaining area information and type of house information and generating default duration information;
Selection information acquisition unit is subscribed, for obtaining budget information, design style information and supplier information, and generates reservation Selection information;Practical selection information acquisition unit, for obtaining practical selection information;
Construction image acquisition unit, for obtaining construction site image information;
Background process storage unit is obtained for receiving actual construction time acquiring unit, estimated duration acquiring unit, subscribing selection information Take unit, practical selection information acquisition unit and construction image acquisition unit transmission data and carry out processing storage;
Feedback unit, for obtaining the data of background process storage unit output and being shown.
By using above-mentioned technical proposal, background process storage unit obtains actual construction time acquiring unit, estimated duration Unit, subscribe selection information acquisition unit, practical selection information acquisition unit and construction image acquisition unit transmit data into Row receives and processes, and is then shown by feedback unit, so that owner be facilitated to exercise supervision fitment process.
In conclusion the invention has the following advantages:
By the acquisition to actual construction time information, the acquisition to practical selection, to realize estimated duration information and actual construction time The comparison of information subscribes the comparison of selection information and practical selection information, so that owner be enable to form preferably fitment process Supervision.
Detailed description of the invention
Fig. 1 is step figure of the invention;
Fig. 2 is system block diagram of the invention.
Appended drawing reference: 1, actual construction time acquiring unit;2, estimated duration acquiring unit;3, selection acquisition of information list is subscribed Member;4, practical selection information acquisition unit;5, construction image acquisition unit;6, background process storage unit;7, feedback unit.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Fig.1, is a kind of finishing project management-control method disclosed by the invention, including,
S1: the corresponding estimated duration information of current finishing project is obtained, obtains area information corresponding to current finishing project, so Type of house information corresponding to current finishing project is obtained afterwards, according to area information and type of house information, from preset face Product information, type of house information preset duration information with it is expected that determining in the corresponding relationship of duration information.If the area in house is believed Breath is 120 square meters, and type of house information is new house, then in preset area information, type of house information and it is expected that duration information Corresponding relationship find default duration information corresponding with 120 square meters and new house.
S2: the actual construction time information of current finishing project is obtained, decoration company personnel are according to practice of construction situation, to construction Temporal information and project under construction information are inputted.
S3: comparing estimated duration information and actual construction time information and obtains duration comparing result information, is compared according to the duration Result information inquires prompting mode information corresponding to preset duration comparing result information, according to prompting mode information to reality Duration information is highlighted and is fed back to current owner, and prompt information includes that engineering extension prompting message and engineering refer in advance Show information, if the estimated duration information on March 15 is furring tile laying, actual construction time information is wall surface leveling, is recognized after comparison Determining wall surface leveling is the preamble work that furring tile is laid with, then duration comparing result information is engineering extension, is compared according to the duration Result information finds prompting mode information corresponding with engineering extension, and according to prompting mode information to actual construction time information into Row highlight, if prompting mode information be display engineering extension and mark it is red, in this way to Practical Project information carry out It highlights, keeps owner visible in detail.
S4: the corresponding predetermined selection information of current finishing project is obtained, the letter of budget corresponding to current finishing project is obtained Breath obtains the corresponding design style name information of current finishing project, inquires the design style according to design style name information The corresponding design style information of name information, obtains supplier information corresponding to current finishing project, according to budget information, sets It counts style information and supplier information determines and subscribes selection information.Owner first selects budget information, and then owner is to design style Name information is selected, and the selection of supplier information is finally carried out, such as owner has first selected 100,000 budgets, then owner couple Mediterranean formula style has been selected, finally supplier has been selected, the total price of material provided by the supplier is less than or equal to 100,000 budgets of owner, while also material category, material quantity, material price and images of materials are shown.
S5: the practical selection information of current finishing project is obtained, when practical selection reaches construction site, to practical selection Material arrival time, material category, material supplier, material price, material quantity and images of materials recorded.
S6: current owner is shown and is fed back to selection information and practical selection information is subscribed, is believed material is subscribed Breath and practical selection information are shown that material information and real material information are subscribed in comparison side by side, are determined and are subscribed material information Difference from real material information simultaneously highlights.If some ceramic tile reaches construction site, obtaining for practical selection information is carried out After taking, by the arrival time for the ceramic tile being actually reached, material category, material supplier, material price, material quantity and material figure As being shown, while material category, material supplier, material price, material quantity and the material for subscribing ceramic tile are also shown side by side Expect image, and the difference of the two is highlighted.
Further include:
Obtain the image information on the spot of current finishing project, feedback on the spot image information to current owner.Obtain decorating house Image information on the spot, and image information will feed back at owner on the spot, the condition of construction of worker can be observed in owner.
It is a kind of finishing project management control system disclosed by the invention referring to Fig. 2, including actual construction time acquiring unit 1, estimated Duration acquiring unit 2, subscribe selection information acquisition unit 3, practical selection information acquisition unit 4, construct image acquisition unit 5, Background process storage unit 6 and feedback unit 7, actual construction time acquiring unit 1, subscribe selection information at estimated duration acquiring unit 2 Acquiring unit 3, practical selection information acquisition unit 4, construction image acquisition unit 5 and feedback unit 7 are stored with background process Unit 6 is electrically connected.Actual construction time acquiring unit 1, estimated duration acquiring unit 2 and reservation selection information acquisition unit 3 are electricity The physical keyboard of the dummy keyboard or mobile terminal of brain keyboard or mobile terminal, practical selection information acquisition unit 4 are mobile whole The camera at end, construction image acquisition unit 5 are camera, and background process storage unit 6 is server, and feedback unit 7 is electricity The display screen of brain display screen or mobile terminal.By actual construction time acquiring unit 1, estimated duration acquiring unit 2, subscribe selection letter It ceases acquiring unit 3 and practical selection information acquisition unit 4 carries out the input of data, background process storage unit 6 carries out data Processing storage, and shown by feedback unit 7.Construction site image is obtained by construction image acquisition unit 5, is deposited from the background Storage processing unit handle to image information and be shown by feedback unit 7.
The implementation principle of the present embodiment are as follows: it is expected that duration acquiring unit 2 obtains the area information and house class of owner's input Type information, and default duration information is generated, and default duration information is transmitted to background process storage unit 6 and is stored, it is real Border duration acquiring unit 1 obtains the input actual construction time information of decoration company, and is transmitted to background process storage unit 6 and is deposited Storage.Budget information, design style information and supplier information that selection information acquisition unit 3 obtains owner's input are subscribed, and raw It at selection information is subscribed, is transmitted to background process storage unit 6 and is stored, practical selection information acquisition unit 4 obtains construction The practical selection information of personnel's input, and be transmitted to background process storage unit 6 and stored, construction image acquisition unit 5 obtains It takes construction site image information and is transmitted to background process storage unit 6 and stored.6 pairs of background process storage unit storage Data are called processing, and are transmitted at feedback unit 7 and are shown, so that owner be enable more to get information about reality Border construction speed and material actually transport to quality, conveniently exercise supervision to whole process.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of finishing project management-control method, it is characterized in that: include,
Obtain the corresponding estimated duration information of current finishing project;
Obtain the actual construction time information of current finishing project;
It compares estimated duration information and actual construction time information and obtains duration comparing result information, according to duration comparing result information Prompting mode information corresponding to preset duration comparing result information is inquired, according to prompting mode information to actual construction time information It is highlighted and feeds back to current owner;
Obtain the corresponding predetermined selection information of current finishing project;
Obtain the practical selection information of current finishing project;
Reservation selection information and practical selection information are shown and feed back to current owner.
2. finishing project management-control method according to claim 1, it is characterized in that: it is corresponding estimated to obtain current finishing project Duration information includes,
Obtain area information corresponding to current finishing project;
Obtain type of house information corresponding to current finishing project;
Information and type of house information according to area, from preset area information, type of house information with it is expected that duration information Default duration information is determined in corresponding relationship.
3. finishing project management-control method according to claim 1, it is characterized in that: it is corresponding predetermined to obtain current finishing project Selection information includes,
Obtain budget information corresponding to current finishing project;
Obtain design style information corresponding to current finishing project;
Obtain supplier information corresponding to current finishing project;
It is determined according to budget information, design style information and supplier information and subscribes selection information.
4. finishing project management-control method according to claim 3 is set corresponding to current finishing project it is characterized in that: obtaining Counting style information includes,
Obtain the corresponding design style name information of current finishing project;
The corresponding design style information of the design style name information is inquired according to design style name information;
The design style information includes material category, material quantity and images of materials.
5. finishing project management-control method according to claim 1, it is characterized in that: when the actual construction time information includes construction Between information and project under construction information.
6. finishing project management-control method according to claim 1, it is characterized in that: the practical selection information includes that material arrives Up to time, material category, material supplier, material price, material quantity and images of materials.
7. finishing project management-control method according to claim 1, it is characterized in that: to selection information and practical selection letter is subscribed Breath, which is shown and feeds back to current owner, includes,
It is shown side by side to material information and practical selection information is subscribed;
Material information and real material information are subscribed in comparison, are determined the difference subscribed material information from real material information and are dashed forward It shows out.
8. finishing project management-control method according to claim 1, it is characterized in that: further include,
Obtain the image information on the spot of current finishing project;
Feedback on the spot image information to current owner.
9. finishing project management-control method according to claim 1, it is characterized in that: the prompting mode information includes that engineering is prolonged Phase prompting message and engineering indicate information in advance.
10. a kind of finishing project management control system, it is characterized in that: include,
Actual construction time acquiring unit (1), for inputting actual construction time information;
It is expected that duration acquiring unit (2), for obtaining area information and type of house information and generating default duration information;
It subscribes selection information acquisition unit (3), for obtaining budget information, design style information and supplier information, and generates Subscribe selection information;Practical selection information acquisition unit (4), for obtaining practical selection information;
It constructs image acquisition unit (5), for obtaining construction site image information;
Background process storage unit (6), for receiving actual construction time acquiring unit (1), estimated duration acquiring unit (2), subscribing The data of selection information acquisition unit (3), practical selection information acquisition unit (4) and construction image acquisition unit (5) transmission are simultaneously Carry out processing storage;
Feedback unit (7), for obtaining the data of background process storage unit (6) output and being shown.
CN201910666370.1A 2019-07-23 2019-07-23 Finishing project management-control method and system Pending CN110428222A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910666370.1A CN110428222A (en) 2019-07-23 2019-07-23 Finishing project management-control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910666370.1A CN110428222A (en) 2019-07-23 2019-07-23 Finishing project management-control method and system

Publications (1)

Publication Number Publication Date
CN110428222A true CN110428222A (en) 2019-11-08

Family

ID=68411976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910666370.1A Pending CN110428222A (en) 2019-07-23 2019-07-23 Finishing project management-control method and system

Country Status (1)

Country Link
CN (1) CN110428222A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111639851A (en) * 2020-05-27 2020-09-08 重庆沃伟思科技有限公司 Decoration construction management method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040249694A1 (en) * 2003-06-06 2004-12-09 Luo Sheng Chi Project management method and system
CN106408187A (en) * 2016-09-13 2017-02-15 安徽广行物联科技有限公司 Transparent regulation system for interior decoration design and construction
CN108009758A (en) * 2018-01-09 2018-05-08 中建七局安装工程有限公司 A kind of site operation material intelligent management based on BIM
CN108959672A (en) * 2017-05-27 2018-12-07 中国二十冶集团有限公司 A kind of finishing management method based on virtual technology
CN109242319A (en) * 2018-09-15 2019-01-18 广东麟辉建设工程有限公司 A kind of intelligence finishing management system
CN109359125A (en) * 2018-08-27 2019-02-19 中铁建工集团有限公司 A kind of progress fine-grained management method and its system for construction project
CN109472426A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Material cost management method, system, storage medium and the terminal device of live project

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040249694A1 (en) * 2003-06-06 2004-12-09 Luo Sheng Chi Project management method and system
CN106408187A (en) * 2016-09-13 2017-02-15 安徽广行物联科技有限公司 Transparent regulation system for interior decoration design and construction
CN108959672A (en) * 2017-05-27 2018-12-07 中国二十冶集团有限公司 A kind of finishing management method based on virtual technology
CN109472426A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Material cost management method, system, storage medium and the terminal device of live project
CN108009758A (en) * 2018-01-09 2018-05-08 中建七局安装工程有限公司 A kind of site operation material intelligent management based on BIM
CN109359125A (en) * 2018-08-27 2019-02-19 中铁建工集团有限公司 A kind of progress fine-grained management method and its system for construction project
CN109242319A (en) * 2018-09-15 2019-01-18 广东麟辉建设工程有限公司 A kind of intelligence finishing management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111639851A (en) * 2020-05-27 2020-09-08 重庆沃伟思科技有限公司 Decoration construction management method

Similar Documents

Publication Publication Date Title
CN109377066A (en) A kind of live Schedule monitoring system and method based on threedimensional model
JP4876214B2 (en) Mixer control system
CN106600711A (en) Virtual decoration method, apparatus, and system
CN106651678A (en) Novel home decoration supervision process management method and system
CN107368967A (en) Engineering safety quality inspection intelligent management based on internet
CN110428222A (en) Finishing project management-control method and system
JP6003116B2 (en) Joint work setting support device, program, and joint work setting support system
WO2017071593A1 (en) Video conference control method and apparatus
CN109146433A (en) A kind of intelligence recruitment methods and system
CN105765474B (en) Electric power consumption control system and method
CN103310277A (en) Conference room management method, central controller and conference room management system
CN107116910A (en) Wall spraying and painting system and method
CN206441237U (en) A kind of caliberating device of three-dimensional camera module
CN106851177A (en) A kind of method and system for automatically creating video conference
CN103679588A (en) Self-service travel grouping method
CN108544856A (en) A kind of chromatic printing machine
CN109063576A (en) Management method and device for flight movement node
CN105635629A (en) Video conference device and method
TW201721576A (en) Transport system and method
CN110232740A (en) Control system and method based on BIM Building Information Model
CN110188434A (en) A kind of framework method of Distribution system design platform
CN107844102A (en) Production plan management method and system
CN107679340B (en) Method and system for determining decoration scheme
CN105955040A (en) Intelligent household system according to real-time video picture visual control and control method thereof
CN108170931A (en) Surface material paving face design system, its method and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191108

RJ01 Rejection of invention patent application after publication