CN110428178A - A kind of applicable fixed-end forces industry ERP management system - Google Patents
A kind of applicable fixed-end forces industry ERP management system Download PDFInfo
- Publication number
- CN110428178A CN110428178A CN201910721381.5A CN201910721381A CN110428178A CN 110428178 A CN110428178 A CN 110428178A CN 201910721381 A CN201910721381 A CN 201910721381A CN 110428178 A CN110428178 A CN 110428178A
- Authority
- CN
- China
- Prior art keywords
- data
- kinds
- solid waste
- module
- warehouse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063112—Skill-based matching of a person or a group to a task
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/0875—Itemisation or classification of parts, supplies or services, e.g. bill of materials
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Quality & Reliability (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Processing Of Solid Wastes (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of applicable fixed-end forces industry ERP management systems, including data acquisition module, data exchange module, database, data analysis module, controller, signal processing module, data recordin module, registration interconnection module, goods amount analysis module and personnel assignment module;The present invention is first to combine all kinds of reaction promoters with cost situation and price situation with the combined amount situation of every kind of solid waste, and according to amendment, the formulation of assignment is analyzed, obtain the earning performance of every kind of solid waste, to formulate the production and procurement plan in later period, again according to all kinds of profit signals corresponding to earning performance, the situation to be processed and pre- shipment situation of every kind of solid waste corresponding thereto are transferred respectively, and the inventories of all kinds of reaction promoters is combined to carry out digitization analysis together, obtain the procurement status of subsequent all kinds of reaction promoters, accurately to provide targeted procurement strategy, foundation is ordered with pin, to deposit the dynamic coordinate feedback mechanism of fixed output quota.
Description
Technical field
The present invention relates to ERP management system technical field, specially a kind of applicable fixed-end forces industry ERP management system.
Background technique
Fixed-end forces refer to using physics, chemistry, biology, materialization or biochemical method, solid waste are converted to suitable
In transport, storage, disposition or recycle substance implementation process, and the final process target of solid waste be it is innoxious, subtract
Quantization and recycling.
And in the file of Publication No. CN109409704A, it is only to formulate task amount according to the actual conditions of employee,
And real-time tracking is carried out by the task amount to the every workday, to improve the working efficiency of employee;And it is fitted with existing
For being combined with fixed-end forces industry ERP management system, still it is difficult to the mixing of all kinds of reaction promoters and every kind of solid waste
Amount situation is combined with cost situation and price situation, and is corrected, after the analysis of the formulation of assignment, to be directed to different profit shapes
The situation to be processed and pre- shipment situation of the associated every kind of solid waste of condition merge together with the inventories of all kinds of reaction promoters
Processing, accurately to provide targeted procurement strategy, foundation ordered with pin, the dynamic coordinate feedback mechanism to deposit fixed output quota;
And it is also difficult to combine the goods amount information and order information in warehouse, and to it after weightization analysis, then carry out the work with employee
Make information phase integrated treatment, and then reasonable personnel assignment scheme can be provided by description of the goods and working condition.
In order to solve drawbacks described above, a kind of technical solution is now provided.
Summary of the invention
The purpose of the present invention is to provide a kind of applicable fixed-end forces industry ERP management systems, and the present invention is first will be all kinds of
Reaction promoter combines with the combined amount situation of every kind of solid waste with cost situation and price situation, and according to amendment, assignment
Formulation analysis, to obtain the earning performance of every kind of solid waste, to formulate the production and procurement plan in later period, then according to profit
All kinds of profit signals corresponding to situation, to transfer the situation to be processed and pre- shipment of every kind of solid waste corresponding thereto respectively
Situation, and the inventories of all kinds of reaction promoters is combined to carry out digitization analysis together, to obtain subsequent all kinds of reaction promoters
Procurement status establish the dynamic coordinate feedback ordered with pin, to deposit fixed output quota accurately to provide targeted procurement strategy
Mechanism;
The present invention is first to analyze goods amount information and order information through calibration, weightization together, to obtain the goods in each warehouse
Flow coefficient is measured, then by the job information phase integrated treatment of itself and employee, and obtains every warehouse through calibration, assignmentization analysis
Allotment between each employee agrees with coefficient, and then provides reasonable personnel assignment scheme with working condition according to description of the goods,
Substantially increase the adaptability and reasonability of personnel assignment.
The technical problems to be solved by the invention are as follows:
(1) how all kinds of reaction promoters and the combined amount situation of every kind of solid waste mutually to be tied with cost situation and price situation
It closes, and is corrected, after the analysis of the formulation of assignment, to be directed to the feelings to be processed of the different associated every kind of solid wastes of earning performance
Condition and pre- shipment the situation fusion treatment together with the inventories of all kinds of reaction promoters, accurately to provide targeted buying
Strategy;
(2) how the goods amount information and order information in warehouse to be combined, and to it after weightization analysis, then come and member
The job information phase integrated treatment of work, to provide reasonable personnel assignment scheme by description of the goods and working condition.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of applicable fixed-end forces industry ERP management system, including data acquisition module, data exchange module, database,
Data analysis module, controller, signal processing module, data recordin module, registration interconnection module, goods amount analysis module and personnel
Scheduling module;
The data acquisition module is added for acquiring all kinds of reaction promoters in real time to the combined amount in every kind of solid waste
Data, and transmit it to data exchange module, and there are many biological assistants, a variety of physics auxiliary agents and a variety of for all kinds of reaction promoters
Chemical assistant etc., and every kind of solid waste has steel class solid waste, Plastic solid waste and papery class solid waste etc.;
The data exchange module then transfers cost data corresponding with all kinds of reaction promoters out of database accordingly, with
And price data corresponding with every kind of solid waste, and it is transmitted to data analysis module together, and all kinds of reactions help in database
The price data of the cost data of agent and every kind of solid waste are preparatory typing;
The data analysis module then by real-time reception to all kinds of reaction promoters be added to the mixing in every kind of solid waste
It is full of together with amount data, cost data corresponding with all kinds of reaction promoters and price data corresponding with every kind of solid waste
Benefit analysis operation, to obtain the high-profit signal and low profit signal in first time period, and by its in first time period
All kinds of reaction promoters are added that via controller is transmitted to signal processing module together to the combined amount data in every kind of solid waste;
The signal processing module is then according to high-profit signal and low profit signal, to adjust out of data recordin module respectively
Take with its corresponding to every kind of solid waste amount data to be processed and pre- shipment amount data, the data recordin module is for real-time
The amount data to be processed for recording every kind of solid waste, pre- shipment amount data and all kinds of reaction promoters inventory data, and will be each
The inventory data of class reaction promoter is transmitted to signal processing module, and basis signal processing module carries out signal analysis together
Operation, to obtain the buying coefficient Fa of all kinds of reaction promoters in second time period, and transmits it to registration interconnection module;
In the second time period that the registration interconnection module then arrives real-time reception according to descending ordinal relation
The buying coefficient Fa marshalling of all kinds of reaction promoters, and buying registration form is accordingly generated to be sent to administrative staff's mobile phone, and
It is wireless transmission connection between administrative staff's mobile phone and registration interconnection module, i.e., according to all kinds of profits letter corresponding to earning performance
Number, to transfer the situation to be processed and pre- shipment situation of every kind of solid waste corresponding thereto respectively, and helped in conjunction with all kinds of reactions
The inventories of agent carry out digitization analysis together, to obtain the procurement status of subsequent all kinds of reaction promoters;And then it will be different
The situation to be processed of the associated every kind of solid waste of earning performance and the inventories one of pre- shipment situation and all kinds of reaction promoters
Same fusion treatment establishes the dynamic coordinate feedback ordered with pin, to deposit fixed output quota accurately to provide targeted procurement strategy
Mechanism;
The data acquisition module is also used to acquire the goods amount information and order information in warehouse in real time, and transmits it to
Goods amount analysis module, and the goods amount information in warehouse includes the storage quantity data and stock level data in warehouse, and the order in warehouse is believed
Breath is then expressed as the shipment amount data in warehouse;
The goods amount analysis module then carries out goods amount evaluation operation to it accordingly, to obtain each warehouse in the third period
Goods amount flow coefficient Li, and its via controller is transmitted to personnel assignment module;
The personnel assignment module for acquiring the job information of employee in real time, and the job information of employee includes employee
Age data, the range data between the gender data of employee and the residence of employee and warehouse, and adjusted together with Li accordingly
It is operated with analysis, agrees with coefficient Aij to obtain the allotment between every warehouse and each employee in the third period, and transmitted
To registration interconnection module;
This warehouse and each employee are then agreed with degree size accordingly by the registration interconnection module, to arrange out each employee
Allotment sequence, and by its with this warehouse it is default needed for personnel's amount combine, Lai Shengcheng personnel setup sheet and the person of being sent to
Work mobile phone, and be wireless transmission connection between employee's mobile phone and registration interconnection module, i.e., by the goods amount information and order information in warehouse
Together carry out weight analysis, and accordingly with the job information phase integrated treatment of employee, so as to by description of the goods and work
Situation provides reasonable personnel assignment scheme.
Further, specific step is as follows for the payoff profile operation:
Step 1: all kinds of reaction promoters in first time period are got and are added to the combined amount number in every kind of solid waste
According to, cost data corresponding with all kinds of reaction promoters and price data corresponding with every kind of solid waste, and successively counted
According to calibration, and first time period is expressed as one month;
Step 2: all kinds of reaction promoters addition ratio when handling every kind of solid waste is first demarcated as Qij, i=1...n, j
=1...m, i.e., all kinds of reaction promoters when Q1j when as i=1 is expressed as handling the first solid waste add ratio, then will
Cost data corresponding with all kinds of reaction promoters is demarcated as Wj, j=1...m, corresponding with every kind of solid waste will finally sell
Valence mumber is to correspond according to Ei, i=1...n, and Qij, Wj and Ei is demarcated as;
Qij, Wj and Ei: first being assigned modifying factor q, w and e by step 3 respectively, and q is greater than w and is greater than e and q+w+e=
2.1657 then according to formulaTo acquire first time period
The profit coefficient of every kind of interior solid waste, σ, ρ, α and β are the profit factor, σ be greater than ρ be greater than α be greater than β and alpha+beta+ρ+σ=
1.6985, finally Ri is compared with preset value r, it, then will every kind of solid waste life corresponding with Ri when Ri is greater than preset value r
It is on the contrary then corresponding with Ri every kind of solid waste is generated into low profit signal at high-profit signal, i.e., by all kinds of reaction promoters with
The combined amount situation of every kind of solid waste is combined with cost situation and price situation, and the formulation according to amendment, assignment is analyzed,
The earning performance of every kind of solid waste is obtained, to formulate the production and procurement plan in later period.
Further, specific step is as follows for the signal analysis operations:
Step 1: get in second time period with every kind of solid waste corresponding to high-profit signal and low profit signal
The inventory data of amount data to be processed and all kinds of reaction promoters in pre- shipment amount data, second time period and when first
Between all kinds of reaction promoters in section be added to the combined amount data in every kind of solid waste, and successively carry out data scaling, and second
Period is expressed as the one month after first time period;
Step 2: the inventory data of all kinds of reaction promoters is first demarcated as Ya, a=1...n, then will be with high-profit signal
The amount data scaling to be processed of every kind of corresponding solid waste be Ub, b=1...m, and by all kinds of reaction promoters be added to
Addition ratio in every kind of solid waste corresponding to high-profit signal be demarcated as Pab, a=1...n, b=1...m, and Ya, Ub and
Pab be correspond, i.e. P1b when as a=1 be expressed as first kind reaction promoter be added to corresponding to high-profit signal
Every kind of solid waste in addition ratio, finally by with it is low profit signal corresponding to every kind of solid waste pre- shipment amount data mark
Be set to Sc, c=1...m, and by all kinds of reaction promoters be added to adding in every kind of solid waste corresponding to low profit signal
Adding ratio to be demarcated as Dac, a=1...n, c=1...m, and Ya, Sc and Dac is to correspond, i.e. D1c when as a=1
Be expressed as first kind reaction promoter be added to the addition ratio corresponding to low profit signal in every kind of solid waste;
Step 3: according to formulaTo acquire second
The buying coefficient of all kinds of reaction promoters in period, y, u and s are the buying factor, and y is less than u and is less than s and y+u+s=
1.8951, and working as corresponding to same class reaction promoterIt is greater thanWhen, factor p to be processed
Take 1.6, pre- shipment factor d that 0.4, factor p on the contrary then to be processed is taken to take 0.4, pre- shipment factor d takes 1.6.
Further, specific step is as follows for the goods amount evaluation operation:
Step 1: the goods amount information and order information in the warehouse in the third period, and always entering each warehouse are got
It is Gi that data scaling is measured in library, i=1...n, each warehouse total stock level data be demarcated as Hi, i=1...n, and by each warehouse
Total shipment amount data scaling be Ki, i=1...n, and Gi, Hi and Ki are to correspond, and the third period is expressed as one
A month;
Step 2: weight distribution first is carried out to the influence accounting that each warehouse goods amount flows according to Gi, Hi and Ki, and is successively divided
It is less than g with weighted value g, h and k, h and is less than k and h+g+k=1, then according to formula Li=Gi*g+Ki*k-Hi*h, i=1...n, comes
Acquire the goods amount flow coefficient in each warehouse in the third period.
Further, specific step is as follows for the allotment analysis operation:
Step 1: the goods amount flow coefficient Li in each warehouse in the third period is got, and is greater than preset range l in Li
Maximum value, minimum value within preset range l and less than preset range l when, Li is assigned respectively calibration value M1, M2 and
M3, M1, M2 and M3 are positive integer and M1 is greater than M2 and is greater than M3;
Step 2: getting the job information of employee corresponding with the third period, and by the age data of each employee,
The gender data of each employee and the range data in every warehouse and each employee residence are demarcated as Zj, Xj and Vij, i=respectively
1...n, the range data that j=1...m, i.e. V1j when as i=1 are expressed as first warehouse Yu each employee residence, and Zj,
Xj, Vij and Li are to correspond;
Step 3: Zj is first greater than the maximum value of preset range z, within preset range z and less than preset range z's
Zj when minimum value assigns calibration value N1, N2 and N3 respectively, and N1, N2 and N3 are positive integer and N2 is greater than N3 and is greater than N1, then will
Xj when Xj is male and female assigns calibration value B1 and B2 respectively, and B1 and B2 are positive integer and B1 is greater than B2, finally by Vij
The Vij when maximum value greater than preset range v, the minimum value within preset range v and less than preset range v is assigned respectively
Calibration value C1, C2 and C3, C1, C2 and C3 are positive integer and C3 is greater than C2 and is greater than C1;
Step 4: according to formula Aij=(Zj+Xj) * t+Vij*o+Li*l, i=1...n, j=1...m, to acquire third
The allotment between every warehouse and each employee in period agrees with coefficient, and t, o and l are to agree with the factor, and t is less than l and is less than o and t+
O+l=2.6874, i.e. A1j when as i=1 are expressed as the allotment contract first in the third period between warehouse and each employee
Collaboration number.
Beneficial effects of the present invention:
1. all kinds of reaction promoters are added to the combined amount data in every kind of solid waste and pass by data acquisition module of the invention
Transport to data exchange module, and transferred out of database accordingly by data exchange module it is corresponding with all kinds of reaction promoters at
Notebook data, and price data corresponding with every kind of solid waste, and carry out payoff profile operation together, i.e., to it through data mark
Fixed, modified formulation analysis, obtains high-profit signal and low profit signal, and it is added with all kinds of reaction promoters to every kind
Via controller is transmitted to signal processing module to combined amount data in solid waste together, i.e., by all kinds of reaction promoters and every kind of solid waste
The combined amount situation of object is combined with cost situation and price situation, and according to amendment, the formulation analysis of assignment, every to obtain
The earning performance of kind solid waste, to formulate the production and procurement plan in later period;
Signal processing module then according to high-profit signal and low profit signal, come transferred out of data recordin module respectively with
The amount data to be processed and pre- shipment amount data of every kind of solid waste corresponding to it, and by itself and data recordin module real-time Transmission
All kinds of reaction promoters inventory data and all kinds of reaction promoters be added to the combined amount data in every kind of solid waste together
Signal analysis operations are carried out, i.e., it is analyzed through calibration, the digitization of precision assignment, obtains the buying coefficient of all kinds of reaction promoters
And transmit it to registration interconnection module;
Interconnection module is registered then according to descending ordinal relation by the buying coefficient marshalling of all kinds of reaction promoters,
And accordingly generate buying registration form and be sent to administrative staff's mobile phone, i.e., according to all kinds of profit signals corresponding to earning performance,
It transfers the situation to be processed and pre- shipment situation of every kind of solid waste corresponding thereto respectively, and combines all kinds of reaction promoters
Inventories carry out digitization analysis together, to obtain the procurement status of subsequent all kinds of reaction promoters;In turn by all kinds of reactions
Auxiliary agent is combined with the combined amount situation of every kind of solid waste with cost situation and price situation, and is corrected, the formulation of assignment
After analysis, react to be directed to situation to be processed and the pre- shipment situation of the different associated every kind of solid wastes of earning performance with all kinds of
The inventories of auxiliary agent together established accurately to provide targeted procurement strategy and ordered with pin, is fixed to deposit by fusion treatment
The dynamic coordinate feedback mechanism of production;
2. the goods amount information and order information in warehouse are also transmitted to goods amount analysis module by data acquisition module of the invention,
And goods amount evaluation operation is carried out by goods amount analysis module accordingly, i.e., it is analyzed through calibration, weightization, obtains the goods in each warehouse
Flow coefficient is measured, and its via controller is transmitted to personnel assignment module, and personnel assignment module is then by the work of itself and employee
Information carries out allotment analysis operation together, i.e., is analyzed through calibration, assignmentization it, obtain the allotment between every warehouse and each employee
Agree with coefficient and is transmitted to registration interconnection module;
This warehouse and each employee are then agreed with degree size accordingly by registration interconnection module, to arrange out the tune of each employee
Sequence ligand, and it is combined with default required personnel's amount in this warehouse, Lai Shengcheng personnel setup sheet is simultaneously sent to employee's hand
The goods amount information and order information in warehouse are carried out weight analysis by machine together, and mutually comprehensive with the job information of employee accordingly
Conjunction processing, to provide reasonable personnel assignment scheme by description of the goods and working condition.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the present invention will be further described below with reference to the drawings;
Fig. 1 is system block diagram of the invention.
Specific embodiment
As shown in Figure 1, a kind of applicable fixed-end forces industry ERP management system, including data acquisition module, data exchange mould
Block, database, data analysis module, controller, signal processing module, data recordin module, registration interconnection module, the analysis of goods amount
Module and personnel assignment module;
Data acquisition module is added for acquiring all kinds of reaction promoters in real time to the combined amount data in every kind of solid waste,
And data exchange module is transmitted it to, and there are many biological assistant, a variety of physics auxiliary agents and a variety of chemistry for all kinds of reaction promoters
Auxiliary agent etc., and every kind of solid waste has steel class solid waste, Plastic solid waste and papery class solid waste etc.;
Data exchange module then transfers cost data corresponding with all kinds of reaction promoters, Yi Jiyu out of database accordingly
The corresponding price data of every kind of solid waste, and it is transmitted to data analysis module together, and all kinds of reaction promoters in database
The price data of cost data and every kind of solid waste are preparatory typing;
Data analysis module then by real-time reception to all kinds of reaction promoters be added to the combined amount number in every kind of solid waste
According to carrying out profit point together with, cost data corresponding with all kinds of reaction promoters and price data corresponding with every kind of solid waste
Analysis operation, to obtain the high-profit signal and low profit signal in first time period, and by its with it is all kinds of in first time period
Reaction promoter is added that via controller is transmitted to signal processing module together to the combined amount data in every kind of solid waste;
Signal processing module then according to high-profit signal and low profit signal, come transferred out of data recordin module respectively with
The amount data to be processed and pre- shipment amount data of every kind of solid waste corresponding to it, data recordin module are every for recording in real time
The amount data to be processed of solid waste, the inventory data of pre- shipment amount data and all kinds of reaction promoters are planted, and all kinds of reactions are helped
The inventory data of agent is transmitted to signal processing module, and basis signal processing module carries out signal analysis operations together, with
The buying coefficient Fa of all kinds of reaction promoters in second time period is obtained, and transmits it to registration interconnection module;
It is all kinds of in the second time period that registration interconnection module then arrives real-time reception according to descending ordinal relation
The buying coefficient Fa marshalling of reaction promoter, and buying registration form is accordingly generated to be sent to administrative staff's mobile phone, and is managed
Come for wireless transmission connection that is, according to all kinds of profit signals corresponding to earning performance between personnel's mobile phone and registration interconnection module
The situation to be processed and pre- shipment situation of every kind of solid waste corresponding thereto are transferred respectively, and combine the library of all kinds of reaction promoters
It deposits situation and carries out digitization analysis together, to obtain the procurement status of subsequent all kinds of reaction promoters;In turn by different profit shapes
The situation to be processed and pre- shipment situation of the associated every kind of solid waste of condition merge together with the inventories of all kinds of reaction promoters
Processing, accurately to provide targeted procurement strategy, foundation ordered with pin, the dynamic coordinate feedback mechanism to deposit fixed output quota;
Data acquisition module is also used to acquire the goods amount information and order information in warehouse in real time, and transmits it to goods amount
Analysis module, and the goods amount information in warehouse includes the storage quantity data and stock level data in warehouse, and the order information in warehouse is then
It is expressed as the shipment amount data in warehouse;
Goods amount analysis module then carries out goods amount evaluation operation to it accordingly, to obtain the goods in each warehouse in the third period
Flow coefficient Li is measured, and its via controller is transmitted to personnel assignment module;
Personnel assignment module for acquiring the job information of employee in real time, and the job information of employee includes the year of employee
Range data between age data, the gender data of employee and the residence and warehouse of employee, and allotment point is carried out together with Li accordingly
Analysis operation, agrees with coefficient Aij to obtain the allotment between every warehouse and each employee in the third period, and transmit it to and step on
Remember interconnection module;
This warehouse and each employee are then agreed with degree size accordingly by registration interconnection module, to arrange out the tune of each employee
Sequence ligand, and it is combined with default required personnel's amount in this warehouse, Lai Shengcheng personnel setup sheet is simultaneously sent to employee's hand
Machine, and be wireless transmission connection between employee's mobile phone and registration interconnection module, i.e., together by the goods amount information and order information in warehouse
Carry out weight analysis, and accordingly with the job information phase integrated treatment of employee, so as to pass through description of the goods and working condition
To provide reasonable personnel assignment scheme;
And specific step is as follows for payoff profile operation:
Step 1: all kinds of reaction promoters in first time period are got and are added to the combined amount number in every kind of solid waste
According to, cost data corresponding with all kinds of reaction promoters and price data corresponding with every kind of solid waste, and successively counted
According to calibration, and first time period is expressed as one month;
Step 2: all kinds of reaction promoters addition ratio when handling every kind of solid waste is first demarcated as Qij, i=1...n, j
=1...m, i.e., all kinds of reaction promoters when Q1j when as i=1 is expressed as handling the first solid waste add ratio, then will
Cost data corresponding with all kinds of reaction promoters is demarcated as Wj, j=1...m, corresponding with every kind of solid waste will finally sell
Valence mumber is to correspond according to Ei, i=1...n, and Qij, Wj and Ei is demarcated as;
Qij, Wj and Ei: first being assigned modifying factor q, w and e by step 3 respectively, and q is greater than w and is greater than e and q+w+e=
2.1657 then according to formulaTo acquire first time period
The profit coefficient of every kind of interior solid waste, σ, ρ, α and β are the profit factor, σ be greater than ρ be greater than α be greater than β and alpha+beta+ρ+σ=
1.6985, finally Ri is compared with preset value r, it, then will every kind of solid waste life corresponding with Ri when Ri is greater than preset value r
It is on the contrary then corresponding with Ri every kind of solid waste is generated into low profit signal at high-profit signal, i.e., by all kinds of reaction promoters with
The combined amount situation of every kind of solid waste is combined with cost situation and price situation, and the formulation according to amendment, assignment is analyzed,
The earning performance of every kind of solid waste is obtained, to formulate the production and procurement plan in later period;
And specific step is as follows for signal analysis operations:
Step 1: get in second time period with every kind of solid waste corresponding to high-profit signal and low profit signal
The inventory data of amount data to be processed and all kinds of reaction promoters in pre- shipment amount data, second time period and when first
Between all kinds of reaction promoters in section be added to the combined amount data in every kind of solid waste, and successively carry out data scaling, and second
Period is expressed as the one month after first time period;
Step 2: the inventory data of all kinds of reaction promoters is first demarcated as Ya, a=1...n, then will be with high-profit signal
The amount data scaling to be processed of every kind of corresponding solid waste be Ub, b=1...m, and by all kinds of reaction promoters be added to
Addition ratio in every kind of solid waste corresponding to high-profit signal be demarcated as Pab, a=1...n, b=1...m, and Ya, Ub and
Pab be correspond, i.e. P1b when as a=1 be expressed as first kind reaction promoter be added to corresponding to high-profit signal
Every kind of solid waste in addition ratio, finally by with it is low profit signal corresponding to every kind of solid waste pre- shipment amount data mark
Be set to Sc, c=1...m, and by all kinds of reaction promoters be added to adding in every kind of solid waste corresponding to low profit signal
Adding ratio to be demarcated as Dac, a=1...n, c=1...m, and Ya, Sc and Dac is to correspond, i.e. D1c when as a=1
Be expressed as first kind reaction promoter be added to the addition ratio corresponding to low profit signal in every kind of solid waste;
Step 3: according to formulaTo acquire second
The buying coefficient of all kinds of reaction promoters in period, y, u and s are the buying factor, and y is less than u and is less than s and y+u+s=
1.8951, and working as corresponding to same class reaction promoterIt is greater thanWhen, factor p to be processed
Take 1.6, pre- shipment factor d that 0.4, factor p on the contrary then to be processed is taken to take 0.4, pre- shipment factor d takes 1.6;
And specific step is as follows for goods amount evaluation operation:
Step 1: the goods amount information and order information in the warehouse in the third period, and always entering each warehouse are got
It is Gi that data scaling is measured in library, i=1...n, each warehouse total stock level data be demarcated as Hi, i=1...n, and by each warehouse
Total shipment amount data scaling be Ki, i=1...n, and Gi, Hi and Ki are to correspond, and the third period is expressed as one
A month;
Step 2: weight distribution first is carried out to the influence accounting that each warehouse goods amount flows according to Gi, Hi and Ki, and is successively divided
It is less than g with weighted value g, h and k, h and is less than k and h+g+k=1, then according to formula Li=Gi*g+Ki*k-Hi*h, i=1...n, comes
Acquire the goods amount flow coefficient in each warehouse in the third period;
And specific step is as follows for allotment analysis operation:
Step 1: the goods amount flow coefficient Li in each warehouse in the third period is got, and is greater than preset range l in Li
Maximum value, minimum value within preset range l and less than preset range l when, Li is assigned respectively calibration value M1, M2 and
M3, M1, M2 and M3 are positive integer and M1 is greater than M2 and is greater than M3;
Step 2: getting the job information of employee corresponding with the third period, and by the age data of each employee,
The gender data of each employee and the range data in every warehouse and each employee residence are demarcated as Zj, Xj and Vij, i=respectively
1...n, the range data that j=1...m, i.e. V1j when as i=1 are expressed as first warehouse Yu each employee residence, and Zj,
Xj, Vij and Li are to correspond;
Step 3: Zj is first greater than the maximum value of preset range z, within preset range z and less than preset range z's
Zj when minimum value assigns calibration value N1, N2 and N3 respectively, and N1, N2 and N3 are positive integer and N2 is greater than N3 and is greater than N1, then will
Xj when Xj is male and female assigns calibration value B1 and B2 respectively, and B1 and B2 are positive integer and B1 is greater than B2, finally by Vij
The Vij when maximum value greater than preset range v, the minimum value within preset range v and less than preset range v is assigned respectively
Calibration value C1, C2 and C3, C1, C2 and C3 are positive integer and C3 is greater than C2 and is greater than C1;
Step 4: according to formula Aij=(Zj+Xj) * t+Vij*o+Li*l, i=1...n, j=1...m, to acquire third
The allotment between every warehouse and each employee in period agrees with coefficient, and t, o and l are to agree with the factor, and t is less than l and is less than o and t+
O+l=2.6874, i.e. A1j when as i=1 are expressed as the allotment contract first in the third period between warehouse and each employee
Collaboration number.
A kind of applicable fixed-end forces industry ERP management system during the work time first will be real-time by data acquisition module
All kinds of reaction promoters of acquisition, which are added to the combined amount data in every kind of solid waste, is transmitted to data exchange module, data exchange mould
Block then transfers cost data corresponding with all kinds of reaction promoters out of database accordingly, and corresponding with every kind of solid waste
Price data, and it is transmitted to data analysis module together, data analysis module then carries out payoff profile operation to it;
It is added according to all kinds of reaction promoters to the combined amount data in every kind of solid waste and obtains every kind of solid waste of processing
When all kinds of reaction promoters add ratio, and by its cost data corresponding with all kinds of reaction promoters and with every kind of solid waste phase
Corresponding price data are together through calibration, the analysis of modified formulation, to obtain high-profit signal and low profit signal, and by its
It is added with all kinds of reaction promoters to via controller together with the combined amount data in every kind of solid waste and is transmitted to signal processing module, i.e.,
All kinds of reaction promoters are combined with the combined amount situation of every kind of solid waste with cost situation and price situation, and according to amendment,
The formulation of assignment is analyzed, to obtain the earning performance of every kind of solid waste, to formulate the production and procurement plan in later period;
Signal processing module then according to high-profit signal and low profit signal, come transferred out of data recordin module respectively with
The amount data to be processed and pre- shipment amount data of every kind of solid waste corresponding to it, and by itself and data recordin module real-time Transmission
All kinds of reaction promoters inventory data and all kinds of reaction promoters be added to the combined amount data in every kind of solid waste together
Carry out signal analysis operations;
It is added according to all kinds of reaction promoters to the combined amount data in every kind of solid waste and show that all kinds of reaction promoters add
Enter to in every kind of solid waste corresponding to high-profit signal addition ratio and all kinds of reaction promoters be added to low profit
Addition ratio in every kind of solid waste corresponding to signal, and by its inventory data with all kinds of reaction promoters, with it is high-profit
The amount data to be processed of every kind of solid waste corresponding to signal and pre- shipment with every kind of solid waste corresponding to low profit signal
It measures data to analyze through calibration, the digitization of precision assignment together, obtains the buying coefficient of all kinds of reaction promoters and transmit it to
Register interconnection module;
Interconnection module is registered then according to descending ordinal relation by the buying coefficient marshalling of all kinds of reaction promoters,
And accordingly generate buying registration form and be sent to administrative staff's mobile phone, i.e., according to all kinds of profit signals corresponding to earning performance,
It transfers the situation to be processed and pre- shipment situation of every kind of solid waste corresponding thereto respectively, and combines all kinds of reaction promoters
Inventories carry out digitization analysis together, to obtain the procurement status of subsequent all kinds of reaction promoters;In turn by all kinds of reactions
Auxiliary agent is combined with the combined amount situation of every kind of solid waste with cost situation and price situation, and is corrected, the formulation of assignment
After analysis, react to be directed to situation to be processed and the pre- shipment situation of the different associated every kind of solid wastes of earning performance with all kinds of
The inventories of auxiliary agent together established accurately to provide targeted procurement strategy and ordered with pin, is fixed to deposit by fusion treatment
The dynamic coordinate feedback mechanism of production;
The goods amount information and order information in the warehouse acquired in real time are also transmitted to goods amount analysis module by data acquisition module,
And the goods amount information in warehouse includes the storage quantity data and stock level data in warehouse, and the order information in warehouse is then expressed as warehouse
Shipment amount data, goods amount analysis module then carries out goods amount evaluation operation to it accordingly;
Will total storage quantity data in each warehouse, total stock level data in each warehouse and each warehouse total shipment amount data warp
Calibration, weightization analysis, obtain the goods amount flow coefficient in each warehouse, and its via controller is transmitted to personnel assignment module;
Personnel assignment module then by the job information of the employee acquired in real time together with the goods amount flow coefficient in each warehouse into
Row allotment analysis operation, and the job information of employee includes the residence of the age data of employee, the gender data of employee and employee
Range data between warehouse;
It will the goods amount flow coefficient in each warehouse, the age data of each employee, the gender data of each employee and every warehouse
It is analyzed with the range data in each employee residence through calibration, assignmentization, show that the allotment between every warehouse and each employee agrees with coefficient,
And transmit it to registration interconnection module;
This warehouse and each employee are then agreed with degree size accordingly by registration interconnection module, to arrange out the tune of each employee
Sequence ligand, and it is combined with default required personnel's amount in this warehouse, Lai Shengcheng personnel setup sheet is simultaneously sent to employee's hand
The goods amount information and order information in warehouse are carried out weight analysis by machine together, and mutually comprehensive with the job information of employee accordingly
Conjunction processing, to provide reasonable personnel assignment scheme by description of the goods and working condition.
Above content is only to structure of the invention example and explanation, affiliated those skilled in the art couple
Described specific embodiment does various modifications or additions or is substituted in a similar manner, without departing from invention
Structure or beyond the scope defined by this claim, is within the scope of protection of the invention.
Claims (5)
1. a kind of applicable fixed-end forces industry ERP management system, which is characterized in that including data acquisition module, data exchange mould
Block, database, data analysis module, controller, signal processing module, data recordin module, registration interconnection module, the analysis of goods amount
Module and personnel assignment module;
The data acquisition module is added for acquiring all kinds of reaction promoters in real time to the combined amount data in every kind of solid waste,
And transmit it to data exchange module;
The data exchange module then transfers cost data corresponding with all kinds of reaction promoters, Yi Jiyu out of database accordingly
The corresponding price data of every kind of solid waste, and it is transmitted to data analysis module together;
The data analysis module then by real-time reception to all kinds of reaction promoters be added to the combined amount number in every kind of solid waste
According to carrying out profit point together with, cost data corresponding with all kinds of reaction promoters and price data corresponding with every kind of solid waste
Analysis operation, to obtain the high-profit signal and low profit signal in first time period, and by its with it is all kinds of in first time period
Reaction promoter is added that via controller is transmitted to signal processing module together to the combined amount data in every kind of solid waste;
The signal processing module then according to high-profit signal and low profit signal, come transferred out of data recordin module respectively with
The amount data to be processed and pre- shipment amount data of every kind of solid waste corresponding to it, the data recordin module for remembering in real time
The amount data to be processed of every kind of solid waste, the inventory data of pre- shipment amount data and all kinds of reaction promoters are recorded, and will be all kinds of anti-
The inventory data of auxiliary agent is answered to be transmitted to signal processing module, and basis signal processing module is grasped to carry out signal analysis together
Make, to obtain the buying coefficient Fa of all kinds of reaction promoters in second time period, and transmits it to registration interconnection module;
It is all kinds of in the second time period that the registration interconnection module then arrives real-time reception according to descending ordinal relation
The buying coefficient Fa marshalling of reaction promoter, and buying registration form is accordingly generated to be sent to administrative staff's mobile phone;
The data acquisition module is also used to acquire the goods amount information and order information in warehouse in real time, and transmits it to goods amount
Analysis module, and the goods amount information in warehouse includes the storage quantity data and stock level data in warehouse, and the order information in warehouse is then
It is expressed as the shipment amount data in warehouse;
The goods amount analysis module then carries out goods amount evaluation operation to it accordingly, to obtain the goods in each warehouse in the third period
Flow coefficient Li is measured, and its via controller is transmitted to personnel assignment module;
The personnel assignment module for acquiring the job information of employee in real time, and the job information of employee includes the year of employee
Range data between age data, the gender data of employee and the residence and warehouse of employee, and allotment point is carried out together with Li accordingly
Analysis operation, agrees with coefficient Aij to obtain the allotment between every warehouse and each employee in the third period, and transmit it to and step on
Remember interconnection module;
This warehouse and each employee are then agreed with degree size accordingly by the registration interconnection module, to arrange out the tune of each employee
Sequence ligand, and it is combined with default required personnel's amount in this warehouse, Lai Shengcheng personnel setup sheet is simultaneously sent to employee's hand
Machine.
2. a kind of applicable fixed-end forces industry ERP management system according to claim 1, which is characterized in that the profit
Specific step is as follows for analysis operation:
Step 1: get all kinds of reaction promoters in first time period be added in every kind of solid waste combined amount data, with
All kinds of corresponding cost data of reaction promoter and price data corresponding with every kind of solid waste, and successively carry out data mark
It is fixed, and first time period is expressed as one month;
Step 2: all kinds of reaction promoters addition ratio when handling every kind of solid waste is first demarcated as Qij, i=1...n, j=
1...m, then by cost data corresponding with all kinds of reaction promoters it is demarcated as Wj, j=1...m, it finally will be with every kind of solid waste
Corresponding price data scaling is that Ei, i=1...n, and Qij, Wj and Ei are to correspond;
Qij, Wj and Ei: first being assigned modifying factor q, w and e by step 3 respectively, and q is greater than w and is greater than e and q+w+e=2.1657, then
According to formulaTo acquire every kind in first time period
The profit coefficient of solid waste, σ, ρ, α and β are the profit factor, and σ is greater than ρ and is greater than α greater than β and+σ=1.6985 alpha+beta+ρ, finally
Ri is compared with preset value r, when Ri is greater than preset value r, then every kind of solid waste corresponding with Ri is generated into high-profit letter
Number, it is on the contrary then corresponding with Ri every kind of solid waste is generated into low profit signal.
3. a kind of applicable fixed-end forces industry ERP management system according to claim 1, which is characterized in that the signal
Specific step is as follows for analysis operation:
Step 1: it gets in second time period with high-profit signal and low every kind of solid waste of getting a profit corresponding to signal wait locate
The inventory data and first time period of reason amount data and all kinds of reaction promoters in pre- shipment amount data, second time period
Interior all kinds of reaction promoters are added to the combined amount data in every kind of solid waste, and successively carry out data scaling, and the second time
Segment table is shown as the one month after first time period;
Step 2: the inventory data of all kinds of reaction promoters is first demarcated as Ya, a=1...n, then will be right with high-profit signal institute
The amount data scaling to be processed for the every kind of solid waste answered be Ub, b=1...m, and by all kinds of reaction promoters be added to Gao Ying
Addition ratio in every kind of solid waste corresponding to sharp signal is demarcated as Pab, a=1...n, b=1...m, and Ya, Ub and Pab
It is to correspond, will is finally Sc, c=with the pre- shipment amount data scaling of every kind of solid waste corresponding to low profit signal
1...m, and all kinds of reaction promoters are added to the addition ratio in every kind of solid waste corresponding to low profit signal and are demarcated
It is to correspond for Dac, a=1...n, c=1...m, and Ya, Sc and Dac;
Step 3: according to formulaTo acquire for the second time
The buying coefficient of all kinds of reaction promoters in section, y, u and s are the buying factor, and y is less than u and is less than s and y+u+s=1.8951, and
Working as corresponding to same class reaction promoterIt is greater thanWhen, factor p to be processed takes 1.6, goes out in advance
Goods factor d takes 0.4, factor p on the contrary then to be processed to take 0.4, and pre- shipment factor d takes 1.6.
4. a kind of applicable fixed-end forces industry ERP management system according to claim 1, which is characterized in that the goods amount
Specific step is as follows for evaluation operation:
Step 1: getting the goods amount information and order information in the warehouse in the third period, and by total storage quantity in each warehouse
Data scaling is Gi, i=1...n, each warehouse total stock level data be demarcated as Hi, i=1...n, and by the total of each warehouse
Shipment amount data scaling is that Ki, i=1...n, and Gi, Hi and Ki are to correspond, and the third period is expressed as one month
Time;
Step 2: weight distribution first is carried out to the influence accounting that each warehouse goods amount flows according to Gi, Hi and Ki, and is sequentially allocated power
Weight values g, h and k, h is less than g and is less than k and h+g+k=1, then foundation formula Li=Gi*g+Ki*k-Hi*h, i=1...n, to acquire
The goods amount flow coefficient in each warehouse in the third period.
5. a kind of applicable fixed-end forces industry ERP management system according to claim 1, which is characterized in that the allotment
Specific step is as follows for analysis operation:
Step 1: the goods amount flow coefficient Li in each warehouse in the third period is got, and is greater than preset range l most in Li
When big value, minimum value within preset range l and less than preset range l, Li is assigned to calibration value M1, M2 and M3 respectively,
M1, M2 and M3 are positive integer and M1 is greater than M2 and is greater than M3;
Step 2: getting the job information of employee corresponding with the third period, and by the age data of each employee, each member
The gender data of work and the range data in every warehouse and each employee residence are demarcated as Zj, Xj and Vij, i=1...n, j=respectively
1...m, and Zj, Xj, Vij and Li are to correspond;
Step 3: Zj is first greater than to maximum value, the minimum within preset range z and less than preset range z of preset range z
Zj when value assigns calibration value N1, N2 and N3 respectively, and N1, N2 and N3 are positive integer and N2 is greater than N3 and is greater than N1, then are by Xj
Xj when male and female assigns calibration value B1 and B2 respectively, and B1 and B2 are positive integer and B1 is greater than B2, is finally greater than Vij
The Vij when maximum value of preset range v, minimum value within preset range v and less than preset range v assigns calibration respectively
Value C1, C2 and C3, C1, C2 and C3 are positive integer and C3 is greater than C2 and is greater than C1;
Step 4: according to formula Aij=(Zj+Xj) * t+Vij*o+Li*l, i=1...n, j=1...m, to acquire the third time
Every warehouse in section and the allotment between each employee agree with coefficient, and t, o and l are to agree with the factor, and t is less than l and is less than o and t+o+l
=2.6874.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910721381.5A CN110428178B (en) | 2019-08-06 | 2019-08-06 | ERP management system suitable for solid waste treatment industry |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910721381.5A CN110428178B (en) | 2019-08-06 | 2019-08-06 | ERP management system suitable for solid waste treatment industry |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110428178A true CN110428178A (en) | 2019-11-08 |
CN110428178B CN110428178B (en) | 2021-02-19 |
Family
ID=68414384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910721381.5A Active CN110428178B (en) | 2019-08-06 | 2019-08-06 | ERP management system suitable for solid waste treatment industry |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110428178B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115829481A (en) * | 2022-12-01 | 2023-03-21 | 航天科技控股集团股份有限公司 | Oil storage management method and system based on Internet of things |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105389653A (en) * | 2015-10-30 | 2016-03-09 | 广东石油化工学院 | Adaptive material requirement plan (MRP) calculation method |
CN106779528A (en) * | 2016-11-25 | 2017-05-31 | 任万坤 | A kind of E-commerce SCM system |
CN108830480A (en) * | 2018-06-12 | 2018-11-16 | 恩龙实业(嘉兴)有限公司 | A kind of ERP buying calculation method and its system |
CN109409704A (en) * | 2018-10-11 | 2019-03-01 | 浙江清大科技有限公司 | A kind of ERP management system |
CN109920523A (en) * | 2019-01-21 | 2019-06-21 | 深圳志来信息技术有限公司 | A kind of comprehensive analysis management system based on medical big data |
-
2019
- 2019-08-06 CN CN201910721381.5A patent/CN110428178B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105389653A (en) * | 2015-10-30 | 2016-03-09 | 广东石油化工学院 | Adaptive material requirement plan (MRP) calculation method |
CN106779528A (en) * | 2016-11-25 | 2017-05-31 | 任万坤 | A kind of E-commerce SCM system |
CN108830480A (en) * | 2018-06-12 | 2018-11-16 | 恩龙实业(嘉兴)有限公司 | A kind of ERP buying calculation method and its system |
CN109409704A (en) * | 2018-10-11 | 2019-03-01 | 浙江清大科技有限公司 | A kind of ERP management system |
CN109920523A (en) * | 2019-01-21 | 2019-06-21 | 深圳志来信息技术有限公司 | A kind of comprehensive analysis management system based on medical big data |
Non-Patent Citations (1)
Title |
---|
李军: "中国天楹股份有限公司固废处理策略研究", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115829481A (en) * | 2022-12-01 | 2023-03-21 | 航天科技控股集团股份有限公司 | Oil storage management method and system based on Internet of things |
Also Published As
Publication number | Publication date |
---|---|
CN110428178B (en) | 2021-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EBRAHTMPOUR et al. | The Japanese just-in-time/total quality control production system: potential for developing countries | |
Oluyisola et al. | Smart production planning and control: Concept, use-cases and sustainability implications | |
Gunasekaran et al. | Improving productivity and quality in manufacturing organizations | |
Zhong et al. | RFID-enabled real-time manufacturing execution system for mass-customization production | |
Gordon et al. | Due date assignment and scheduling: SLK, TWK and other due date assignment models | |
Pekarcikova et al. | Solution of bottlenecks in the logistics flow by applying the kanban module in the tecnomatix plant simulation software | |
CN108459567A (en) | A kind of ERP system of concrete mixing plant | |
Jeong et al. | An assembly scheduler for TFT LCD manufacturing | |
Tsai et al. | Activity-based standard costing product-mix decision in the future digital era: green recycling steel-scrap material for steel industry | |
Shahbazi et al. | Comparison of four environmental assessment tools in Swedish manufacturing: a case study | |
Mecheter et al. | Additive manufacturing technology for spare parts application: A systematic review on supply chain management | |
Tsai et al. | Applying ERP and MES to implement the IFRS 8 operating segments: A steel group’s activity-based standard costing production decision model | |
CN110428178A (en) | A kind of applicable fixed-end forces industry ERP management system | |
CN115965302A (en) | Production resource logistics management method and equipment based on knowledge graph | |
Gong et al. | The role of humans in flexible smart factories | |
Micheli et al. | A revised systematic layout planning to fit disabled workers contexts | |
Utku | The evaluation and improvement of the production processes of an automotive industry company via simulation and optimization | |
Tominc et al. | Artificial intelligence and agility-based model for successful project implementation and company competitiveness | |
Bertolini et al. | A scrumban board-based approach to improve material flow in engineering to order (ETO) companies: an industrial application based on action research | |
CN108681888A (en) | It is a kind of towards the manufacturing execution system for remanufacturing full process stream journey | |
Lin et al. | Optimal Fair-Workload Scheduling: A Case Study at Glorytek | |
Song et al. | Research and implementation of lean production mode in shipbuilding | |
Yin et al. | Design of mixed-model assembly lines integrating new energy vehicles | |
Zhang et al. | Research on multiple constraints intelligent production line scheduling problem based on beetle antennae search (BAS) algorithm | |
De Souza et al. | Application of value stream mapping and Monte Carlo simulation in a university hospital |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |