CN110428152A - A kind of building decoration engineering progress monitoring system - Google Patents
A kind of building decoration engineering progress monitoring system Download PDFInfo
- Publication number
- CN110428152A CN110428152A CN201910651927.4A CN201910651927A CN110428152A CN 110428152 A CN110428152 A CN 110428152A CN 201910651927 A CN201910651927 A CN 201910651927A CN 110428152 A CN110428152 A CN 110428152A
- Authority
- CN
- China
- Prior art keywords
- finishing tool
- server
- rack
- finishing
- building decoration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005034 decoration Methods 0.000 title claims abstract description 23
- 238000012544 monitoring process Methods 0.000 title description 5
- 239000000463 material Substances 0.000 claims description 17
- 238000003384 imaging method Methods 0.000 claims description 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 3
- 238000012790 confirmation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 210000000697 sensory organ Anatomy 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/0875—Itemisation or classification of parts, supplies or services, e.g. bill of materials
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- General Health & Medical Sciences (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Multimedia (AREA)
- Signal Processing (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of building decoration engineering progresses to monitor system, including server, scanning means, finishing tool rack and the tool code tag being attached on finishing tool, be equipped on finishing tool rack for acquire finishing tool whether the infrared sensor on rack, the pressure sensor for whether being placed on designated position for detecting finishing tool be additionally provided on the transverse slat of the finishing tool rack, the photographic device of the transverse slat image information for acquiring finishing tool rack is additionally provided on the finishing tool rack, the image data output end of the photographic device and the image data input of server connect, the data output end of the infrared sensor and the infrared data input terminal of server connect, the output end of the pressure sensor and the input terminal of server connect;The output end of the scanning means and the label data input terminal of server connect, and system understands project progress according to the lending situation of finishing tool.
Description
Technical field
The invention belongs to building decoration engineering technology fields, specifically, being related to a kind of building decoration engineering progress monitoring
System.
Background technique
With the development of economy, various ornament materials emerge one after another, and the home dwelling as people's daily life system is either
The paving for wanting attraction customer, can all carry out fitting-up, and the house after finishing is whole cleaner and tidier, more comfortable to the sense organ of people.
Finishing at this stage is all often that a decoration company is directly looked for be fitted up, it is specified that good due date, remaining
Long full powers are given decoration company and are responsible for.And decoration company, during being fitted up, decoration company needs to each different
Engineering project carries out control, understands finishing progress and avoids exceeding the time limit to break a contract to guarantee to complete to deliver at due date.
Summary of the invention
For deficiency above-mentioned in the prior art, the present invention provides a kind of building decoration engineering progress monitoring system, system
Distinctive finishing tool rack is set to place finishing tool, fits up and infrared sensor, pressure biography is set on tool rack
Sensor and photographic device acquire finishing tool whether on tool rack, for confirming whether device is lent, according to finishing
The lending situation of tool understands project progress.
In order to achieve the above object, the solution that the present invention uses is: a kind of building decoration engineering progress monitoring system,
Including server, scanning means, finishing tool rack and the tool code tag being attached on finishing tool, the upfitter
Be equipped on tool rack for acquire finishing tool whether the infrared sensor on rack, the finishing tool places
The pressure sensor for whether being placed on designated position for detecting finishing tool, the upfitter are additionally provided on the transverse slat of frame
The photographic device of the transverse slat image information for acquiring finishing tool rack, the camera shooting dress are additionally provided on tool rack
The image data input of the image data output end and server set connects, the data output end of the infrared sensor with
The infrared data input terminal of server connects, and the output end of the pressure sensor and the input terminal of server connect;It is described
Scanning means output end and server label data input terminal connect;
The server includes that finishing tool borrows also recording unit, analytical unit and material outbound recording unit, described
Scanning means scanning finishing tool on code tag and be transferred to server, infrared sensor, pressure sensor and camera shooting
The information of device acquisition is transferred to server, and server analyzes dress according to the information on collected finishing tool rack
The placement information for repairing tool realizes that borrowing for finishing tool also records by means of also recording unit, and the material outbound recording unit is real
The ornament materials record that existing engineering project is got, analytical unit is according to the type of the finishing tool of lending and the decoration material got
Material analyzes decorative engineering progress.
Further, the finishing tool rack includes support column, is fixedly connected on the support column multiple
Transverse slat offers multiple grooves on the transverse slat, and the pressure sensor is mounted in groove, one end of the groove
It is hinged with cover board, the transmitting terminal of the infrared sensor is mounted on the bottom of cover board;The also fixed peace in the bottom of the cover board
Equipped with spring, one end of the spring is fixedly connected with the bottom of cover board, the sensitive face connection of the other end and pressure sensor.
Further, the receiving end of the infrared sensor is fixedly mounted on transverse slat, so that after cover board bounces, it is infrared
The infrared ray receiving end that sensor emission end issues receives.
Further, the photographic device is fixedly mounted on the support columns.
Further, the support column is cylinder, and correspondence is fixed with sliding sleeve, the sliding sleeve and branch on the transverse slat
Dagger is slidably connected.
Further, the bottom of the support column is fixedly installed with universal wheel.
Further, the photographic device is fixed on the base, and pedestal is fixedly mounted on anchor ear, and anchor ear, which is held tightly, to be fixed
On the support columns.
Further, there are number, the placement position of each finishing tool in each position on the finishing tool rack
Set fixation, the server confirms that the finishing tool does not exist with infrared data, pressure data and image information according to collecting
On finishing tool rack, while further confirming that the finishing tool is according to the finishing tool encoded information that scanning means scans
It is no to be lent.
Further, the finishing tool for receiving scanning means scanning acquisition by means of also recording unit encodes, and configures
Project is also fitted up in borrowing also state and borrowing for the finishing tool, and is stored.
The beneficial effects of the present invention are:
(1) distinctive finishing tool rack is arranged to place finishing tool in system, is arranged on finishing tool rack red
Outer sensor, pressure sensor and photographic device acquire finishing tool whether on tool rack, for whether confirming device
It is lent, project progress is understood according to the lending situation of finishing tool.
(2) finishing tool lending situation and material outbound situation are combined, determines fitting-out work progress.
(3) when finishing tool is borrowed, cover board is bounced, and infrared sensor receiving end receives the infrared sensing of cover board bottom
The infrared ray that device transmitting terminal issues, while tool is not pushing down cover board, the spring of cover board bottom is not pressurized, pressure sensor acquisition
Less than pressure, and photographic device collects the image information of finishing tool rack, and confirmation finishing tool is not on finishing frame, really
Recognize finishing tool to be borrowed.
Detailed description of the invention
Fig. 1 is structure of the invention block diagram;
Fig. 2 is finishing tool rack structural schematic diagram of the present invention;
Fig. 3 is finishing tool rack covering plate structure schematic diagram of the present invention;
In figure;1- support column, 2- transverse slat, 3- cover board, 4- groove, 5- infrared sensor receiving end, 6- photographic device, 7- bullet
Spring.
Specific embodiment
Below in conjunction with attached drawing, the invention will be further described:
As shown in Figure 1, a kind of building decoration engineering progress monitors system, including server, scanning means, finishing tool are put
The tool code tag setting frame and being attached on finishing tool is equipped with for acquiring upfitter on the finishing tool rack
Tool whether the infrared sensor on rack, be additionally provided on the transverse slat 2 of the finishing tool rack and filled for detecting
The pressure sensor whether tool is placed on designated position is repaired, is additionally provided on the finishing tool rack for acquiring dress
Repair the photographic device 6 of 2 image information of transverse slat of tool rack, the image data output end of the photographic device 6 and service
The image data input of device connects, and the data output end of the infrared sensor and the infrared data input terminal of server connect
It connects, the output end of the pressure sensor and the input terminal of server connect;The output end of the scanning means and service
The label data input terminal of device connects, and distinctive finishing tool rack is arranged to place finishing tool, fits up tool rack
Upper setting infrared sensor, pressure sensor and photographic device 6 acquire finishing tool whether on tool rack, for true
Recognize whether device is lent, project progress is understood according to the lending situation of finishing tool.
The server includes that finishing tool borrows also recording unit, analytical unit and material outbound recording unit, described
Scanning means scanning finishing tool on code tag and be transferred to server, infrared sensor, pressure sensor and camera shooting
The information that device 6 acquires is transferred to server, and server analyzes dress according to the information on collected finishing tool rack
The placement information for repairing tool realizes that borrowing for finishing tool also records by means of also recording unit, and the material outbound recording unit is real
The ornament materials record that existing engineering project is got, analytical unit is according to the type of the finishing tool of lending and the decoration material got
Material analyzes decorative engineering progress.In conjunction with finishing tool lending situation and material outbound situation, fitting-out work progress is determined.
As shown in Figures 2 and 3, the finishing tool rack includes support column 1, fixed on the support column 1 to connect
Multiple transverse slats 2 are connected to, multiple grooves 4 are offered on the transverse slat 2, the pressure sensor is mounted in groove 4, described
One end of groove 4 be hinged with cover board 3, the transmitting terminal of the infrared sensor is mounted on the bottom of cover board 3;The cover board
3 bottom is also fixedly installed with spring 7, and one end of the spring 7 is fixedly connected with the bottom of cover board 3, and the other end and pressure pass
The sensitive face of sensor connects.The infrared sensor receiving end 5 is fixedly mounted on transverse slat 2, so that after cover board 3 bounces, it is red
The infrared ray receiving end that outer sensor transmitting terminal issues receives.When finishing tool is borrowed, cover board 3 is bounced, infrared sensor
Receiving end 5 receives the infrared ray that the infrared sensor transmitting terminal of 3 bottom of cover board issues, while tool is not pushing down cover board 3, lid
The spring 7 of 3 bottom of plate is not pressurized, and pressure sensor does not acquire pressure, and photographic device 6 collects the image of finishing tool rack
Information, confirmation finishing tool not on finishing frame, borrowed by confirmation finishing tool.
Further, the photographic device 6 is fixedly mounted on support column 1.
Further, the support column 1 is cylinder, corresponding on the transverse slat 2 to be fixed with sliding sleeve, the sliding sleeve with
Support column 1 is slidably connected, and finishing tool rack is moved after disassembly by being completed.
Further, the bottom of the support column 1 is fixedly installed with universal wheel, mobile convenient for finishing tool rack.
Further, the photographic device 6 is fixed on the base, and pedestal is fixedly mounted on anchor ear, and anchor ear is held tightly solid
It is scheduled on support column 1.
Further, there are number, the placement position of each finishing tool in each position on the finishing tool rack
Set fixation, the server confirms that the finishing tool does not exist with infrared data, pressure data and image information according to collecting
On finishing tool rack, while further confirming that the finishing tool is according to the finishing tool encoded information that scanning means scans
No to be lent each pressure sensor and the corresponding finishing tool of infrared sensor, described borrows also recording unit reception to sweep
The finishing tool coding that imaging apparatus scanning obtains, and borrowing also state and borrow and also fitting up project for the finishing tool is configured, and it carries out
Storage.Server determines the coding for the finishing tool taken away according to the pressure sensor and infrared sensor for passing signal back, and sweeps
The finishing tool coding that imaging apparatus scans is compared, and determines the coding for the finishing tool borrowed, and is recorded in borrow and also be recorded
In unit.
A specific embodiment of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention
Protect range.
Claims (9)
1. a kind of building decoration engineering progress monitors system, it is characterised in that: put including server, scanning means, finishing tool
The tool code tag setting frame and being attached on finishing tool is equipped with for acquiring upfitter on the finishing tool rack
Tool whether the infrared sensor on rack, be additionally provided with for detecting on the transverse slat (2) of the finishing tool rack
Whether finishing tool is placed on the pressure sensor of designated position, is additionally provided on the finishing tool rack for acquiring
The photographic device (6) of transverse slat (2) image information of finishing tool rack, the image data output of the photographic device (6)
End is connect with the image data input of server, the data output end of the infrared sensor and the infrared data of server
Input terminal connection, the output end of the pressure sensor and the input terminal of server connect;The output of the scanning means
End is connect with the label data input terminal of server;
The server includes that finishing tool borrows also recording unit, analytical unit and material outbound recording unit, and described sweeps
Imaging apparatus scans the code tag on finishing tool and is transferred to server, infrared sensor, pressure sensor and photographic device
(6) information acquired is transferred to server, and server analyzes finishing according to the information on collected finishing tool rack
The placement information of tool realizes that borrowing for finishing tool also records by means of also recording unit, and the material outbound recording unit is realized
Ornament materials that engineering project is got record, analytical unit is according to the type of the finishing tool of lending and the ornament materials got
Analyze decorative engineering progress.
2. a kind of building decoration engineering progress according to claim 1 monitors system, it is characterised in that: the upfitter
Having rack includes support column (1), is fixedly connected on the support column (1) multiple transverse slats (2), on the transverse slat (2)
It offers multiple grooves (4), the pressure sensor is mounted in groove (4), and one end of the groove (4) is hinged with lid
Plate (3), the transmitting terminal of the infrared sensor are mounted on the bottom of cover board (3);The also fixed peace in the bottom of the cover board (3)
Equipped with spring (7), one end of the spring (7) is fixedly connected with the bottom of cover board (3), the sensing of the other end and pressure sensor
Face connection.
3. a kind of building decoration engineering progress according to claim 2 monitors system, it is characterised in that: the infrared biography
Sensor receiving end (5) is fixedly mounted on transverse slat (2), so that infrared sensor transmitting terminal issues infrared after cover board (3) bounces
Line receiving end receives.
4. a kind of building decoration engineering progress according to claim 1 monitors system, it is characterised in that: the camera shooting dress
(6) are set to be fixedly mounted on support column (1).
5. a kind of building decoration engineering progress according to claim 2 monitors system, it is characterised in that: the support column
It (1) is cylinder, correspondence is fixed with sliding sleeve on the transverse slat (2), and the sliding sleeve is slidably connected with support column (1).
6. a kind of building decoration engineering progress according to claim 2 monitors system, it is characterised in that: the support column
(1) bottom is fixedly installed with universal wheel.
7. a kind of building decoration engineering progress according to claim 4 monitors system, it is characterised in that: the camera shooting dress
It sets (6) to be fixed on the base, pedestal is fixedly mounted on anchor ear, and anchor ear holding is fixed on support column (1).
8. a kind of building decoration engineering progress according to claim 1 monitors system, it is characterised in that: the upfitter
There is number in each position on tool rack, and the placement location of each finishing tool is fixed, and the server is according to collecting
The finishing tool is confirmed not on finishing tool rack with infrared data, pressure data and image information, while according to scanning
The finishing tool encoded information of device scanning further confirms that whether the finishing tool is lent.
9. a kind of building decoration engineering progress according to claim 1 monitors system, it is characterised in that: described borrowing also is remembered
It records unit and receives the finishing tool coding that scanning means scanning obtains, and configure the finishing tool borrows also state and by means of also fitting up
Project, and stored.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910385206 | 2019-05-09 | ||
CN2019103852063 | 2019-05-09 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110428152A true CN110428152A (en) | 2019-11-08 |
Family
ID=68411151
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910651927.4A Pending CN110428152A (en) | 2019-05-09 | 2019-07-18 | A kind of building decoration engineering progress monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110428152A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107025611A (en) * | 2017-04-25 | 2017-08-08 | 成都泰和易装网络科技有限公司 | A kind of implementation method of interior decoration service platform |
CN107183943A (en) * | 2017-05-16 | 2017-09-22 | 江苏食品药品职业技术学院 | A kind of file management cabinet and its method of work |
CN107257985A (en) * | 2015-04-15 | 2017-10-17 | 实耐宝公司 | Use the automatic asset management system of multiple sensing technologies |
CN108053180A (en) * | 2017-12-25 | 2018-05-18 | 广州善施电子商务有限公司 | A kind of finishing project information management-control method and system |
CN109146224A (en) * | 2018-06-14 | 2019-01-04 | 广东易凌科技股份有限公司 | Program of real estate enterprise fully-decorated residence integrated management system under Partnering mode |
-
2019
- 2019-07-18 CN CN201910651927.4A patent/CN110428152A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107257985A (en) * | 2015-04-15 | 2017-10-17 | 实耐宝公司 | Use the automatic asset management system of multiple sensing technologies |
CN107025611A (en) * | 2017-04-25 | 2017-08-08 | 成都泰和易装网络科技有限公司 | A kind of implementation method of interior decoration service platform |
CN107183943A (en) * | 2017-05-16 | 2017-09-22 | 江苏食品药品职业技术学院 | A kind of file management cabinet and its method of work |
CN108053180A (en) * | 2017-12-25 | 2018-05-18 | 广州善施电子商务有限公司 | A kind of finishing project information management-control method and system |
CN109146224A (en) * | 2018-06-14 | 2019-01-04 | 广东易凌科技股份有限公司 | Program of real estate enterprise fully-decorated residence integrated management system under Partnering mode |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102616617B (en) | Elevator monitoring method | |
CN106303397A (en) | Image-pickup method and system, video frequency monitoring method and system | |
CN103439002A (en) | Thermal imaging and temperature measuring system based on smart mobile terminal | |
CN103321129A (en) | Remote pavement construction diagnosis system and method based on infrared thermal image of third-generation (3G) network | |
CN114399408A (en) | Intelligent construction site comprehensive management platform and method thereof | |
KR101647424B1 (en) | Apparatus for diagnosing electric power equipments automatically | |
CN110363937A (en) | One kind being based on the self-service cash register of recognition of face | |
CN110428152A (en) | A kind of building decoration engineering progress monitoring system | |
CN101536899A (en) | System for acquiring biological information of human body | |
US20110121989A1 (en) | Remote sensing system | |
CN111402107A (en) | Fusion type intelligent temperature measuring method and system | |
CN110974235A (en) | Outdoor physical examination pavilion of intelligence | |
CN110779655A (en) | Mechanical pressure gauge monitoring system and method | |
CN106056693A (en) | Online inspection method and system of thermal imaging picture data on basis of mobile terminal | |
CN112134944A (en) | Handheld intelligent residual pesticide detector and detection method | |
CN110553706A (en) | Unattended automatic weighing controller and system | |
CN103018626B (en) | Machine and method for automatically identifying color of audio and video connector | |
CN210836194U (en) | Architectural decoration engineering progress monitoring system | |
CN211043704U (en) | Leak protection inspection equipment | |
CN208400245U (en) | A kind of Book Circulation Management | |
CN114609158A (en) | Substation equipment target and defect intelligent detection equipment based on deep learning | |
CN206248983U (en) | The self photographing equipment and self photographing booth of a kind of use modular construction | |
CN211602173U (en) | Replaceable body temperature monitoring system | |
CN103986865A (en) | Imaging apparatus, control method, and program | |
CN217159711U (en) | Automatic angle searching and positioning device for laser communication |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |