CN110427371A - Server FRU field management method, device, equipment and readable storage medium storing program for executing - Google Patents
Server FRU field management method, device, equipment and readable storage medium storing program for executing Download PDFInfo
- Publication number
- CN110427371A CN110427371A CN201910657529.3A CN201910657529A CN110427371A CN 110427371 A CN110427371 A CN 110427371A CN 201910657529 A CN201910657529 A CN 201910657529A CN 110427371 A CN110427371 A CN 110427371A
- Authority
- CN
- China
- Prior art keywords
- fru
- field
- file
- server
- obtains
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 46
- 238000004590 computer program Methods 0.000 claims description 11
- 238000004364 calculation method Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 23
- 230000000694 effects Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 235000012054 meals Nutrition 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/22—Indexing; Data structures therefor; Storage structures
- G06F16/2282—Tablespace storage structures; Management thereof
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
- G06F16/235—Update request formulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
- G06F16/2379—Updates performed during online database operations; commit processing
- G06F16/2386—Bulk updating operations
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
- H04L41/0813—Configuration setting characterised by the conditions triggering a change of settings
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/085—Retrieval of network configuration; Tracking network configuration history
- H04L41/0853—Retrieval of network configuration; Tracking network configuration history by actively collecting configuration information or by backing up configuration information
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Software Systems (AREA)
- Mathematical Physics (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
The invention discloses a kind of server FRU field management methods, method includes the following steps: obtaining the corresponding configuration file of server FRU field;Configuration file is retrieved, each FRU field and the corresponding field value of each FRU field are obtained;Assignment successively is carried out to corresponding field in FRU file using field value, obtains target FRU file;Target FRU file is imported in BMC, and replaces original FRU file in BMC.The FRU field efficiency of management can be improved in this method.The invention also discloses a kind of server FRU field managing device, equipment and readable storage medium storing program for executing, have corresponding technical effect.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of server FRU field management method, device, set
Standby and readable storage medium storing program for executing.
Background technique
Big data, cloud service continued burning hot in recent years, and major operator and numerous Internet enterprises are to server
Demand increases year after year, therefore major server provider all increases the investment of the exploitation to server, and the market Lai Yinghe is more, wider
Demand.As what manufacturer customized gos deep into, flexible set meal configuration is more applied in server FRU (Field
Replaceable Unit, Field Replaceable Unit) in field extension.
Due to the continuous customization demand of Internet subscribers, a server product can be customized according to configuration and demand difference
Many different set meal products, in order to preferably distinguish different set meal configurations, the FRU on mainboard can be flexibly set different
Field, and then various cumbersome configurations can be distinguished, while also more easily managing the safety and ease for maintenance of machine.
Server in the manufacturing and management process, can by refresh FRU field method, Differentiated Services device type,
Other attributes such as different hardware configuration.When a large amount of FRU fields occur needs to be modified, previous ipmitool passes through defeated one by one
Entering the mode of order, to modify FRU field no longer practical, it is difficult to meet FRU field modification demand.
In conclusion the problems such as how efficiently solving the FRU field efficiency of management, is that current those skilled in the art are badly in need of
The technical issues of solution.
Summary of the invention
The object of the present invention is to provide a kind of server FRU field management method, device, equipment and readable storage medium storing program for executing,
To improve the FRU field efficiency of management.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of server FRU field management method, comprising:
Obtain the corresponding configuration file of server FRU field;
The configuration file is retrieved, each FRU field and the corresponding word of each FRU field are obtained
Segment value;
Assignment successively is carried out to corresponding field in FRU file using the field value, obtains target FRU file;
The target FRU file is imported in BMC, and replaces original FRU file in the BMC.
Preferably, described that assignment successively is carried out to corresponding field in FRU file using the field value, obtain target FRU
File, comprising:
Original FRU file is exported from the BMC;
Successively original FRU file is corresponded to using the field value and has field progress assignment again, described in acquisition
Target FRU file.
Preferably, assignment successively is carried out to original FRU file corresponding field using the field value, obtains the mesh
Mark FRU file, comprising:
According to field corresponding relationship, field value and the unmatched target of the field value in original FRU file are determined
Field;
By the corresponding field value of the aiming field replace with the matched numerical value of the field value, obtain the target
FRU file.
Preferably, assignment successively is carried out to original FRU file corresponding field using the field value, obtains the mesh
Mark FRU file, comprising:
According to field corresponding relationship, the aiming field increased newly in the configuration file is determined;
The aiming field is added in the extended field of original FRU file and the aiming field is corresponding
The field value obtains the target FRU file.
Preferably, the corresponding configuration file of the acquisition server FRU field, comprising:
According to the type and hardware configuration of the server, correspondingly FRU field obtains the configuration file for configuration.
Preferably, the configuration file is retrieved, obtains each FRU field and each FRU field difference
Corresponding field value, comprising:
The configuration file is retrieved according to field definition format, obtains each FRU field and each described
The corresponding field value of FRU field.
Preferably, assignment successively is carried out to corresponding field in FRU file using the field value, obtains target FRU file,
Include:
It is successively modified to the corresponding field in the FRU file using the field value, obtains the target FRU text
Part.
A kind of server FRU field managing device, comprising:
Configuration file obtains module, for obtaining the corresponding configuration file of server FRU field;
Field value obtains module, for retrieving to the configuration file, obtains each FRU field and each described
The corresponding field value of FRU field;
Field assignment module obtains mesh for successively carrying out assignment to corresponding field in FRU file using the field value
Mark FRU file;
FRU file update module for importing the target FRU file in BMC, and replaces original FRU in the BMC
File.
A kind of server FRU field management equipment, comprising:
Memory, for storing computer program;
Processor, the step of above-mentioned server FRU field management method is realized when for executing the computer program.
A kind of readable storage medium storing program for executing is stored with computer program, the computer program quilt on the readable storage medium storing program for executing
The step of processor realizes above-mentioned server FRU field management method when executing.
Using method provided by the embodiment of the present invention, the corresponding configuration file of server FRU field is obtained;To configuration text
Part is retrieved, and each FRU field and the corresponding field value of each FRU field are obtained;Using field value successively to FRU
Corresponding field carries out assignment in file, obtains target FRU file;Target FRU file is imported in BMC, and is replaced original in BMC
FRU file.
In the method, the corresponding configuration file of server FRU field is obtained first, and then configuration file is examined
Rope obtains each FRU field and the corresponding field value of each FRU field.Then the road field value is to right in FRU file
It answers field to carry out assignment, obtains target FRU file.Finally, target FRU file is imported into BMC, by original FRU file into
Row replacement.As it can be seen that replaced FRU file includes and the matched FRU field of configuration file and field value.Carry out a file
Whole replacement can modify, it is seen then that the FRU field efficiency of management can be improved in this method for multiple fields in FRU file.
Correspondingly, the embodiment of the invention also provides servers corresponding with above-mentioned server FRU field management method
FRU field managing device, equipment and readable storage medium storing program for executing, have above-mentioned technique effect, details are not described herein.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of implementation flow chart of server FRU field management method in the embodiment of the present invention;
Fig. 2 is a kind of structural schematic diagram of server FRU field managing device in the embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of server FRU field management equipment in the embodiment of the present invention;
Fig. 4 is a kind of concrete structure schematic diagram of server FRU field management equipment in the embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment one:
Referring to FIG. 1, Fig. 1 is a kind of flow chart of server FRU field management method in the embodiment of the present invention, this method
The following steps are included:
S101, the corresponding configuration file of server FRU field is obtained.
Wherein, configuration file includes as the data information configured to server FRU field.Wherein, FRU field is
For the variable for indicating FRU.
In embodiments of the present invention, the configuration file set can be read directly from readable storage medium storing program for executing, it can also
By way of other attributes such as the type of acquisition server and hardware configuration, the configuration file is obtained.Specifically, i.e. according to clothes
The type and hardware configuration of business device, correspondingly FRU field obtains configuration file for configuration.Specifically, about server type and
Hardware configuration specifically corresponds to which field and field value and can refer to the usual definition of existing FRU field configuration, herein not
It repeats one by one again.
S102, configuration file is retrieved, obtains each FRU field and the corresponding field of each FRU field
Value.
In embodiments of the present invention, the field data in configuration file is successively detected, each FRU field and each is obtained
The corresponding field value of FRU field.That is, obtaining the field name and field value of each FRU field.Wherein, field name
It can be able to be new field for existing field.
Specifically, can retrieve according to field definition format to configuration file, each FRU field and each FRU word are obtained
The corresponding field value of section.Field definition format referred herein can be configured as desired, specifically can be according to configuration
In file depending on the record form of field.
S103, assignment successively is carried out to corresponding field in FRU file using field value, obtains target FRU file.
Wherein, FRU file, the fields such as including Chassis, Board and Product, each field are respectively corresponding different
Information, specifically include manufacturer server, server ID number, server assets number, the server date of production, server exist
Host equipment room etc..For example, FRU information is specific as follows:
Duan Dingyi and its explanation, this is no longer going to repeat them.
It, can be using the field value successively in FRU file after obtaining each FRU field and corresponding field value
Corresponding field carry out assignment.For example, the FRU field newly obtained assigns corresponding byte according to the definition of FRU file
Value.
Specifically, successively modifying to the corresponding field in FRU file using field value, target FRU file is obtained.
Wherein, it modifies to corresponding field and modifies its corresponding field value.
Also assignment directly can be carried out to original FRU file in BMC in embodiments of the present invention, specifically, utilizing field
Value successively carries out assignment to corresponding field in FRU file, obtains target FRU file, comprising:
Step 1: exporting original FRU file from BMC;
Step 2: using field value, successively existing field corresponding to original FRU file carries out assignment again, obtains target
FRU file.
Above-mentioned two step is combined below and is illustrated.
Existing file export mode can be used, original FRU file is exported from BMC, then recycles field value successively
Again assignment is carried out to the corresponding field of original FRU file, to obtain target FRU file.For example, if FRU word in FRU file
The field value of section A is x, and the field value of the FRU field A newly obtained after step S101 and step S102 is y, then by FRU
The field value of FRU field A in file is assigned a value of y again.Using the field value newly obtained successively to the correspondence word in FRU file
After section completes assignment, the FRU file after completion field value again assignment is known as target FRU file.
In the manufacturing and management process of server, the method for refreshing FRU field, Differentiated Services device class can be passed through
Other attributes such as type, different hardware configurations.That is, carrying out assignment for FRU field may include but be not limited to following two situation:
Situation one modifies to existing field:
In view of will not usually modify to all FRU fields to the modification of existing FRU field or adjustment, therefore, In
When carrying out assignment to original FRU file corresponding field, assignment directly can be carried out to the field that needs are modified.I.e. using field value according to
It is secondary that assignment is carried out to original FRU file corresponding field, obtain target FRU file, comprising:
Step 1: determining field value and the unmatched target word of field value in original FRU file according to field corresponding relationship
Section;
Step 2: the corresponding field value of aiming field is replaced with and the matched numerical value of field value, acquisition target FRU text
Part.
Wherein it is determined that present field value and the newly determining unmatched FUR field of field value can be determined when aiming field
For aiming field.That is, can modify for existing FRU field, directly the field value of corresponding FUR field can be repaired
Change.
Situation two, expands field:
When needing to expand field, existing ipmitool cannot achieve field expansion.In the method, when needing to expand
When field, new field and respective field value can be recorded in configuration file.Then, using field value successively to original FRU
File corresponding field carries out assignment, obtains target FRU file, comprising:
Step 1: determining the aiming field increased newly in configuration file according to field corresponding relationship;
Step 2: adding aiming field and the corresponding field of aiming field in the extended field of original FRU file
Value obtains target FRU file.
That is, matched field can not be found from original FRU file when finding a FUR field, it at this time can be true
The fixed FRU field is to expand field, the FRU field directly can be determined as newly-increased aiming field.Then, in original FRU word
The aiming field and corresponding field value are added in the extended field of section.In this way, the target of new extended field can be obtained
FRU file.
In practical applications, situation one and situation two can individually occur, and can also occur together, that is to say, that can occur
When field is modified, assignment again is carried out to the field that needs are modified;Or occur field it is newly-increased when, newly-increased field will be needed to add
It adds in FRU file;Certainly, modifying when existing field has field extension again, can carry out assignment again to the field that needs are modified
And newly-increased field will be needed to be added in FRU file.
At this point, the field value of the FRU field of target FRU file is matched with configuration file.
S104, target FRU file is imported in BMC, and replaces original FRU file in BMC.
Target FRU file is imported into BMC (baseboard management controller), and replaces original FRU file in BMC, is realized
Field batch modification.In this way, BMC can based in target FRU file FRU field and field value be managed control.
Using method provided by the embodiment of the present invention, the corresponding configuration file of server FRU field is obtained;To configuration text
Part is retrieved, and each FRU field and the corresponding field value of each FRU field are obtained;Using field value successively to FRU
Corresponding field carries out assignment in file, obtains target FRU file;Target FRU file is imported in BMC, and is replaced original in BMC
FRU file.
In the method, the corresponding configuration file of server FRU field is obtained first, and then configuration file is examined
Rope obtains each FRU field and the corresponding field value of each FRU field.Then the road field value is to right in FRU file
It answers field to carry out assignment, obtains target FRU file.Finally, target FRU file is imported into BMC, by original FRU file into
Row replacement.As it can be seen that replaced FRU file includes and the matched FRU field of configuration file and field value.Carry out a file
Whole replacement can modify, it is seen then that the FRU field efficiency of management can be improved in this method for multiple fields in FRU file.
Embodiment two:
Corresponding to above method embodiment, the embodiment of the invention also provides a kind of server FRU field managing device,
Server FRU field managing device described below can correspond to each other ginseng with above-described server FRU field management method
According to.
Shown in Figure 2, which comprises the following modules:
Configuration file obtains module 101, for obtaining the corresponding configuration file of server FRU field;
Field value obtains module 102 and obtains each FRU field and each FRU word for retrieving to configuration file
The corresponding field value of section;
Field assignment module 103 obtains mesh for successively carrying out assignment to corresponding field in FRU file using field value
Mark FRU file;
FRU file update module 104 for importing target FRU file in BMC, and replaces original FRU file in BMC.
Using device provided by the embodiment of the present invention, the corresponding configuration file of server FRU field is obtained;To configuration text
Part is retrieved, and each FRU field and the corresponding field value of each FRU field are obtained;Using field value successively to FRU
Corresponding field carries out assignment in file, obtains target FRU file;Target FRU file is imported in BMC, and is replaced original in BMC
FRU file.
In the present apparatus, the corresponding configuration file of server FRU field is obtained first, then configuration file is examined
Rope obtains each FRU field and the corresponding field value of each FRU field.Then the road field value is to right in FRU file
It answers field to carry out assignment, obtains target FRU file.Finally, target FRU file is imported into BMC, by original FRU file into
Row replacement.As it can be seen that replaced FRU file includes and the matched FRU field of configuration file and field value.Carry out a file
Whole replacement can modify, it is seen then that the FRU field efficiency of management can be improved in the present apparatus for multiple fields in FRU file.
In a kind of specific embodiment of the invention, field assignment module 103 is original specifically for exporting from BMC
FRU file;Using field value, successively existing field corresponding to original FRU file carries out assignment again, obtains target FRU file.
In a kind of specific embodiment of the invention, field assignment module 103 is specifically used for closing according to field is corresponding
System determines field value and the unmatched aiming field of field value in original FRU file;By the corresponding field value replacement of aiming field
For with the matched numerical value of field value, obtain target FRU file.
In a kind of specific embodiment of the invention, field assignment module 103 is specifically used for closing according to field is corresponding
System determines the aiming field increased newly in configuration file;Aiming field and mesh are added in the extended field of original FRU file
The corresponding field value of marking-up section obtains target FRU file.
In a kind of specific embodiment of the invention, configuration file obtains module 101, specifically for according to server
Type and hardware configuration, correspondingly FRU field obtains configuration file for configuration.
In a kind of specific embodiment of the invention, field value obtains module 102, according to field definition format to configuration
File is retrieved, and each FRU field and the corresponding field value of each FRU field are obtained.
In a kind of specific embodiment of the invention, field assignment module 103, it is successively right using field value to be specifically used for
Corresponding field in FRU file is modified, and target FRU file is obtained.
Embodiment three:
Corresponding to above method embodiment, the embodiment of the invention also provides a kind of server FRU field management equipment,
A kind of server FRU field management equipment described below can phase with a kind of above-described server FRU field management method
Mutually to should refer to.
Shown in Figure 3, server FRU field management equipment includes:
Memory D1, for storing computer program;
Processor D2 realizes the server FRU field manager of above method embodiment when for executing computer program
The step of method.
Specifically, referring to FIG. 4, Fig. 4 is a kind of specific knot of server FRU field management equipment provided in this embodiment
Structure schematic diagram, server FRU field management equipment can generate bigger difference because configuration or performance are different, may include
One or more processors (central processing units, CPU) 322 are (for example, one or more are handled
Device) and memory 332, one or more storage application programs 342 or data 344 storage medium 330 (such as one or
More than one mass memory unit).Wherein, memory 332 and storage medium 330 can be of short duration storage or persistent storage.It deposits
Storage may include one or more modules (diagram does not mark) in the program of storage medium 330, and each module may include
To the series of instructions operation in data processing equipment.Further, central processing unit 322 can be set to and storage medium
330 communications execute the series of instructions operation in storage medium 330 in server FRU field management equipment 301.
Server FRU field management equipment 301 can also include one or more power supplys 326, one or one with
Upper wired or wireless network interface 350, one or more input/output interfaces 358, and/or, one or more behaviour
Make system 341.For example, Windows ServerTM, Mac OS XTM, UnixTM, LinuxTM, FreeBSDTM etc..
Step in server FRU field management method as described above can be by server FRU field management equipment
Structure realize.
Example IV:
Corresponding to above method embodiment, the embodiment of the invention also provides a kind of readable storage medium storing program for executing, are described below
A kind of readable storage medium storing program for executing can correspond to each other reference with a kind of above-described server FRU field management method.
A kind of readable storage medium storing program for executing is stored with computer program on readable storage medium storing program for executing, and computer program is held by processor
The step of server FRU field management method of above method embodiment is realized when row.
The readable storage medium storing program for executing be specifically as follows USB flash disk, mobile hard disk, read-only memory (Read-Only Memory,
ROM), the various program storage generations such as random access memory (Random Access Memory, RAM), magnetic or disk
The readable storage medium storing program for executing of code.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
Claims (10)
1. a kind of server FRU field management method characterized by comprising
Obtain the corresponding configuration file of server FRU field;
The configuration file is retrieved, each FRU field and the corresponding field of each FRU field are obtained
Value;
Assignment successively is carried out to corresponding field in FRU file using the field value, obtains target FRU file;
The target FRU file is imported in BMC, and replaces original FRU file in the BMC.
2. server FRU field management method according to claim 1, which is characterized in that described to utilize the field value
Assignment successively is carried out to corresponding field in FRU file, obtains target FRU file, comprising:
Original FRU file is exported from the BMC;
Using the field value, successively existing field corresponding to original FRU file carries out assignment again, obtains the target
FRU file.
3. server FRU field management method according to claim 2, which is characterized in that successively using the field value
Assignment is carried out to original FRU file corresponding field, obtains the target FRU file, comprising:
According to field corresponding relationship, field value and the unmatched aiming field of the field value in original FRU file are determined;
By the corresponding field value of the aiming field replace with the matched numerical value of the field value, obtain target FRU text
Part.
4. server FRU field management method according to claim 2, which is characterized in that successively using the field value
Assignment is carried out to original FRU file corresponding field, obtains the target FRU file, comprising:
According to field corresponding relationship, the aiming field increased newly in the configuration file is determined;
The aiming field is added in the extended field of original FRU file and the aiming field is corresponding described
Field value obtains the target FRU file.
5. server FRU field management method according to claim 1, which is characterized in that the acquisition server FRU word
The corresponding configuration file of section, comprising:
According to the type and hardware configuration of the server, correspondingly FRU field obtains the configuration file for configuration.
6. server FRU field management method according to claim 1, which is characterized in that carried out to the configuration file
Retrieval, obtains each FRU field and the corresponding field value of each FRU field, comprising:
The configuration file is retrieved according to field definition format, obtains each FRU field and each FRU word
The corresponding field value of section.
7. server FRU field management method according to claim 1, which is characterized in that successively using the field value
Assignment is carried out to corresponding field in FRU file, obtains target FRU file, comprising:
It is successively modified to the corresponding field in the FRU file using the field value, obtains the target FRU file.
8. a kind of server FRU field managing device characterized by comprising
Configuration file obtains module, for obtaining the corresponding configuration file of server FRU field;
Field value obtains module and obtains each FRU field and each FRU for retrieving to the configuration file
The corresponding field value of field;
Field assignment module obtains target for successively carrying out assignment to corresponding field in FRU file using the field value
FRU file;
FRU file update module for importing the target FRU file in BMC, and replaces original FRU text in the BMC
Part.
9. a kind of server FRU field management equipment characterized by comprising
Memory, for storing computer program;
Processor realizes the server FRU field as described in any one of claim 1 to 7 when for executing the computer program
The step of management method.
10. a kind of readable storage medium storing program for executing, which is characterized in that be stored with computer program, the meter on the readable storage medium storing program for executing
The step of the server FRU field management method as described in any one of claim 1 to 7 is realized when calculation machine program is executed by processor
Suddenly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910657529.3A CN110427371A (en) | 2019-07-19 | 2019-07-19 | Server FRU field management method, device, equipment and readable storage medium storing program for executing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910657529.3A CN110427371A (en) | 2019-07-19 | 2019-07-19 | Server FRU field management method, device, equipment and readable storage medium storing program for executing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110427371A true CN110427371A (en) | 2019-11-08 |
Family
ID=68411394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910657529.3A Pending CN110427371A (en) | 2019-07-19 | 2019-07-19 | Server FRU field management method, device, equipment and readable storage medium storing program for executing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110427371A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111104548A (en) * | 2019-12-18 | 2020-05-05 | 腾讯科技(深圳)有限公司 | Data feedback method, system and storage medium |
CN111367988A (en) * | 2020-03-31 | 2020-07-03 | 中国建设银行股份有限公司 | Data import method and device |
CN113032214A (en) * | 2021-03-24 | 2021-06-25 | 山东英信计算机技术有限公司 | Server running state monitoring method, device and medium |
CN113254087A (en) * | 2021-05-14 | 2021-08-13 | 山东英信计算机技术有限公司 | Method and system for rapidly switching Expander configuration |
CN113672451A (en) * | 2021-07-21 | 2021-11-19 | 济南浪潮数据技术有限公司 | BMC service detection method, device, equipment and readable storage medium |
CN116820596A (en) * | 2023-04-23 | 2023-09-29 | 超聚变数字技术有限公司 | FRU (field replaceable unit) management method, device and system |
US12032517B2 (en) | 2022-10-26 | 2024-07-09 | Hewlett Packard Enterprise Development Lp | File system areas in field replaceable unit storage devices |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150046761A1 (en) * | 2013-08-09 | 2015-02-12 | American Megatrends, Inc. | System and method for generating field replaceable unit information files |
CN104899061A (en) * | 2015-05-27 | 2015-09-09 | 浪潮电子信息产业股份有限公司 | Method for automatically refreshing FRU information |
CN107704390A (en) * | 2017-09-28 | 2018-02-16 | 郑州云海信息技术有限公司 | A kind of method of test FRU consistency on messagings |
CN108182278A (en) * | 2018-01-26 | 2018-06-19 | 郑州云海信息技术有限公司 | A kind of FRU information maintenance methods and relevant apparatus |
US20180267858A1 (en) * | 2017-03-20 | 2018-09-20 | Hewlett Packard Enterprise Development Lp | Baseboard Management Controller To Deconfigure Field Replaceable Units According To Deep Learning Model |
CN108845815A (en) * | 2018-06-20 | 2018-11-20 | 郑州云海信息技术有限公司 | A method of refreshing SMBIOS information |
-
2019
- 2019-07-19 CN CN201910657529.3A patent/CN110427371A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150046761A1 (en) * | 2013-08-09 | 2015-02-12 | American Megatrends, Inc. | System and method for generating field replaceable unit information files |
CN104899061A (en) * | 2015-05-27 | 2015-09-09 | 浪潮电子信息产业股份有限公司 | Method for automatically refreshing FRU information |
US20180267858A1 (en) * | 2017-03-20 | 2018-09-20 | Hewlett Packard Enterprise Development Lp | Baseboard Management Controller To Deconfigure Field Replaceable Units According To Deep Learning Model |
CN107704390A (en) * | 2017-09-28 | 2018-02-16 | 郑州云海信息技术有限公司 | A kind of method of test FRU consistency on messagings |
CN108182278A (en) * | 2018-01-26 | 2018-06-19 | 郑州云海信息技术有限公司 | A kind of FRU information maintenance methods and relevant apparatus |
CN108845815A (en) * | 2018-06-20 | 2018-11-20 | 郑州云海信息技术有限公司 | A method of refreshing SMBIOS information |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111104548A (en) * | 2019-12-18 | 2020-05-05 | 腾讯科技(深圳)有限公司 | Data feedback method, system and storage medium |
CN111104548B (en) * | 2019-12-18 | 2021-09-14 | 腾讯科技(深圳)有限公司 | Data feedback method, system and storage medium |
CN111367988A (en) * | 2020-03-31 | 2020-07-03 | 中国建设银行股份有限公司 | Data import method and device |
CN113032214A (en) * | 2021-03-24 | 2021-06-25 | 山东英信计算机技术有限公司 | Server running state monitoring method, device and medium |
CN113254087A (en) * | 2021-05-14 | 2021-08-13 | 山东英信计算机技术有限公司 | Method and system for rapidly switching Expander configuration |
CN113672451A (en) * | 2021-07-21 | 2021-11-19 | 济南浪潮数据技术有限公司 | BMC service detection method, device, equipment and readable storage medium |
CN113672451B (en) * | 2021-07-21 | 2023-12-22 | 济南浪潮数据技术有限公司 | BMC service detection method, device, equipment and readable storage medium |
US12032517B2 (en) | 2022-10-26 | 2024-07-09 | Hewlett Packard Enterprise Development Lp | File system areas in field replaceable unit storage devices |
CN116820596A (en) * | 2023-04-23 | 2023-09-29 | 超聚变数字技术有限公司 | FRU (field replaceable unit) management method, device and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110427371A (en) | Server FRU field management method, device, equipment and readable storage medium storing program for executing | |
Noureddine et al. | A preliminary study of the impact of software engineering on greenit | |
CN107967316A (en) | A kind of method of data synchronization, equipment and computer-readable recording medium | |
US20110320394A1 (en) | Creation and Revision of Network Object Graph Topology for a Network Performance Management System | |
CN102999369A (en) | Method and device for upgrading virtual machines | |
CN110798467B (en) | Target object identification method and device, computer equipment and storage medium | |
JP2016164775A (en) | Field device commissioning system and method | |
CN105719112A (en) | Determination method and device for distribution abnormal state, and server | |
CN109388397A (en) | Product page generation method, system, computer equipment and storage medium | |
CN103399781A (en) | Cloud server and virtual machine management method thereof | |
CN110597887A (en) | Data management method, device and storage medium based on block chain network | |
CN108833592A (en) | Cloud host schedules device optimization method, device, equipment and storage medium | |
CN105302536A (en) | Configuration method and apparatus for related parameters of MapReduce application | |
CN110852559A (en) | Resource allocation method and device, storage medium and electronic device | |
CN105159750A (en) | Virtual machine creation method and apparatus | |
CN107329966B (en) | Machine data storage method and system | |
JPWO2021192191A5 (en) | Abnormal Access Prediction System, Abnormal Access Prediction Method and Abnormal Access Prediction Program | |
US11049477B2 (en) | Configuration display apparatus, configuration display method, and recording medium | |
CN105511914A (en) | Application update method, device and system | |
CN110674150A (en) | BMC setting strategy updating method and equipment | |
CN112764719A (en) | Configuration updating method, device, equipment and storage medium for organization architecture information | |
CN115686816A (en) | Data processing method, related device and equipment | |
CN114553859A (en) | BMC configuration management method and device, electronic equipment and storage medium | |
CN110443560B (en) | Protocol data management method, device, computer equipment and storage medium | |
CN108595488B (en) | Data migration method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191108 |