CN110426542A - Electricity consumption monitoring device - Google Patents

Electricity consumption monitoring device Download PDF

Info

Publication number
CN110426542A
CN110426542A CN201910717871.8A CN201910717871A CN110426542A CN 110426542 A CN110426542 A CN 110426542A CN 201910717871 A CN201910717871 A CN 201910717871A CN 110426542 A CN110426542 A CN 110426542A
Authority
CN
China
Prior art keywords
cabinet body
electricity consumption
cabinet
monitoring device
consumption monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910717871.8A
Other languages
Chinese (zh)
Inventor
郭斌
何圣川
陈健华
邓广昌
刘珮琪
许丽娟
冯兴兴
曹琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201910717871.8A priority Critical patent/CN110426542A/en
Publication of CN110426542A publication Critical patent/CN110426542A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • G01R1/0416Connectors, terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/25Arrangements for indicating or signalling faults
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/065Details of electronic electricity meters related to mechanical aspects
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/068Arrangements for indicating or signaling faults

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Patch Boards (AREA)

Abstract

The present invention relates to a kind of electricity consumption monitoring devices comprising: Installation cabinet, the Installation cabinet include the cabinet body being mutually rotatablely connected and cabinet door, and the bottom of the cabinet body is equipped with movable pulley;Insert row is switched, the switch insert row is set on the cabinet body, and the switch insert row includes at least two jacks, and the jack is for the plug grafting with power device;Fixing seat, the fixing seat are set on the inner wall of the cabinet body;And three-phase kilowatt-hour meter, the three-phase kilowatt-hour meter is set in the cabinet body and is electrically connected with the switch insert row, and the three-phase kilowatt-hour meter is also used to connect with external power supply.By installing movable pulley in the bottom of cabinet body, thus has stronger maneuverability, it can be according to the flexible mobile handoff of need of work to different job sites, use electric installation and switch insert row grafting, it is monitored and measures with the real-time electricity consumption situation to power device, realize in the unit time to the synchronous purpose for carrying out electricity consumption metering of different power devices.

Description

Electricity consumption monitoring device
Technical field
The present invention relates to electric quantity metering equipment technical fields, more particularly to a kind of electricity consumption monitoring device.
Background technique
With the development of the social economy, people's lives level is also continuously improved, mark the most significant is various each The household electricity equipment of sample more and more appears in us at one's side.In order to understand the use of each household electricity equipment under different conditions Charge condition, to prevent electricity consumption is excessive from causing circuit overload is on fire to wait danger, it is therefore desirable to measuring equipment be used Ensure Electrical Safety.
However, traditional Electro-metering mode is between end of incoming cables and transformer or between transformer and load end Three-phase intelligent ammeter is installed to record the real-time electricity consumption of user, but since three-phase intelligent ammeter in this kind of metering method can not be right The electricity consumption of the different power devices of different location carries out flexible, real time on-line monitoring and metering, leads to service performance and is applicable in There are biggish limitations for range.
Summary of the invention
Based on this, it is necessary to provide a kind of electricity consumption monitoring device, it is intended to which different location can not be directed to by solving the prior art Different power devices electricity consumption realize effectively detection, lead to the problem big using limitation.
Its technical solution is as follows:
A kind of electricity consumption monitoring device comprising:
Installation cabinet, the Installation cabinet include the cabinet body being mutually rotatablely connected and cabinet door, and the bottom of the cabinet body is equipped with shifting Driving wheel;
Insert row is switched, the switch insert row is set on the cabinet body, and the switch insert row includes at least two jacks, institute Jack is stated for the plug grafting with power device;
Fixing seat, the fixing seat are set on the inner wall of the cabinet body;And
Three-phase kilowatt-hour meter, the three-phase kilowatt-hour meter are set in the cabinet body and are electrically connected with the switch insert row, and described three Phase ammeter is also used to connect with external power supply.
Above-mentioned electricity consumption monitoring device and is pacified respectively on the cabinet in use, by installing movable pulley in the bottom of cabinet body Three-phase kilowatt-hour meter and switch insert row are filled, and is electrically connected three-phase kilowatt-hour meter and switch insert row, three-phase kilowatt-hour meter connects with external power supply simultaneously It connects well, thus has stronger maneuverability using electric quantity monitoring equipment by movable pulley, can flexibly be moved according to need of work It is dynamic to switch to different job sites, using electric installation and switch insert row grafting, with the real-time electricity consumption situation to power device It is monitored and measures.Further, since being provided at least two jacks on switch insert row, it is thus possible to while not at least two Same power device connects simultaneously, realizes in the unit time to the synchronous purpose for carrying out electricity consumption metering of different power devices.On The scheme of stating can greatly promote the scope of application and service performance of electricity consumption monitoring device.
The technical solution of the application is further described below:
The cabinet body is rotatably set on the cabinet body by gear assembly in one of the embodiments, the tooth Wheel assembly includes the first gear being set on the cabinet body and the second gear that is set in the cabinet door, first tooth Wheel is engaged with the second gear, and the cabinet door and the cabinet body is enabled to open and close cooperation;The three-phase kilowatt-hour meter is set to institute It states on the inner wall of cabinet body, the cabinet door is equipped with visual windows, and the visual windows are opposite with the three-phase kilowatt-hour meter.
The switch insert row is two in one of the embodiments, and the two sides of the width direction of the cabinet body are distinguished It is concaved with mounting groove, the cell wall of the mounting groove is provided with latch catch, and the switch insert row is set to correspondingly It is snapped connection in the mounting groove and with the latch catch, the mounting groove offered line close to the side wall of the movable pulley Notch.
Two lateral surfaces of the width direction of the cabinet body are provided with shield, the protection in one of the embodiments, It covers above the notch of the mounting groove.
The cabinet body is equipped with sliding rail in one of the embodiments, and the shield is equipped with sliding slot, and the sliding rail clamps In in the sliding slot, enabling the shield mobile relative to the mounting groove.
Handle lock is provided on the inner sidewall of the cabinet door in one of the embodiments, on the lateral wall of the cabinet door It is provided with knob, the knob is connect by trundle with the handle lock.
The rear wall of the cabinet body offers spaced heat dissipation grid and outlet hole in one of the embodiments,.
The electricity consumption monitoring device further includes connecting terminal in one of the embodiments, the connecting terminal setting In on the rear wall of the cabinet body and between the three-phase kilowatt-hour meter and the switch extension socket.
The electricity consumption monitoring device further includes the first operating status lamp, the second operation shape in one of the embodiments, State lamp and third operating status lamp, the first operating status lamp, the second operating status lamp and the third run shape State lamp is electrically connected with the connecting terminal respectively.
The electricity consumption monitoring device further includes drawing handle in one of the embodiments, and the drawing handle is set to the cabinet On the outside of the roof of body.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of electricity consumption monitoring device described in one embodiment of the invention;
Fig. 2 is the positive structure diagram of Fig. 1.
Description of symbols:
10, Installation cabinet, 11, cabinet body, 12, cabinet door, 13, gear assembly, 14, visual windows, 15, heat dissipation grid, 16, outlet Hole, 20, movable pulley, 30, switch insert row, 40, three-phase kilowatt-hour meter, 50, mounting groove, 60, shield, 70, handle lock, 80, terminals Son, the 90, first operating status lamp, the 100, second operating status lamp, 110, third operating status lamp, 120, drawing handle.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, below in conjunction with attached drawing and specific embodiment party Formula, the present invention is further described in detail.It should be understood that the specific embodiments described herein are only to solve The present invention is released, and the scope of protection of the present invention is not limited.
It should be noted that when element is referred to as " being fixedly arranged on ", " being set to " or " install in " another element, it can be with Directly on the other element or there may also be elements placed in the middle.When an element is considered as " connection " another yuan Part, it can be directly to another element or may be simultaneously present centering elements;One element and another element The concrete mode being fixedly connected can be achieved by the prior art, and details are not described herein, it is preferred to use the fixation side of threaded connection Formula.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
As shown in Figure 1, for one embodiment of the application show electricity consumption monitoring device, for different electricity consumption places not Electricity consumption monitoring and metering are carried out with power device, such as a skyscraper, numerous air-conditionings, electricity are installed Depending on, headlamp etc., when there are influence factors such as ageing equipment, electric current transmission unstabilitys, for avoid electricity consumption be more than rated capacity (i.e. Carry), then it needs to carry out electricity consumption monitoring and metering respectively to each air-conditioning, TV, headlamp, it is hidden utmostly to eliminate electricity consumption Suffer from, lifting means use reliability.
Specifically, electricity consumption monitoring device includes: Installation cabinet 10, switch insert row 30 and three-phase kilowatt-hour meter 40.The Installation cabinet Including the cabinet body 11 being mutually rotatablely connected and cabinet door 12, the bottom of the cabinet body 11 is equipped with movable pulley 20, and movable pulley 20 is preferred For universal wheel, thus assign the stronger locomotivity of equipment.In addition, the bottom of cabinet body 11 is also equipped with positioning stabilizer blade, for setting It is standby to be fixed on work-yard.The switch insert row 30 is set on the cabinet body 11, and the switch insert row 30 includes at least Two jacks, the jack is for the plug grafting with power device;The three-phase kilowatt-hour meter 40 is set in the cabinet body 11 simultaneously It is electrically connected with the switch insert row 30, and the three-phase kilowatt-hour meter 40 is also used to connect with external power supply.
Above-mentioned electricity consumption monitoring device is in use, by installing movable pulley 20 in the bottom of cabinet body 11, and on cabinet body 11 Installation three-phase kilowatt-hour meter 40 and switch insert row 30 respectively, and it is electrically connected three-phase kilowatt-hour meter 40 and switch insert row 30, three-phase kilowatt-hour meter 40 It is connect simultaneously with external power supply well, thus has stronger maneuverability using electric quantity monitoring equipment by movable pulley 20, it can According to the flexible mobile handoff of need of work to different job sites, using electric installation and switch 30 grafting of insert row, to electricity consumption The real-time electricity consumption situation of device is monitored and measures.Further, since at least two jacks are provided on switch insert row 30, because And can be connected simultaneously from least two different power devices simultaneously, it realizes in the unit time to the same stepping of different power devices The purpose of row electricity consumption metering.Above scheme can greatly promote the scope of application and service performance of electricity consumption monitoring device.
Please continue to refer to Fig. 1 and Fig. 2, in an embodiment, the cabinet door 12 is rotatably set to institute by gear assembly 13 It states on cabinet body 11, the gear assembly includes the first gear being set on the cabinet body 11 and is set in the cabinet door 12 Second gear, the first gear engages with the second gear, so that the cabinet door 12 and the cabinet body 11 opening and closing cooperate. It should be understood that first gear and second gear are bevel gear.
Wherein, cabinet body 11 and cabinet door 12 constitute the Installation cabinet 10 of trapezoidal cube structure, can increase the capacity of Installation cabinet 10, Each electronic component is set to keep installation electric clearance;It is preferred that being made of stainless steel material, to improve service life.Cabinet door 12 passes through Upper and lower two gear assemblies 13 are installed on the leading flank of cabinet body 11, and staff is facilitated to open or close operation.The three-phase electricity Table 40 is set on the inner wall of the cabinet body 11, and the cabinet door 12 is equipped with visual windows 14, the visual windows 14 and described three Phase ammeter 40 is opposite.By the way that visual windows 14 are arranged, so that equipment is also able to observe that on three-phase kilowatt-hour meter 40 when working normally Numerical value takes into account work convenience and safety.The size of visual windows 14 should be equal or slightly larger than three-phase kilowatt-hour meter 40 Size, so as to show ammeter completely to effectively record required data.
It is provided with handle lock 70 on the inner sidewall of the cabinet door 12, is provided with knob on the lateral wall of the cabinet door 12, institute Knob is stated to connect by trundle with the handle lock.Wherein, trundle is installed through preset installation through-hole in cabinet door 12 It is interior, and both ends exceed 12 thickness both side surface of cabinet door respectively.Handle lock 70 is placed in the position of the center-right side of cabinet door 12, work When, rotation work personnel can synchronize driving handle lock 70 in external turning knob and rotate, it will be able to which locking opens Installation cabinet 10, to keep equipment use more safe and reliable.It should be understood that handle lock 70 can be using any mature skill in the prior art The lockset of art.
For further lifting means service performance, the switch insert row 30 is two, the width direction of the cabinet body 11 Two sides are recessed with mounting groove 50 respectively inwards, and the switch insert row 30 is set to correspondingly in the mounting groove 50, institute The side wall that mounting groove 50 is stated close to the movable pulley 20 offers crossed beam trunking mouth.Mounting groove 50 can will switch the firm peace of insert row 30 Dress is fixed, and the outlet of switch insert row 30 can be passed through out of crossed beam trunking mouth, and mounting groove 50 is avoided to interfere with switch insert row 30. Preferably, it is convenient to mount and dismount to make to switch insert row 30, the cell wall of mounting groove 50 is equipped with latch catch, enables to switch insert row 30 It is enough buckled and is fixed by elastic force;When taking-up, it is only necessary to which slightly firmly lifting occurs, can be whole out of mounting groove 50 by switch insert row 30 Body takes out.Further, it is also equipped with positive stop hook on mounting groove 50, the positive stop hook is by torsional spring and shaft is rotatable is fixed on Crossed beam trunking mouth side, positive stop hook can cover crossed beam trunking mouth, and the outlet for switching insert row 30 is fixed, to further prevent switch to insert It comes in carrying or transportational process and falls.
Please continue to refer to Fig. 1 and Fig. 2, in addition, for the security protection ability of lifting means, the width direction of the cabinet body 11 Two lateral surfaces are provided with shield 60, and the shield 60 covers above the notch of the mounting groove 50.Shield 60 can Play dust-proof, waterproof ability, avoid causing in foreign matter access switch insert row 30 electronic component damage and can not normal use.
Further, the cabinet body 11 is equipped with sliding rail, and the shield 60 is equipped with sliding slot, and the sliding rail is installed in described In sliding slot, enable the shield 60 mobile relative to the mounting groove 50.When needing to enter power device, it is only necessary to sliding Dynamic shield 60, which makes it away from card pass insert row, can expose jack, and grafting is facilitated to operate.The outside wall surface of shield 60 is equipped with interval The recess portion and protrusion of setting, recess portion and the continuous arrangement of protrusion form non-slip texture, to skid when preventing operation shield 60.
Shield 60 is preferably made of transparent material, such as glass, acrylic etc., and staff can be facilitated to observe switch The working condition of socket, excludes hidden danger in time.
In addition, the electricity consumption monitoring device further includes connecting terminal 80, the connecting terminal 80 is set to the cabinet body On 11 rear wall and between the three-phase kilowatt-hour meter 40 and the switch extension socket.Connecting terminal 80 can be to cabinet body 11 inside Route carry out regular storage, facilitate staff to carry out operation and maintenance to device, avoid electric wire is rambling from being scattered.
Please continue to refer to Fig. 1 and Fig. 2, further, the rear wall of the cabinet body 11 offers spaced heat dissipation Grid 15 and outlet hole 16.The outlet that outlet hole 16 is used to make to switch insert row 30 is stretched out outside cabinet body 11 in order to external power supply company It connects.Preferably, outlet hole 16 is located at installation pedestal and (is fixedly arranged on by screw on the inner wall of cabinet body 11, is inserted for fixed switch Row is 30) connecting terminal 80 between, so that switching the appearance of insert row 30 closer to three-phase kilowatt-hour meter 40, to reduce out line length. In real work, equipment is very likely placed in hot environment, interior when equipment can be made to work by opening up heat dissipation grid 15 Portion generate amount of heat be effectively discharged in environment or long lasting for work when, avoid route or electronic device from being chronically at Accelerated ageing in hot environment and influence service life.
Please continue to refer to figure Fig. 2, the electricity consumption monitoring device further includes the first operating status lamp 90, the second operating status Lamp 100 and third operating status lamp 110, the first operating status lamp 90, the second operating status lamp 100 and described Three operating status lamps 110 are electrically connected with the connecting terminal 80 respectively.In this way, different operating status lamps can real-time display set Standby operating condition then shows equipment normal ON external power supply when the first operating status lamp 90 is lighted, and equipment obtains electricity Energy;When the second operating status lamp 100 is lighted, then show that power device normally connects equipment and carries out electricity consumption monitoring and meter Amount;When third operating status lamp 110 is lighted, then show that line short or load too high problem occurs in tested power device.
It should be understood that the first operating status lamp 90 is lighted with amber light, the second operating status lamp 100 is with green light point Bright, third operating status lamp 110 is lighted with red colored lamp.
Please continue to refer to Fig. 1, the electricity consumption monitoring device further includes drawing 120, and the drawing is set to the cabinet 120 On the outside of the roof of body 11.It is drawn by setting 120, facilitates staff to lift equipment, translates etc. and operate.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of electricity consumption monitoring device characterized by comprising
Installation cabinet, the Installation cabinet include the cabinet body being mutually rotatablely connected and cabinet door, and the bottom of the cabinet body is equipped with movable pulley;
Insert row is switched, the switch insert row is set on the cabinet body, and the switch insert row includes at least two jacks, described to insert Hole is for the plug grafting with power device;
Fixing seat, the fixing seat are set on the inner wall of the cabinet body;And
Three-phase kilowatt-hour meter, the three-phase kilowatt-hour meter is set in the cabinet body and is electrically connected with the switch insert row, and the three-phase electricity Table is also used to connect with external power supply.
2. electricity consumption monitoring device according to claim 1, which is characterized in that the cabinet body can be rotated by gear assembly It is set on the cabinet body, the gear assembly includes the first gear being set on the cabinet body and is set to the cabinet door On second gear, the first gear engages with the second gear, the cabinet door opened and closed with the cabinet body and is matched It closes;The three-phase kilowatt-hour meter is set on the inner wall of the cabinet body, the cabinet door be equipped with visual windows, the visual windows with it is described Three-phase kilowatt-hour meter is opposite.
3. electricity consumption monitoring device according to claim 1, which is characterized in that the switch insert row is two, the cabinet The two sides of the width direction of body are recessed with mounting groove respectively inwards, and the cell wall of the mounting groove is provided with latch catch, described Switch insert row is set in the mounting groove correspondingly and snaps connection with the latch catch, and the mounting groove is close to institute The side wall for stating movable pulley offers crossed beam trunking mouth.
4. electricity consumption monitoring device according to claim 3, which is characterized in that two outsides of the width direction of the cabinet body Face is provided with shield, and the shield covers above the notch of the mounting groove.
5. electricity consumption monitoring device according to claim 4, which is characterized in that the cabinet body is equipped with sliding rail, described anti- Shield is equipped with sliding slot, and the sliding rail is installed in the sliding slot, enables the shield mobile relative to the mounting groove.
6. electricity consumption monitoring device according to claim 1, which is characterized in that be provided with hand on the inner sidewall of the cabinet door Locking, knob is provided on the lateral wall of the cabinet door, the knob is connect by trundle with the handle lock.
7. electricity consumption monitoring device according to claim 1, which is characterized in that the rear wall of the cabinet body offers interval The heat dissipation grid and outlet hole of setting.
8. electricity consumption monitoring device according to any one of claims 1 to 7, which is characterized in that the electricity consumption monitoring is set Standby further includes connecting terminal, the connecting terminal be set on the rear wall of the cabinet body and be located at the three-phase kilowatt-hour meter with it is described Between switch extension socket.
9. electricity consumption monitoring device according to claim 8, which is characterized in that the electricity consumption monitoring device further includes One operating status lamp, the second operating status lamp and third operating status lamp, the first operating status lamp, the second operation shape State lamp and the third operating status lamp are electrically connected with the connecting terminal respectively.
10. electricity consumption monitoring device according to claim 9, which is characterized in that the electricity consumption monitoring device further includes Handle is drawn, it is described to draw the roof outside for being set to the cabinet body.
CN201910717871.8A 2019-08-05 2019-08-05 Electricity consumption monitoring device Pending CN110426542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910717871.8A CN110426542A (en) 2019-08-05 2019-08-05 Electricity consumption monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910717871.8A CN110426542A (en) 2019-08-05 2019-08-05 Electricity consumption monitoring device

Publications (1)

Publication Number Publication Date
CN110426542A true CN110426542A (en) 2019-11-08

Family

ID=68412613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910717871.8A Pending CN110426542A (en) 2019-08-05 2019-08-05 Electricity consumption monitoring device

Country Status (1)

Country Link
CN (1) CN110426542A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113327175A (en) * 2021-04-29 2021-08-31 青岛海尔科技有限公司 Method and device for determining total power consumption, storage medium and electronic device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100001706U (en) * 2008-08-07 2010-02-18 김용완 Gauge box of a method of non-interruption of electric power
CN205091376U (en) * 2015-11-06 2016-03-16 国网山东省电力公司菏泽供电公司 Movable type electric power metering box
CN108428296A (en) * 2018-05-16 2018-08-21 许昌亿源电气有限公司 A kind of mobile vacuum band isolation on-load switch type prepaid high voltage metering box
CN207966074U (en) * 2018-01-26 2018-10-12 周口平高智能电气有限公司 A kind of outdoor high-voltage integral type prepayment metering device
CN208937631U (en) * 2018-10-10 2019-06-04 国网安徽省电力有限公司阜阳供电公司 A kind of low-voltage electric energy metering case easy to remove
CN211263560U (en) * 2019-08-05 2020-08-14 广州供电局有限公司 Power consumption monitoring equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100001706U (en) * 2008-08-07 2010-02-18 김용완 Gauge box of a method of non-interruption of electric power
CN205091376U (en) * 2015-11-06 2016-03-16 国网山东省电力公司菏泽供电公司 Movable type electric power metering box
CN207966074U (en) * 2018-01-26 2018-10-12 周口平高智能电气有限公司 A kind of outdoor high-voltage integral type prepayment metering device
CN108428296A (en) * 2018-05-16 2018-08-21 许昌亿源电气有限公司 A kind of mobile vacuum band isolation on-load switch type prepaid high voltage metering box
CN208937631U (en) * 2018-10-10 2019-06-04 国网安徽省电力有限公司阜阳供电公司 A kind of low-voltage electric energy metering case easy to remove
CN211263560U (en) * 2019-08-05 2020-08-14 广州供电局有限公司 Power consumption monitoring equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113327175A (en) * 2021-04-29 2021-08-31 青岛海尔科技有限公司 Method and device for determining total power consumption, storage medium and electronic device

Similar Documents

Publication Publication Date Title
CN103326291A (en) Interlocking device for bus duct plug box
CN110426542A (en) Electricity consumption monitoring device
CN211263560U (en) Power consumption monitoring equipment
CN211263639U (en) Electricity consumption metering display equipment
CN110456195A (en) Electro-metering shows equipment
CN208444748U (en) A kind of panel switches for AC low voltage power switch box
CN210111461U (en) Intelligent all-insulated AC screen
CN104701920A (en) Portable DC power supply
CN211905471U (en) High-voltage electric energy meter capable of being replaced in electrified mode and connecting structure thereof
CN103872599B (en) Multifunctional mobile maintenance power box
CN203813241U (en) Movable type multifunctional maintenance power supply box
CN203589814U (en) Portable direct current power source
CN215600775U (en) Electrical switch cabinet with safety interlocking function
CN111162466A (en) Modular convenient block terminal that overhauls
CN217115950U (en) Multi-loop electromagnetic starter device
CN220553812U (en) Automatic discharging device of capacitor box
CN212366533U (en) Lighting distribution box
CN210347757U (en) High-voltage live display device
CN209821286U (en) Capacitance and inductance tester
CN214473524U (en) Intelligent transformer test junction box
CN217720486U (en) Full-voltage safety power utilization intelligent equipment
CN213423323U (en) Hand-held DC resistance tester
CN218070564U (en) Isolated formula winding displacement device of high-low voltage switchgear
CN211605744U (en) Alternating-current high-low voltage complete switch equipment
CN216773899U (en) Double-layer protection type cabinet door for power distribution cabinet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201021

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd.

TA01 Transfer of patent application right