CN110424953A - Pressure testing pipe nipple - Google Patents

Pressure testing pipe nipple Download PDF

Info

Publication number
CN110424953A
CN110424953A CN201910856120.4A CN201910856120A CN110424953A CN 110424953 A CN110424953 A CN 110424953A CN 201910856120 A CN201910856120 A CN 201910856120A CN 110424953 A CN110424953 A CN 110424953A
Authority
CN
China
Prior art keywords
pressure testing
pipe nipple
testing pipe
inlet
preventer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910856120.4A
Other languages
Chinese (zh)
Inventor
李艺
李聪
金鑫
冯金敬
韩霞
孙文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN ZHENGFANG TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
TIANJIN ZHENGFANG TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN ZHENGFANG TECHNOLOGY DEVELOPMENT Co Ltd filed Critical TIANJIN ZHENGFANG TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201910856120.4A priority Critical patent/CN110424953A/en
Publication of CN110424953A publication Critical patent/CN110424953A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/02Valve arrangements for boreholes or wells in well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

The present invention provides pressure testing pipe nipple, and pressure testing pipe nipple is divided into 3 sections, includes successively from top to bottom upper pressure testing pipe nipple, middle pressure testing pipe nipple, lower pressure testing pipe nipple, and 3 sections are not connected, are respectively equipped with inlet I, inlet II on the tube wall of upper, middle pressure testing pipe nipple;The tube wall of the middle pressure testing pipe nipple of II lower part of inlet is equipped with liquid outlet;Preventer is mounted on well head oil tube head four-way, and pressure testing pipe nipple is integrally inserted into the central through hole in preventer, and the bottom of pressure testing pipe nipple is locked in the port of well head oil tube head four-way by hanger, and lower pressure testing pipe nipple is connected through a screw thread with hanger;Preventer is located in the liquid inlet between II and liquid outlet, and the top of upper pressure testing pipe nipple is connect with plug valve;When pressure testing, first to hanger pressure testing, finally to blowout preventer pressure-testing;The utility model has the advantages that test medium be water, save the cost, it is free from environmental pollution, can be more reliable to preventer, plug valve difference pressure testing, pressure testing result, safety is higher.

Description

Pressure testing pipe nipple
Technical field
The present invention relates to testing pressure of well head pipe nipple technical fields, more particularly, to pressure testing pipe nipple.
Technical background
In petroleum production engineering workover treatment, installation preventer is needed before construction and pressure testing is qualified.For oil gas water well well memory It is in traditional pressure-measuring method of tubing string: installs preventer in well head four-way, tripping in pressure testing pipe nipple is connected with hanger, closes Ram block makes preventer be in sealing state, starts hydraulic test pump, and pressure testing oil enters the biography on pressure testing pipe nipple by hose Carrying out pressure testing to preventer behind pressure hole is the pressure testing completed to preventer.
Plug valve can in case of emergency close well head, and traditional pressure testing pipe nipple is a section, therefore cannot be individually to blowout prevention Device and the independent pressure testing of plug valve, and water flow from pressure testing pipe nipple bottom, by preventer section, to the plug valve at top, drawn again by its distance It is longer, energy is weakened, thus the pressure that goes out of plug valve pressure testing be compared to independent pressure testing pressure it is opposite become smaller, therefore Result after pressure testing is not accurate enough, and safety is not high enough.
Traditional test medium is directly the oil in shaft bottom, and the oil of pressure testing cannot be collected completely, therefore not only cause to waste The problem of, it also will cause pollution well head, pollute the problem of environment.
Therefore need to develop new pressure testing pipe nipple.
Summary of the invention
To solve the above-mentioned problems, the present invention provide a kind of structure is simple, processing cost is low, its size is prefabricated in the factory, Test medium is water, saves more money and do not pollute around well head, can carry out pressure testing to plug valve and preventer respectively, and safety is higher Pressure testing pipe nipple.
Technical scheme is as follows:
Pressure testing pipe nipple, including pressure testing pipe nipple, the pressure testing pipe nipple are divided into 3 sections, from top to bottom successively include upper pressure testing pipe nipple, in Pressure testing pipe nipple, lower pressure testing pipe nipple, 3 sections are not connected, the upper pressure testing pipe nipple, middle pressure testing pipe nipple tube wall on be equipped with feed liquor Mouth, respectively inlet I, inlet II;Liquid outlet is additionally provided on the tube wall of the middle pressure testing pipe nipple of II lower part of inlet;
Preventer is mounted on well head oil tube head four-way by leather cup, and it is logical that pressure testing pipe nipple is integrally inserted into the center in preventer Hole, the bottom of pressure testing pipe nipple are locked in the port of well head oil tube head four-way by hanger, wherein pressure testing pipe nipple and the suspension The connection type of device are as follows: the bottom peripheral hardware screw thread of the lower pressure testing pipe nipple sets screw thread, the lower pressure testing pipe nipple in the hanger It is connected through a screw thread with hanger;
The preventer is located in the liquid inlet between II and liquid outlet, and the top of the upper pressure testing pipe nipple is connect with plug valve;
The inlet I, inlet II, liquid outlet are in a vertical line on pressure testing pipe nipple;
The length of this pressure testing pipe nipple entirety is prefabricated in the factory according to the distance of the hanger, preventer, plug valve;It is described Preventer include flashboard full-enclosed type preventer and half-closed type preventer, the length of the middle pressure testing pipe nipple is according to the height of preventer Degree and type are configured, and are allowed to match with the preventer, and the length for further adjusting pressure testing pipe nipple is allowed to and preventer Conjunction is fitted directly into, preventer is located in the liquid inlet between II and liquid outlet;
The inlet I, inlet II connect hydraulic test pump by pressure testing pipeline respectively;
The sequence that pressure testing pipeline is connect with inlet are as follows: first connect the inlet I and reconnect inlet II;
Test medium is water;
Pressure testing is carried out to the upper pressure testing pipe nipple first, pressure testing pipeline is connect with the inlet I, starts pressure testing at this time Pump, test medium water is entered in upper pressure testing pipe nipple by the inlet I, the pressure of pressure testing is gradually increased to from 21Mpa 35Mpa pressure testing 10 minutes, observes the state of the pressure valve on the hanger, under normal circumstances, when pressure is less than 35Mpa, hangs The pressure of pressure valve in hanging device is normal value between 0.3Mpa-0.5Mpa, and water is flowed out from the hanger, when on hanger Pressure valve pressure be greater than 0.5Mpa after, the hanger, which is automatically closed, realizes closing well;Or when the pressure on hanger The pressure of power valve manual energy when being greater than 0.5Mpa, which closes the hanger, realizes closing well, is further able to avoid blowout event Occur;The pressure testing of the hanger is just completed at this time.
Pressure testing finally is carried out to the middle pressure testing pipe nipple, the connection closed pump, disconnect pressure testing pipeline and the inlet I will Pressure testing pipeline is connect with the inlet II, starts hydraulic test pump at this time, and test medium water is entered by the inlet II In middle pressure testing pipe nipple, the pressure of pressure testing is gradually increased to 35Mpa from 21Mpa, pressure testing 10 minutes, observes the pressure on the preventer The state of power valve, under normal circumstances, when pressure is less than 35Mpa, the pressure of the pressure valve on the preventer is in 0.3Mpa- Between 0.5Mpa, the preventer, which does not leak, completes work pressure test, and the preventer is qualified;When pressure is urgent greater than 0.5Mpa In the case of, closing the hanger realizes closing well, is further able to that blowout event is avoided to occur.
It has the beneficial effect that
1. testing pressure of well head pipe nipple can carry out independent pressure testing to plug valve, preventer respectively, therefore water flow is not present from examination The problem of pressure pipe nipple bottom is weakened by longer, the energy that plug valve its distance that preventer section arrives top again is drawn, because This ensured plug valve, preventer in an emergency situation can closing well, further enhance the reliability of closing well, improve safety Property.
2. wellhead blowout preventor pressure testing pipe nipple structure of the present invention is simple, manufacture craft and operating process are simple, therefore reduce Pressure testing cost improves pressure testing efficiency.
3. traditional pressure testing is to carry out pressure testing with shaft bottom oil, therefore oil can splash down well head surrounding after will cause waste, pressure testing The problem of polluting well head, we have selected water as test medium, save cost and will not bring problem of environmental pollution.
4. since the length of this pressure testing pipe nipple entirety is prefabricated in the factory according to the distance of hanger, preventer, plug valve, in The length of pressure testing pipe nipple is configured according to the height and type of preventer, and the length for further adjusting pressure testing pipe nipple is allowed to and prevents Spray apparatus fits directly into conjunction, is allowed to match with the preventer, so wellhead blowout preventor pressure testing pipe nipple of the present invention is able to satisfy difference The demand of size testing pressure of well head, in addition to this since the length of pressure testing pipe nipple and preventer fit directly into conjunction so material can be saved Material, avoids energy loss.
5. since inlet I, inlet II, inlet III, liquid outlet are in a vertical line on pressure testing pipe nipple, so connecing examination When pressure pipeline more it is easy need not pitch of the laps connect pressure testing pipeline.
Detailed description of the invention
Fig. 1: pressure testing pipe nipple schematic diagram of the present invention;
In figure:
1, upper pressure testing pipe nipple 2, middle pressure testing pipe nipple 3, lower pressure testing pipe nipple
4, inlet I 5, inlet II
7, liquid outlet 8, preventer 9, hanger
10, plug valve
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
The present embodiment pressure testing pipe nipple, including pressure testing pipe nipple, the pressure testing pipe nipple are divided into 3 sections, from top to bottom successively include upper examination Press pipe nipple 1, middle pressure testing pipe nipple 2,3,3 section of lower pressure testing pipe nipple not connected, the tube wall of the upper pressure testing pipe nipple 1, middle pressure testing pipe nipple 2 On be equipped with inlet, respectively inlet I 4, inlet II 5;The tube wall of the middle pressure testing pipe nipple 2 of II 5 lower part of inlet On be additionally provided with liquid outlet 7;
Preventer 8 is mounted on well head oil tube head four-way by leather cup, and pressure testing pipe nipple is integrally inserted into the center in preventer 8 Through-hole, the bottom of pressure testing pipe nipple are locked in the port of well head oil tube head four-way by hanger 9, wherein pressure testing pipe nipple with it is described The connection type of hanger 9 are as follows: the bottom peripheral hardware screw thread of the lower pressure testing pipe nipple 3 sets screw thread in the hanger 9, under described Pressure testing pipe nipple 3 is connected through a screw thread with hanger 9;
The preventer 8 is located in the liquid inlet between II 5 and liquid outlet 7, the top of the upper pressure testing pipe nipple 1 and plug valve 10 Connection;
The inlet I 4, inlet II 5, liquid outlet 7 are in a vertical line on pressure testing pipe nipple;Due to inlet I 4, into Liquid mouth II 5, liquid outlet 7 on pressure testing pipe nipple be in a vertical line, so when connecing pressure testing pipeline more it is easy need not pitch of the laps connect pressure testing Pipeline.
The length of this pressure testing pipe nipple entirety is prefabricated in the factory according to the distance of the hanger 9, preventer 8, plug valve 10;
The preventer 8 include flashboard full-enclosed type preventer and half-closed type preventer, the length of the middle pressure testing pipe nipple 2 It is configured according to the height of preventer 8 and type, is allowed to match with the preventer 8, preventer 8 is located in the liquid inlet II 5 Between liquid outlet 7;
Since the length of this pressure testing pipe nipple entirety is prefabricated in the factory according to the distance of hanger 9, preventer 8, plug valve 10, The length of middle pressure testing pipe nipple 2 is configured according to the height and type of preventer 8, so 8 pressure testing of wellhead blowout preventor of the present invention is short Energy conservation meets the needs of different size testing pressure of well head.
The inlet I 4, inlet II 5, inlet III 6 connect hydraulic test pump by pressure testing pipeline respectively;
The sequence that pressure testing pipeline is connect with inlet are as follows: first connect the inlet I 4 finally connection inlet II 5;Its is suitable Sequence is exchanged can also be with.
Test medium is water;
The course of work: 1, traditional pressure testing is to carry out pressure testing with shaft bottom oil, therefore oil can splash down after will cause waste, pressure testing Well head surrounding pollutes the problem of well head, we have selected water as test medium, save cost and will not bring environmental pollution Problem.Pressure testing is carried out to the upper pressure testing pipe nipple 1 first, pressure testing pipeline is connect with the inlet I 4, starts pressure testing at this time Pump, test medium water is entered in upper pressure testing pipe nipple 1 by the inlet I 4, the pressure of pressure testing is gradually increased from 21Mpa To 35Mpa, pressure testing 10 minutes, the state of the pressure valve on the hanger 9 is observed, under normal circumstances, pressure is less than 35Mpa When, the pressure of the pressure valve on the hanger 9 is normal value between 0.3Mpa-0.5Mpa, and water is flowed from the hanger 9 Out, after pressure is more than or equal to 35Mpa, the hanger 9, which is automatically closed, realizes closing well;Or when pressure is more than or equal to Manual energy, which closes the hanger 9, when 35Mpa realizes closing well, is further able to that blowout event is avoided to occur;It just completes at this time The pressure testing of the hanger 9.
2, pressure testing is carried out to the middle pressure testing pipe nipple 2, the connection closed pump, disconnect pressure testing pipeline and the inlet I 4 will Pressure testing pipeline is connect with the inlet II 5, starts hydraulic test pump at this time, and test medium water is entered by the inlet II 5 Into middle pressure testing pipe nipple 2, the pressure of pressure testing is gradually increased to 35Mpa from 21Mpa, pressure testing 10 minutes, observes on the preventer 8 Pressure valve state, under normal circumstances, when pressure is less than 35Mpa, the pressure of the pressure valve on the preventer 8 exists Between 0.3Mpa-0.5Mpa, the preventer 8, which does not leak, completes work pressure test, and the preventer 8 is qualified;Water from it is described into Liquid mouth II 5 is flowed out into from liquid outlet 7, and when pressure is greater than 0.5Mpa in emergency circumstances, the hanger 9 for closing its bottom is i.e. real Closing well is showed, has been further able to that blowout event is avoided to occur.
8 pressure testing pipe nipple of wellhead blowout preventor of the present invention can carry out pressure testing to plug valve 10, preventer 8 respectively, therefore ensure Plug valve 10, hanger 9, preventer 8 in an emergency situation can closing well, further enhance the reliability of closing well, improve Safety.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" be based on attached orientation or positional relationship shown in FIG. 1, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
One embodiment of the present invention has been described in detail above, but the content is only preferable implementation of the invention Example, should not be considered as limiting the scope of the invention.It is all according to all the changes and improvements made by the present patent application range Deng should still be within the scope of the patent of the present invention.

Claims (6)

1. pressure testing pipe nipple, including pressure testing pipe nipple, it is characterised in that: the pressure testing pipe nipple is divided into 3 sections, from top to bottom successively includes upper examination Pipe nipple (1), middle pressure testing pipe nipple (2), lower pressure testing pipe nipple (3) are pressed, 3 sections are not connected, and the upper pressure testing pipe nipple (1), middle pressure testing are short It saves and is equipped with inlet, respectively inlet I (4), inlet II (5) on the tube wall of (2);Inlet II (5) lower part Liquid outlet (7) are additionally provided on the tube wall of middle pressure testing pipe nipple (2);
Preventer (8) is mounted on well head oil tube head four-way by leather cup, and pressure testing pipe nipple is integrally inserted into the center in preventer (8) Through-hole, the bottom of pressure testing pipe nipple are locked in the port of well head oil tube head four-way by hanger (9);The preventer (8) is located at Between inlet II (5) and liquid outlet (7), the top of the upper pressure testing pipe nipple (1) is connect with plug valve (10).
2. pressure testing pipe nipple according to claim 1, it is characterised in that: the connection side of pressure testing pipe nipple and the hanger (9) Formula are as follows: the bottom peripheral hardware screw thread of the lower pressure testing pipe nipple (3), the hanger (9) is interior to set screw thread, the lower pressure testing pipe nipple (3) It is connected through a screw thread with hanger (9).
3. pressure testing pipe nipple according to claim 1, it is characterised in that: the inlet I (4), goes out liquid at inlet II (5) Mouth (7) is in a vertical line on pressure testing pipe nipple.
4. pressure testing pipe nipple according to claim 1, it is characterised in that: the length of this pressure testing pipe nipple entirety is according to the suspension Device (9), preventer (8), plug valve (10) distance be prefabricated in the factory;The length of the middle pressure testing pipe nipple (2) is according to preventer (8) height and type, which is configured, to be allowed to match with the preventer (8).
5. pressure testing pipe nipple according to claim 1, it is characterised in that: the inlet I (4), inlet II (5) lead to respectively Cross pressure testing pipeline connection hydraulic test pump, the sequence that pressure testing pipeline is connect with inlet are as follows: first connect the inlet I (4) and reconnect Inlet II (5).
6. pressure testing pipe nipple described according to claim 1 or 2 or 2 or 4 or 5, it is characterised in that: test medium is water.
CN201910856120.4A 2019-09-11 2019-09-11 Pressure testing pipe nipple Pending CN110424953A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910856120.4A CN110424953A (en) 2019-09-11 2019-09-11 Pressure testing pipe nipple

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910856120.4A CN110424953A (en) 2019-09-11 2019-09-11 Pressure testing pipe nipple

Publications (1)

Publication Number Publication Date
CN110424953A true CN110424953A (en) 2019-11-08

Family

ID=68418952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910856120.4A Pending CN110424953A (en) 2019-09-11 2019-09-11 Pressure testing pipe nipple

Country Status (1)

Country Link
CN (1) CN110424953A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4347733A (en) * 1980-10-03 1982-09-07 Crain Jack A Blowout preventor test system
RU2298637C2 (en) * 2005-08-04 2007-05-10 Открытое акционерное общество "Северо-Кавказский научно-исследовательский проектный институт природных газов" Открытого акционерного общества "Газпром" (ОАО "СевКавНИПИгаз" ОАО "Газпром") Plant for threaded casing pipe connection air-tightness determination during casing pipe lowering in well
CN203310704U (en) * 2013-07-12 2013-11-27 田金合 Manual pressure test device with multifunctional blowout preventer
CN104359624A (en) * 2014-10-15 2015-02-18 重庆中重石油机械有限公司 Plug valve pressure tester
CN206174883U (en) * 2016-11-03 2017-05-17 中国石油集团西部钻探工程有限公司 Multi -functional pressure testing nipple joint
CN210422597U (en) * 2019-09-11 2020-04-28 天津市正方科技发展有限公司 Pressure test nipple

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4347733A (en) * 1980-10-03 1982-09-07 Crain Jack A Blowout preventor test system
RU2298637C2 (en) * 2005-08-04 2007-05-10 Открытое акционерное общество "Северо-Кавказский научно-исследовательский проектный институт природных газов" Открытого акционерного общества "Газпром" (ОАО "СевКавНИПИгаз" ОАО "Газпром") Plant for threaded casing pipe connection air-tightness determination during casing pipe lowering in well
CN203310704U (en) * 2013-07-12 2013-11-27 田金合 Manual pressure test device with multifunctional blowout preventer
CN104359624A (en) * 2014-10-15 2015-02-18 重庆中重石油机械有限公司 Plug valve pressure tester
CN206174883U (en) * 2016-11-03 2017-05-17 中国石油集团西部钻探工程有限公司 Multi -functional pressure testing nipple joint
CN210422597U (en) * 2019-09-11 2020-04-28 天津市正方科技发展有限公司 Pressure test nipple

Similar Documents

Publication Publication Date Title
CN2426550Y (en) Auto-control valve for deep well pump
CN205100930U (en) Multistage preventer pressure testing system of well head and pressure testing device thereof
CN201730579U (en) High-temperature resistant well control device for double-pipe operation in horizontal wells
CN110424953A (en) Pressure testing pipe nipple
CN210422597U (en) Pressure test nipple
CN208669272U (en) A kind of storm valve
CN207109965U (en) A kind of water intaking valve water inlet pipe and water outlet pipe body improved structure
CN206636537U (en) Well head backward flowing preventing device
CN210105821U (en) Wellhead device for intermittent gas lift liquid drainage and gas production assisted by plunger
CN207278231U (en) A kind of conversion pipe hanger short circuit being badly in need of for gas well liquid loading
CN207813574U (en) A kind of well mouth of oil well, which does not stop production, replaces flow path device
CN208152132U (en) A kind of integrated water supply device
CN206902823U (en) Check-valves water circuit system is opened in rubber clack rotation
CN203499616U (en) Simple wellhead
CN201444107U (en) Pressure testing device of operating well
CN205101304U (en) Explosion -proof oil return device in oil field
CN209163763U (en) Water source wellhead assembly and water supply well intelligences combination device comprising it
CN205027485U (en) Water conservancy anchor detection device and water conservancy anchor check out test set
CN204983030U (en) Secondary water supply stationary flow compensation jar
CN203507614U (en) Automatic vacuum liquid discharge tank
CN203116298U (en) Multifunctional gas heating water heater valve
CN208081928U (en) Liquid water seal gas water separation tank under basement
CN216242463U (en) Flange type three-way stop for oil field
CN212110449U (en) Two isolation tank buffer solution fill system
CN208845900U (en) A kind of Lined Pipeline port connecting structure

Legal Events