CN110424705A - Quick detachable tool-type builder's jack - Google Patents

Quick detachable tool-type builder's jack Download PDF

Info

Publication number
CN110424705A
CN110424705A CN201910577449.7A CN201910577449A CN110424705A CN 110424705 A CN110424705 A CN 110424705A CN 201910577449 A CN201910577449 A CN 201910577449A CN 110424705 A CN110424705 A CN 110424705A
Authority
CN
China
Prior art keywords
loop bar
embedded board
bull stick
fixedly connected
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910577449.7A
Other languages
Chinese (zh)
Inventor
钱明
夏晨
俞成龙
王少丹
曹小兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jincheng Group Co Ltd
Original Assignee
Jincheng Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jincheng Group Co Ltd filed Critical Jincheng Group Co Ltd
Priority to CN201910577449.7A priority Critical patent/CN110424705A/en
Publication of CN110424705A publication Critical patent/CN110424705A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/22Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses quick detachable tool-type builder's jacks, belong to builder's jack mounting technique field.Quick detachable tool-type builder's jack, it is fixedly connected with abutment sleeve on first embedded board, positioning loop bar is connected on the second embedded board, the second bull stick is fixedly connected with second gear far from one end of shaft, it is also fixedly connected with arc snap-gauge on first bull stick, is rotatably connected to compression bar in shaft;The present invention is threadedly engaged by positioning loop bar with abutment sleeve, and then positioning loop bar is accurately mounted on the first embedded board, during location and installation, it is rotated by first gear, and then arc snap-gauge fastens with card slot, pass through the device installation and removal, and then do not have to cut embedded bar after construction, save a large amount of steel, manpower is saved simultaneously, reduce cost, and the first embedded board and the second embedded board are just embedded in concrete in building construction, the next finishing of user will not be caused to perplex.

Description

Quick detachable tool-type builder's jack
Technical field
The present invention relates to builder's jack mounting technique field more particularly to quick detachable tool-type builder's jacks.
Background technique
Currently, in high-building construction, the mode of overhanging is often taken to set up external scaffolding, it is set with floor phase Cantilever Beams even, dispersion undertake load, it is necessary to assure the safety of scaffold, at present builder's jack and concrete main body structure Connection be usually in concrete slab pre-buried one group of diameter steel bar then make the overhanging for the scaffold that need to be set up as anchor point Beam, I-steel, channel steel one end be inserted into one group of pre-buried bar reinforcement of falling U in.
In U-shaped steel muscle installation process, manually installed operation may be such that U-shaped steel muscle tilts, inclined U-shaped steel muscle I-steel can not be effectively fixed, after construction, these can not normally take out after being fixed on the bar reinforcement in concrete, must It must be sliced off using the method for cutting, convenient for being normally carried out for subsequent flooring processing work, this construction method is not only unrestrained Great deal of steel is taken, and has increased the workload of construction and the difficulty of operation, sometimes, the reinforcing bar left can also give the dress of user Problem is built into, so that builder's jack is particularly important when a kind of easy-to-dismount tool.
Summary of the invention
The purpose of the present invention is to solve the problems of the prior art, and the quick detachable tool-type proposed overhangs foot hand Frame.
To achieve the goals above, present invention employs following technical solutions:
Quick detachable tool-type builder's jack, including the first embedded board and the second embedded board, first embedded board and second is in advance Buried plate is fixedly linked, and abutment sleeve is fixedly connected on first embedded board, is connected with positioning sleeve on second embedded board Bar, and offered on second embedded board with the corresponding slide opening of positioning loop bar, the is rotatably connected on the positioning loop bar One bull stick is fixedly connected with first gear on first bull stick, is rotatably connected to the second bull stick, and institute on the positioning loop bar It states and offers rotation slot corresponding with the second bull stick on positioning loop bar, be fixedly connected with shaft on second bull stick, it is described Second bull stick is fixedly connected with second gear far from one end of shaft, and the first gear and second gear are intermeshed, described It is also fixedly connected with arc snap-gauge on first bull stick, card slot corresponding with arc snap-gauge is offered on second embedded board, The side of the remotely located loop bar of shaft is rotatably connected to compression bar.
Preferably, internal screw thread is offered on the abutment sleeve inner wall, the positioning loop bar is opened up far from one end of shaft There is external screw thread corresponding with internal screw thread.
Preferably, the number of the arc snap-gauge and the first bull stick is 2-4, and is evenly distributed on positioning loop bar.
Preferably, rotary handle is fixedly connected on the positioning sleeve bar side wall.
Preferably, anti-skid wearable pad is fixedly connected on the compression bar.
Compared with prior art, the present invention provides quick detachable tool-type builder's jack, have it is following the utility model has the advantages that
1, the first embedded board and the second embedded board are placed in concrete by the tool-type builder's jack during installation, to mixed After solidifying soil coagulation forming, I-steel to be fixed is placed on the first embedded board, then positioning loop bar is mounted in slide opening, is led to It crosses positioning loop bar to offset with abutment sleeve, when fixed, rotary handle is rotated by construction personnel, thus drive and rotary handle The positioning loop bar rotation being fixedly linked, by positioning loop bar rotation, on the external screw thread and abutment sleeve by positioning loop bar bottom end Internal screw thread match, and then by positioning loop bar be accurately mounted on the first embedded board, during location and installation, pass through Position loop bar rotation, and then drive positioning loop bar on connect first gear rotation, first gear will on the second bull stick The second gear engagement rotation being fixedly connected, by the rotation of first gear, and then drives the first bar rotation, the first bull stick will It will drive and be secured to connected arc snap-gauge rotation, after turning to certain angle, opened on arc snap-gauge and the second embedded board If card slot fasten, and then further stationary positioned loop bar is fixed on the second embedded board, in disassembly, passes through constructor Member rotates backward rotary handle, and then first gear is driven to rotate backward, and first gear will will drive the reset of arc snap-gauge, then will It positions loop bar to extract, disassembly can be completed, by the device installation and removal, and then do not have to cut pre-buried steel after construction Muscle saves a large amount of steel, while saving manpower, reduces cost, and the first embedded board and the second embedded board are in room Room is just embedded in concrete when building, and will not cause to perplex to the next finishing of user.
Detailed description of the invention
Fig. 1 is the first structure diagram of quick detachable tool-type builder's jack proposed by the present invention;
Fig. 2 is the second structural schematic diagram of quick detachable tool-type builder's jack proposed by the present invention;
Fig. 3 is the schematic diagram of the section structure of quick detachable tool-type builder's jack proposed by the present invention;
Fig. 4 is the partial enlargement diagram of part A in quick detachable tool-type builder's jack Fig. 3 proposed by the present invention;
Fig. 5 is the installation pre-structure schematic diagram of quick detachable tool-type builder's jack proposed by the present invention;
Fig. 6 is the mounted configuration schematic diagram of quick detachable tool-type builder's jack proposed by the present invention.
In figure: 1, the first embedded board;101, abutment sleeve;2, the second embedded board;201, slide opening;2011, card slot;3, it positions Loop bar;301, rotary handle;302, the second bull stick;3021, second gear;303, the first bull stick;3031, first gear;3032, Arc snap-gauge;4, shaft;5, compression bar;501, anti-skid wearable pad.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
Embodiment:
Referring to Fig.1-6, quick detachable tool-type builder's jack, including the first embedded board 1 and the second embedded board 2, the first embedded board 1 It is fixedly linked with the second embedded board 2, abutment sleeve 101 is fixedly connected on the first embedded board 1, is connected on the second embedded board 2 Loop bar 3 is positioned, and offers slide opening 201 corresponding with positioning loop bar 3 on the second embedded board 2, positions and is rotatablely connected on loop bar 3 There is the first bull stick 303, first gear 3031 is fixedly connected on the first bull stick 303, positions and be rotatably connected to second turn on loop bar 3 Bar 302, and position and offer rotation slot corresponding with the second bull stick 302 on loop bar 3, it is fixedly connected on the second bull stick 302 Shaft 4, the second bull stick 302 are fixedly connected with second gear 3021, first gear 3031 and second gear far from one end of shaft 4 3021 intermeshings, are also fixedly connected with arc snap-gauge 3032 on the first bull stick 303, offer on the second embedded board 2 and arc The side of the corresponding card slot 2011 of snap-gauge 3032, the remotely located loop bar 3 of shaft 4 is rotatably connected to compression bar 5.
Internal screw thread is offered on 101 inner wall of abutment sleeve, positioning loop bar 3 is offered far from one end of shaft 4 and internal screw thread Corresponding external screw thread.
The number of arc snap-gauge 3032 and the first bull stick 303 is 4, and is evenly distributed on positioning loop bar 3, and arc is passed through The number of shape snap-gauge 3032 and the first bull stick 303 is 4, and then improves and connect between positioning loop bar 3 and the second embedded board 2 Stability.
Rotary handle 301 is fixedly connected on positioning 3 side wall of loop bar.
Anti-skid wearable pad 501 is fixedly connected on compression bar 5, it, can by the anti-skid wearable pad 501 being fixedly connected on compression bar 5 The frictional force between I-steel and compression bar 5 is improved, the stability after improving I-steel installation.
During installation, the first embedded board 1 and the second embedded board 2 are placed in concrete, after concrete setting molding, I-steel to be fixed is placed on the first embedded board 1, then positioning loop bar 3 is mounted in slide opening 201, by positioning loop bar 3 offset with abutment sleeve 101, when fixed, rotary handle 301 are rotated by construction personnel, to drive and rotary handle 301 The positioning loop bar 3 being fixedly linked rotates, and is rotated by positioning loop bar 3, by the external screw thread and abutment sleeve that position 3 bottom end of loop bar Internal screw thread on 101 matches, and then positioning loop bar 3 is accurately mounted on the first embedded board 1, in the process of location and installation In, by positioning the rotation of loop bar 3, and then the first gear 3031 connected on positioning loop bar 3 is driven to rotate, first gear 3031 Rotation will be engaged with the second gear 3021 being fixedly connected on the second bull stick 302, by the rotation of first gear 3031, in turn The first bull stick 303 is driven to rotate, the first bull stick 303, which will will drive, to be secured to connected arc snap-gauge 3032 and rotate, and rotation is worked as To certain angle, the card slot 2011 opened up on arc snap-gauge 3032 and the second embedded board 2 fastens, and then will further fix Positioning loop bar 3 is fixed on the second embedded board 2, and then compression bar 5 is made to press I-steel, reversed by construction personnel in disassembly Rotary handle 301 is rotated, and then first gear 3031 is driven to rotate backward, first gear 3031 will will drive arc snap-gauge 3032 It resets, then positioning loop bar 3 is extracted, disassembly can be completed, by the device installation and removal, and then do not have to after construction Embedded bar is cut, saves a large amount of steel, while saving manpower, reduces cost, and the first embedded board 1 and second is pre- Buried plate 2 is just embedded in concrete in building construction, will not cause to perplex to the next finishing of user.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. quick detachable tool-type builder's jack, including the first embedded board (1) and the second embedded board (2), first embedded board (1) it is fixedly linked with the second embedded board (2), which is characterized in that be fixedly connected with abutment sleeve on first embedded board (1) (101), it is connected with positioning loop bar (3) on second embedded board (2), and offers and positions on second embedded board (2) Loop bar (3) corresponding slide opening (201) is rotatably connected to the first bull stick (303) on the positioning loop bar (3), described first turn It is fixedly connected on bar (303) first gear (3031), is rotatably connected to the second bull stick (302) on the positioning loop bar (3), and Rotation slot corresponding with the second bull stick (302) is offered on the positioning loop bar (3), is fixed on second bull stick (302) It is connected with shaft (4), second bull stick (302) is fixedly connected with second gear (3021) far from the one end of shaft (4), described First gear (3031) and second gear (3021) are intermeshed, and are also fixedly connected with arc card on first bull stick (303) Plate (3032) offers card slot (2011) corresponding with arc snap-gauge (3032), the shaft on second embedded board (2) (4) side of remotely located loop bar (3) is rotatably connected to compression bar (5).
2. quick detachable tool-type builder's jack according to claim 1, which is characterized in that the abutment sleeve (101) Internal screw thread is offered on inner wall, positioning loop bar (3) offers outer spiral shell corresponding with internal screw thread far from the one end of shaft (4) Line.
3. quick detachable tool-type builder's jack according to claim 2, which is characterized in that the arc snap-gauge (3032) Number with the first bull stick (303) is 2-4, and is evenly distributed in positioning loop bar (3).
4. quick detachable tool-type builder's jack according to claim 2, which is characterized in that positioning loop bar (3) side Rotary handle (301) are fixedly connected on wall.
5. quick detachable tool-type builder's jack according to claim 1, which is characterized in that fixed on the compression bar (5) It is connected with anti-skid wearable pad (501).
CN201910577449.7A 2019-06-28 2019-06-28 Quick detachable tool-type builder's jack Pending CN110424705A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910577449.7A CN110424705A (en) 2019-06-28 2019-06-28 Quick detachable tool-type builder's jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910577449.7A CN110424705A (en) 2019-06-28 2019-06-28 Quick detachable tool-type builder's jack

Publications (1)

Publication Number Publication Date
CN110424705A true CN110424705A (en) 2019-11-08

Family

ID=68408852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910577449.7A Pending CN110424705A (en) 2019-06-28 2019-06-28 Quick detachable tool-type builder's jack

Country Status (1)

Country Link
CN (1) CN110424705A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177356A (en) * 2020-09-27 2021-01-05 中冶建工集团有限公司 Mounting and dismounting method of embedded steel ring for connecting main beam of steel cantilever unloading platform
CN112177320A (en) * 2020-09-28 2021-01-05 厦门安科科技有限公司 Attachment structure for creeping formwork frame body
CN114961227A (en) * 2022-06-07 2022-08-30 中建八局第一建设有限公司 Turnover type cantilever I-steel embedding device and implementation mode thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177356A (en) * 2020-09-27 2021-01-05 中冶建工集团有限公司 Mounting and dismounting method of embedded steel ring for connecting main beam of steel cantilever unloading platform
CN112177320A (en) * 2020-09-28 2021-01-05 厦门安科科技有限公司 Attachment structure for creeping formwork frame body
CN114961227A (en) * 2022-06-07 2022-08-30 中建八局第一建设有限公司 Turnover type cantilever I-steel embedding device and implementation mode thereof
CN114961227B (en) * 2022-06-07 2023-07-11 中建八局第一建设有限公司 Turnover cantilever I-steel pre-embedding device and implementation mode thereof

Similar Documents

Publication Publication Date Title
CN110424705A (en) Quick detachable tool-type builder's jack
CN106738309B (en) Robot is used in a kind of stirring of building site concrete
CN111360981A (en) Aluminum template for precast concrete pouring
US10967490B2 (en) Concrete form stripping tool
CN111733814A (en) Working method of multistage pile pulling device with one-way locking effect
KR20090042223A (en) Form elevating apparatus
KR101166260B1 (en) Shut for mixer truck
CN210195197U (en) Quick detachable instrument formula scaffold frame of encorbelmenting
CN108797384A (en) A kind of bridge pier clears up repair apparatus and its cleaning reparation construction technique automatically
CN209277506U (en) A kind of height-adjustable architectural furniture
CN204920224U (en) Novel early form removal board form removal ware
CN101644102A (en) Auxiliary tool for top plate drilling machinery
KR200438109Y1 (en) Pipe fixing hook for mold fom fixing
US2554350A (en) Wire-bending tool with work clamp
US3792831A (en) Scaffold-waler bracket
CN208219669U (en) A kind of foundation pit supporting construction
CN219952584U (en) Plastering device for wall decoration
CN208116624U (en) Bend reinforcing bar station
CN212201328U (en) Floor concrete grouting device
CN219338168U (en) Auxiliary tool for positioning cutting line of pavement brick
CN104278847B (en) Brick wall mortar mortar joint cleaning plant and method for cleaning
EP0667221A1 (en) Mixing and applying plasters
CN217760794U (en) Elevator shaft door opening safety plugging device
CN221778996U (en) Hydraulic climbing device with pawl position capable of being indicated
CN107838475A (en) A kind of construction material perforating device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191108