CN110424190A - The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design - Google Patents

The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design Download PDF

Info

Publication number
CN110424190A
CN110424190A CN201910672694.6A CN201910672694A CN110424190A CN 110424190 A CN110424190 A CN 110424190A CN 201910672694 A CN201910672694 A CN 201910672694A CN 110424190 A CN110424190 A CN 110424190A
Authority
CN
China
Prior art keywords
sleeper
concrete filled
steel pipe
sleeper block
filled steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910672694.6A
Other languages
Chinese (zh)
Inventor
孙立
张育红
王森荣
李秋义
杨艳丽
朱彬
张世杰
李启航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201910672694.6A priority Critical patent/CN110424190A/en
Publication of CN110424190A publication Critical patent/CN110424190A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/005Ballastless track, e.g. concrete slab trackway, or with asphalt layers with sleeper shoes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses the connection reinforcing structures of a kind of concrete filled steel tubular member of non-fragment orbit and sleeper block, it is characterized by: being risen being embedded to position of the hollow steel pipe of sleeper block (1) apart from open end 100mm-200mm, there is radial width diminution portion (3) in the length range less than 50mm, and also there is radial width diminution portion (3) in the intermediate stage of hollow steel pipe embedment railway roadbed, during hollow steel pipe perfusion, also concrete is filled in radial width diminution portion (3), and it pours and is integrated with sleeper block (1) in the casting process of in-orbit bolster (1), it pours and is integrated with railway roadbed in the casting process of railway roadbed.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at part and sleeper block clamping in sleeper, in part and the railway roadbed concrete clamping of railway roadbed, load action is preferably resisted, so that concrete filled steel tube sleeper binding performance is reinforced.

Description

The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design
Technical field
The invention belongs to non-fragment orbit concrete sleeper fields, and in particular to a kind of concrete filled steel tubular member of non-fragment orbit With the concrete filled steel tube sleeper of the connection reinforcing structure of sleeper block, and the non-fragment orbit with the connection reinforcing structure.
Background technique
In railway ballastless track system, there is a kind of prefabricated sleeper, sleeper is mounted in railway roadbed or using concrete It pours and is integrated with railway roadbed, be used to fastener for installing, further fix the rail of top, and need to keep good connection with railway roadbed Performance, but there is also following defects:
1, existing concrete filled steel tube surface is relatively smooth steel face, after the materials such as direct Transducers Embedded in Concrete, with it The bond stress of contact is limited, and the combination between concrete filled steel tube and sleeper block is not secured enough, is easy to appear loosening and is detached from.
2, the diameter of hollow steel pipe is smaller, and pouring concrete within steel pipe is extremely difficult, and compactness is inadequate in pipe, steel pipe outlet Place is also inadequate with the compactness of sleeper block, brings disease hidden danger to overall sleeper structure, late maintaining maintenance cost is high.
Summary of the invention
For at least one of prior art the above defects or improvement requirements, the present invention provides a kind of non-fragment orbits The connection reinforcing structure of concrete filled steel tubular member and sleeper block is reduced steel tube end part and mid diameter by the way of undergauge, When being acted on by external load, concrete filled steel tubular member is located at part and sleeper block clamping in sleeper, in the part and road of railway roadbed Bed concrete clamping, preferably resists load action, so that concrete filled steel tube sleeper binding performance is reinforced.
To achieve the above object, according to one aspect of the present invention, a kind of concrete filled steel tube structure of non-fragment orbit is provided The connection reinforcing structure of part and sleeper block, in the concrete filled steel tube sleeper of non-fragment orbit, the concrete filled steel tube sleeper packet Include two or more sleeper blocks and connect more concrete filled steel tubes of above-mentioned sleeper block, the sleeper block by concreting and At the concrete filled steel tube is formed by hollow steel pipe concrete perfusion, and is arranged in the manufacture of two sleeper blocks adjacent to each other In mold, pours and be integrated with the sleeper block in the casting process of the sleeper block;Wherein:
It is being embedded to the hollow steel pipe of the sleeper block position apart from open end 100mm-200mm, is being less than There is radial width diminution portion in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed Radial width diminution portion, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion, and Pour and be integrated with the sleeper block in the casting process of the sleeper block, in the casting process of the railway roadbed with the railway roadbed It pours and is integrated.
Preferably, the cross section in radial width diminution portion is round, ellipse or strip.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steels The line of centres of the cross section of pipe constitutes triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit Sleeper, the more concrete filled steel tubes including two or more sleeper blocks and the above-mentioned sleeper block of connection, also has foregoing nothing The concrete filled steel tubular member of tiny fragments of stone, coal, etc. track and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm As low as outer diameter 37mm is compressed, several radial width diminutions portion is formed;And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion;
Step 3: from hollow steel pipe one end to other end jet pouring high pressure concrete packing material, and by all radial directions Also use Concrete Filled closely knit in reduced width portion;
Step 4: maintenance concrete filled steel tubular member, so as to form prefabricated several concrete filled steel tubes;
Step 5: concrete filled steel tube, steel reinforcement cage are put into sleeper production mold, casting concrete material, so that steel pipe is mixed Solidifying soil is poured into sleeper block;
Step 6: the concrete filled steel tube intermediate stage in the casting process of railway roadbed, including radial width diminution portion It pours and is integrated with railway roadbed.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit The connection reinforcing structure of component and sleeper block, in the concrete filled steel tube sleeper of non-fragment orbit, the concrete filled steel tube sleeper Including two or more sleeper blocks and connect more concrete filled steel tubes of above-mentioned sleeper block, the sleeper block by concreting and At the concrete filled steel tube is configured in the manufacture mold for being arranged in two sleeper blocks adjacent to each other using hollow steel pipe, In It pours and is integrated with the sleeper block in the casting process of the sleeper block, while filling concrete in the hollow steel pipe;Its In:
It is being embedded to the hollow steel pipe of the sleeper block position apart from open end 100mm-200mm, is being less than There is radial width diminution portion in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed Radial width diminution portion, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion, and Pour and be integrated with the sleeper block in the casting process of the sleeper block, in the casting process of the railway roadbed with the railway roadbed It pours and is integrated.
Preferably, the cross section in radial width diminution portion is round, ellipse or strip.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steels The line of centres of the cross section of pipe constitutes triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit Sleeper, the more concrete filled steel tubes including two or more sleeper blocks and the above-mentioned sleeper block of connection, also has foregoing nothing The concrete filled steel tubular member of tiny fragments of stone, coal, etc. track and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm As low as outer diameter 37mm is compressed, several radial width diminutions portion is formed;And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion;
Step 3: so as to form prefabricated several hollow steel pipes;
Step 4: being put into sleeper production mold for hollow steel pipe, steel reinforcement cage, sprays from one end of hollow steel pipe to the other end Penetrate high pressure concrete packing material, until fill up the other end sleeper block die cavity and all radial width diminution portions, then after The continuous sleeper block die cavity for filling up this side, so that concrete filled steel tube is poured into sleeper block;
Step 5: maintenance concrete filled steel tube sleeper;
Step 6: the concrete filled steel tube intermediate stage in the casting process of railway roadbed, including radial width diminution portion It pours and is integrated with railway roadbed.
Above-mentioned preferred feature can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect Fruit:
1, the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, since steel pipe is round The case where bond stress on the more smooth surface of shape, its contact of direct Transducers Embedded in Concrete is limited, is likely to occur play under load action, Steel pipe is perfused steel tube end part or middle part before packing material using processing equipment reduced outside diameter, and mortar is then filled in steel pipe Packing material, then concrete filled steel tubular member and sleeper block are poured together, so that concrete filled steel tubular member and sleeper agllutination close Securely.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member position Part and sleeper block clamping in sleeper are preferably resisted load action, are made in part and the railway roadbed concrete clamping of railway roadbed Concrete filled steel tube sleeper binding performance is obtained to reinforce.
2, the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, while sleeper pours Into after railway roadbed, with railway roadbed concrete clamping, the effect of load is preferably resisted.
Detailed description of the invention
Fig. 1 is the sky of the concrete filled steel tubular member of the non-fragment orbit of the embodiment of the present invention Yu the connection reinforcing structure of sleeper block The schematic diagram of heart steel pipe;
Fig. 2 is the schematic cross-sectional view of Section A-A in Fig. 1;
Fig. 3 is the schematic cross-sectional view of section B-B in Fig. 1;
Fig. 4 is the schematic diagram of the concrete filled steel tube sleeper of the non-fragment orbit of the embodiment of the present invention.
In above-mentioned attached drawing, the unit of dimension mark is mm.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below Not constituting a conflict with each other can be combined with each other.The present invention is described in more detail With reference to embodiment.
As the first better embodiment of the invention, as shown in Figs 1-4, the present invention provides a kind of steel of non-fragment orbit The connection reinforcing structure of pipe concrete component and sleeper block, in the concrete filled steel tube sleeper of non-fragment orbit, the steel pipe to be mixed Solidifying soil sleeper includes two or more sleeper blocks 1 and more concrete filled steel tubes 2 for connecting above-mentioned sleeper block 1, the sleeper block 1 by Concreting forms, and the concrete filled steel tube 2 is formed by hollow steel pipe concrete perfusion, and is arranged in adjacent to each other two In the manufacture mold of sleeper block 1, pours and be integrated with the sleeper block 1 in the casting process of the sleeper block 1;Wherein:
It is being embedded to the hollow steel pipe of the sleeper block 1 position apart from open end 100mm-200mm, is being less than There is radial width diminution portion 3 in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed There is radial width diminution portion 3, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion 3, And pour and be integrated with the sleeper block 1 in the casting process of the sleeper block 1, in the casting process of the railway roadbed with institute It states railway roadbed and pours and be integrated.
Preferably, the cross section in radial width diminution portion 3 is round, ellipse or strip etc..Hollow steel pipe is When circular cross-section, main part outer diameter is preferably 40mm, hollow steel pipe both ends 0-50mm range shorter to outer diameter 37mm or so. Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at rail Load action is preferably resisted, so that steel in part and the railway roadbed concrete clamping of railway roadbed in part and sleeper block clamping in pillow Pipe concrete sleeper binding performance is reinforced.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block.Or the hollow steel Guan Weisan root, above-mentioned three hollow steel pipes are arranged in the following manner: the line of centres structure of the cross section of three hollow steel pipes At triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit Sleeper, the more concrete filled steel tubes 2 including two or more sleeper blocks 1 and the above-mentioned sleeper block 1 of connection, also has foregoing The concrete filled steel tubular member of non-fragment orbit and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm As low as outer diameter 37mm is compressed, several radial width diminutions portion 3 is formed;And in intermediate stage, the In of hollow steel pipe embedment railway roadbed It is squeezed in the length range of 0-50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion 3;
Step 3: from hollow steel pipe one end to other end jet pouring high pressure concrete packing material, and by all radial directions Reduced width portion 3 is also closely knit with Concrete Filled;
Step 4: maintenance concrete filled steel tubular member, so as to form prefabricated several concrete filled steel tubes 2;
Step 5: concrete filled steel tube 2, steel reinforcement cage are put into sleeper production mold, casting concrete material, so that steel pipe is mixed Solidifying soil 2 is poured into sleeper block 1;
Step 6: the 2 interlude portion of concrete filled steel tube in the casting process of railway roadbed, including radial width diminution portion 3 Divide to pour with railway roadbed and be integrated.
The concrete filled steel tubular member of non-fragment orbit of the invention and the connection reinforcing structure of sleeper block, since steel pipe is round The case where bond stress on more smooth surface, its contact of direct Transducers Embedded in Concrete is limited, is likely to occur play under load action, steel Pipe is perfused steel tube end part or middle part before packing material using processing equipment reduced outside diameter, then fills mortar in steel pipe and fills out Material is filled, then concrete filled steel tubular member and sleeper block are poured together, so that concrete filled steel tubular member and sleeper agllutination close jail Gu.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at Load action is preferably resisted in part and the railway roadbed concrete clamping of railway roadbed in part and sleeper block clamping in sleeper, so that Concrete filled steel tube sleeper binding performance is reinforced.
The connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, at the same sleeper pour into After entering railway roadbed, with railway roadbed concrete clamping, the effect of load is preferably resisted.
As second of better embodiment of the invention, as shown in Figs 1-4, the present invention also provides a kind of non-fragment orbits Concrete filled steel tubular member and sleeper block connection reinforcing structure, in the concrete filled steel tube sleeper of non-fragment orbit, the steel Pipe concrete sleeper includes two or more sleeper blocks 1 and more concrete filled steel tubes 2 for connecting above-mentioned sleeper block 1, the sleeper Block 1 is formed by concreting, and the concrete filled steel tube 2 is configured to be arranged in two sleepers adjacent to each other using hollow steel pipe In the manufacture mold of block 1, pours and be integrated with the sleeper block 1 in the casting process of the sleeper block 1, while is described hollow Concrete is filled in steel pipe;Wherein:
It is being embedded to the hollow steel pipe of the sleeper block 1 position apart from open end 100mm-200mm, is being less than There is radial width diminution portion 3 in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed There is radial width diminution portion 3, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion 3, And pour and be integrated with the sleeper block 1 in the casting process of the sleeper block 1, in the casting process of the railway roadbed with institute It states railway roadbed and pours and be integrated.
Preferably, the cross section in radial width diminution portion 3 is round, ellipse or strip.Hollow steel pipe is circle When tee section, main part outer diameter is preferably 40mm, hollow steel pipe both ends 0-50mm range shorter to outer diameter 37mm or so.It adopts Steel tube end part and mid diameter are reduced with the mode of undergauge, when being acted on by external load, concrete filled steel tubular member is located at sleeper In part and sleeper block clamping in part and the railway roadbed concrete clamping of railway roadbed load action is preferably resisted, so that steel pipe Concrete sleeper binding performance is reinforced.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block.Or the hollow steel Guan Weisan root, above-mentioned three hollow steel pipes are arranged in the following manner: the line of centres structure of the cross section of three hollow steel pipes At triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit Sleeper, the more concrete filled steel tubes 2 including two or more sleeper blocks 1 and the above-mentioned sleeper block 1 of connection, also has foregoing The concrete filled steel tubular member of non-fragment orbit and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm As low as outer diameter 37mm is compressed, several radial width diminutions portion 3 is formed;And in intermediate stage, the In of hollow steel pipe embedment railway roadbed It is squeezed in the length range of 0-50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion 3;
Step 3: so as to form prefabricated several hollow steel pipes;
Step 4: being put into sleeper production mold for hollow steel pipe, steel reinforcement cage, sprays from one end of hollow steel pipe to the other end Penetrate high pressure concrete packing material, until fill up the other end sleeper block die cavity and all radial width diminution portions 3, then after The continuous sleeper block die cavity for filling up this side, so that concrete filled steel tube 2 is poured into sleeper block 1;
Step 5: maintenance concrete filled steel tube sleeper;
Step 6: the 2 interlude portion of concrete filled steel tube in the casting process of railway roadbed, including radial width diminution portion 3 Divide to pour with railway roadbed and be integrated.
The concrete filled steel tubular member of non-fragment orbit of the invention and the connection reinforcing structure of sleeper block, since steel pipe is round The case where bond stress on more smooth surface, its contact of direct Transducers Embedded in Concrete is limited, is likely to occur play under load action, steel Pipe is perfused steel tube end part or middle part before packing material using processing equipment reduced outside diameter, then fills mortar in steel pipe and fills out Material is filled, then concrete filled steel tubular member and sleeper block are poured together, so that concrete filled steel tubular member and sleeper agllutination close jail Gu.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at Load action is preferably resisted in part and the railway roadbed concrete clamping of railway roadbed in part and sleeper block clamping in sleeper, so that Concrete filled steel tube sleeper binding performance is reinforced.
The connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, at the same sleeper pour into After entering railway roadbed, with railway roadbed concrete clamping, the effect of load is preferably resisted.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (10)

1. a kind of connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit and sleeper block, the steel pipe for non-fragment orbit is mixed In solidifying soil sleeper, the concrete filled steel tube sleeper includes more of two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection Concrete filled steel tube (2), the sleeper block (1) are formed by concreting, and the concrete filled steel tube (2) is perfused mixed by hollow steel pipe Solidifying soil forms, and is arranged in the manufacture mold of two sleeper blocks (1) adjacent to each other, in pouring for sleeper block (1) Sleeper block (1), which pours, described in Cheng Zhongyu is integrated;It is characterized by:
It rises, being embedded to position of the hollow steel pipe of the sleeper block (1) apart from open end 100mm-200mm less than 50mm Length range in have radial width diminution portion (3), and the hollow steel pipe embedment railway roadbed intermediate stage also have Radial width diminution portion (3), during hollow steel pipe perfusion, coagulation is also filled in radial width diminution portion (3) Soil, and pour and be integrated with the sleeper block (1) in the casting process of the sleeper block (1), in pouring for the railway roadbed Railway roadbed described in Cheng Zhongyu, which pours, to be integrated.
2. the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit as described in claim 1 and sleeper block, feature It is:
The cross section in radial width diminution portion (3) is round, ellipse or strip.
3. the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit as described in claim 1 and sleeper block, feature It is:
The hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steel pipes The line of centres of cross section constitutes triangle.
4. a kind of concrete filled steel tube sleeper of non-fragment orbit, including two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection More concrete filled steel tubes (2), also with non-fragment orbit as described in any one of claims 1-3 concrete filled steel tubular member with The connection reinforcing structure of sleeper block.
5. a kind of construction method of the concrete filled steel tube sleeper of non-fragment orbit as claimed in claim 4, which is characterized in that including Following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: in position of the hollow steel pipe apart from open end 100mm-200mm, the extruding contracting in the length range of 0-50mm As low as outer diameter 37mm forms several radial width diminutions portion (3);And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion (3);
Step 3: from hollow steel pipe one end to other end jet pouring high pressure concrete packing material, and by all radial widths Diminution portion (3) is also closely knit with Concrete Filled;
Step 4: maintenance concrete filled steel tubular member, so as to form prefabricated several concrete filled steel tubes (2);
Step 5: concrete filled steel tube (2), steel reinforcement cage are put into sleeper production mold, casting concrete material, so that steel tube concrete Native (2) are poured into sleeper block (1);
Step 6: concrete filled steel tube (2) interlude portion in the casting process of railway roadbed, including radial width diminution portion (3) Divide to pour with railway roadbed and be integrated.
6. a kind of connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit and sleeper block, the steel pipe for non-fragment orbit is mixed In solidifying soil sleeper, the concrete filled steel tube sleeper includes more of two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection Concrete filled steel tube (2), the sleeper block (1) are formed by concreting, and the concrete filled steel tube (2) is configured to utilize hollow steel Pipe is arranged in the manufacture mold of two sleeper blocks (1) adjacent to each other, in the casting process of the sleeper block (1) with it is described Sleeper block (1), which pours, to be integrated, while filling concrete in the hollow steel pipe;It is characterized by:
It rises, being embedded to position of the hollow steel pipe of the sleeper block (1) apart from open end 100mm-200mm less than 50mm Length range in have radial width diminution portion (3), and the hollow steel pipe embedment railway roadbed intermediate stage also have Radial width diminution portion (3), during hollow steel pipe perfusion, coagulation is also filled in radial width diminution portion (3) Soil, and pour and be integrated with the sleeper block (1) in the casting process of the sleeper block (1), in pouring for the railway roadbed Railway roadbed described in Cheng Zhongyu, which pours, to be integrated.
7. the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit as claimed in claim 6 and sleeper block, feature It is:
The cross section in radial width diminution portion (3) is round, ellipse or strip.
8. the concrete filled steel tubular member of non-fragment orbit as claimed in claim 6 and the connection reinforcing structure of sleeper block, feature It is:
The hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steel pipes The line of centres of cross section constitutes triangle.
9. a kind of concrete filled steel tube sleeper of non-fragment orbit, including two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection More concrete filled steel tubes (2), also have as the described in any item non-fragment orbits of claim 6-8 concrete filled steel tubular member with The connection reinforcing structure of sleeper block.
10. a kind of construction method of the concrete filled steel tube sleeper of non-fragment orbit as claimed in claim 9, which is characterized in that packet Include following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: in position of the hollow steel pipe apart from open end 100mm-200mm, the extruding contracting in the length range of 0-50mm As low as outer diameter 37mm forms several radial width diminutions portion (3);And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion (3);
Step 3: so as to form prefabricated several hollow steel pipes;
Step 4: being put into sleeper production mold for hollow steel pipe, steel reinforcement cage, sprays from one end of hollow steel pipe to the other end high Press Concrete Filled material, until fill up the other end sleeper block die cavity and all radial width diminution portions (3), then proceed to The sleeper block die cavity of this side is filled up, so that concrete filled steel tube (2) is poured into sleeper block (1);
Step 5: maintenance concrete filled steel tube sleeper;
Step 6: concrete filled steel tube (2) interlude portion in the casting process of railway roadbed, including radial width diminution portion (3) Divide to pour with railway roadbed and be integrated.
CN201910672694.6A 2019-07-24 2019-07-24 The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design Pending CN110424190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910672694.6A CN110424190A (en) 2019-07-24 2019-07-24 The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910672694.6A CN110424190A (en) 2019-07-24 2019-07-24 The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design

Publications (1)

Publication Number Publication Date
CN110424190A true CN110424190A (en) 2019-11-08

Family

ID=68412228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910672694.6A Pending CN110424190A (en) 2019-07-24 2019-07-24 The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design

Country Status (1)

Country Link
CN (1) CN110424190A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306006A (en) * 2020-03-27 2020-06-19 中国华能集团清洁能源技术研究院有限公司 Steel pipe concrete tower and mounting method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU272911A1 (en) * Иностранец Роже Поль Сонневилль REINFORCED CONCRETE TRAILER FOR A RAILWAY
CN1167183A (en) * 1996-04-30 1997-12-10 财团法人铁道综合技术研究所 Steel pipe connector of ladder-type sleeper for railway track
JP2003105867A (en) * 2001-09-27 2003-04-09 Daiwa House Ind Co Ltd Anchor bolt
CN101235615A (en) * 2007-01-31 2008-08-06 财团法人铁道综合技术研究所 Ladder type crosstie
CN204662712U (en) * 2015-04-03 2015-09-23 沈阳建筑大学 A kind of power consumption compound shear wall
CN205077629U (en) * 2015-10-23 2016-03-09 山东科技大学 Cavity intermediate layer steel core concrete column and girder steel connecting device
CN105463948A (en) * 2015-11-20 2016-04-06 中铁第四勘察设计院集团有限公司 Concrete-filled steel tube sleeper for ballastless track
CN109457547A (en) * 2018-12-13 2019-03-12 中铁第四勘察设计院集团有限公司 A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block
CN109457551A (en) * 2018-12-18 2019-03-12 中铁第四勘察设计院集团有限公司 Group frame type connection reinforcing structure and construction method between sleeper block and railway roadbed
CN210657803U (en) * 2019-07-24 2020-06-02 中铁第四勘察设计院集团有限公司 Steel pipe concrete component and sleeper block connection reinforcing structure and sleeper comprising same

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU272911A1 (en) * Иностранец Роже Поль Сонневилль REINFORCED CONCRETE TRAILER FOR A RAILWAY
CN1167183A (en) * 1996-04-30 1997-12-10 财团法人铁道综合技术研究所 Steel pipe connector of ladder-type sleeper for railway track
JP2003105867A (en) * 2001-09-27 2003-04-09 Daiwa House Ind Co Ltd Anchor bolt
CN101235615A (en) * 2007-01-31 2008-08-06 财团法人铁道综合技术研究所 Ladder type crosstie
CN204662712U (en) * 2015-04-03 2015-09-23 沈阳建筑大学 A kind of power consumption compound shear wall
CN205077629U (en) * 2015-10-23 2016-03-09 山东科技大学 Cavity intermediate layer steel core concrete column and girder steel connecting device
CN105463948A (en) * 2015-11-20 2016-04-06 中铁第四勘察设计院集团有限公司 Concrete-filled steel tube sleeper for ballastless track
CN109457547A (en) * 2018-12-13 2019-03-12 中铁第四勘察设计院集团有限公司 A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block
CN109457551A (en) * 2018-12-18 2019-03-12 中铁第四勘察设计院集团有限公司 Group frame type connection reinforcing structure and construction method between sleeper block and railway roadbed
CN210657803U (en) * 2019-07-24 2020-06-02 中铁第四勘察设计院集团有限公司 Steel pipe concrete component and sleeper block connection reinforcing structure and sleeper comprising same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306006A (en) * 2020-03-27 2020-06-19 中国华能集团清洁能源技术研究院有限公司 Steel pipe concrete tower and mounting method thereof
CN111306006B (en) * 2020-03-27 2024-05-28 中国华能集团清洁能源技术研究院有限公司 Steel pipe concrete tower and installation method thereof

Similar Documents

Publication Publication Date Title
CN109457550A (en) Groove type connection reinforcing structure and construction method between a kind of sleeper block and railway roadbed
CN109457551B (en) Combined frame type connection reinforcing structure between sleeper block and ballast bed and construction method
CN107190585A (en) A kind of cast-in-place sleeper plate-type ballastless track and its construction method
CN215441415U (en) Quick-connect combined column pier structure
CN207091835U (en) A kind of cast-in-place sleeper plate-type ballastless track
CN110424190A (en) The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design
CN110424191A (en) The anti-detachment design of the concrete filled steel tubular member and sleeper block of non-fragment orbit
CN111364374A (en) Shear-resistant reinforcing method for small-section hollow beam
CN109457547A (en) A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block
CN109457549A (en) Frame-type connection reinforcing structure between the concrete filled steel tube and sleeper block of non-fragment orbit
CN210657804U (en) Concrete filled steel tube member and sleeper block separation preventing structure and sleeper comprising same
CN210657803U (en) Steel pipe concrete component and sleeper block connection reinforcing structure and sleeper comprising same
CN110405935B (en) Prestressed concrete corrugated sheet pile and preparation method thereof
CN209412615U (en) A kind of groove type connection reinforcing structure between sleeper block and railway roadbed
CN110359932B (en) Two-lining vault grouting pipe assembly and grouting construction method thereof
CN115467372B (en) Pipe joint steel plate concrete combined structure for immersed tunnel and manufacturing method thereof
CN207484261U (en) A kind of T-shaped bridge structure of pipe stiffener
CN212052384U (en) Shear-resisting reinforcing structure of small-section hollow beam
CN212715463U (en) Assembled wall body
CN209652659U (en) Frame-type connection reinforcing structure between the concrete filled steel tube and sleeper block of non-fragment orbit
CN209384032U (en) A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block
CN209384033U (en) A kind of penetration type connection reinforcing structure of concrete filled steel tube and sleeper block
CN212714464U (en) Concrete placement structure of durability bridge construction
CN1769624B (en) Hollow pipe for concrete filling
CN215948568U (en) Hollow outer wall of prestressed basement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination