CN110424190A - The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design - Google Patents
The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design Download PDFInfo
- Publication number
- CN110424190A CN110424190A CN201910672694.6A CN201910672694A CN110424190A CN 110424190 A CN110424190 A CN 110424190A CN 201910672694 A CN201910672694 A CN 201910672694A CN 110424190 A CN110424190 A CN 110424190A
- Authority
- CN
- China
- Prior art keywords
- sleeper
- concrete filled
- steel pipe
- sleeper block
- filled steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 236
- 239000010959 steel Substances 0.000 title claims abstract description 236
- 241001669679 Eleotris Species 0.000 title claims abstract description 183
- 239000012634 fragment Substances 0.000 title claims abstract description 49
- 230000002787 reinforcement Effects 0.000 title claims description 8
- 238000013461 design Methods 0.000 title description 2
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 27
- 238000005266 casting Methods 0.000 claims abstract description 26
- 230000010412 perfusion Effects 0.000 claims abstract description 9
- 239000000463 material Substances 0.000 claims description 16
- 238000004519 manufacturing process Methods 0.000 claims description 12
- 238000012856 packing Methods 0.000 claims description 9
- 239000002689 soil Substances 0.000 claims description 8
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 claims description 6
- 239000007921 spray Substances 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims 2
- 238000005345 coagulation Methods 0.000 claims 2
- 230000009471 action Effects 0.000 abstract description 10
- 230000000694 effects Effects 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 239000003245 coal Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
- E01B1/005—Ballastless track, e.g. concrete slab trackway, or with asphalt layers with sleeper shoes
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B3/00—Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
- E01B3/28—Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses the connection reinforcing structures of a kind of concrete filled steel tubular member of non-fragment orbit and sleeper block, it is characterized by: being risen being embedded to position of the hollow steel pipe of sleeper block (1) apart from open end 100mm-200mm, there is radial width diminution portion (3) in the length range less than 50mm, and also there is radial width diminution portion (3) in the intermediate stage of hollow steel pipe embedment railway roadbed, during hollow steel pipe perfusion, also concrete is filled in radial width diminution portion (3), and it pours and is integrated with sleeper block (1) in the casting process of in-orbit bolster (1), it pours and is integrated with railway roadbed in the casting process of railway roadbed.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at part and sleeper block clamping in sleeper, in part and the railway roadbed concrete clamping of railway roadbed, load action is preferably resisted, so that concrete filled steel tube sleeper binding performance is reinforced.
Description
Technical field
The invention belongs to non-fragment orbit concrete sleeper fields, and in particular to a kind of concrete filled steel tubular member of non-fragment orbit
With the concrete filled steel tube sleeper of the connection reinforcing structure of sleeper block, and the non-fragment orbit with the connection reinforcing structure.
Background technique
In railway ballastless track system, there is a kind of prefabricated sleeper, sleeper is mounted in railway roadbed or using concrete
It pours and is integrated with railway roadbed, be used to fastener for installing, further fix the rail of top, and need to keep good connection with railway roadbed
Performance, but there is also following defects:
1, existing concrete filled steel tube surface is relatively smooth steel face, after the materials such as direct Transducers Embedded in Concrete, with it
The bond stress of contact is limited, and the combination between concrete filled steel tube and sleeper block is not secured enough, is easy to appear loosening and is detached from.
2, the diameter of hollow steel pipe is smaller, and pouring concrete within steel pipe is extremely difficult, and compactness is inadequate in pipe, steel pipe outlet
Place is also inadequate with the compactness of sleeper block, brings disease hidden danger to overall sleeper structure, late maintaining maintenance cost is high.
Summary of the invention
For at least one of prior art the above defects or improvement requirements, the present invention provides a kind of non-fragment orbits
The connection reinforcing structure of concrete filled steel tubular member and sleeper block is reduced steel tube end part and mid diameter by the way of undergauge,
When being acted on by external load, concrete filled steel tubular member is located at part and sleeper block clamping in sleeper, in the part and road of railway roadbed
Bed concrete clamping, preferably resists load action, so that concrete filled steel tube sleeper binding performance is reinforced.
To achieve the above object, according to one aspect of the present invention, a kind of concrete filled steel tube structure of non-fragment orbit is provided
The connection reinforcing structure of part and sleeper block, in the concrete filled steel tube sleeper of non-fragment orbit, the concrete filled steel tube sleeper packet
Include two or more sleeper blocks and connect more concrete filled steel tubes of above-mentioned sleeper block, the sleeper block by concreting and
At the concrete filled steel tube is formed by hollow steel pipe concrete perfusion, and is arranged in the manufacture of two sleeper blocks adjacent to each other
In mold, pours and be integrated with the sleeper block in the casting process of the sleeper block;Wherein:
It is being embedded to the hollow steel pipe of the sleeper block position apart from open end 100mm-200mm, is being less than
There is radial width diminution portion in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed
Radial width diminution portion, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion, and
Pour and be integrated with the sleeper block in the casting process of the sleeper block, in the casting process of the railway roadbed with the railway roadbed
It pours and is integrated.
Preferably, the cross section in radial width diminution portion is round, ellipse or strip.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steels
The line of centres of the cross section of pipe constitutes triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit
Sleeper, the more concrete filled steel tubes including two or more sleeper blocks and the above-mentioned sleeper block of connection, also has foregoing nothing
The concrete filled steel tubular member of tiny fragments of stone, coal, etc. track and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit
The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm
As low as outer diameter 37mm is compressed, several radial width diminutions portion is formed;And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe
It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion;
Step 3: from hollow steel pipe one end to other end jet pouring high pressure concrete packing material, and by all radial directions
Also use Concrete Filled closely knit in reduced width portion;
Step 4: maintenance concrete filled steel tubular member, so as to form prefabricated several concrete filled steel tubes;
Step 5: concrete filled steel tube, steel reinforcement cage are put into sleeper production mold, casting concrete material, so that steel pipe is mixed
Solidifying soil is poured into sleeper block;
Step 6: the concrete filled steel tube intermediate stage in the casting process of railway roadbed, including radial width diminution portion
It pours and is integrated with railway roadbed.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit
The connection reinforcing structure of component and sleeper block, in the concrete filled steel tube sleeper of non-fragment orbit, the concrete filled steel tube sleeper
Including two or more sleeper blocks and connect more concrete filled steel tubes of above-mentioned sleeper block, the sleeper block by concreting and
At the concrete filled steel tube is configured in the manufacture mold for being arranged in two sleeper blocks adjacent to each other using hollow steel pipe, In
It pours and is integrated with the sleeper block in the casting process of the sleeper block, while filling concrete in the hollow steel pipe;Its
In:
It is being embedded to the hollow steel pipe of the sleeper block position apart from open end 100mm-200mm, is being less than
There is radial width diminution portion in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed
Radial width diminution portion, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion, and
Pour and be integrated with the sleeper block in the casting process of the sleeper block, in the casting process of the railway roadbed with the railway roadbed
It pours and is integrated.
Preferably, the cross section in radial width diminution portion is round, ellipse or strip.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steels
The line of centres of the cross section of pipe constitutes triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit
Sleeper, the more concrete filled steel tubes including two or more sleeper blocks and the above-mentioned sleeper block of connection, also has foregoing nothing
The concrete filled steel tubular member of tiny fragments of stone, coal, etc. track and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit
The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm
As low as outer diameter 37mm is compressed, several radial width diminutions portion is formed;And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe
It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion;
Step 3: so as to form prefabricated several hollow steel pipes;
Step 4: being put into sleeper production mold for hollow steel pipe, steel reinforcement cage, sprays from one end of hollow steel pipe to the other end
Penetrate high pressure concrete packing material, until fill up the other end sleeper block die cavity and all radial width diminution portions, then after
The continuous sleeper block die cavity for filling up this side, so that concrete filled steel tube is poured into sleeper block;
Step 5: maintenance concrete filled steel tube sleeper;
Step 6: the concrete filled steel tube intermediate stage in the casting process of railway roadbed, including radial width diminution portion
It pours and is integrated with railway roadbed.
Above-mentioned preferred feature can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect
Fruit:
1, the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, since steel pipe is round
The case where bond stress on the more smooth surface of shape, its contact of direct Transducers Embedded in Concrete is limited, is likely to occur play under load action,
Steel pipe is perfused steel tube end part or middle part before packing material using processing equipment reduced outside diameter, and mortar is then filled in steel pipe
Packing material, then concrete filled steel tubular member and sleeper block are poured together, so that concrete filled steel tubular member and sleeper agllutination close
Securely.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member position
Part and sleeper block clamping in sleeper are preferably resisted load action, are made in part and the railway roadbed concrete clamping of railway roadbed
Concrete filled steel tube sleeper binding performance is obtained to reinforce.
2, the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, while sleeper pours
Into after railway roadbed, with railway roadbed concrete clamping, the effect of load is preferably resisted.
Detailed description of the invention
Fig. 1 is the sky of the concrete filled steel tubular member of the non-fragment orbit of the embodiment of the present invention Yu the connection reinforcing structure of sleeper block
The schematic diagram of heart steel pipe;
Fig. 2 is the schematic cross-sectional view of Section A-A in Fig. 1;
Fig. 3 is the schematic cross-sectional view of section B-B in Fig. 1;
Fig. 4 is the schematic diagram of the concrete filled steel tube sleeper of the non-fragment orbit of the embodiment of the present invention.
In above-mentioned attached drawing, the unit of dimension mark is mm.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below
Not constituting a conflict with each other can be combined with each other.The present invention is described in more detail With reference to embodiment.
As the first better embodiment of the invention, as shown in Figs 1-4, the present invention provides a kind of steel of non-fragment orbit
The connection reinforcing structure of pipe concrete component and sleeper block, in the concrete filled steel tube sleeper of non-fragment orbit, the steel pipe to be mixed
Solidifying soil sleeper includes two or more sleeper blocks 1 and more concrete filled steel tubes 2 for connecting above-mentioned sleeper block 1, the sleeper block 1 by
Concreting forms, and the concrete filled steel tube 2 is formed by hollow steel pipe concrete perfusion, and is arranged in adjacent to each other two
In the manufacture mold of sleeper block 1, pours and be integrated with the sleeper block 1 in the casting process of the sleeper block 1;Wherein:
It is being embedded to the hollow steel pipe of the sleeper block 1 position apart from open end 100mm-200mm, is being less than
There is radial width diminution portion 3 in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed
There is radial width diminution portion 3, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion 3,
And pour and be integrated with the sleeper block 1 in the casting process of the sleeper block 1, in the casting process of the railway roadbed with institute
It states railway roadbed and pours and be integrated.
Preferably, the cross section in radial width diminution portion 3 is round, ellipse or strip etc..Hollow steel pipe is
When circular cross-section, main part outer diameter is preferably 40mm, hollow steel pipe both ends 0-50mm range shorter to outer diameter 37mm or so.
Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at rail
Load action is preferably resisted, so that steel in part and the railway roadbed concrete clamping of railway roadbed in part and sleeper block clamping in pillow
Pipe concrete sleeper binding performance is reinforced.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block.Or the hollow steel
Guan Weisan root, above-mentioned three hollow steel pipes are arranged in the following manner: the line of centres structure of the cross section of three hollow steel pipes
At triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit
Sleeper, the more concrete filled steel tubes 2 including two or more sleeper blocks 1 and the above-mentioned sleeper block 1 of connection, also has foregoing
The concrete filled steel tubular member of non-fragment orbit and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit
The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm
As low as outer diameter 37mm is compressed, several radial width diminutions portion 3 is formed;And in intermediate stage, the In of hollow steel pipe embedment railway roadbed
It is squeezed in the length range of 0-50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion 3;
Step 3: from hollow steel pipe one end to other end jet pouring high pressure concrete packing material, and by all radial directions
Reduced width portion 3 is also closely knit with Concrete Filled;
Step 4: maintenance concrete filled steel tubular member, so as to form prefabricated several concrete filled steel tubes 2;
Step 5: concrete filled steel tube 2, steel reinforcement cage are put into sleeper production mold, casting concrete material, so that steel pipe is mixed
Solidifying soil 2 is poured into sleeper block 1;
Step 6: the 2 interlude portion of concrete filled steel tube in the casting process of railway roadbed, including radial width diminution portion 3
Divide to pour with railway roadbed and be integrated.
The concrete filled steel tubular member of non-fragment orbit of the invention and the connection reinforcing structure of sleeper block, since steel pipe is round
The case where bond stress on more smooth surface, its contact of direct Transducers Embedded in Concrete is limited, is likely to occur play under load action, steel
Pipe is perfused steel tube end part or middle part before packing material using processing equipment reduced outside diameter, then fills mortar in steel pipe and fills out
Material is filled, then concrete filled steel tubular member and sleeper block are poured together, so that concrete filled steel tubular member and sleeper agllutination close jail
Gu.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at
Load action is preferably resisted in part and the railway roadbed concrete clamping of railway roadbed in part and sleeper block clamping in sleeper, so that
Concrete filled steel tube sleeper binding performance is reinforced.
The connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, at the same sleeper pour into
After entering railway roadbed, with railway roadbed concrete clamping, the effect of load is preferably resisted.
As second of better embodiment of the invention, as shown in Figs 1-4, the present invention also provides a kind of non-fragment orbits
Concrete filled steel tubular member and sleeper block connection reinforcing structure, in the concrete filled steel tube sleeper of non-fragment orbit, the steel
Pipe concrete sleeper includes two or more sleeper blocks 1 and more concrete filled steel tubes 2 for connecting above-mentioned sleeper block 1, the sleeper
Block 1 is formed by concreting, and the concrete filled steel tube 2 is configured to be arranged in two sleepers adjacent to each other using hollow steel pipe
In the manufacture mold of block 1, pours and be integrated with the sleeper block 1 in the casting process of the sleeper block 1, while is described hollow
Concrete is filled in steel pipe;Wherein:
It is being embedded to the hollow steel pipe of the sleeper block 1 position apart from open end 100mm-200mm, is being less than
There is radial width diminution portion 3 in the length range of 50mm, and also have in the intermediate stage of hollow steel pipe embedment railway roadbed
There is radial width diminution portion 3, during hollow steel pipe perfusion, concrete is also filled in radial width diminution portion 3,
And pour and be integrated with the sleeper block 1 in the casting process of the sleeper block 1, in the casting process of the railway roadbed with institute
It states railway roadbed and pours and be integrated.
Preferably, the cross section in radial width diminution portion 3 is round, ellipse or strip.Hollow steel pipe is circle
When tee section, main part outer diameter is preferably 40mm, hollow steel pipe both ends 0-50mm range shorter to outer diameter 37mm or so.It adopts
Steel tube end part and mid diameter are reduced with the mode of undergauge, when being acted on by external load, concrete filled steel tubular member is located at sleeper
In part and sleeper block clamping in part and the railway roadbed concrete clamping of railway roadbed load action is preferably resisted, so that steel pipe
Concrete sleeper binding performance is reinforced.
Preferably, the hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block.Or the hollow steel
Guan Weisan root, above-mentioned three hollow steel pipes are arranged in the following manner: the line of centres structure of the cross section of three hollow steel pipes
At triangle.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of concrete filled steel tube of non-fragment orbit
Sleeper, the more concrete filled steel tubes 2 including two or more sleeper blocks 1 and the above-mentioned sleeper block 1 of connection, also has foregoing
The concrete filled steel tubular member of non-fragment orbit and the connection reinforcing structure of sleeper block.
To achieve the above object, it is another aspect of this invention to provide that additionally providing a kind of foregoing non-fragment orbit
The construction method of concrete filled steel tube sleeper, wherein include the following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: it rises in position of the hollow steel pipe apart from open end 100mm-200mm, squeezed in the length range of 0-50mm
As low as outer diameter 37mm is compressed, several radial width diminutions portion 3 is formed;And in intermediate stage, the In of hollow steel pipe embedment railway roadbed
It is squeezed in the length range of 0-50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion 3;
Step 3: so as to form prefabricated several hollow steel pipes;
Step 4: being put into sleeper production mold for hollow steel pipe, steel reinforcement cage, sprays from one end of hollow steel pipe to the other end
Penetrate high pressure concrete packing material, until fill up the other end sleeper block die cavity and all radial width diminution portions 3, then after
The continuous sleeper block die cavity for filling up this side, so that concrete filled steel tube 2 is poured into sleeper block 1;
Step 5: maintenance concrete filled steel tube sleeper;
Step 6: the 2 interlude portion of concrete filled steel tube in the casting process of railway roadbed, including radial width diminution portion 3
Divide to pour with railway roadbed and be integrated.
The concrete filled steel tubular member of non-fragment orbit of the invention and the connection reinforcing structure of sleeper block, since steel pipe is round
The case where bond stress on more smooth surface, its contact of direct Transducers Embedded in Concrete is limited, is likely to occur play under load action, steel
Pipe is perfused steel tube end part or middle part before packing material using processing equipment reduced outside diameter, then fills mortar in steel pipe and fills out
Material is filled, then concrete filled steel tubular member and sleeper block are poured together, so that concrete filled steel tubular member and sleeper agllutination close jail
Gu.Steel tube end part and mid diameter are reduced by the way of undergauge, when being acted on by external load, concrete filled steel tubular member is located at
Load action is preferably resisted in part and the railway roadbed concrete clamping of railway roadbed in part and sleeper block clamping in sleeper, so that
Concrete filled steel tube sleeper binding performance is reinforced.
The connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit of the invention and sleeper block, at the same sleeper pour into
After entering railway roadbed, with railway roadbed concrete clamping, the effect of load is preferably resisted.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to
The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include
Within protection scope of the present invention.
Claims (10)
1. a kind of connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit and sleeper block, the steel pipe for non-fragment orbit is mixed
In solidifying soil sleeper, the concrete filled steel tube sleeper includes more of two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection
Concrete filled steel tube (2), the sleeper block (1) are formed by concreting, and the concrete filled steel tube (2) is perfused mixed by hollow steel pipe
Solidifying soil forms, and is arranged in the manufacture mold of two sleeper blocks (1) adjacent to each other, in pouring for sleeper block (1)
Sleeper block (1), which pours, described in Cheng Zhongyu is integrated;It is characterized by:
It rises, being embedded to position of the hollow steel pipe of the sleeper block (1) apart from open end 100mm-200mm less than 50mm
Length range in have radial width diminution portion (3), and the hollow steel pipe embedment railway roadbed intermediate stage also have
Radial width diminution portion (3), during hollow steel pipe perfusion, coagulation is also filled in radial width diminution portion (3)
Soil, and pour and be integrated with the sleeper block (1) in the casting process of the sleeper block (1), in pouring for the railway roadbed
Railway roadbed described in Cheng Zhongyu, which pours, to be integrated.
2. the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit as described in claim 1 and sleeper block, feature
It is:
The cross section in radial width diminution portion (3) is round, ellipse or strip.
3. the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit as described in claim 1 and sleeper block, feature
It is:
The hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steel pipes
The line of centres of cross section constitutes triangle.
4. a kind of concrete filled steel tube sleeper of non-fragment orbit, including two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection
More concrete filled steel tubes (2), also with non-fragment orbit as described in any one of claims 1-3 concrete filled steel tubular member with
The connection reinforcing structure of sleeper block.
5. a kind of construction method of the concrete filled steel tube sleeper of non-fragment orbit as claimed in claim 4, which is characterized in that including
Following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: in position of the hollow steel pipe apart from open end 100mm-200mm, the extruding contracting in the length range of 0-50mm
As low as outer diameter 37mm forms several radial width diminutions portion (3);And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe
It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion (3);
Step 3: from hollow steel pipe one end to other end jet pouring high pressure concrete packing material, and by all radial widths
Diminution portion (3) is also closely knit with Concrete Filled;
Step 4: maintenance concrete filled steel tubular member, so as to form prefabricated several concrete filled steel tubes (2);
Step 5: concrete filled steel tube (2), steel reinforcement cage are put into sleeper production mold, casting concrete material, so that steel tube concrete
Native (2) are poured into sleeper block (1);
Step 6: concrete filled steel tube (2) interlude portion in the casting process of railway roadbed, including radial width diminution portion (3)
Divide to pour with railway roadbed and be integrated.
6. a kind of connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit and sleeper block, the steel pipe for non-fragment orbit is mixed
In solidifying soil sleeper, the concrete filled steel tube sleeper includes more of two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection
Concrete filled steel tube (2), the sleeper block (1) are formed by concreting, and the concrete filled steel tube (2) is configured to utilize hollow steel
Pipe is arranged in the manufacture mold of two sleeper blocks (1) adjacent to each other, in the casting process of the sleeper block (1) with it is described
Sleeper block (1), which pours, to be integrated, while filling concrete in the hollow steel pipe;It is characterized by:
It rises, being embedded to position of the hollow steel pipe of the sleeper block (1) apart from open end 100mm-200mm less than 50mm
Length range in have radial width diminution portion (3), and the hollow steel pipe embedment railway roadbed intermediate stage also have
Radial width diminution portion (3), during hollow steel pipe perfusion, coagulation is also filled in radial width diminution portion (3)
Soil, and pour and be integrated with the sleeper block (1) in the casting process of the sleeper block (1), in pouring for the railway roadbed
Railway roadbed described in Cheng Zhongyu, which pours, to be integrated.
7. the connection reinforcing structure of the concrete filled steel tubular member of non-fragment orbit as claimed in claim 6 and sleeper block, feature
It is:
The cross section in radial width diminution portion (3) is round, ellipse or strip.
8. the concrete filled steel tubular member of non-fragment orbit as claimed in claim 6 and the connection reinforcing structure of sleeper block, feature
It is:
The hollow steel pipe is two, is distributed in the two sides of the built-in fitting of sleeper block;
Or the hollow steel pipe is three, above-mentioned three hollow steel pipes are arranged in the following manner: three hollow steel pipes
The line of centres of cross section constitutes triangle.
9. a kind of concrete filled steel tube sleeper of non-fragment orbit, including two or more sleeper blocks (1) and the above-mentioned sleeper block (1) of connection
More concrete filled steel tubes (2), also have as the described in any item non-fragment orbits of claim 6-8 concrete filled steel tubular member with
The connection reinforcing structure of sleeper block.
10. a kind of construction method of the concrete filled steel tube sleeper of non-fragment orbit as claimed in claim 9, which is characterized in that packet
Include following steps:
Step 1: root long 2000mm, the hollow steel pipe of outer diameter 40mm are chosen;
Step 2: in position of the hollow steel pipe apart from open end 100mm-200mm, the extruding contracting in the length range of 0-50mm
As low as outer diameter 37mm forms several radial width diminutions portion (3);And the intermediate stage of railway roadbed is embedded to, in 0- in hollow steel pipe
It is squeezed in the length range of 50mm and is contracted to outer diameter 37mm, form several radial width diminutions portion (3);
Step 3: so as to form prefabricated several hollow steel pipes;
Step 4: being put into sleeper production mold for hollow steel pipe, steel reinforcement cage, sprays from one end of hollow steel pipe to the other end high
Press Concrete Filled material, until fill up the other end sleeper block die cavity and all radial width diminution portions (3), then proceed to
The sleeper block die cavity of this side is filled up, so that concrete filled steel tube (2) is poured into sleeper block (1);
Step 5: maintenance concrete filled steel tube sleeper;
Step 6: concrete filled steel tube (2) interlude portion in the casting process of railway roadbed, including radial width diminution portion (3)
Divide to pour with railway roadbed and be integrated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672694.6A CN110424190A (en) | 2019-07-24 | 2019-07-24 | The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672694.6A CN110424190A (en) | 2019-07-24 | 2019-07-24 | The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110424190A true CN110424190A (en) | 2019-11-08 |
Family
ID=68412228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910672694.6A Pending CN110424190A (en) | 2019-07-24 | 2019-07-24 | The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110424190A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306006A (en) * | 2020-03-27 | 2020-06-19 | 中国华能集团清洁能源技术研究院有限公司 | Steel pipe concrete tower and mounting method thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU272911A1 (en) * | Иностранец Роже Поль Сонневилль | REINFORCED CONCRETE TRAILER FOR A RAILWAY | ||
CN1167183A (en) * | 1996-04-30 | 1997-12-10 | 财团法人铁道综合技术研究所 | Steel pipe connector of ladder-type sleeper for railway track |
JP2003105867A (en) * | 2001-09-27 | 2003-04-09 | Daiwa House Ind Co Ltd | Anchor bolt |
CN101235615A (en) * | 2007-01-31 | 2008-08-06 | 财团法人铁道综合技术研究所 | Ladder type crosstie |
CN204662712U (en) * | 2015-04-03 | 2015-09-23 | 沈阳建筑大学 | A kind of power consumption compound shear wall |
CN205077629U (en) * | 2015-10-23 | 2016-03-09 | 山东科技大学 | Cavity intermediate layer steel core concrete column and girder steel connecting device |
CN105463948A (en) * | 2015-11-20 | 2016-04-06 | 中铁第四勘察设计院集团有限公司 | Concrete-filled steel tube sleeper for ballastless track |
CN109457547A (en) * | 2018-12-13 | 2019-03-12 | 中铁第四勘察设计院集团有限公司 | A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block |
CN109457551A (en) * | 2018-12-18 | 2019-03-12 | 中铁第四勘察设计院集团有限公司 | Group frame type connection reinforcing structure and construction method between sleeper block and railway roadbed |
CN210657803U (en) * | 2019-07-24 | 2020-06-02 | 中铁第四勘察设计院集团有限公司 | Steel pipe concrete component and sleeper block connection reinforcing structure and sleeper comprising same |
-
2019
- 2019-07-24 CN CN201910672694.6A patent/CN110424190A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU272911A1 (en) * | Иностранец Роже Поль Сонневилль | REINFORCED CONCRETE TRAILER FOR A RAILWAY | ||
CN1167183A (en) * | 1996-04-30 | 1997-12-10 | 财团法人铁道综合技术研究所 | Steel pipe connector of ladder-type sleeper for railway track |
JP2003105867A (en) * | 2001-09-27 | 2003-04-09 | Daiwa House Ind Co Ltd | Anchor bolt |
CN101235615A (en) * | 2007-01-31 | 2008-08-06 | 财团法人铁道综合技术研究所 | Ladder type crosstie |
CN204662712U (en) * | 2015-04-03 | 2015-09-23 | 沈阳建筑大学 | A kind of power consumption compound shear wall |
CN205077629U (en) * | 2015-10-23 | 2016-03-09 | 山东科技大学 | Cavity intermediate layer steel core concrete column and girder steel connecting device |
CN105463948A (en) * | 2015-11-20 | 2016-04-06 | 中铁第四勘察设计院集团有限公司 | Concrete-filled steel tube sleeper for ballastless track |
CN109457547A (en) * | 2018-12-13 | 2019-03-12 | 中铁第四勘察设计院集团有限公司 | A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block |
CN109457551A (en) * | 2018-12-18 | 2019-03-12 | 中铁第四勘察设计院集团有限公司 | Group frame type connection reinforcing structure and construction method between sleeper block and railway roadbed |
CN210657803U (en) * | 2019-07-24 | 2020-06-02 | 中铁第四勘察设计院集团有限公司 | Steel pipe concrete component and sleeper block connection reinforcing structure and sleeper comprising same |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306006A (en) * | 2020-03-27 | 2020-06-19 | 中国华能集团清洁能源技术研究院有限公司 | Steel pipe concrete tower and mounting method thereof |
CN111306006B (en) * | 2020-03-27 | 2024-05-28 | 中国华能集团清洁能源技术研究院有限公司 | Steel pipe concrete tower and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109457550A (en) | Groove type connection reinforcing structure and construction method between a kind of sleeper block and railway roadbed | |
CN109457551B (en) | Combined frame type connection reinforcing structure between sleeper block and ballast bed and construction method | |
CN107190585A (en) | A kind of cast-in-place sleeper plate-type ballastless track and its construction method | |
CN215441415U (en) | Quick-connect combined column pier structure | |
CN207091835U (en) | A kind of cast-in-place sleeper plate-type ballastless track | |
CN110424190A (en) | The concrete filled steel tubular member of non-fragment orbit and the connection reinforcement of sleeper block design | |
CN110424191A (en) | The anti-detachment design of the concrete filled steel tubular member and sleeper block of non-fragment orbit | |
CN111364374A (en) | Shear-resistant reinforcing method for small-section hollow beam | |
CN109457547A (en) | A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block | |
CN109457549A (en) | Frame-type connection reinforcing structure between the concrete filled steel tube and sleeper block of non-fragment orbit | |
CN210657804U (en) | Concrete filled steel tube member and sleeper block separation preventing structure and sleeper comprising same | |
CN210657803U (en) | Steel pipe concrete component and sleeper block connection reinforcing structure and sleeper comprising same | |
CN110405935B (en) | Prestressed concrete corrugated sheet pile and preparation method thereof | |
CN209412615U (en) | A kind of groove type connection reinforcing structure between sleeper block and railway roadbed | |
CN110359932B (en) | Two-lining vault grouting pipe assembly and grouting construction method thereof | |
CN115467372B (en) | Pipe joint steel plate concrete combined structure for immersed tunnel and manufacturing method thereof | |
CN207484261U (en) | A kind of T-shaped bridge structure of pipe stiffener | |
CN212052384U (en) | Shear-resisting reinforcing structure of small-section hollow beam | |
CN212715463U (en) | Assembled wall body | |
CN209652659U (en) | Frame-type connection reinforcing structure between the concrete filled steel tube and sleeper block of non-fragment orbit | |
CN209384032U (en) | A kind of bridging type connection reinforcing structure of concrete filled steel tube and sleeper block | |
CN209384033U (en) | A kind of penetration type connection reinforcing structure of concrete filled steel tube and sleeper block | |
CN212714464U (en) | Concrete placement structure of durability bridge construction | |
CN1769624B (en) | Hollow pipe for concrete filling | |
CN215948568U (en) | Hollow outer wall of prestressed basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |