CN110414816B - Least square-based power system state estimation method - Google Patents
Least square-based power system state estimation method Download PDFInfo
- Publication number
- CN110414816B CN110414816B CN201910653752.0A CN201910653752A CN110414816B CN 110414816 B CN110414816 B CN 110414816B CN 201910653752 A CN201910653752 A CN 201910653752A CN 110414816 B CN110414816 B CN 110414816B
- Authority
- CN
- China
- Prior art keywords
- load
- node
- power system
- matrix
- admittance matrix
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/16—Matrix or vector computation, e.g. matrix-matrix or matrix-vector multiplication, matrix factorization
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Mathematical Physics (AREA)
- Development Economics (AREA)
- Computational Mathematics (AREA)
- Health & Medical Sciences (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Optimization (AREA)
- Educational Administration (AREA)
- Mathematical Analysis (AREA)
- Data Mining & Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- Software Systems (AREA)
- Computing Systems (AREA)
- Algebra (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Databases & Information Systems (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a least square-based power system state estimation method, which relates to a power system and comprises the following steps: first, determining the identification parameter matrix as eta(n)=(‑[YLL]‑1YLG‑[YLL]‑1) (ii) a Then, collecting a power supply voltage phasor on a generator node, a load voltage and a current phasor on a load node; then, solving the identification parameter matrix eta(n)Is estimated value ofFrom the matrix to be identifiedSplitting the load admittance matrix YLGThe inter-charge admittance matrix YLLSolving said load admittance matrix YLGThe rate of change of the items within; finally, a load admittance matrix Y is extractedLGAnd determining the first transmission line matched with the fault item as a fault line when the internal change rate is greater than the fault item of the preset value. According to the invention, the previous data are removed, so that the calculation processing amount is reduced, the data far away from the current moment are removed, the system estimation precision is effectively improved, and the fault route of the power system can be effectively identified.
Description
Technical Field
The invention relates to the field of power systems, in particular to a least square-based power system state estimation method.
Background
The electric power system is an electric energy production and consumption system which consists of links such as a power plant, a power transmission and transformation line, a power supply and distribution station, power utilization and the like. The function of the device is to convert the primary energy of the nature into electric energy through a power generation device, and then supply the electric energy to each user through power transmission, power transformation and power distribution. In order to realize the function, the power system is also provided with corresponding information and control systems at each link and different levels, and the production process of the electric energy is measured, regulated, controlled, protected, communicated and scheduled so as to ensure that users obtain safe and high-quality electric energy.
The main structures of the power system include a power source (power plants such as hydropower stations, thermal power plants, and nuclear power plants), a substation (a step-up substation, a load center substation, and the like), a power transmission and distribution line, and a load center. The power supply points are also mutually connected to realize the exchange and regulation of electric energy among different regions, thereby improving the safety and the economical efficiency of power supply. The network formed by the transmission line and the substation is usually called a power network. The information and control system of the power system consists of various detection devices, communication devices, safety protection devices, automatic control devices and automatic monitoring and dispatching systems. The structure of the power system should ensure reasonable coordination of power generation and consumption on the basis of advanced technical equipment and high economic benefit.
A typical power system model includes a plurality of generator nodes, a plurality of load nodes, and a power network.
Because the power system is a complex time-varying system, the data processing amount is larger and larger along with the operation of the system, and the required computer processing capacity for processing data is greatly increased, so that the data processing speed is reduced or the data processing cost is increased. In addition, in the prior art, a forgetting factor is used for weighting to perform recursive least square method, on one hand, old data cannot be completely eliminated, and on the other hand, in some prior arts, the total weighted value of the old data and new data is greater than 1, so that the solved value is shifted.
Disclosure of Invention
In view of some of the above-mentioned drawbacks of the prior art, the present invention provides a method for estimating a state of an electric power system based on least squares, which aims to optimize the solution of parameter estimation of an electric power system network, only retain the most recent data, perform parameter identification, and increase the solution speed of system parameter estimation.
In order to achieve the above object, the present invention provides a least square-based power system state estimation method, including:
step S1, determining the identification parameter matrix as eta(n)=(-[YLL]-1YLG -[YLL]-1) (ii) a Said Y isLLIs an inter-load admittance matrix Y between load nodes of the power systemLLSaid Y isLGFor load transmitting admittance matrix Y between load node and generator node of power systemLG(ii) a The model of the power system satisfies: being a full admittance matrix of the power system, E, IGGenerator node voltage phasor and generator node current phasor respectively, and V, I load node voltage phasor and load node current phasor respectively;
step S2, collecting power supply voltage phasor E on each generator node on the power system networknLoad voltage V on the load nodenAnd the current phasor I at the load noden(ii) a The supply voltage phasor En=[E(1,n),E(2,n),...,E(i,n)]TA load voltage V on said load noden=[V(1,n),V(2,n),...,V(j,n)]TCurrent phasor I at the load noden=[I(1,n),I(2,n),...,I(j,n)]T(ii) a The i is the node number of the generator node, the j is the node number of the load node, and the n is the serial number of the sampling data;
step S3, responding n > p, solving eta after increasing nth sampling data(n-1,add n)Is estimated value ofThe above-mentionedSatisfies the following conditions:
V n=[Vn-p+1 Vn-p+2 ... Vn],the above-mentionedI is an identity matrix; p is a preset positive integer; the p is greater than the number of parameters to be estimated anda full rank;
step S4, in response to n > p and theSolving the identification parameter matrix eta after removing the n-p times of sampling data(n)Is estimated value ofThe above-mentionedSatisfies the following conditions:
step S5, responding to the matrix to be identifiedThe data in the matrix to be identified fluctuatesAfter stabilization, from the matrix to be identifiedSplitting the load admittance matrix YLGThe inter-charge admittance matrix YLLSolving said load admittance matrix YLGThe rate of change of the items within;
step S6, extracting the load admittance matrix YLGAnd acquiring a first load node and a second generator node corresponding to the fault item when the internal change rate of the fault item is greater than a preset value, and determining a first transmission line between the first load node and the second generator node as a fault line.
In one embodiment, in the step S2, the power voltage phasor EnLoad voltage V on the load nodenAnd the current phasor I at the load nodenIs synchronous sampling.
In one embodiment, in the step S2, the power voltage phasor EnLoad voltage V on the load nodenAnd the current phasor I at the load nodenThe sampling period of (2) is 10ms-1000 ms.
In one embodiment, in the step S5, the charging admittance matrix YLGThe change rate of each item in the data storage is the ratio of a first stable state before the data fluctuates to a second stable state after the data fluctuates.
In a specific embodiment, the step S6 further includes:
obtaining the load admittance matrix YLGThe load node number and the generator node number of the fault item, a first load node is determined according to the load node number, and a second generator node is determined according to the generator node number.
The invention has the beneficial effects that: in the invention, the upper limit of data is kept as p items by limiting the number of data items of the power system, namely, in the actual operation, the first addition of the second addition can be adoptedn times sampling data Hn、VnThen deleting the first data of the current sequence and maintaining the length of the data sequence. On one hand, the invention eliminates the previous data, so that the calculation processing amount is reduced, and meanwhile, as the power system is a gradual change system, the data accuracy is lower when the power system is farther from the current time node, the farther data from the current time is eliminated, and the system precision is effectively improved. In addition, the two-step solution is carried out through the formula, the higher the obtained parameter estimation precision is, and the parameter estimation accuracy is enhanced. The invention can effectively identify the fault route of the power system on line, improve the efficiency of fault identification and reduce the fault maintenance cost of the power system.
Drawings
FIG. 1 is a schematic flow chart of a least squares based power system state estimation method according to an embodiment of the present invention;
FIG. 2 is a model of a multi-source, multi-load power system in accordance with an embodiment of the present invention.
Detailed Description
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
the power system is a complex time-varying system, such as a multi-source and multi-load power system shown in fig. 2, the total number of generators is i, the total number of loads is j, a node admittance matrix is introduced, and a power network model based on the whole network can be obtained based on kirchhoff voltage and current laws:
the following can be obtained:
V=-[YLL]-1YLGE-[YLL]-1I (1)
obtaining power supply voltage phasor E on each generator node through continuous sampling of synchronous Phasor Measurement Unit (PMU) on network node of power systemnLoad voltage V on the load nodenAnd the current phasor I at the load noden(ii) a The supply voltage phasor En=[E(1,n),E(2,n),...,E(i,n)]TA load voltage V on said load noden=[V(1,n),V(2,n),...,V(j,n)]TCurrent phasor I at the load noden=[I(1,n),I(2,n),...,I(j,n)]T(ii) a The i is the node number of the generator node, the j is the node number of the load node, and the n is the serial number of the sampling data;
and (3) simultaneously obtaining the comprehensive power grid model by the n times of sampling data:
namely:
According to the least square method, forV n=η(n) H nIn a term of (A), (B), (C)H n)(H n)TWhen the device is not in a strange state,obtaining a minimum value:
for the power system model, the model is the same asH n、V nIncreasing the nth sample data[Vn]Then, the following are respectively changed:
V n-1_add_n=[Vn-p Vn-p+1 ... Vn-1 Vn] (7)
H n-1_add_n=[H n-1 Hn] (8)
V n-1_add_n=[V n-1 Vn] (9);
according to a matrix inversion formula, the method is simplified to obtain:
in the same way, the above steps are carried outH n-1_add_n、V n-1_add_nDelete leader, getH n、V n(ii) a Wherein the content of the first and second substances,
V n-1_add_n=[Vn-p Vn-p ... Vn-1 Vn] (13)
V n+1=[Vn-p+1 Vn-p+2 ... Vn] (15)
namely:
H n-1_add_n=[Hn-p H n] (16)
V n-1_add_n=[Vn-p V n] (17)
according to a matrix inversion formula, the method is simplified to obtain:
in the invention, the upper limit of the data is kept to be p items by limiting the number of data items of the power system, namely, in the actual operation, the nth sampling data H can be increased firstlyn、VnThen deleting the first data of the current sequence and maintaining the length of the data sequence.
On one hand, the previous data are removed, so that the calculation processing amount is reduced, and meanwhile, as the power system is a gradual change system, the data accuracy is lower when the power system is farther from the current time node, the data farther from the current time are removed, and the system precision is effectively improved. In addition, the two-step solution is carried out through the formula, the higher the obtained parameter estimation precision is, and the parameter estimation accuracy is enhanced.
Specifically, as shown in fig. 1, in a first example of the present invention, there is provided a least-squares-based power system state estimation method, the method including:
step S1, determining the identification parameter matrix as eta(n)=(-[YLL]-1YLG -[YLL]-1) (ii) a Said Y isLLIs an inter-load admittance matrix Y between load nodes of the power systemLLSaid Y isLGFor load transmitting admittance matrix Y between load node and generator node of power systemLG(ii) a The model of the power system satisfies: being a full admittance matrix of the power system, E, IGGenerator node voltage phasor and generator node current phasor respectively, and V, I load node voltage phasor and load node current phasor respectively;
step S2, collecting power supply voltage phasor E on each generator node on the power system networknLoad voltage V on the load nodenAnd the current phasor I at the load noden(ii) a The supply voltage phasor En=[E(1,n),E(2,n),...,E(i,n)]TA load voltage V on said load noden=[V(1,n),V(2,n),...,V(j,n)]TCurrent phasor I at the load noden=[I(1,n),I(2,n),...,I(j,n)]T(ii) a The i is the node number of the generator node, the j is the node number of the load node, and the n is the serial number of the sampling data;
step S3, responding n > p, solving eta after increasing nth sampling data(n-1,add n)Is estimated value ofThe above-mentionedSatisfies the following conditions:
V n=[Vn-p+1 Vn-p+2 ... Vn],the above-mentionedI is an identity matrix; p is a preset positive integer;
step S4, in response to n > p and theSolving the identification parameter matrix eta after removing the n-p times of sampling data(n)Is estimated value ofThe above-mentionedSatisfies the following conditions:
step S5, responding to the matrix to be identifiedThe data in the matrix to be identified fluctuatesAfter stabilization, from the matrix to be identifiedSplitting the load admittance matrix YLGThe inter-charge admittance matrix YLLSolving said load admittance matrix YLGThe rate of change of the items within;
step S6, extracting the load admittance matrix YLGAnd acquiring a first load node and a second generator node corresponding to the fault item when the internal change rate of the fault item is greater than a preset value, and determining a first transmission line between the first load node and the second generator node as a fault line.
In this embodiment, in the step S2, the power supply voltage phasor EnLoad voltage V on the load nodenAnd the current phasor I at the load nodenIs synchronous sampling.
In this embodiment, in the step S2, the power supply voltage phasor EnLoad voltage V on the load nodenAnd the current phasor I at the load nodenThe sampling period of (2) is 10ms-1000 ms.
In this embodiment, in the step S5, the load admittance matrix YLGThe change rate of each item in the data storage is the ratio of a first stable state before the data fluctuates to a second stable state after the data fluctuates.
In this embodiment, the step S6 further includes:
obtaining the load admittance matrix YLGThe load node number and the generator node number of the fault item, a first load node is determined according to the load node number, and a second generator node is determined according to the generator node number.
The foregoing detailed description of the preferred embodiments of the invention has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.
Claims (5)
1. A least squares based power system state estimation method, the method comprising:
step S1, determining the identification parameter matrix as eta(n)=(-[YLL]-1YLG -[YLL]-1) (ii) a Said Y isLLIs an inter-load admittance matrix Y between load nodes of the power systemLLSaid Y isLGFor load transmitting admittance matrix Y between load node and generator node of power systemLG(ii) a The model of the power system satisfies: being a full admittance matrix of the power system, E, IGGenerator node voltage phasor and generator node current phasor respectively, and V, I load node voltage phasor and load node current phasor respectively;
step S2, collecting power supply voltage phasor E on each generator node on the power system networknLoad voltage V on the load nodenAnd the current phasor I at the load noden(ii) a The supply voltage phasor En=[E(1,n),E(2,n),...,E(i,n)]TA load voltage V on said load noden=[V(1,n),V(2,n),...,V(j,n)]TCurrent phasor I at the load noden=[I(1,n),I(2,n),...,I(j,n)]T(ii) a The i is the node number of the generator node, the j is the node number of the load node, and the n is the serial number of the sampling data;
step S3, responding n > p, solving eta after increasing nth sampling data(n-1,add n)Is estimated value ofThe above-mentionedSatisfies the following conditions:
V n=[Vn-p+1 Vn-p+2 ... Vn],the above-mentionedI is an identity matrix; p is a preset positive integer;
step S4, in response to n > p and theSolving the identification parameter matrix eta after removing the n-p times of sampling data(n)Is estimated value ofThe above-mentionedSatisfies the following conditions:
step S5, responding to the matrix to be identifiedThe data in the matrix to be identified fluctuatesAfter stabilization, from the matrix to be identifiedSplitting the load admittance matrix YLGThe inter-charge admittance matrix YLLSolving said load admittance matrix YLGThe rate of change of the items within;
step S6, extracting the load admittance matrix YLGAnd acquiring a first load node and a second generator node corresponding to the fault item when the internal change rate of the fault item is greater than a preset value, and determining a first transmission line between the first load node and the second generator node as a fault line.
2. The least squares-based power system state estimation method of claim 1, wherein in the step S2, the supply voltage phasor EnLoad voltage V on the load nodenAnd the current phasor I at the load nodenIs synchronous sampling.
3. The least squares-based power system state estimation method of claim 1, wherein in the step S2, the supply voltage phasor EnLoad voltage V on the load nodenAnd the current phasor I at the load nodenThe sampling period of (2) is 10ms-1000 ms.
4. A substrate as claimed in claim 1In the least square power system state estimation method, in the step S5, the load admittance matrix YLGThe change rate of each item in the data storage is the ratio of a first stable state before the data fluctuates to a second stable state after the data fluctuates.
5. The least squares-based power system state estimation method of claim 1, wherein the step S6 further comprises:
obtaining the load admittance matrix YLGThe load node number and the generator node number of the fault item, a first load node is determined according to the load node number, and a second generator node is determined according to the generator node number.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910653752.0A CN110414816B (en) | 2019-07-19 | 2019-07-19 | Least square-based power system state estimation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910653752.0A CN110414816B (en) | 2019-07-19 | 2019-07-19 | Least square-based power system state estimation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110414816A CN110414816A (en) | 2019-11-05 |
CN110414816B true CN110414816B (en) | 2021-11-23 |
Family
ID=68362028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910653752.0A Active CN110414816B (en) | 2019-07-19 | 2019-07-19 | Least square-based power system state estimation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110414816B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001128360A (en) * | 1999-08-17 | 2001-05-11 | Mitsubishi Electric Corp | Power control apparatus |
CN101666825A (en) * | 2009-08-28 | 2010-03-10 | 西南交通大学 | Grid voltage stabilization on-line monitoring method based on voltage stability local indexes |
CN103258103A (en) * | 2013-05-29 | 2013-08-21 | 国家电网公司 | Thevenin equivalent parameter identification method based on partial least squares regression |
CN106443246A (en) * | 2016-09-06 | 2017-02-22 | 山东大学 | Online identification method of small-disturbance stability parameters based on PMU measurement data |
CN107328996A (en) * | 2017-06-12 | 2017-11-07 | 华北电力大学 | Robust electric transmission line positive sequence parameter identification method |
CN107832959A (en) * | 2017-11-16 | 2018-03-23 | 广东电网有限责任公司电力调度控制中心 | A kind of voltage stability assessment method for considering part throttle characteristics and power constraints |
CN109412153A (en) * | 2018-11-09 | 2019-03-01 | 广东电网有限责任公司 | Grid operation mode recognition methods and its system based on electric parameter state estimation |
CN109470988A (en) * | 2018-10-10 | 2019-03-15 | 国网浙江省电力有限公司杭州供电公司 | A kind of fault localization system and method suitable for T-type transmission line of electricity |
-
2019
- 2019-07-19 CN CN201910653752.0A patent/CN110414816B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001128360A (en) * | 1999-08-17 | 2001-05-11 | Mitsubishi Electric Corp | Power control apparatus |
CN101666825A (en) * | 2009-08-28 | 2010-03-10 | 西南交通大学 | Grid voltage stabilization on-line monitoring method based on voltage stability local indexes |
CN103258103A (en) * | 2013-05-29 | 2013-08-21 | 国家电网公司 | Thevenin equivalent parameter identification method based on partial least squares regression |
CN106443246A (en) * | 2016-09-06 | 2017-02-22 | 山东大学 | Online identification method of small-disturbance stability parameters based on PMU measurement data |
CN107328996A (en) * | 2017-06-12 | 2017-11-07 | 华北电力大学 | Robust electric transmission line positive sequence parameter identification method |
CN107832959A (en) * | 2017-11-16 | 2018-03-23 | 广东电网有限责任公司电力调度控制中心 | A kind of voltage stability assessment method for considering part throttle characteristics and power constraints |
CN109470988A (en) * | 2018-10-10 | 2019-03-15 | 国网浙江省电力有限公司杭州供电公司 | A kind of fault localization system and method suitable for T-type transmission line of electricity |
CN109412153A (en) * | 2018-11-09 | 2019-03-01 | 广东电网有限责任公司 | Grid operation mode recognition methods and its system based on electric parameter state estimation |
Non-Patent Citations (1)
Title |
---|
应用导纳矩阵方程的配电网状态估计迭代算法;彭谦 等;《中国电机工程学报》;20081015;第28卷(第19期);第65-68页 * |
Also Published As
Publication number | Publication date |
---|---|
CN110414816A (en) | 2019-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ding et al. | Multi-stage distributionally robust stochastic dual dynamic programming to multi-period economic dispatch with virtual energy storage | |
CN107222348B (en) | Method for reducing cascading failure risk of power information physical system | |
Wang et al. | Stochastic DG placement for conservation voltage reduction based on multiple replications procedure | |
EP3140898B1 (en) | Method and system for monitoring distribution systems | |
CN107256448B (en) | Risk assessment method fusing element level and system level of photovoltaic power station | |
CN104779611A (en) | Economic dispatch method for micro grid based on centralized and distributed double-layer optimization strategy | |
CN110389268B (en) | Online monitoring system of electric power system | |
CN103927598A (en) | Photovoltaic generation power prediction method based on self-learning radial basis function | |
CN105207255B (en) | A kind of power system peak regulation computational methods suitable for wind power output | |
CN110414816B (en) | Least square-based power system state estimation method | |
CN117473384A (en) | Power grid line safety constraint identification method, device, equipment and storage medium | |
CN105354761B (en) | Safety and efficiency evaluation method and system for accessing wind power into power grid | |
CN110401190B (en) | Real-time frequency detection and identification system for power system | |
CN110380379B (en) | Fault monitoring and alarming system for power system | |
Hua et al. | Design of energy dispatch strategy of active distribution network using chance-constrained programming | |
Sun et al. | Determining optimal generator start-up sequence in bulk power system restoration considering uncertainties: A confidence gap decision theory based robust optimization approach | |
CN110398630B (en) | Dynamic tracking method for frequency of power system | |
Gao et al. | Substation Load Characteristics and Forecasting Model for Large-scale Distributed Generation Integration | |
Su et al. | Day-Ahead PV and EVs Power Forecasting of Distribution Network Based on LSTM | |
Lanqing et al. | Economic optimal dispatching method of power microgrid under environmental uncertainties | |
Guo et al. | Research on Dispatching and Control Strategy of UHVDC Blocking Fault in Sending-end Power Grid Based on K-means Clustering | |
Lin et al. | Research on Probabilistic Power Flow Calculation of DC Distribution Network | |
Wei et al. | Frequency prediction of synchronous generators in a multi-machine power system with a photovoltaic plant using a cellular computational network | |
Garrido-Zafra et al. | LSTM-based Network for Current Harmonic Distortion Time Series Forecasting | |
CN113572162B (en) | New energy collection area voltage rolling prediction method, device, terminal and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |