CN110414697A - A kind of garbage burning factory regular working management method based on quartz - Google Patents

A kind of garbage burning factory regular working management method based on quartz Download PDF

Info

Publication number
CN110414697A
CN110414697A CN201910706361.0A CN201910706361A CN110414697A CN 110414697 A CN110414697 A CN 110414697A CN 201910706361 A CN201910706361 A CN 201910706361A CN 110414697 A CN110414697 A CN 110414697A
Authority
CN
China
Prior art keywords
regular working
task
regular
selection
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910706361.0A
Other languages
Chinese (zh)
Inventor
胡春廷
马永贵
李明
薛江涛
李文豪
李阳平
朱军豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING XINYE ENERGY TECHNOLOGY Co Ltd
Original Assignee
NANJING XINYE ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING XINYE ENERGY TECHNOLOGY Co Ltd filed Critical NANJING XINYE ENERGY TECHNOLOGY Co Ltd
Priority to CN201910706361.0A priority Critical patent/CN110414697A/en
Publication of CN110414697A publication Critical patent/CN110414697A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety

Abstract

Step one: the garbage burning factory regular working management method based on quartz that the present invention relates to a kind of inputs regular working configuration according to the system of garbage burning factory in systems;Active configuration includes incoming task description, selection execution regular working department, the equipment that selection needs check, the type for selecting regular working, the state pause judgments time for selecting regular working, selects profession, the shift for selecting post, selection to execute, the time cycle for executing the period, work being selected to generate for inputting regular working;Two modification regular working configurations;Regular working task after today is all deleted the regenerating one month future of the task by modification;It enables and generates following one month after today regular working task, can be deactivated after enabling;It deactivates, delete and all delete the regular working task after today, can be enabled after deactivating.The present invention can carry out paperless office.

Description

A kind of garbage burning factory regular working management method based on quartz
Technical field
The present invention relates to enterprise work management domains, and in particular to a kind of garbage burning factory regular working based on quartz Management method.
Background technique
With economic continuous development, people's lives level is continuously improved, thus also produces more and more rubbish. In the case where people increasingly pay attention to quality of the life, a large amount of rubbish causes great puzzlement to people's lives, simultaneously Also the health of people can be threatened.To rubbish carry out power generation by waste combustion be to house refuse one of the most common type processing method, Can be generated during burning it is many to the harmful substance of equipment, therefore inspect periodically equipment be improve equipment reliability, It is the main means of auxiliary enhancing equipment life management, is the basic measures for guaranteeing safety in production.Currently, municipal solid waste incinerator The regular working task executed needed for generally being recorded using paper document, so processing can make the paper of record more and more, dimension Pillar reason, which is consulted, to be not easy.Therefore one kind is needed to be able to achieve garbage burning factory regular working management method.
Summary of the invention
1. technical problem to be solved:
For the above technical issues, the present invention proposes a kind of garbage burning factory regular working management method based on quartz, This method is realized using Quartz generates regular working task according to the execution time of configuration.
2. technical solution:
A kind of garbage burning factory regular working management method based on quartz, it is characterised in that: the following steps are included:
Step 1: regular working configuration is inputted according to the system of garbage burning factory in systems;The active configuration includes input Task description, selection execute regular working department, select the equipment for needing to check, the type of selection regular working, selection regular The state pause judgments time of work, selection profession, selection post, the shift that selection executes, the execution period for inputting regular working, choosing Select the time cycle of work generation;The regular identical of the same day to preset time is generated according to the time cycle of input to realize Task.
Step 2: modification regular working configuration;According to life burn away the refuse factory system modification or enable, deactivate, delete Regular working configuration came into force or next day comes into force according to life factory's system same day of burning away the refuse;The next day comes into force, and modification is Regular working task after today is all deleted to the regenerating one month future of the task;Described enable i.e. will be after today Following one month regular working task generates, and can deactivate after enabling;It deactivates, delete the regular work after today i.e. Make task all to delete, can be enabled after deactivating.
It further, further include that incoming task executes receipt;The task execution receipt includes inputting retouching for execution task It states, post and profession, the input of the position of input equipment, incoming task execute time, the state for selecting equipment, selection processing People.
It further, further include system for prompting;The system for prompting is to be held needs according to the time cycle of active configuration Capable task is notified by short massage notice or computer to relevant people.
3. the utility model has the advantages that
It is utilized according to the original system of garbage burning factory by the regular working input system for needing to do to equipment in the present invention Quartz automatically generates the prompting of the corresponding equipment regular working in the period of selection, and staff mentions according to what is received Awake content regularly works to corresponding equipment, and input executes explanation to this subtask after the completion of work.To real Row paperless office, the task of completion and regularly task dispatching etc. can be passed round between each department, pass through hardware, software and network Cooperate working efficiency allowed to greatly promote.
Detailed description of the invention
Fig. 1 is the interface of regular working configuration in the present invention;
Fig. 2 is the interface of the task execution receipt in the present invention.
Specific embodiment
The present invention is specifically described with reference to the accompanying drawing.
A kind of garbage burning factory regular working management method based on quartz, it is characterised in that: the following steps are included:
Step 1: regular working configuration is inputted according to the system of garbage burning factory in systems;The active configuration includes input Task description, selection execute regular working department, select the equipment for needing to check, the type of selection regular working, selection regular The state pause judgments time of work, selection profession, selection post, the shift that selection executes, the execution period for inputting regular working, choosing Select the time cycle of work generation;The regular identical of the same day to preset time is generated according to the time cycle of input to realize Task.In this step, if the end time is not selected to be defaulted as permanently executing.According to the starting knot in configuration in this step Beam time and execution period generate 1 month task in advance, and what is do not generated at 23: 50 daily mitogenetic Cheng Jinyi months appoints Business (is generated according to the task among the task execution time of last task to same day next month).
Step 2: modification regular working configuration;According to life burn away the refuse factory system modification or enable, deactivate, delete Regular working configuration came into force or next day comes into force according to life factory's system same day of burning away the refuse;The next day comes into force, and modification is Regular working task after today is all deleted to the regenerating one month future of the task;Described enable i.e. will be after today Following one month regular working task generates, and can deactivate after enabling;It deactivates, delete the regular work after today i.e. Make task all to delete, can be enabled after deactivating.
It further, further include that incoming task executes receipt;The task execution receipt includes inputting retouching for execution task It states, post and profession, the input of the position of input equipment, incoming task execute time, the state for selecting equipment, selection processing People.
It further, further include system for prompting;The system for prompting is to be held needs according to the time cycle of active configuration Capable task is notified by short massage notice or computer to relevant people.
Although the present invention has been described by way of example and in terms of the preferred embodiments, they be not it is for the purpose of limiting the invention, it is any ripe This those skilled in the art is practised, without departing from the spirit and scope of the invention, can make various changes or retouch from working as, therefore guarantor of the invention Shield range should be subject to what claims hereof protection scope was defined.

Claims (3)

1. a kind of garbage burning factory regular working management method based on quartz, it is characterised in that: the following steps are included:
Step 1: regular working configuration is inputted according to the system of garbage burning factory in systems;The active configuration includes input Task description, selection execute regular working department, select the equipment for needing to check, the type of selection regular working, selection regular The state pause judgments time of work, selection profession, selection post, the shift that selection executes, the execution period for inputting regular working, choosing Select the time cycle of work generation;The regular identical of the same day to preset time is generated according to the time cycle of input to realize Task;
Step 2: modification regular working configuration;According to life burn away the refuse factory system modification or enable, deactivate, delete it is regular Active configuration came into force or next day comes into force according to life factory's system same day of burning away the refuse;The next day comes into force, and modification i.e. will be modern Regular working task after day all deletes the regenerating one month future of the task;It is described to enable future after today i.e. One month regular working task generates, and can deactivate after enabling;It deactivates, delete and appoint the regular working after today Business is all deleted, and can be enabled after deactivating.
2. a kind of garbage burning factory regular working management method based on quartz according to claim 1, feature exist In: it further include that incoming task executes receipt;The task execution receipt includes the description for inputting execution task, the position of input equipment It sets, the post of incoming task and profession, input execute time, the state for selecting equipment, selection processing people.
3. a kind of garbage burning factory regular working management method based on quartz according to claim 1, feature exist In: it further include system for prompting;The system for prompting is short to be passed through needing to be implemented for task according to the time cycle of active configuration Letter notice or computer are notified to relevant people.
CN201910706361.0A 2019-08-01 2019-08-01 A kind of garbage burning factory regular working management method based on quartz Pending CN110414697A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910706361.0A CN110414697A (en) 2019-08-01 2019-08-01 A kind of garbage burning factory regular working management method based on quartz

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910706361.0A CN110414697A (en) 2019-08-01 2019-08-01 A kind of garbage burning factory regular working management method based on quartz

Publications (1)

Publication Number Publication Date
CN110414697A true CN110414697A (en) 2019-11-05

Family

ID=68365196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910706361.0A Pending CN110414697A (en) 2019-08-01 2019-08-01 A kind of garbage burning factory regular working management method based on quartz

Country Status (1)

Country Link
CN (1) CN110414697A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102129393A (en) * 2011-03-09 2011-07-20 南京恩瑞特实业有限公司 Universal timed task management realization method
CN201974848U (en) * 2011-01-07 2011-09-14 北京三博中自科技有限公司 Management system for comprehensively arranging and executing maintenance plan of production equipment
CN103810555A (en) * 2012-11-13 2014-05-21 中国广东核电集团有限公司 Scheduling method and system for regular maintenance items
CN106096903A (en) * 2016-05-28 2016-11-09 张维秀 A kind of standardization effort management platform
CN107783820A (en) * 2017-11-01 2018-03-09 国云科技股份有限公司 A kind of cloud platform virtual machine timing operation task method to set up
CN109389231A (en) * 2018-11-02 2019-02-26 上海长庚信息技术股份有限公司 A kind of method of improved triggering equipment periodic maintenance work

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201974848U (en) * 2011-01-07 2011-09-14 北京三博中自科技有限公司 Management system for comprehensively arranging and executing maintenance plan of production equipment
CN102129393A (en) * 2011-03-09 2011-07-20 南京恩瑞特实业有限公司 Universal timed task management realization method
CN103810555A (en) * 2012-11-13 2014-05-21 中国广东核电集团有限公司 Scheduling method and system for regular maintenance items
CN106096903A (en) * 2016-05-28 2016-11-09 张维秀 A kind of standardization effort management platform
CN107783820A (en) * 2017-11-01 2018-03-09 国云科技股份有限公司 A kind of cloud platform virtual machine timing operation task method to set up
CN109389231A (en) * 2018-11-02 2019-02-26 上海长庚信息技术股份有限公司 A kind of method of improved triggering equipment periodic maintenance work

Similar Documents

Publication Publication Date Title
Abraham et al. “Green engineering: Defining the principles”—resdts from the sandestin conference
CN102867219B (en) A kind of business automatic arrangement program system and method
CN102663645A (en) Integrated management system of investment bank and realization method thereof
CN106201472A (en) The method for scheduling task of software development and device
CN101556586A (en) Method, system and device of automatic data collection
CN104978622A (en) Business process management system and method
CN103544016A (en) Service registering configuration method and system based on JAVA reflection technology
CN110647323A (en) Code-free business application software development platform
CN103197927B (en) A kind of method that realizes of Workflow and system thereof
CN108154341A (en) United Dispatching platform and method of work based on data flow and workflow
CN105405043A (en) Electronic commerce platform order grabbing method and system
CN103544060A (en) WEBSERVICE based service dispatching system and method
CN110414697A (en) A kind of garbage burning factory regular working management method based on quartz
CN103279421B (en) A kind of program exception propagation model building method based on data origin technology
CN105446812A (en) Multitask scheduling configuration method
CN101110022A (en) Method for implementing workflow model by software
CN106354493B (en) A kind of implementation method for the development mode solving traditional software exploitation pain spot
CN109903149B (en) Generation method and generation device of audit model, audit method and audit system
CN115775132A (en) Automatic generation system, method, device and storage medium for backlog
CN103902574A (en) Real-time data loading method and device based on data flow technology
Bauer et al. Agents and the UML: A unified notation for agents and multi-agent systems?
CN111459771A (en) Workflow process tracking method
Gomes et al. Synthesis of schedulers for planned shutdowns of power plants
Grzywaczewski et al. Software developers’ information needs: Towards the development of intelligent recommender systems
Gustafsson et al. Identifying IT impacts on organizational structure and business value

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191105

RJ01 Rejection of invention patent application after publication