CN110414697A - A kind of garbage burning factory regular working management method based on quartz - Google Patents
A kind of garbage burning factory regular working management method based on quartz Download PDFInfo
- Publication number
- CN110414697A CN110414697A CN201910706361.0A CN201910706361A CN110414697A CN 110414697 A CN110414697 A CN 110414697A CN 201910706361 A CN201910706361 A CN 201910706361A CN 110414697 A CN110414697 A CN 110414697A
- Authority
- CN
- China
- Prior art keywords
- regular working
- task
- regular
- selection
- working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000010813 municipal solid waste Substances 0.000 title claims abstract description 20
- 238000007726 management method Methods 0.000 title claims abstract description 13
- 239000010453 quartz Substances 0.000 title claims abstract description 12
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N silicon dioxide Inorganic materials O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 title claims abstract description 12
- 238000012986 modification Methods 0.000 claims abstract description 11
- 230000004048 modification Effects 0.000 claims abstract description 11
- 230000001172 regenerating effect Effects 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 description 2
- 238000002485 combustion reaction Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002073 mitogenetic effect Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
Abstract
Step one: the garbage burning factory regular working management method based on quartz that the present invention relates to a kind of inputs regular working configuration according to the system of garbage burning factory in systems;Active configuration includes incoming task description, selection execution regular working department, the equipment that selection needs check, the type for selecting regular working, the state pause judgments time for selecting regular working, selects profession, the shift for selecting post, selection to execute, the time cycle for executing the period, work being selected to generate for inputting regular working;Two modification regular working configurations;Regular working task after today is all deleted the regenerating one month future of the task by modification;It enables and generates following one month after today regular working task, can be deactivated after enabling;It deactivates, delete and all delete the regular working task after today, can be enabled after deactivating.The present invention can carry out paperless office.
Description
Technical field
The present invention relates to enterprise work management domains, and in particular to a kind of garbage burning factory regular working based on quartz
Management method.
Background technique
With economic continuous development, people's lives level is continuously improved, thus also produces more and more rubbish.
In the case where people increasingly pay attention to quality of the life, a large amount of rubbish causes great puzzlement to people's lives, simultaneously
Also the health of people can be threatened.To rubbish carry out power generation by waste combustion be to house refuse one of the most common type processing method,
Can be generated during burning it is many to the harmful substance of equipment, therefore inspect periodically equipment be improve equipment reliability,
It is the main means of auxiliary enhancing equipment life management, is the basic measures for guaranteeing safety in production.Currently, municipal solid waste incinerator
The regular working task executed needed for generally being recorded using paper document, so processing can make the paper of record more and more, dimension
Pillar reason, which is consulted, to be not easy.Therefore one kind is needed to be able to achieve garbage burning factory regular working management method.
Summary of the invention
1. technical problem to be solved:
For the above technical issues, the present invention proposes a kind of garbage burning factory regular working management method based on quartz,
This method is realized using Quartz generates regular working task according to the execution time of configuration.
2. technical solution:
A kind of garbage burning factory regular working management method based on quartz, it is characterised in that: the following steps are included:
Step 1: regular working configuration is inputted according to the system of garbage burning factory in systems;The active configuration includes input
Task description, selection execute regular working department, select the equipment for needing to check, the type of selection regular working, selection regular
The state pause judgments time of work, selection profession, selection post, the shift that selection executes, the execution period for inputting regular working, choosing
Select the time cycle of work generation;The regular identical of the same day to preset time is generated according to the time cycle of input to realize
Task.
Step 2: modification regular working configuration;According to life burn away the refuse factory system modification or enable, deactivate, delete
Regular working configuration came into force or next day comes into force according to life factory's system same day of burning away the refuse;The next day comes into force, and modification is
Regular working task after today is all deleted to the regenerating one month future of the task;Described enable i.e. will be after today
Following one month regular working task generates, and can deactivate after enabling;It deactivates, delete the regular work after today i.e.
Make task all to delete, can be enabled after deactivating.
It further, further include that incoming task executes receipt;The task execution receipt includes inputting retouching for execution task
It states, post and profession, the input of the position of input equipment, incoming task execute time, the state for selecting equipment, selection processing
People.
It further, further include system for prompting;The system for prompting is to be held needs according to the time cycle of active configuration
Capable task is notified by short massage notice or computer to relevant people.
3. the utility model has the advantages that
It is utilized according to the original system of garbage burning factory by the regular working input system for needing to do to equipment in the present invention
Quartz automatically generates the prompting of the corresponding equipment regular working in the period of selection, and staff mentions according to what is received
Awake content regularly works to corresponding equipment, and input executes explanation to this subtask after the completion of work.To real
Row paperless office, the task of completion and regularly task dispatching etc. can be passed round between each department, pass through hardware, software and network
Cooperate working efficiency allowed to greatly promote.
Detailed description of the invention
Fig. 1 is the interface of regular working configuration in the present invention;
Fig. 2 is the interface of the task execution receipt in the present invention.
Specific embodiment
The present invention is specifically described with reference to the accompanying drawing.
A kind of garbage burning factory regular working management method based on quartz, it is characterised in that: the following steps are included:
Step 1: regular working configuration is inputted according to the system of garbage burning factory in systems;The active configuration includes input
Task description, selection execute regular working department, select the equipment for needing to check, the type of selection regular working, selection regular
The state pause judgments time of work, selection profession, selection post, the shift that selection executes, the execution period for inputting regular working, choosing
Select the time cycle of work generation;The regular identical of the same day to preset time is generated according to the time cycle of input to realize
Task.In this step, if the end time is not selected to be defaulted as permanently executing.According to the starting knot in configuration in this step
Beam time and execution period generate 1 month task in advance, and what is do not generated at 23: 50 daily mitogenetic Cheng Jinyi months appoints
Business (is generated according to the task among the task execution time of last task to same day next month).
Step 2: modification regular working configuration;According to life burn away the refuse factory system modification or enable, deactivate, delete
Regular working configuration came into force or next day comes into force according to life factory's system same day of burning away the refuse;The next day comes into force, and modification is
Regular working task after today is all deleted to the regenerating one month future of the task;Described enable i.e. will be after today
Following one month regular working task generates, and can deactivate after enabling;It deactivates, delete the regular work after today i.e.
Make task all to delete, can be enabled after deactivating.
It further, further include that incoming task executes receipt;The task execution receipt includes inputting retouching for execution task
It states, post and profession, the input of the position of input equipment, incoming task execute time, the state for selecting equipment, selection processing
People.
It further, further include system for prompting;The system for prompting is to be held needs according to the time cycle of active configuration
Capable task is notified by short massage notice or computer to relevant people.
Although the present invention has been described by way of example and in terms of the preferred embodiments, they be not it is for the purpose of limiting the invention, it is any ripe
This those skilled in the art is practised, without departing from the spirit and scope of the invention, can make various changes or retouch from working as, therefore guarantor of the invention
Shield range should be subject to what claims hereof protection scope was defined.
Claims (3)
1. a kind of garbage burning factory regular working management method based on quartz, it is characterised in that: the following steps are included:
Step 1: regular working configuration is inputted according to the system of garbage burning factory in systems;The active configuration includes input
Task description, selection execute regular working department, select the equipment for needing to check, the type of selection regular working, selection regular
The state pause judgments time of work, selection profession, selection post, the shift that selection executes, the execution period for inputting regular working, choosing
Select the time cycle of work generation;The regular identical of the same day to preset time is generated according to the time cycle of input to realize
Task;
Step 2: modification regular working configuration;According to life burn away the refuse factory system modification or enable, deactivate, delete it is regular
Active configuration came into force or next day comes into force according to life factory's system same day of burning away the refuse;The next day comes into force, and modification i.e. will be modern
Regular working task after day all deletes the regenerating one month future of the task;It is described to enable future after today i.e.
One month regular working task generates, and can deactivate after enabling;It deactivates, delete and appoint the regular working after today
Business is all deleted, and can be enabled after deactivating.
2. a kind of garbage burning factory regular working management method based on quartz according to claim 1, feature exist
In: it further include that incoming task executes receipt;The task execution receipt includes the description for inputting execution task, the position of input equipment
It sets, the post of incoming task and profession, input execute time, the state for selecting equipment, selection processing people.
3. a kind of garbage burning factory regular working management method based on quartz according to claim 1, feature exist
In: it further include system for prompting;The system for prompting is short to be passed through needing to be implemented for task according to the time cycle of active configuration
Letter notice or computer are notified to relevant people.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910706361.0A CN110414697A (en) | 2019-08-01 | 2019-08-01 | A kind of garbage burning factory regular working management method based on quartz |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910706361.0A CN110414697A (en) | 2019-08-01 | 2019-08-01 | A kind of garbage burning factory regular working management method based on quartz |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110414697A true CN110414697A (en) | 2019-11-05 |
Family
ID=68365196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910706361.0A Pending CN110414697A (en) | 2019-08-01 | 2019-08-01 | A kind of garbage burning factory regular working management method based on quartz |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110414697A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102129393A (en) * | 2011-03-09 | 2011-07-20 | 南京恩瑞特实业有限公司 | Universal timed task management realization method |
CN201974848U (en) * | 2011-01-07 | 2011-09-14 | 北京三博中自科技有限公司 | Management system for comprehensively arranging and executing maintenance plan of production equipment |
CN103810555A (en) * | 2012-11-13 | 2014-05-21 | 中国广东核电集团有限公司 | Scheduling method and system for regular maintenance items |
CN106096903A (en) * | 2016-05-28 | 2016-11-09 | 张维秀 | A kind of standardization effort management platform |
CN107783820A (en) * | 2017-11-01 | 2018-03-09 | 国云科技股份有限公司 | A kind of cloud platform virtual machine timing operation task method to set up |
CN109389231A (en) * | 2018-11-02 | 2019-02-26 | 上海长庚信息技术股份有限公司 | A kind of method of improved triggering equipment periodic maintenance work |
-
2019
- 2019-08-01 CN CN201910706361.0A patent/CN110414697A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201974848U (en) * | 2011-01-07 | 2011-09-14 | 北京三博中自科技有限公司 | Management system for comprehensively arranging and executing maintenance plan of production equipment |
CN102129393A (en) * | 2011-03-09 | 2011-07-20 | 南京恩瑞特实业有限公司 | Universal timed task management realization method |
CN103810555A (en) * | 2012-11-13 | 2014-05-21 | 中国广东核电集团有限公司 | Scheduling method and system for regular maintenance items |
CN106096903A (en) * | 2016-05-28 | 2016-11-09 | 张维秀 | A kind of standardization effort management platform |
CN107783820A (en) * | 2017-11-01 | 2018-03-09 | 国云科技股份有限公司 | A kind of cloud platform virtual machine timing operation task method to set up |
CN109389231A (en) * | 2018-11-02 | 2019-02-26 | 上海长庚信息技术股份有限公司 | A kind of method of improved triggering equipment periodic maintenance work |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Abraham et al. | “Green engineering: Defining the principles”—resdts from the sandestin conference | |
CN102867219B (en) | A kind of business automatic arrangement program system and method | |
CN102663645A (en) | Integrated management system of investment bank and realization method thereof | |
CN106201472A (en) | The method for scheduling task of software development and device | |
CN101556586A (en) | Method, system and device of automatic data collection | |
CN104978622A (en) | Business process management system and method | |
CN103544016A (en) | Service registering configuration method and system based on JAVA reflection technology | |
CN110647323A (en) | Code-free business application software development platform | |
CN103197927B (en) | A kind of method that realizes of Workflow and system thereof | |
CN108154341A (en) | United Dispatching platform and method of work based on data flow and workflow | |
CN105405043A (en) | Electronic commerce platform order grabbing method and system | |
CN103544060A (en) | WEBSERVICE based service dispatching system and method | |
CN110414697A (en) | A kind of garbage burning factory regular working management method based on quartz | |
CN103279421B (en) | A kind of program exception propagation model building method based on data origin technology | |
CN105446812A (en) | Multitask scheduling configuration method | |
CN101110022A (en) | Method for implementing workflow model by software | |
CN106354493B (en) | A kind of implementation method for the development mode solving traditional software exploitation pain spot | |
CN109903149B (en) | Generation method and generation device of audit model, audit method and audit system | |
CN115775132A (en) | Automatic generation system, method, device and storage medium for backlog | |
CN103902574A (en) | Real-time data loading method and device based on data flow technology | |
Bauer et al. | Agents and the UML: A unified notation for agents and multi-agent systems? | |
CN111459771A (en) | Workflow process tracking method | |
Gomes et al. | Synthesis of schedulers for planned shutdowns of power plants | |
Grzywaczewski et al. | Software developers’ information needs: Towards the development of intelligent recommender systems | |
Gustafsson et al. | Identifying IT impacts on organizational structure and business value |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191105 |
|