CN110412253A - A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method - Google Patents

A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method Download PDF

Info

Publication number
CN110412253A
CN110412253A CN201910784209.4A CN201910784209A CN110412253A CN 110412253 A CN110412253 A CN 110412253A CN 201910784209 A CN201910784209 A CN 201910784209A CN 110412253 A CN110412253 A CN 110412253A
Authority
CN
China
Prior art keywords
pervious concrete
test specimen
water
concrete test
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910784209.4A
Other languages
Chinese (zh)
Inventor
张健
郁子阳
陶羽杭
顾云凡
胡晨晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Institute of Technology
Original Assignee
Nanjing Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Institute of Technology filed Critical Nanjing Institute of Technology
Priority to CN201910784209.4A priority Critical patent/CN110412253A/en
Publication of CN110412253A publication Critical patent/CN110412253A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample
    • G01N15/0826Investigating permeability by forcing a fluid through a sample and measuring fluid flow rate, i.e. permeation rate or pressure change
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/088Investigating volume, surface area, size or distribution of pores; Porosimetry
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N17/00Investigating resistance of materials to the weather, to corrosion, or to light
    • G01N17/002Test chambers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N17/00Investigating resistance of materials to the weather, to corrosion, or to light
    • G01N17/004Investigating resistance of materials to the weather, to corrosion, or to light to light
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/56Investigating resistance to wear or abrasion
    • G01N3/567Investigating resistance to wear or abrasion by submitting the specimen to the action of a fluid or of a fluidised material, e.g. cavitation, jet abrasion
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; Lime; Mortar; Gypsum; Bricks; Ceramics; Glass
    • G01N33/383Concrete or cement
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N5/00Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid
    • G01N5/04Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid by removing a component, e.g. by evaporation, and weighing the remainder
    • G01N5/045Analysing materials by weighing, e.g. weighing small particles separated from a gas or liquid by removing a component, e.g. by evaporation, and weighing the remainder for determining moisture content

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Pathology (AREA)
  • Immunology (AREA)
  • General Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Environmental Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Fluid Mechanics (AREA)
  • Ceramic Engineering (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention is a kind of blocking of pervious concrete and repair mechanism simulator and its analogy method, simulator include transparent cylinder, water-storing device, cleaning device and drainage arrangement;Transparent inner barrel bottom end is provided with the pervious concrete test specimen that can be taken off;The top of transparent cylinder can be connect with water-storing device or cleaning device removable seal respectively, the bottom end of transparent cylinder can be connect with drainage arrangement removable seal, water-storing device is used for emulation when carrying out rainy to pervious concrete test specimen Emission test sewage, cleaning device is used for pervious concrete test specimen high-pressure discharge clear water, for simulating the washing and cleaning operation on sprinkling truck.Can during test experiments the parameters such as the clay content of pervious concrete test specimen, whole porosity, coefficient of permeability and blocking simulated time variation tendency, provide effectively data reference for the design and later period clean and maintenance of subsequent pervious concrete pavement.

Description

A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method
Technical field
The present invention is to be related to technical field of civil engineering, specifically a kind of pervious concrete blocking and repair machine molding Quasi- device and its analogy method.
Background technique
Pervious concrete refers to that its interior porosity is greater than 10%, and generally 15%-30%, most apertures are greater than 1mm, tool There is the concrete of certain water-permeable and air permeable performance.It is a kind of porous material as made of aggregate, cement and water mixing, it be free of or Containing a small amount of fine aggregate, the equally distributed honeycomb structure in hole is formed by coarse aggregate surface package a thin layer cement slurry bonding, Have the characteristics that gas permeability, water penetration and light-weight.
Nowadays, city Permeable stratum area is increasing, and rainfall often imports Storm Sewer Network outflow city, thus gives city Bring a series of ecological problem.Pervious concrete porosity is big, can collect, store part rainwater, to a certain extent Alleviate municipal drainage pressure.Since effect of the pervious concrete pavement in rainfall runoff management is more obvious, in the past ten Year in using increasingly extensive.Along with the growth in application item quantity and scale, must be taken into consideration during operation permeable mixed Coagulate the rain penetration ability of soil.
However, water penetration is just at pervious concrete when organic matter and particulate impurity add the gap of stifled pervious concrete Urgent problem to be solved.Therefore, it is necessary to a kind of blocking of pervious concrete and repair mechanism simulator and its analogy methods, are Various performance parameters of the water coagulation soil surface on rainy day and giant cleaning road surface carry out effective simulation and prediction point Analysis, and design for pervious concrete pavement and later period clean and maintenance provide effectively data reference.
Summary of the invention
The present invention aiming at the shortcomings in the prior art, provide a kind of blocking of pervious concrete and repair mechanism simulator and Its analogy method.
To achieve the above object, the invention adopts the following technical scheme:
A kind of blocking of pervious concrete and repair mechanism simulator, it is characterised in that: filled including transparent cylinder, water storage It sets, cleaning device and drainage arrangement;
The transparent cylinder is made of transparent acrylic, and the transparent inner barrel bottom end, which is provided with, can be taken off Pervious concrete test specimen;
The water-storing device includes storage cylinder of water, and the storage cylinder of water bottom centre position is provided with storage cylinder of water discharge outlet, Storage cylinder of water water inlet is provided at the top of the storage cylinder of water, the storage cylinder of water bottom surface is provided with top seal nipple, described Top seal nipple connect with transparent cylinder top opening removable seal;
The cleaning device includes wash bowl, and wash bowl bottom centre position is provided with high-pressure nozzle, the high pressure Flow pipe, which passes through, to be connected to inside wash bowl with high-pressure nozzle, and the high pressure flow pipe other end is connected to high-pressure water, high pressure flow pipe It is inside provided with water valve, the water valve is fixedly connected with switch handle, and the wash bowl bottom surface is provided with top seal nipple, The top seal nipple is connect with transparent cylinder top opening removable seal;
The drainage arrangement includes adjutage, is provided with adjutage water inlet, the row at the top of the adjutage Water drum top surface is provided with bottom rubber seal connector, and the bottom rubber seal connector is arranged along adjutage water inlet edge, The adjutage sidewall bottom edge is provided with sewage effluent, and bottom rubber seal connector and transparent cylinder bottom opening can Disassembly is tightly connected.
Level scale is provided on the outer wall of the transparent cylinder.
Strainer is removably fixedly installed in the adjutage water inlet.
The transparent cylinder inboard wall cross section is square, and the horizontal cross-section of the pervious concrete test specimen is pros Shape, the horizontal cross-section side length of the pervious concrete test specimen are less than transparent cylinder inboard wall cross section side length, and described is permeable mixed Butter is filled between solidifying soil test specimen side wall and transparent cylinder inboard wall.
The top seal nipple and bottom rubber seal connector is all made of elastic rubber material and is made, the top Seal nipple and bottom rubber seal inner nosepiece wall cross section are square.
The butter is industrial butter.
The analogy method of a kind of blocking of pervious concrete and repair mechanism, it is characterised in that: pass through simulation pervious concrete Process test specimen blocking and repaired, further obtains the silt storage limit and optimal clean work of pervious concrete test specimen Condition, the specific steps are as follows:
Step 1, according to the wastewater parameters data of target, soil and clear water are mixed to concentration needed for being formed in proportion Test sewage sample;
Step 2, the sample for obtaining pervious concrete test specimen carries out porosity measurement to pervious concrete test specimen, and obtaining should The whole porosity of test specimen, and measure the quality m of the original state of pervious concrete test specimen1
Step 3, one layer of butter is uniformly smeared into the side of pervious concrete test specimen, and pervious concrete test specimen is placed in Bright cylinder body bottom, the butter can be filled up completely the gap between concrete sample side wall and transparent cylinder inboard wall;
Step 4, from top to bottom the assembling of water-storing device, transparent cylinder and drainage arrangement is finished, closes storage cylinder of water discharge outlet And experiment sewage sample is passed through into storage cylinder of water water inlet injection storage cylinder of water;
Step 5, start timing while opening storage cylinder of water discharge outlet, until the experiment sewage row of being discharged into completely in storage cylinder of water Terminate timing when in water drum, timing time is to block simulated time for the first time, while calculating the coefficient of permeability of blocking simulation for the first time;
Step 6, it when the experiment sewage in storage cylinder of water is discharged into adjutage completely through pervious concrete test specimen, takes out saturating The intracorporal pervious concrete test specimen of placket, wipes the butter on pervious concrete test specimen side;
Step 7, the pervious concrete test specimen for having cleaned butter is put into high temperature drying box and continuous high temperature is dried, drying Duration is not less than for 24 hours, and measures the clay content of the test specimen;.
Step 8, the pervious concrete test specimen that butter has been cleaned after drying is taken out, repeats step 2 to step 7, recycles N Secondary, coefficient of permeability is simulated in the whole porosity of the test specimen, blocking simulated time and blocking to record each time;
Step 9, one layer of butter is uniformly smeared in the side of the pervious concrete test specimen after n-th being dried, and will be permeable mixed Solidifying soil test specimen is placed in transparent cylinder body bottom, the butter can be filled up completely concrete sample side wall and transparent cylinder inboard wall it Between gap;
Step 10, from top to bottom the assembling of cleaning device, transparent cylinder and drainage arrangement is finished, and by the height of cleaning device Force feed water pipe is connected to high-pressure water;
Step 11, handle is turned on the switch, by high-pressure nozzle to the pervious concrete test specimen high-pressure injection for having cleaned butter Clear water n seconds;
Step 12, the intracorporal pervious concrete test specimen of transparent tube is taken out, the butter on pervious concrete test specimen side is wiped, Pervious concrete test specimen is put into high temperature drying box and continuous high temperature is dried, drying time period is not less than for 24 hours, and measures the test specimen Clay content;.
Step 13, the pervious concrete test specimen after drying is taken out, records the mould of pervious concrete test specimen after high-pressure wash Quasi- coefficient of permeability.
Specific step is as follows for the silt test:
Step 1, after the sample for obtaining pervious concrete test specimen, pervious concrete test specimen is dried, it is initial to measure it State quality is m1, the time that the pervious concrete test specimen is dried was not less than 2 hours;
Step 2, the pervious concrete test specimen after experiment drying is placed on electronic scale and is weighed, measure permeable coagulation Native test specimen and the total m of internal Sediment quality2
Step 3, the pervious concrete test specimen clay content after experiment is m2-m1
Specific step is as follows for the porosity measurement:
The volume for measuring pervious concrete test specimen after pervious concrete test specimen is tested is V, then by test specimen in water Middle immersion for 24 hours, and tests the quality m of test specimen in water3, then test specimen is air-dried for 24 hours, surveys its quality m4, the density of water is ρWater, The then porosity P of pervious concrete test specimen are as follows:
The calculation method of the coefficient of permeability is as follows: if coefficient of permeability of the test pervious concrete under sewage state, It is then put into experiment sewage in storage cylinder of water, if only testing the coefficient of permeability of pervious concrete itself, is put into storage cylinder of water clear Water;Before test, the water measured in storage cylinder of water is V, when test, starts timing while opening storage cylinder of water discharge outlet, until storing Water in water drum terminates timing when being discharged into adjutage completely, the timing overboard time is t, calculates the coefficient of permeability of pervious concrete For
The beneficial effect of a kind of pervious concrete blocking of the present invention and repair mechanism simulator and its analogy method is: will Water-storing device and cleaning device are separately independently arranged, and are arranged by water-storing device to pervious concrete test specimen sewage effluent simulated precipitation Dirty process is cleaned road surface process to pervious concrete test specimen high-pressure injection clear water simulated high-pressure hydraulic giant by cleaning device, is passed through Drying box dries simulation concrete road surface solar exposure process;By during test experiments pervious concrete test specimen contain mud The variation tendency of the parameters such as amount, whole porosity, coefficient of permeability and blocking simulated time, is subsequent pervious concrete pavement Design and later period clean and maintenance effectively data reference is provided, and simple and convenient, data are reliable.Mentioned by the present invention The clay content of pervious concrete test specimen represent the remaining clay content of practical pervious concrete pavement, the hole of pervious concrete test specimen Gap rate represents the degree of porosity inside practical pervious concrete pavement, and the coefficient of permeability of pervious concrete event represents practical permeable The water permeability of concrete road surface.
Detailed description of the invention
Fig. 1 is the structure principle chart of a kind of pervious concrete blocking of the present invention and repair mechanism simulator.
Fig. 2 is the structure principle chart of a kind of pervious concrete blocking of the present invention and the transparent cylinder of repair mechanism simulator.
Fig. 3 is the structure principle chart of a kind of pervious concrete blocking of the present invention and repair mechanism simulator water-storing device.
Fig. 4 is the structure principle chart of a kind of pervious concrete blocking of the present invention and repair mechanism simulator cleaning device.
Fig. 5 is the structure principle chart of a kind of pervious concrete blocking of the present invention and repair mechanism simulator drainage arrangement.
Appended drawing reference: 1, pervious concrete test specimen;2, transparent cylinder;3, level scale;4, storage cylinder of water;5, storage cylinder of water drains Mouthful;6, storage cylinder of water water inlet;7, top seal nipple;8, wash bowl;9, high-pressure nozzle;10, high pressure flow pipe;11, handle is switched Hand;12, adjutage;13, sewage effluent;14, bottom rubber seal connector;15, strainer.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.
As shown in Figure 1, a kind of pervious concrete blocking and repair mechanism simulator, it is characterised in that: including transparent tube Body (2), water-storing device, cleaning device and drainage arrangement;
The transparent cylinder 2 is made of transparent acrylic, and 2 inner bottom of transparent cylinder is provided with desirable Pervious concrete test specimen 1 out;
The water-storing device includes storage cylinder of water 4, and 4 bottom centre position of storage cylinder of water is provided with storage cylinder of water discharge outlet 5, the top of the storage cylinder of water 4 is provided with storage cylinder of water water inlet 6, and 4 bottom surface of storage cylinder of water is provided with top seal nipple 7, the top seal nipple 7 is connect with transparent 2 top opening removable seal of cylinder;
The cleaning device includes wash bowl 8, and 8 bottom centre position of wash bowl is provided with high-pressure nozzle 9, the height Force feed water pipe 10 passes through 8 inside of wash bowl and is connected to high-pressure nozzle 9, and 10 other end of high pressure flow pipe is connected to high-pressure water, high Water valve is provided in force feed water pipe 10, the water valve is fixedly connected with switch handle 11, and 8 bottom surface of wash bowl is provided with Top seal nipple 7, the top seal nipple 7 are connect with transparent 2 top opening removable seal of cylinder;
The drainage arrangement includes adjutage 12, and adjutage water inlet is provided at the top of the adjutage 12, described 12 top surface of adjutage be provided with bottom rubber seal connector 14, the bottom rubber seal connector 14 is along adjutage water inlet Edge setting, the 12 sidewall bottom edge of adjutage are provided with sewage effluent 13, bottom rubber seal connector 14 and thoroughly The connection of 2 bottom opening removable seal of placket body.
In the present embodiment, level scale 3 is provided on the outer wall of transparent cylinder 2, level scale 3 is used in transparent cylinder 2 When inside there is ponding, the water accumulating volume of bucket internal water accumulation is read.
In the present embodiment, strainer 15 is removably fixedly installed in adjutage water inlet.Strainer 15 is for recycling sewage In residue, by clay content test and sewage in soil content data compare, pervious concrete test specimen 1 can be confirmed and contained The validity of mud amount.
In the present embodiment, transparent 2 cross section of inboard wall of cylinder is square, and the level of the pervious concrete test specimen 1 is cut Face is square, and the horizontal cross-section side length of the pervious concrete test specimen 1 is less than transparent 2 cross section of inboard wall side length of cylinder, institute Butter is filled between 2 inner wall of 1 side wall of pervious concrete test specimen stated and transparent cylinder.
The further transparent cylinder 2 uses transparent acrylic to surround cross sectional dimensions as 101mm*101mm's Cylinder.
Further, the specification of pervious concrete test specimen 1 be 100mm*100mm*100mm, the level scale 3 by away from It rises and upwardly extends from transparent 2 bottom edge 100mm of cylinder.
In the present embodiment, top seal nipple 7 and bottom rubber seal connector 14 are all made of elastic rubber material and are made, institute The top seal nipple 7 and 14 cross section of inboard wall of bottom rubber seal connector stated are square.
When transparent 2 end of cylinder is embedded in top seal nipple 7 and bottom rubber seal connector 14, due to elastic rubber The elasticity of material, top seal nipple 7 and bottom rubber seal connector 14 tightly compress transparent 2 end of cylinder, realize watertight.
Further, 5 bore of storage cylinder of water discharge outlet of 4 bottom of storage cylinder of water setting is larger, for quickly will be in storage cylinder of water 4 Sewage is discharged into transparent cylinder 2, and the switch state of storage cylinder of water discharge outlet 5 is controlled using the relay mould group of wireless control, High pressure flow pipe 10 passes through 8 inside of wash bowl and is connected to high-pressure nozzle 9, since the hydraulic pressure of high-pressure nozzle can be set in advance, therefore Quantitative water spray is realized by the duration of control high-pressure nozzle cleaning.
In the present embodiment, butter is industrial butter, and due to its thick feature, butter is applied to pervious concrete examination Between 2 inner wall of 1 side wall of part and transparent cylinder, the leakage of experiment sewage can be prevented.
The analogy method of a kind of blocking of pervious concrete and repair mechanism, it is characterised in that: pass through simulation pervious concrete Process test specimen 1 blocking and repaired, further obtains the silt storage limit and optimal clean work of pervious concrete test specimen 1 Condition, the specific steps are as follows:
Step 1, according to the wastewater parameters data of target, soil and clear water are mixed to concentration needed for being formed in proportion Test sewage sample;
Step 2, the sample for obtaining pervious concrete test specimen 1 carries out porosity measurement to pervious concrete test specimen 1, obtains The whole porosity of the test specimen 1, and measure the quality m of the original state of pervious concrete test specimen 11
Step 3, one layer of butter is uniformly smeared into the side of pervious concrete test specimen 1, and pervious concrete test specimen 1 is placed in Transparent 2 bottom of cylinder, the butter can be filled up completely the gap between 2 inner wall of 1 side wall of concrete sample and transparent cylinder;
Step 4, from top to bottom the assembling of water-storing device, transparent cylinder 2 and drainage arrangement is finished, closes storage cylinder of water discharge outlet And experiment sewage sample is passed through into the injection storage cylinder of water 4 of storage cylinder of water water inlet 6;
Step 5, start timing while opening storage cylinder of water discharge outlet, until the experiment sewage row of being discharged into completely in storage cylinder of water Terminate timing when in water drum, timing time is to block simulated time for the first time, while calculating the coefficient of permeability of blocking simulation for the first time;
Step 6, it when the experiment sewage in storage cylinder of water 4 is discharged into adjutage 12 completely through pervious concrete test specimen 1, takes Pervious concrete test specimen 1 in transparent cylinder 2 out, wipes the butter on 1 side of pervious concrete test specimen;
Step 7, the pervious concrete test specimen 1 for having cleaned butter is put into high temperature drying box and continuous high temperature is dried, dried Dry duration is not less than for 24 hours, and measures the clay content of the test specimen 1;.
Step 8, the pervious concrete test specimen 1 that butter has been cleaned after drying is taken out, repeats step 2 to step 7, recycles N Secondary, coefficient of permeability is simulated in the whole porosity of the test specimen 1, blocking simulated time and blocking to record each time;
Step 9, one layer of butter is uniformly smeared in the side of the pervious concrete test specimen 1 after n-th being dried, and will be permeable mixed Solidifying soil test specimen 1 is placed in transparent 2 bottom of cylinder, and the butter can be filled up completely in 1 side wall of concrete sample and transparent cylinder 2 Gap between wall;
Step 10, from top to bottom the assembling of cleaning device, transparent cylinder 2 and drainage arrangement is finished, and by cleaning device High pressure flow pipe 10 is connected to high-pressure water;
Step 11, handle 11 is turned on the switch, by high-pressure nozzle 9 to 1 high pressure of pervious concrete test specimen for having cleaned butter Injection clear water n seconds;
Step 12, the pervious concrete test specimen 1 in transparent cylinder 2 is taken out, the Huang on 1 side of pervious concrete test specimen is wiped Pervious concrete test specimen 1 is put into high temperature drying box and continuous high temperature is dried by oil, and drying time period is not less than for 24 hours, and measuring should The clay content of test specimen 1;.
Step 13, the pervious concrete test specimen 1 after drying is taken out, pervious concrete test specimen 1 after record high-pressure wash Simulate coefficient of permeability.
Specific step is as follows for the silt test:
Step 1, after the sample for obtaining pervious concrete test specimen 1, pervious concrete test specimen 1 is dried, at the beginning of measuring it Beginning state quality is m1, the time that the pervious concrete test specimen 1 is dried was not less than 2 hours;
Step 2, the pervious concrete test specimen 1 after experiment drying is placed on electronic scale and is weighed, measured permeable mixed Solidifying soil test specimen 1 and the total m of internal Sediment quality2
Step 3,1 clay content of pervious concrete test specimen after experiment is m2-m1
Specific step is as follows for the porosity measurement:
The volume for measuring pervious concrete test specimen 1 after pervious concrete test specimen 1 is tested is V, and then test specimen exists It is impregnated for 24 hours in water, and tests the quality m of test specimen in water3, then test specimen is air-dried for 24 hours, surveys its quality m4, the density of water is ρWater, then the porosity P of pervious concrete test specimen 1 are as follows:
The calculation method of the coefficient of permeability is as follows: if coefficient of permeability of the test pervious concrete under sewage state, It is then put into experiment sewage in storage cylinder of water, if only testing the coefficient of permeability of pervious concrete itself, is put into storage cylinder of water clear Water;Before test, the water measured in storage cylinder of water is V, when test, starts timing while opening storage cylinder of water discharge outlet, until storing Water in water drum terminates timing when being discharged into adjutage completely, the timing overboard time is t, calculates the coefficient of permeability of pervious concrete For
In the present embodiment, by water-storing device to pervious concrete test specimen sewage effluent simulated precipitation blowdown process, pass through Cleaning device cleans road surface process to pervious concrete test specimen high-pressure injection clear water simulated high-pressure hydraulic giant, dries mould by drying box Quasi- concrete road surface solar exposure process;The clay content of pervious concrete test specimen mentioned by the present invention represents practical permeable coagulation The remaining clay content in soil surface, the porosity of pervious concrete test specimen represent the hole journey inside practical pervious concrete pavement Degree, the coefficient of permeability of pervious concrete event represent the water permeability of practical pervious concrete pavement.Pass through test experiments process The variation tendency of the parameters such as clay content, blocking simulated time, coefficient of permeability and the porosity of middle pervious concrete test specimen, after being The design and later period clean and maintenance of continuous pervious concrete pavement provide effectively data reference, and simple and convenient, number According to reliable.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment, All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as protection of the invention Range.

Claims (10)

1. a kind of pervious concrete blocking and repair mechanism simulator, it is characterised in that: filled including transparent cylinder (2), water storage It sets, cleaning device and drainage arrangement;
The transparent cylinder (2) is made of transparent acrylic, and described transparent cylinder (2) inner bottom is provided with desirable Pervious concrete test specimen (1) out;
The water-storing device includes storage cylinder of water (4), and the storage cylinder of water (4) bottom centre position is provided with storage cylinder of water discharge outlet (5), it is provided with storage cylinder of water water inlet (6) at the top of the storage cylinder of water (4), the storage cylinder of water (4) bottom surface is provided with top Seal nipple (7), the top seal nipple (7) are connect with transparent cylinder (2) top opening removable seal;
The cleaning device includes wash bowl (8), and wash bowl (8) bottom centre position is provided with high-pressure nozzle (9), described High pressure flow pipe (10), which passes through, to be connected to inside wash bowl (8) with high-pressure nozzle (9), high pressure flow pipe (10) other end and high pressure water Source connection, high pressure flow pipe (10) is interior to be provided with water valve, and the water valve is fixedly connected with switch handle (11), the cleaning Cylinder (8) bottom surface is provided with top seal nipple (7), and the top seal nipple (7) and transparent cylinder (2) top opening are removable Unload sealed connection;
The drainage arrangement includes adjutage (12), is provided with adjutage water inlet at the top of the adjutage (12), described Adjutage (12) top surface be provided with bottom rubber seal connector (14), the bottom rubber seal connector (14) is along adjutage The setting of water inlet edge, the adjutage (12) sidewall bottom edge is provided with sewage effluent (13), bottom rubber seal Connector (14) is connect with transparent cylinder (2) bottom opening removable seal.
2. a kind of pervious concrete blocking as described in claim 1 and repair mechanism simulator, it is characterised in that: described Level scale (3) are provided on the outer wall of transparent cylinder (2).
3. a kind of pervious concrete blocking as described in claim 1 and repair mechanism simulator, it is characterised in that: described Strainer (15) are removably fixedly installed in adjutage water inlet.
4. a kind of pervious concrete blocking as described in claim 1 and repair mechanism simulator, it is characterised in that: described Transparent cylinder (2) cross section of inboard wall is square, and the horizontal cross-section of the pervious concrete test specimen (1) is square, described Pervious concrete test specimen (1) horizontal cross-section side length be less than transparent cylinder (2) cross section of inboard wall side length, the permeable coagulation Butter is filled between native test specimen (1) side wall and transparent cylinder (2) inner wall.
5. a kind of pervious concrete blocking as claimed in claim 4 and repair mechanism simulator, it is characterised in that: described Top seal nipple (7) and bottom rubber seal connector (14) are all made of elastic rubber material and are made, and the top sealing connects Head (7) and bottom rubber seal connector (14) cross section of inboard wall is square.
6. a kind of pervious concrete blocking as claimed in claim 4 and repair mechanism simulator, it is characterised in that: described Butter is industrial butter.
7. the analogy method of a kind of pervious concrete blocking and repair mechanism, it is characterised in that: pass through simulation pervious concrete examination Process part (1) blocking and repaired, further obtains the silt storage limit and optimal clean of pervious concrete test specimen (1) Operating condition, the specific steps are as follows:
Step 1, according to the wastewater parameters data of target, soil and clear water are mixed to the experiment of concentration needed for being formed in proportion Sewage sample;
Step 2, the sample for obtaining pervious concrete test specimen (1) carries out porosity measurement to pervious concrete test specimen (1), thus The whole porosity of the test specimen (1) is obtained, and measures the quality m of the original state of pervious concrete test specimen (1)1
Step 3, one layer of butter is uniformly smeared into the side of pervious concrete test specimen (1), and pervious concrete test specimen (1) is placed in Transparent cylinder (2) bottom, the butter can be filled up completely between concrete sample (1) side wall and transparent cylinder (2) inner wall Gap;
Step 4, from top to bottom the assembling of water-storing device, transparent cylinder (2) and drainage arrangement is finished, closes storage cylinder of water discharge outlet (5) and by experiment sewage sample pass through storage cylinder of water water inlet (6) injection storage cylinder of water (4);
Step 5, start timing while opening storage cylinder of water discharge outlet (5), until the experiment sewage in storage cylinder of water (4) is discharged into completely Adjutage (12) terminates timing when interior, timing time is to block simulated time for the first time, while it is saturating to calculate blocking simulation for the first time Water coefficient;
Step 6, when the experiment sewage in storage cylinder of water (4) completely through pervious concrete test specimen (1) be discharged into adjutage (12) it is interior when, The pervious concrete test specimen (1) in transparent cylinder (2) is taken out, the butter on pervious concrete test specimen (1) side is wiped;
Step 7, the pervious concrete test specimen (1) for having cleaned butter is put into high temperature drying box and continuous high temperature is dried, drying Duration is not less than for 24 hours, and measures the clay content of the test specimen (1);.
Step 8, the pervious concrete test specimen (1) that butter will have been cleaned after drying takes out, and repeats step 2 to step 7, recycles n times, Coefficient of permeability is simulated in the whole porosity of the test specimen (1), blocking simulated time and blocking to record each time;
Step 9, one layer of butter is uniformly smeared in the side of the pervious concrete test specimen (1) after n-th being dried, and by permeable coagulation Native test specimen (1) is placed in transparent cylinder (2) bottom, and the butter can be filled up completely concrete sample (1) side wall and transparent tube Gap between body (2) inner wall;
Step 10, from top to bottom the assembling of cleaning device, transparent cylinder (2) and drainage arrangement is finished, and by the height of cleaning device Force feed water pipe (10) is connected to high-pressure water;
Step 11, handle (11) are turned on the switch, it is high to the pervious concrete test specimen (1) for having cleaned butter by high-pressure nozzle (9) Pressure injection clear water n seconds;
Step 12, the pervious concrete test specimen (1) in transparent cylinder (2) is taken out, is wiped on pervious concrete test specimen (1) side Pervious concrete test specimen (1) is put into high temperature drying box and continuous high temperature is dried by butter, and drying time period is not less than for 24 hours, and surveys The clay content of the fixed test specimen (1);.
Step 13, the pervious concrete test specimen (1) after drying is taken out, pervious concrete test specimen (1) after record high-pressure wash Simulate coefficient of permeability.
8. the analogy method of a kind of pervious concrete blocking as claimed in claim 7 and repair mechanism, it is characterised in that: described Silt test specific step is as follows:
Step 1, after the sample for obtaining pervious concrete test specimen (1), pervious concrete test specimen (1) is dried, at the beginning of measuring it Beginning state quality is m1, the time that the pervious concrete test specimen (1) is dried was not less than 2 hours;
Step 2, the pervious concrete test specimen (1) after experiment drying is placed on electronic scale and is weighed, measure permeable coagulation Native test specimen (1) and the total m of internal Sediment quality2
Step 3, pervious concrete test specimen (1) clay content after experiment is m2-m1
9. the analogy method of a kind of pervious concrete blocking as claimed in claim 7 and repair mechanism, it is characterised in that: described Porosity measurement specific step is as follows:
The volume for measuring pervious concrete test specimen (1) after pervious concrete test specimen (1) is tested is V, and then test specimen exists It is impregnated for 24 hours in water, and tests the quality m of test specimen in water3, then test specimen is air-dried for 24 hours, surveys its quality m4, the density of water is ρWater, then the porosity P of pervious concrete test specimen (1) are as follows:
10. the analogy method of a kind of pervious concrete blocking as claimed in claim 7 and repair mechanism, it is characterised in that: institute The calculation method for the coefficient of permeability stated is as follows: if coefficient of permeability of the test pervious concrete under sewage state, in storage cylinder of water In be put into experiment sewage, if only test pervious concrete itself coefficient of permeability, clear water is put into storage cylinder of water;Before test, The water measured in storage cylinder of water is V, when test, starts timing while opening storage cylinder of water discharge outlet (5), until storage cylinder of water (4) Interior water be discharged into completely adjutage (12) it is interior when terminate timing, the timing overboard time is t, calculates the coefficient of permeability of pervious concrete For
CN201910784209.4A 2019-08-23 2019-08-23 A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method Pending CN110412253A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910784209.4A CN110412253A (en) 2019-08-23 2019-08-23 A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910784209.4A CN110412253A (en) 2019-08-23 2019-08-23 A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method

Publications (1)

Publication Number Publication Date
CN110412253A true CN110412253A (en) 2019-11-05

Family

ID=68368620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910784209.4A Pending CN110412253A (en) 2019-08-23 2019-08-23 A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method

Country Status (1)

Country Link
CN (1) CN110412253A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887760A (en) * 2019-12-20 2020-03-17 广州市建筑科学研究院有限公司 Permeation wall anti-clogging performance testing device and testing method
CN114324115A (en) * 2022-01-06 2022-04-12 中建市政工程有限公司 Rapid determination device and test method for permeability coefficient of pervious concrete

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001011811A (en) * 1999-06-29 2001-01-16 Obayashi Road Corp Permeable pavement structure
CN103439236A (en) * 2013-08-30 2013-12-11 山东大学 Blocking experiment stimulation device and method for water-permeable concrete pavement
KR101436316B1 (en) * 2014-02-25 2014-09-02 주식회사 삼기엔텍 Color elastic permeable concrete pavement composition and its method that is improved on anti-freeze process, the radiant heat reduction, and nonslip surface by sustainable porosity
KR20160144292A (en) * 2015-10-29 2016-12-16 (주)제이스코리아 Method for testing water permeability of concrete
CN206095859U (en) * 2016-07-01 2017-04-12 临沂市金泰混凝土有限公司 Quick detecting instrument of regeneration aggregate sediment percentage
CN107727552A (en) * 2017-10-27 2018-02-23 中国科学院寒区旱区环境与工程研究所 A kind of permafrost region crushed rock base course porosity in-situ test system and its control evaluation method
CN108680484A (en) * 2018-06-11 2018-10-19 三峡大学 A kind of pervious concrete blocks the assay method of permeance property decaying
CN109459365A (en) * 2018-11-06 2019-03-12 河海大学 A method of concrete permeability of the measurement under various working
CN211179824U (en) * 2019-08-23 2020-08-04 南京工程学院 Permeable concrete blocking and repairing mechanism simulation device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001011811A (en) * 1999-06-29 2001-01-16 Obayashi Road Corp Permeable pavement structure
CN103439236A (en) * 2013-08-30 2013-12-11 山东大学 Blocking experiment stimulation device and method for water-permeable concrete pavement
KR101436316B1 (en) * 2014-02-25 2014-09-02 주식회사 삼기엔텍 Color elastic permeable concrete pavement composition and its method that is improved on anti-freeze process, the radiant heat reduction, and nonslip surface by sustainable porosity
KR20160144292A (en) * 2015-10-29 2016-12-16 (주)제이스코리아 Method for testing water permeability of concrete
CN206095859U (en) * 2016-07-01 2017-04-12 临沂市金泰混凝土有限公司 Quick detecting instrument of regeneration aggregate sediment percentage
CN107727552A (en) * 2017-10-27 2018-02-23 中国科学院寒区旱区环境与工程研究所 A kind of permafrost region crushed rock base course porosity in-situ test system and its control evaluation method
CN108680484A (en) * 2018-06-11 2018-10-19 三峡大学 A kind of pervious concrete blocks the assay method of permeance property decaying
CN109459365A (en) * 2018-11-06 2019-03-12 河海大学 A method of concrete permeability of the measurement under various working
CN211179824U (en) * 2019-08-23 2020-08-04 南京工程学院 Permeable concrete blocking and repairing mechanism simulation device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887760A (en) * 2019-12-20 2020-03-17 广州市建筑科学研究院有限公司 Permeation wall anti-clogging performance testing device and testing method
CN114324115A (en) * 2022-01-06 2022-04-12 中建市政工程有限公司 Rapid determination device and test method for permeability coefficient of pervious concrete

Similar Documents

Publication Publication Date Title
CN208999271U (en) A kind of test device of pervious concrete blocking test infiltration coefficient
CN103460006B (en) Water absorption test method and water absorption test device for concrete surface
CN106525689B (en) Water seepage instrument and method for measuring multidirectional permeability coefficient of large-gap pavement structure
CN105784526B (en) The measuring device and its application method of cement concrete road surface scour resistance
CN105203443A (en) Penetration coefficient determination apparatus for permeable asphalt concrete track board test piece, and test method thereof
CN203658190U (en) Horizontal abrasion-resistance apparatus for cement pavement base material
CN110320147A (en) A kind of sponge urban water-through is mated formation permeance property attenuation law test device and method
CN213986117U (en) Device that pervious concrete road surface blockked up under different rainfall of simulation and runoff circumstances
CN110130194B (en) Comprehensive evaluation method and device for asphalt pavement
CN106769798B (en) Water storage brick, permeable pavement performance detector and detection method
CN110412253A (en) A kind of blocking of pervious concrete and repair mechanism simulator and its analogy method
CN205643059U (en) Measurement device for cement concrete pavement top layer scour resistance ability
CN108344544B (en) Test device and method for measuring defect leakage quantity of composite geomembrane
CN113237813A (en) Device and method for testing sponge city effects of different permeable road structures
CN111896445B (en) Polymorphic soil-stone mixture hydraulic parameter and flowing potential testing device and method
Walsh et al. Laboratory scale study to quantify the effect of sediment accumulation on the hydraulic conductivity of pervious concrete
CN205120540U (en) A infiltration coefficient measurement device for permeating water asphalt concrete rut board test piece
CN113552037B (en) Device and method for testing dual-porosity seepage parameters of garbage
CN108414420B (en) Research device and method for detecting permeable rate attenuation and recovery effect of permeable pavement
CN211179824U (en) Permeable concrete blocking and repairing mechanism simulation device
CN209280523U (en) A kind of simulation permeable pavement structure layer pervasion test device
CN102680377A (en) Test device for measuring rising heights and speeds of porous medium capillary water
CN210395056U (en) Comprehensive evaluation device for asphalt pavement
CN115630557B (en) Prediction method for residual quantity of foundation trench dredging matters in immersed tunnel pipe joint installation
CN206609763U (en) A kind of retaining brick and permeable pavement performance detector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200810

Address after: No. 629 Jiangning Science Park longmian Road District of Nanjing City, Jiangsu province 210000

Applicant after: NANJING COMMUNICATIONS INSTITUTE OF TECHNOLOGY

Address before: 1 No. 211167 Jiangsu city of Nanjing province science and Technology Park Jiangning District Hongjing Road

Applicant before: NANJING INSTITUTE OF TECHNOLOGY

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200927

Address after: 210000 1 Hong Kong Avenue, Science Park, Jiangning District, Nanjing, Jiangsu.

Applicant after: NANJING INSTITUTE OF TECHNOLOGY

Address before: No. 629 Jiangning Science Park longmian Road District of Nanjing City, Jiangsu province 210000

Applicant before: NANJING COMMUNICATIONS INSTITUTE OF TECHNOLOGY

TA01 Transfer of patent application right