CN110411428A - A kind of mapping method of reallocation of land regulation project - Google Patents

A kind of mapping method of reallocation of land regulation project Download PDF

Info

Publication number
CN110411428A
CN110411428A CN201910719362.9A CN201910719362A CN110411428A CN 110411428 A CN110411428 A CN 110411428A CN 201910719362 A CN201910719362 A CN 201910719362A CN 110411428 A CN110411428 A CN 110411428A
Authority
CN
China
Prior art keywords
mapping
reallocation
data
land
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910719362.9A
Other languages
Chinese (zh)
Inventor
陈锋
黄华东
樊川
汪孝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinghui Space Design And Planning (nanjing) Co Ltd
Original Assignee
Xinghui Space Design And Planning (nanjing) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinghui Space Design And Planning (nanjing) Co Ltd filed Critical Xinghui Space Design And Planning (nanjing) Co Ltd
Priority to CN201910719362.9A priority Critical patent/CN110411428A/en
Publication of CN110411428A publication Critical patent/CN110411428A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of mapping method of reallocation of land of reallocation of land technical field regulation project, specific step is as follows: S1 for the mapping method of reallocation of land regulation project: analyzing foundation engineering;S2: subregion is carried out to mapping region;S3: section is divided;S4: data are acquired and are uploaded in three-dimensional coordinate;S5: information labeling is carried out to 3 dimensional drawing, the present invention handles surveying and mapping data by measurement adjustment, can reduce the influence of measurement error to greatest extent, export more accurate mapped results, by evaluating mapping process.

Description

A kind of mapping method of reallocation of land regulation project
Technical field
The present invention relates to reallocation of land technical field, specially a kind of mapping method of reallocation of land regulation project.
Background technique
With population in the world sharp increase, social economy is rapidly developed, the excess exploitation of land resource, the existence of the mankind and Development receives serious threat.Land resource is basis for the survival of mankind, is developed very prominent with the contradiction of protection.For Holding total tilled amount guards arable land red line rigidly and is firm, and passes through the farmland construction of high standard, and appropriate to expand agricultural raw Scale of operation is produced, agriculture production cost is reduced.With the rapid development of our country's economy, the process of Process of Urbanization Construction is also gradually adding Fastly.But the construction of various buildings such as residential quarters, Industry Development Area, gets over variation of the city on land ownership boundary also Come it is bigger, urban development to measurement land ownership boundary, position, shape, the ground levels measurement work such as class demand increasingly Increase.It is a basic work of socio-economic development and national defense construction, to any one for the mapping operations of the reallocation of land A amount is observed, and always there is errors, therefore in order to more close to true value, obtain more accurate data, Wo Menbi The surveying and mapping data that these must be contained with error carries out Error processing, has obtained the achievement of degree of precision.For this purpose, we have proposed one The mapping method of kind reallocation of land regulation project comes into operation, to solve the above problems.
Summary of the invention
The purpose of the present invention is to provide a kind of mapping methods of reallocation of land regulation project, to solve above-mentioned background technique The problem of middle proposition.
To achieve the above object, the invention provides the following technical scheme: the mapping method of project is renovated in a kind of reallocation of land, Specific step is as follows for the mapping method of reallocation of land regulation project:
S1: analyzing the analysis of foundation engineering geologic elements and unfavorable geology and special geology, specifies form between each element, sky Between distribution, the origin cause of formation, correlation and the influence to route;
S2: determining enginering geologic sections principle, treats mapping region and carries out enginering geologic sections and SUBNUCLEAR DIVISION, according to research The characteristics of surveying and drawing area determines Evaluation of Engineering Geological Conditions standard, carries out integration engineering geological conditions superior and inferior evaluating to each region;
S3: region to be surveyed and drawn is carried out by section division according to the otherness of evaluation result, the comparison for two or more Route synthesis in terms of landforms, lithology, construction, hydrogeology, unfavorable geology, special geology, line length, ecological environment is commented Valence engineering geological condition superiority and inferiority provides sufficient foundation for final scheme;
S4: using atural object, the geomorphology information in GPS, hydrology instrument, total station acquisition mapping region, by measurement adjustment method to survey It draws data to be handled, and the data of acquisition is imported in coordinate system, visualization three is carried out on three-dimensional visualization software platform Dimension is shown;
S5: standard line style compatible with surveying and mapping data, the information of symbol, label character on three-dimensional display platform have been formed Whole reallocation of land schema mapping.
Preferably, in the step S1, foundation engineering geologic elements include topography and geomorphology, bottom lithology, geological structure and Hydrogeological element.
Preferably, in the step S4, data processing is carried out using measurement adjustment method for surveying and mapping data, it is specific to walk Suddenly are as follows:
S41: according to the specific data column condition equation of Surveying and Mapping Project;
S42: composition normal equation, AQATK+W=0;
S43: solution normal equation asks connection COEFFICIENT K, K=- (AQAT) -1W;
S44: correction V, V=P-1ATK=QATK are asked;
S45: seeking the mean difference of mapping value,
S46: core inspection is carried out to mapping mean difference.
Compared with prior art, the beneficial effects of the present invention are: the present invention by measurement adjustment to surveying and mapping data at Reason, can reduce the influence of measurement error, export more accurate mapped results, to greatest extent by carrying out to mapping process Evaluation.
Detailed description of the invention
Fig. 1 is work flow diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution: a kind of mapping method of reallocation of land regulation project, the soil Specific step is as follows for the mapping method of ground planning and restoration project:
S1: analyzing the analysis of foundation engineering geologic elements and unfavorable geology and special geology, specifies form between each element, sky Between distribution, the origin cause of formation, correlation and the influence to route, foundation engineering geologic elements include topography and geomorphology, bottom lithology, Geological structure and hydrogeological element;
S2: determining enginering geologic sections principle, treats mapping region and carries out enginering geologic sections and SUBNUCLEAR DIVISION, according to research The characteristics of surveying and drawing area determines Evaluation of Engineering Geological Conditions standard, carries out integration engineering geological conditions superior and inferior evaluating to each region;
S3: region to be surveyed and drawn is carried out by section division according to the otherness of evaluation result, the comparison for two or more Route synthesis in terms of landforms, lithology, construction, hydrogeology, unfavorable geology, special geology, line length, ecological environment is commented Valence engineering geological condition superiority and inferiority provides sufficient foundation for final scheme;
S4: using atural object, the geomorphology information in GPS, hydrology instrument, total station acquisition mapping region, by measurement adjustment method to survey It draws data to be handled, and the data of acquisition is imported in coordinate system, visualization three is carried out on three-dimensional visualization software platform Dimension is shown, carries out data processing, specific step using measurement adjustment method for surveying and mapping data are as follows:
S41: according to the specific data column condition equation of Surveying and Mapping Project;
S42: composition normal equation, AQATK+W=0;
S43: solution normal equation asks connection COEFFICIENT K, K=- (AQAT) -1W;
S44: correction V, V=P-1ATK=QATK are asked;
S45: seeking the mean difference of mapping value,
S46: core inspection is carried out to mapping mean difference;
S5: standard line style compatible with surveying and mapping data, the information of symbol, label character on three-dimensional display platform have been formed Whole reallocation of land schema mapping.
The present invention is handled surveying and mapping data using the method for measurement adjustment, is eliminated and is respectively seen in plane or vertical control network Geometrical condition between measured value is asked the optimum evaluation and evaluation observation element of each geometric element in fixed control net by least square method And its work that function precision is carried out.The data of one compensating computation unit can be divided into initial data, observation data and wait ask Data three classes.Observation data include known high-precision elongated, azimuth, elevation etc., and observation data include horizontal direction, become Length, height difference etc., data to be asked include the coordinate of unknown point, elevation etc..Initial data and data to be asked are non-random datas, and Observing data is random data, and containing error, error can be divided into systematic error and accidental error.
The influence attenuation method of systematic error can carry out observation data by using being adjusted and examining and determine to instrument Design allows same people to observe whole observations and observes habit variation bring systematic error and progress to avoid substitution bring Atmosphere Refraction and correction for earth curvature etc.;Accidental error all shows contingency in size and symbol, but accidentally misses from a large amount of The totality of difference sees that it is normal distribution, least square method aiming at accidental error processing method, in practical work process In, in order to improve the quality of achievement, and also to check and find that whether there is or not rough error presence in observation, will usually carry out in time Redundant observation.It due to the presence of accidental error, can find that observed result is inconsistent by redundant observation, or not meet and should have relationship And the contradiction generated.Therefore, it is necessary to adjustment processing be carried out to these observations with accidental error, so that after eliminating discrepancy Result be considered the reliable results of observed quantity.
According to mathematical statistics, a certain observing buoy is the increment seeing all possible values (parent) to this and being extracted, son Sample and parent have identical probability distribution, can use increment and judge to the statistical property of parent, but due to limited Several observations can only obtain the estimated value of observation, and cannot obtain its true value, therefore the present invention is according to the accidental mistake having Difference limited observation come determine parameter optimum evaluation and assess observing buoy quality.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (3)

1. a kind of mapping method of reallocation of land regulation project, it is characterised in that: the mapping method of reallocation of land regulation project Specific step is as follows:
S1: analyzing the analysis of foundation engineering geologic elements and unfavorable geology and special geology, specifies form between each element, space Distribution, the origin cause of formation, correlation and the influence to route;
S2: determining enginering geologic sections principle, treats mapping region and carries out enginering geologic sections and SUBNUCLEAR DIVISION, is surveyed according to research The characteristics of drawing area determines Evaluation of Engineering Geological Conditions standard, carries out integration engineering geological conditions superior and inferior evaluating to each region;
S3: region to be surveyed and drawn is carried out by section division according to the otherness of evaluation result, the comparison for two or more Route overall merit in terms of landforms, lithology, construction, hydrogeology, unfavorable geology, special geology, line length, ecological environment Engineering geological condition superiority and inferiority provides sufficient foundation for final scheme;
S4: using atural object, the geomorphology information in GPS, hydrology instrument, total station acquisition mapping region, by measurement adjustment method to survey It draws data to be handled, and the data of acquisition is imported in coordinate system, visualization three is carried out on three-dimensional visualization software platform Dimension is shown;
S5: standard line style compatible with surveying and mapping data, the information of symbol, label character on three-dimensional display platform have been formed Whole reallocation of land schema mapping.
2. a kind of mapping method of reallocation of land regulation project according to claim 1, it is characterised in that: the step S1 In, foundation engineering geologic elements include topography and geomorphology, bottom lithology, geological structure and hydrogeological element.
3. a kind of mapping method of reallocation of land regulation project according to claim 1, it is characterised in that: the step S4 In, data processing, specific step are carried out using measurement adjustment method for surveying and mapping data are as follows:
S41: according to the specific data column condition equation of Surveying and Mapping Project;
S42: composition normal equation, AQATK+W=0;
S43: solution normal equation asks connection COEFFICIENT K, K=- (AQAT) -1W;
S44: correction V, V=P-1ATK=QATK are asked;
S45: seeking the mean difference of mapping value,
S46: core inspection is carried out to mapping mean difference.
CN201910719362.9A 2019-08-06 2019-08-06 A kind of mapping method of reallocation of land regulation project Pending CN110411428A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910719362.9A CN110411428A (en) 2019-08-06 2019-08-06 A kind of mapping method of reallocation of land regulation project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910719362.9A CN110411428A (en) 2019-08-06 2019-08-06 A kind of mapping method of reallocation of land regulation project

Publications (1)

Publication Number Publication Date
CN110411428A true CN110411428A (en) 2019-11-05

Family

ID=68365870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910719362.9A Pending CN110411428A (en) 2019-08-06 2019-08-06 A kind of mapping method of reallocation of land regulation project

Country Status (1)

Country Link
CN (1) CN110411428A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022241629A1 (en) * 2021-05-18 2022-11-24 南京经纬地诚土地规划咨询有限公司 Gis-based land consolidation and rehabilitation design system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022241629A1 (en) * 2021-05-18 2022-11-24 南京经纬地诚土地规划咨询有限公司 Gis-based land consolidation and rehabilitation design system

Similar Documents

Publication Publication Date Title
CN102609986B (en) Ore body modeling system in digital mine and modeling and detecting method of ore body modeling system
Aucelli et al. Multi‐temporal digital photogrammetric analysis for quantitative assessment of soil erosion rates in the Landola catchment of the Upper Orcia Valley (Tuscany, Italy)
CN109272227B (en) Green mine site selection method based on remote sensing data and geographic information system
Hancock et al. Channel head location and characteristics using digital elevation models
CN110457422B (en) Automatic soil sample collection and distribution system and method
CN108427741B (en) DEM relative error evaluation method based on large number of high-precision control points
CN107063210A (en) The mapping method of project is renovated in a kind of reallocation of land
Zhang et al. A method to determine optimum ecological groundwater table depth in semi-arid areas
CN108205718A (en) Production method and system are surveyed in a kind of cereal crops sampling
CN104698508A (en) Portable device and method for soil erosion field investigation
CN110411428A (en) A kind of mapping method of reallocation of land regulation project
CN109542995B (en) Method for analyzing landslide of reservoir area
Chitsazan et al. Land subsidence susceptibility mapping using PWRSTFAL framework and analytic hierarchy process: fuzzy method (case study: Damaneh-Daran Plain in the west of Isfahan Province, Iran)
Rasel et al. Geospatial analysis of groundwater level variations using Kriging Method
CN114184173A (en) Comprehensive evaluation method for mapping capability of three-dimensional image of remote sensing satellite
Balla et al. Approximation of the WRB reference group with the reapplication of archive soil databases
Daoud Integrated hydrological model to study surface-groundwater interaction in hard rock systems using an unstructured grid approach, the Sardon Catchment, Spain
Barthélemy et al. Modelling of the Saq aquifer system (Saudi Arabia)
CN116703031B (en) Method for analyzing big data of paddy field site selection by using GIS
Olang et al. A spatial database of hydrological and water resources Information for the Nyangores watershed of Kenya
Ghazavi et al. Impacts of land-use change on groundwater resources using remote sensing and numerical modeling
Li et al. Regionalization of coaxial correlation diagrams for the semi-humid and semi-arid catchments in Northern China
Scannavino et al. Spatial variability on soil pH gradient: A case study in vineyards
Pukite et al. ANALYSIS OF URBAN TERRITORIES FOR THE GREEN DEVELOPMENT OF LATVIA
Radło-Kulisiewicz Digital Terrain Model Derivatives Analysis with the Aim of Identifying Specific Soil Types in Young Post-Glacial Topography with a Vector Approach

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191105

WD01 Invention patent application deemed withdrawn after publication