CN110410595A - A kind of pine set power transmission insulating flange and its surface crack detection method - Google Patents

A kind of pine set power transmission insulating flange and its surface crack detection method Download PDF

Info

Publication number
CN110410595A
CN110410595A CN201910675617.6A CN201910675617A CN110410595A CN 110410595 A CN110410595 A CN 110410595A CN 201910675617 A CN201910675617 A CN 201910675617A CN 110410595 A CN110410595 A CN 110410595A
Authority
CN
China
Prior art keywords
power transmission
flange
insulating flange
set power
pine set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910675617.6A
Other languages
Chinese (zh)
Other versions
CN110410595B (en
Inventor
张晋锋
李瑞清
李文峰
姚晓敏
肖云鹏
李津津
陈冲
葛洪青
王文龙
王海波
吉辉
刘明安
杨磊
崔金秀
陈小松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute
Original Assignee
Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute filed Critical Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute
Priority to CN201910675617.6A priority Critical patent/CN110410595B/en
Publication of CN110410595A publication Critical patent/CN110410595A/en
Application granted granted Critical
Publication of CN110410595B publication Critical patent/CN110410595B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/006Attachments
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/02Flanged joints the flanges being connected by members tensioned axially
    • F16L23/024Flanged joints the flanges being connected by members tensioned axially characterised by how the flanges are joined to, or form an extension of, the pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/02Flanged joints the flanges being connected by members tensioned axially
    • F16L23/036Flanged joints the flanges being connected by members tensioned axially characterised by the tensioning members, e.g. specially adapted bolts or C-clamps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/16Flanged joints characterised by the sealing means
    • F16L23/18Flanged joints characterised by the sealing means the sealing means being rings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N21/00Investigating or analysing materials by the use of optical means, i.e. using sub-millimetre waves, infrared, visible or ultraviolet light
    • G01N21/84Systems specially adapted for particular applications
    • G01N21/88Investigating the presence of flaws or contamination
    • G01N21/91Investigating the presence of flaws or contamination using penetration of dyes, e.g. fluorescent ink

Abstract

The invention discloses a kind of pine set power transmission insulating flange and its surface crack detection methods, belong to insulating flange field, a kind of pine set power transmission insulating flange, including SR connector and a pair of of flange short tube, a pair of of flange short tube is connected to SR connector left and right ends, SR connector side is connected with seal assembly, SR connector and flange short tube surface are enclosed with self-test coating film, polymorphic layer is coated between SR connector and flange short tube surface and self-test coating film, the function of insulating flange and pine set power transmission flange is integrated by the present invention, form pine set power transmission insulating flange, insulating flange is using pine set expansion joint, it can compensate for the installation error of pipeline, convenient for flange dismounting;And insulating flange uses dowel bar structure, transmits the pressure of pipeline;In addition, adding self-test clad in flange surface, the high cost drawbacks detected in abandoning tradition technology using precision instrument facilitate user to carry out crack self-test to flange before actual use.

Description

A kind of pine set power transmission insulating flange and its surface crack detection method
Technical field
The present invention relates to insulating flange fields, split more specifically to a kind of pine set power transmission insulating flange and its surface Stitch detection method.
Background technique
Buried long distance line can generally use the pipeline of various material according to landform, geological conditions.Subterranean oil tracheae Road, water supply pipe, heat distribution pipeline and other metallic facilities, not only densely distributed and complex geometry, and all in complexity Soil environment in, therefore by the severe jamming by stray electrical current in the strong corrosion of soil and ground, when connecting between pipelines When connecing, when as being directly connected between PCCP pipeline and steel pipe, in the soil, since steel pipe is more vulnerable to electrochemistry corruption compared with PCCP Erosion, steel pipe are equivalent to the anode of PCCP, and corrosion will aggravate when connecting with PCCP, and the steel pipe service life will significantly reduce, once and pipeline Be corroded damage, and not only maintenance and inspection are difficult, heavy workload, but also due to the leakage of oil, gas etc., causes the dirt to natural environment Dye, or even causes the major accidents such as poisoning, fire, explosion, interruption pumped (conveying) medium, affects the production order and the people in city Living safety.In order to ensure the safety of the normal production order and people's lives, mostly using safety in underground piping network Reliable cathode protection measure, to prevent underground piping from being corroded, and insulating flange is exactly cathodic protection essential one A critical facility, it not only can avoid causing current drain excessive because being grounded excessively without cathodic protection pipe end, reduce its protection Effect can also divide interference range and non-interference area in the pipeline section of stray electrical current serious interference, reduce the influence of stray electrical current, thus Improve its protection efficiency and anti-interference corrosion.Therefore the superiority and inferiority of insulation performance will be directly related to the safety of entire underground pipe network.
Insulating flange effect is exactly the pipeline for completely cutting off two kinds of unlike materials, is not directly contacted with pipeline enclosure, and then play guarantor The effect in pillar road.
Early stage Chinese Patent Application No. be CN88215226.2 propose it is a kind of can be embedded to underground for a long time, safely may be used It leans on, performance stabilization, the superior insulating flange of insulation performance, feature is mainly equipped with an insulation protection in the periphery of insulating flange Cover.The insulation performance that it can not only be improved using the insulating flange makes anti-corrosion protection rate up to 95% or more, can also extend its use One times of service life or more, extend service life 20 years or more, thus in solving China insulating flange must not placing into the soil at that time, or It is mounted on the pipeline of conveying water-bearing media, makes insulation performance is unstable to wait all problems, expand insulating flange in underground Application range on pipeline.
Traditional insulating flange is made of two flange plates, insulation spacer (or insulation sleeve) and bolt.Insulating flange utilizes The electrical isolation that the electrical insulating property of insulation spacer and high-strength insulating sleeve gasket in insulating flange can be carried out insulating flange both sides carries out Work.Insulating materials is mainly the materials such as polytetrafluoroethylene (PTFE), oil resistant rubber sheet asbestos, neoprene.With the design longevity of engineering Life is compared, and insulating materials service life is shorter, needs repeatedly to overhaul and replace within the pipe design service life.
In addition, the surface requirements free from flaw of insulating flange, because it once occurs crack, to exist between connecting tube biggish It is detached from hidden danger, but the detection of insulating flange surface crack usually only carries out simple qualified inspection in process of production in the prior art It tests, not will do it Crack Detection substantially then before later period actual use, and even if using preceding carry out Crack Detection, detection Method is often used to accurate detecting instrument, and testing cost is high.
Summary of the invention
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide it is a kind of pine set power transmission insulating flange and its Surface crack detection method has abandoned traditional insulating flange set-up mode, by the function of insulating flange and pine set power transmission flange It being integrated, forms pine set power transmission insulating flange, insulating flange can compensate for the installation error of pipeline using pine set expansion joint, Convenient for flange dismounting;And insulating flange uses dowel bar structure, transmits the pressure of pipeline;In addition, adding self-test in flange surface Clad is surveyed, the high cost drawbacks detected in abandoning tradition technology using precision instrument facilitate user before actual use Crack self-test is carried out to flange.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of pine set power transmission insulating flange, including SR connector and a pair of of flange short tube, a pair of flange short tube connect respectively It is connected to SR connector left and right ends, the junction of the flange short tube and SR connector is equipped with insulating flange pad and the first O-ring, described SR connector and flange short tube side offer multiple corresponding screw holes, are threaded with biography in the screw hole on the SR connector Power screw rod, and power transmission screw rod or so is threadedly coupled with the screw hole on a pair of of flange short tube respectively, is connected on the power transmission screw rod Multipair power transmission stem nut is equipped with insulation sleeve between the power transmission screw rod and screw hole inner wall, SR connector side is connected with sealing Component, the SR connector and flange short tube surface are enclosed with self-test coating film, the self-test coating film from inside to outside according to Secondary includes semi-transparent film layer, membrane waterproofing and outer cuticle layer, between the SR connector and flange short tube surface and self-test coating film Be coated with polymorphic layer, the polymorphic layer include can recovery-type high-temperature expansion particle and environment-friendly type fluorescer, the present invention abandon The function of insulating flange and pine set power transmission flange is integrated by traditional insulating flange set-up mode, and it is exhausted to form pine set power transmission Lot or luck by which people are brought together is blue, and insulating flange can compensate for the installation error of pipeline, dismounted convenient for flange using pine set expansion joint;And insulating flange Using dowel bar structure, the pressure of pipeline is transmitted;In addition, self-test clad is added in flange surface, in abandoning tradition technology The high cost drawbacks detected using precision instrument facilitate user to carry out crack self-test to flange before actual use.
Further, the seal assembly includes wedge-type seal circle and the second O-ring, and the second O-ring is located at SR connector Angle, the height of the wedge-type seal circle is consistent with the diameter of section of the second O-ring, O-shaped using wedge-type seal circle+the second Circle guarantees pine set power transmission insulating flange product sealing effect.
Further, the outer cuticle layer uses coloured covering material, and outer cuticle layer is applied far from the surface of membrane waterproofing It is covered with super anti-corrosion slip coating, outer cuticle layer, which can play, protects pine set power transmission insulating flange surface not easily damaged, coloured outer shield The setting of film layer can prompt the presence of user pine set power transmission insulating flange surface outer cuticle layer, convenient for reminding user before the use Crack Detection operation is carried out, in addition, on the one hand super anti-corrosion slip coating can reduce the friction of remaining extraneous object, on the other hand may be used It prevents it from fading, brings pollution of fading.
Further, the membrane waterproofing uses colorless and transparent covering material, guarantees that the problem of fading is not present in itself, Guarantee that semi-transparent film layer is not faded pollution.
Further, Nian Jie using the transparent jelly of strength between the outer cuticle layer and membrane waterproofing, guarantee outside tearing While cuticular layer, related membrane waterproofing of tearing avoids user's general idea from forgetting colorless and transparent membrane waterproofing of tearing, leads to not Carry out Crack Detection.
Further, the semi-transparent film layer equally uses colorless and transparent covering material, and in the making material of semi-transparent film layer Mixed with the modified elastic epoxy resin material of 2%-5%, semi-transparent film layer allows the water of extraneous side to enter, and prevents the other side Polymorphic layer spilling, the modified elastic epoxy resin material of 2%-5% may make semi-transparent film layer have good elasticity, In When pine set power transmission insulating flange surface is squeezed, semi-transparent film layer has certain buffering effect.
Further, the semi-transparent film layer is connected with multiple quick-fried balls far from the surface of membrane waterproofing, and multiple quick-fried balls are equal It is even to be distributed in semi-transparent film layer, and distance is 2-3mm between two neighboring quick-fried ball, apart from too small then semi-transparent film layer and pine set power transmission Reserved space between insulating flange surface is too small, and the water of infiltration is difficult to meet quick-fried ball and dissolves explosion, and the water penetrated into is difficult So that self-test solvent melts and is separated from each other;Quantity apart from excessive then quick-fried ball is very few, it is difficult to play preferable explosion punching Hit power;The quick-fried ball includes ball bubble and collision mat, and the ball bubble is glued by collision mat in semi-transparent film surface, and the ball bubble is Water-soluble shell, and it is honeycomb that ball bubble is internal, the ball bubble is internal filled with carbon dioxide gas, and after quick-fried ball meets water, ball bubble is molten It solves, the carbon dioxide gas inside ball bubble overflows, and is formed miniature " explosion ", polymorphic layer can be accelerated to transport by the impact of force of explosion It is dynamic, in the crack for more easily entering pine set power transmission insulating flange surface;The setting of collision mat can be achieved quick-fried ball and be glued in semi-transparent In film layer.
A kind of pine set power transmission insulating flange, surface crack detection method step are as follows:
S1, one basin clear water of preparation are spare, and prepare the closed hood for having observation panel;
After S2, the outer cuticle layer and membrane waterproofing torn on pine set power transmission insulating flange, pine set power transmission insulating flange is put Enter in clear water;
S3, it is gently agitated for clear water in basin, pine set power transmission insulating flange, outer cuticle layer of tearing is taken out after 3-5min;
S4, again by pine set power transmission insulating flange be put into clear water, wash away the polymorphic layer on surface;
After S5, naturally dry pine set power transmission insulating flange, pine set power transmission insulating flange is placed in closed hood, from Observation panel observation pine covers the crack on power transmission insulating flange and carries out handmarking.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) this programme has abandoned traditional insulating flange set-up mode, by the function of insulating flange and pine set power transmission flange It being integrated, forms pine set power transmission insulating flange, insulating flange can compensate for the installation error of pipeline using pine set expansion joint, Convenient for flange dismounting;And insulating flange uses dowel bar structure, transmits the pressure of pipeline;In addition, adding self-test in flange surface Clad is surveyed, the high cost drawbacks detected in abandoning tradition technology using precision instrument facilitate user before actual use Crack self-test is carried out to flange.
(2) seal assembly includes wedge-type seal circle and the second O-ring, and the second O-ring is located at the angle of SR connector, wedge The height of shape sealing ring is consistent with the diameter of section of the second O-ring, using the+the second O-ring of wedge-type seal circle, guarantees pine set power transmission Insulating flange product sealing effect.
(3) outer cuticle layer uses coloured covering material, and outer cuticle layer is coated with super anti-corrosion far from the surface of membrane waterproofing Slip coating, outer cuticle layer, which can play, protects pine set power transmission insulating flange surface not easily damaged, the setting of coloured outer cuticle layer The presence of user pine set power transmission insulating flange surface outer cuticle layer can be prompted, convenient for reminding user to carry out crack inspection before the use Operation is surveyed, in addition, on the one hand super anti-corrosion slip coating can reduce the friction of remaining extraneous object, on the other hand can prevent it from falling Color brings pollution of fading.
(4) membrane waterproofing uses colorless and transparent covering material, guarantees that the problem of fading is not present in itself, guarantees semi-permeable membrane Layer is not faded pollution.
(5) Nian Jie using the transparent jelly of strength between outer cuticle layer and membrane waterproofing, guarantee in the same of outer cuticle layer of tearing When, related membrane waterproofing of tearing avoids user's general idea from forgetting colorless and transparent membrane waterproofing of tearing, and leads to not carry out crack inspection It surveys.
(6) semi-transparent film layer equally uses colorless and transparent covering material, and mixed with 2%-5% in the making material of semi-transparent film layer Modified elastic epoxy resin material, semi-transparent film layer allows the water of extraneous side to enter, prevents the polymorphic layer of the other side It overflows, the modified elastic epoxy resin material of 2%-5% may make semi-transparent film layer to have good elasticity, exhausted in pine set power transmission When edge flange surface is squeezed, semi-transparent film layer has certain buffering effect.
(7) semi-transparent film layer is connected with multiple quick-fried balls far from the surface of membrane waterproofing, and multiple quick-fried balls are uniformly distributed in semi-permeable membrane On layer, and between two neighboring quick-fried ball distance be 2-3mm, apart from too small then semi-transparent film layer and pine set power transmission insulating flange surface it Between reserved space it is too small, the water of infiltration is difficult to meet quick-fried ball and dissolves explosion, and the water penetrated into is difficult to so that self-test is molten Agent is melted and is separated from each other;Quantity apart from excessive then quick-fried ball is very few, it is difficult to play preferable blasting impact power;Quick-fried ball includes ball Bubble and collision mat, ball bubble are glued by collision mat in semi-transparent film surface, and ball bubble is water-soluble shell, and it is honeycomb that ball bubble is internal Shape, ball bubble is internal filled with carbon dioxide gas, and after quick-fried ball meets water, ball bubble dissolves, and the carbon dioxide gas inside ball bubble overflows, shape At miniature " explosion ", polymorphic layer can be accelerated by the impact of force of explosion, more easily enter pine set power transmission insulating flange In the crack on surface;The setting of collision mat can be achieved quick-fried ball and be glued in semi-transparent film layer.
Detailed description of the invention
Fig. 1 is the surface structure schematic diagram of present invention pine set power transmission insulating flange;
Fig. 2 is the schematic diagram of the section structure of present invention pine set power transmission insulating flange;
Fig. 3 is the half the schematic diagram of the section structure of present invention pine set power transmission insulating flange;
Fig. 4 is the structural schematic diagram in Fig. 3 at A;
Fig. 5 is the half structural schematic diagram of traditional insulating flange;
Fig. 6 is the structural schematic diagram at self-test coating film of the invention;
Fig. 7 is the refinement structural schematic diagram at self-test coating film of the invention;
Fig. 8 is the structural schematic diagram in Fig. 7 at B;
Fig. 9 is the structural schematic diagram of quick-fried ball of the invention;
Figure 10 is the structural schematic diagram at the crack that do not heated under clear water state in the present invention;
Figure 11 is the structural schematic diagram in Figure 10 at C;
Figure 12 is the structural schematic diagram at the crack under present invention heating clear water state;
Figure 13 is the structural schematic diagram in Figure 12 at D.
Figure label explanation:
1 flange short tube, 2 power transmission screw rods, 3 insulation sleeves, 4 insulating flange pads, 5 first O-rings, 6SR connector, 7 transmission rod spiral shells Mother, 8 seal assemblies, 81 wedge-type seal circles, 82 second O-rings, 9 self-test coating films, 91 outer cuticle layers, 92 semi-transparent film layers, 93 Membrane waterproofing, 10 quick-fried balls, 101 balls bubble, 102 collision mats.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description;Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments, is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instruction such as term " on ", "lower", "inner", "outside", " top/bottom end " Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot understand For indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
Please refer to Fig. 1, Fig. 2 and Fig. 3, a kind of pine set power transmission insulating flange, including SR connector 6 and a pair of of flange short tube 1, one 6 left and right ends of SR connector are connected to flange short tube 1, flange short tube 1 and the junction of SR connector 6 are equipped with insulating flange pad 4 and first O-ring 5, SR connector 6 and 1 side of flange short tube offer multiple corresponding screw holes, the screw hole on SR connector 6 In be threaded with power transmission screw rod 2, and power transmission screw rod 2 or so is threadedly coupled with the screw hole on a pair of of flange short tube 1 respectively, power transmission It is connected with multipair power transmission stem nut 7 on screw rod 2, insulation sleeve 3 is equipped between power transmission screw rod 2 and screw hole inner wall, 6 side of SR connector connects It is connected to seal assembly 8, SR connector 6 and 1 surface of flange short tube are enclosed with self-test coating film 9, referring to Fig. 7, self-test packet Overlay film 9 includes successively from inside to outside semi-transparent film layer 92, membrane waterproofing 93 and outer cuticle layer 91, referring to Fig. 6, SR connector 6 and method Be coated with polymorphic layer between blue 1 surface of short tube and self-test coating film 9, polymorphic layer using can recovery-type high-temperature expansion particle it is solidifying It ties, and in recovery-type high-temperature expansion particle mixed with environment-friendly type fluorescer, pine set power transmission insulating flange surface crack can be penetrated into In can recovery-type high-temperature expansion particle user can be facilitated to observe the crack location on pine set power transmission insulating flange surface, the present invention gets rid of Traditional insulating flange set-up mode has been abandoned, the function of insulating flange and pine set power transmission flange is integrated, Song Taochuan is formed Power insulating flange, insulating flange can compensate for the installation error of pipeline, dismounted convenient for flange using pine set expansion joint;And it insulate Flange uses dowel bar structure, transmits the pressure of pipeline;In addition, adding self-test clad 9, abandoning tradition skill in flange surface The high cost drawbacks detected in art using precision instrument facilitate user to carry out crack self-test to flange before actual use It surveys.
Referring to Fig. 4, seal assembly 8 includes wedge-type seal circle 81 and the second O-ring 82, and the second O-ring 82 is located at SR The angle of connector 6, the height of wedge-type seal circle 81 is consistent with the diameter of section of the second O-ring 82, using wedge-type seal circle 81+ Second O-ring 82 guarantees pine set power transmission insulating flange product sealing effect.
Outer cuticle layer 91 uses coloured covering material, and surface of the outer cuticle layer 91 far from membrane waterproofing 93 is coated with super anti- Rotten slip coating, outer cuticle layer 91, which can play, protects pine set power transmission insulating flange surface not easily damaged, coloured outer cuticle layer 91 Setting can prompt user pine set power transmission insulating flange surface outer cuticle layer 91 presence, convenient for remind user before the use into On the other hand the operation of row Crack Detection can be prevented in addition, on the one hand super anti-corrosion slip coating can reduce the friction of remaining extraneous object Only it fades, and brings pollution of fading.
Membrane waterproofing 93 uses colorless and transparent covering material, guarantees that the problem of fading is not present in itself, guarantees semi-permeable membrane Layer 92 is not faded pollution.
It is Nian Jie using the transparent jelly of strength between outer cuticle layer 91 and membrane waterproofing 93, guarantee in outer cuticle layer 91 of tearing Meanwhile related membrane waterproofing 93 of tearing, the membrane waterproofing 93 for avoiding user's general idea from forgetting to tear colorless and transparent lead to not carry out Crack Detection.
Semi-transparent film layer 92 equally uses colorless and transparent covering material, and mixed with 2%- in the making material of semi-transparent film layer 92 5% modified elastic epoxy resin material, semi-transparent film layer 92 allow the water of extraneous side to enter, prevent the polymorphic of the other side The spilling of layer, the modified elastic epoxy resin material of 2%-5% may make semi-transparent film layer 92 to have good elasticity, cover in pine When power transmission insulating flange surface is squeezed, semi-transparent film layer 92 has certain buffering effect.
Referring to Fig. 8, semi-transparent film layer 92 is connected with multiple quick-fried balls 10 far from the surface of membrane waterproofing 93, multiple quick-fried balls 10 are It is even to be distributed in semi-transparent film layer 92, and distance is 2-3mm between two neighboring quick-fried ball 10, apart from too small then semi-transparent film layer 92 and pine The reserved space covered between power transmission insulating flange surface is too small, and the water of infiltration is difficult to meet quick-fried ball 10 and dissolves explosion, and penetrates into Water be difficult to so that self-test solvent melts and is separated from each other;Quantity apart from excessive then quick-fried ball 10 is very few, it is difficult to play compared with Good blasting impact power;
Referring to Fig. 9, quick-fried ball 10 includes ball bubble 101 and collision mat 102, ball bubble 101 is glued by collision mat 102 in semi-transparent 92 surface of film layer, ball bubble 101 is water-soluble shell, and 101 inside of ball bubble is honeycomb, and ball steeps inside 101 filled with carbon dioxide Gas, after quick-fried ball 10 meets water, 101 dissolution of ball bubble, ball steeps the carbon dioxide gas inside 101 and overflows, and forms miniature " explosion ", Impact of the polymorphic layer by force of explosion, mixed with environment-friendly type fluorescer can recovery-type high-temperature expansion particle can scatter and accelerate rapidly Movement more easily enters pine and covers in the crack on power transmission insulating flange surface;The setting of collision mat 102 can be achieved quick-fried ball 10 and be glued In in semi-transparent film layer 92.
A kind of pine set power transmission insulating flange, surface crack detection method step are as follows:
S1, one basin clear water of preparation are spare, and prepare the closed hood for having observation panel;
After S2, the outer cuticle layer 91 and membrane waterproofing 93 torn on pine set power transmission insulating flange, by pine set power transmission insulation method Orchid is put into clear water;
S3, Figure 10 and Figure 11 are please referred to, be gently agitated for clear water in basin (normal temperature environment), clear water is heated after 3-5min to 50- 55 DEG C (hot environment), continue to stand 30s, please refer to Figure 12 and Figure 13, takes out pine set power transmission insulating flange, outer cuticle layer of tearing 91;
S4, again by pine set power transmission insulating flange be put into the clear water of heating, wash away the polymorphic layer on surface;
After S5, naturally dry pine set power transmission insulating flange, pine set power transmission insulating flange is placed in closed hood, from Observation panel observation pine covers the crack on power transmission insulating flange and carries out handmarking.
Can recovery-type high-temperature expansion particle can restore prototype in low temperature, specific material can be selected according to actual needs With or experimental formula guarantee in S3 that heating is clear for example, by using the microspheres mixed with carboxymethyl cellulose and polyacrylamide Before water, can recovery-type high-temperature expansion particle volume it is smaller, can smoothly enter into pine set power transmission insulating flange surface crack in, add After hot clear water, can recovery-type high-temperature expansion particle expansion, make its own stabilization be stuck in pine set power transmission insulating flange surface crack In, it is not easy to overflow the crack on pine set power transmission insulating flange surface in the cleaning process of S4, guarantee in S5, penetrate into pine set power transmission In insulating flange surface crack can becoming apparent of highlighting of recovery-type high-temperature expansion particle, be more conducive to user and observe pine set The crack location on power transmission insulating flange surface.
The drawbacks of needing repeatedly maintenance and replacement compared to the insulating flange being arranged in traditional technology, the present invention has abandoned it The function of insulating flange and pine set power transmission flange is integrated by the set-up mode of conventional insulator flange, and it is exhausted to form pine set power transmission Lot or luck by which people are brought together is blue, and insulating flange can compensate for the installation error of pipeline, dismounted convenient for flange using pine set expansion joint;And insulating flange Using dowel bar structure, the pressure of pipeline is transmitted;In addition, adding self-test clad 9, composition self-test cladding in flange surface The semi-transparent film layer 92 of layer 9 allows the water of extraneous side to enter, after preventing the spilling of the polymorphic layer of the other side, quick-fried ball 10 from meeting water, 101 dissolution of ball bubble, ball steep the carbon dioxide gas inside 101 and overflow, and form miniature " explosion ", polymorphic layer is by force of explosion Impact can accelerate, and in the crack for more easily entering pine set power transmission insulating flange surface, user carries out handmarking, thus Repairing measures are taken, are accurately repaired, the high cost drawbacks detected in abandoning tradition technology using precision instrument are convenient User carries out crack self-test to flange before actual use.
The foregoing is intended to be a preferred embodiment of the present invention;But scope of protection of the present invention is not limited thereto. Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its It improves design and is subject to equivalent substitution or change, should be covered by the scope of protection of the present invention.

Claims (10)

1. a kind of pine set power transmission insulating flange, including SR connector (6) and a pair of of flange short tube (1), it is characterised in that: described in a pair Flange short tube (1) is connected to SR connector (6) left and right ends, and the flange short tube (1) and the junction of SR connector (6) are equipped with Insulating flange pad (4) and the first O-ring (5), the SR connector (6) and flange short tube (1) side offer multiple corresponding Screw hole, be threaded with power transmission screw rod (2) in the screw hole on the SR connector (6), and power transmission screw rod (2) left and right is respectively with one Screw hole on flange short tube (1) is threadedly coupled, is connected with multipair power transmission stem nut (7), the biography on the power transmission screw rod (2) Insulation sleeve (3) are equipped between power screw rod (2) and screw hole inner wall, SR connector (6) side is connected with seal assembly (8), described SR connector (6) and flange short tube (1) surface are enclosed with self-test coating film (9), and the self-test coating film (9) is from inside to outside It successively include semi-transparent film layer (92), membrane waterproofing (93) and outer cuticle layer (91), the SR connector (6) and flange short tube (1) table Polymorphic layer is coated between face and self-test coating film (9), the polymorphic layer includes can recovery-type high-temperature expansion particle and ring Guarantor's type fluorescer.
2. a kind of pine set power transmission insulating flange according to claim 1, it is characterised in that: the seal assembly (8) includes Wedge-type seal circle (81) and the second O-ring (82), and the 2nd 0 type circle (82) is located at the angle of SR connector (6), the wedge shape is close The height of seal (81) is consistent with the diameter of section of the second O-ring (82).
3. a kind of pine set power transmission insulating flange according to claim 1, it is characterised in that: the outer cuticle layer (91) uses Coloured covering material, and outer cuticle layer (91) is coated with super anti-corrosion slip coating far from the surface of membrane waterproofing (93).
4. a kind of pine set power transmission insulating flange according to claim 1, it is characterised in that: the membrane waterproofing (93) uses Colorless and transparent covering material.
5. a kind of pine set power transmission insulating flange according to claim 3 or 4, it is characterised in that: the outer cuticle layer (91) It is Nian Jie using the transparent jelly of strength between membrane waterproofing (93).
6. a kind of pine set power transmission insulating flange according to claim 1, it is characterised in that: the semi-transparent film layer (92) is same Using colorless and transparent covering material, and mixed with the modified elastic epoxy of 2%-5% in the making material of semi-transparent film layer (92) Rouge material.
7. a kind of pine set power transmission insulating flange according to claim 6, it is characterised in that: the semi-transparent film layer (92) is separate The surface of membrane waterproofing (93) is connected with multiple quick-fried balls (10), and multiple quick-fried balls (10) are uniformly distributed in semi-transparent film layer (92) On, and distance is 2-3mm between two neighboring quick-fried ball (10).
8. a kind of pine set power transmission insulating flange according to claim 7, it is characterised in that: the self-destruction ball (10) includes ball (101) and collision mat (102) are steeped, the ball bubble (101) is glued by collision mat (102) in semi-transparent film layer (92) surface.
9. a kind of pine set power transmission insulating flange according to claim 8, it is characterised in that: the ball bubble (101) is water-soluble Property shell, and be honeycomb inside ball bubble (101), ball bubble (101) is internal filled with carbon dioxide gas.
10. a kind of pine set power transmission insulating flange according to claim 1, it is characterised in that: its surface crack detection method Step are as follows:
S1, one basin clear water of preparation are spare, and prepare the closed hood for having observation panel;
After S2, the outer cuticle layer (91) and membrane waterproofing (93) torn on pine set power transmission insulating flange, by pine set power transmission insulation method Orchid is put into clear water;
S3, it is gently agitated for clear water in basin, pine set power transmission insulating flange is taken out after 3-5min, is torn outer cuticle layer (91);
S4, again by pine set power transmission insulating flange be put into clear water, wash away the polymorphic layer on surface;
After S5, naturally dry pine set power transmission insulating flange, pine set power transmission insulating flange is placed in closed hood, from Mouth observation pine covers the crack on power transmission insulating flange and carries out handmarking.
CN201910675617.6A 2019-07-25 2019-07-25 Loose sleeve force transmission insulating flange and surface crack detection method thereof Active CN110410595B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910675617.6A CN110410595B (en) 2019-07-25 2019-07-25 Loose sleeve force transmission insulating flange and surface crack detection method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910675617.6A CN110410595B (en) 2019-07-25 2019-07-25 Loose sleeve force transmission insulating flange and surface crack detection method thereof

Publications (2)

Publication Number Publication Date
CN110410595A true CN110410595A (en) 2019-11-05
CN110410595B CN110410595B (en) 2020-12-29

Family

ID=68363102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910675617.6A Active CN110410595B (en) 2019-07-25 2019-07-25 Loose sleeve force transmission insulating flange and surface crack detection method thereof

Country Status (1)

Country Link
CN (1) CN110410595B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112984230A (en) * 2019-12-02 2021-06-18 湖南诚路管业科技有限公司 Plastic pipe convenient to replace and with abrasion prompt function
CN114962827A (en) * 2022-05-26 2022-08-30 北京韩建河山管业股份有限公司湖北分公司 Insulating flange convenient for observing integrity of insulating part

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004125006A (en) * 2002-09-30 2004-04-22 Ebara Corp Loose flange and pump mechanism
DE102010021834A1 (en) * 2010-05-28 2011-12-01 Lannewehr + Thomsen GmbH & Co. KG Ingenieurbüro für Apparate-, Rohrleitungs- und Dichtungstechnik Loose flange connector i.e. flare flange connector, has pipe sockets connected over sealing material, where sealing material is arranged in force shunt between sealing surfaces in inwardly displaced manner opposite to fastening unit
CN202349497U (en) * 2011-11-29 2012-07-25 北京中海威环保科技有限公司荥阳制造分公司 Large-deflection loose tube compensation joint
CN204573393U (en) * 2015-03-19 2015-08-19 中船黄埔文冲船舶有限公司 For the electrical insulation protecting jacket of ambrose alloy ring sleeving steel flange
CN107795774A (en) * 2017-11-28 2018-03-13 中国人民解放军海军工程大学 Naval vessel dissimilar metal piping junction corrosion safeguard structure and construction method
CN207848677U (en) * 2017-12-27 2018-09-11 山东建华阀门制造有限公司 Double flange pines cover power transmission compensating joint
CN110003869A (en) * 2019-04-29 2019-07-12 西南石油大学 A kind of crack blocking agent based on expanded granular Yu curable particle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004125006A (en) * 2002-09-30 2004-04-22 Ebara Corp Loose flange and pump mechanism
DE102010021834A1 (en) * 2010-05-28 2011-12-01 Lannewehr + Thomsen GmbH & Co. KG Ingenieurbüro für Apparate-, Rohrleitungs- und Dichtungstechnik Loose flange connector i.e. flare flange connector, has pipe sockets connected over sealing material, where sealing material is arranged in force shunt between sealing surfaces in inwardly displaced manner opposite to fastening unit
CN202349497U (en) * 2011-11-29 2012-07-25 北京中海威环保科技有限公司荥阳制造分公司 Large-deflection loose tube compensation joint
CN204573393U (en) * 2015-03-19 2015-08-19 中船黄埔文冲船舶有限公司 For the electrical insulation protecting jacket of ambrose alloy ring sleeving steel flange
CN107795774A (en) * 2017-11-28 2018-03-13 中国人民解放军海军工程大学 Naval vessel dissimilar metal piping junction corrosion safeguard structure and construction method
CN207848677U (en) * 2017-12-27 2018-09-11 山东建华阀门制造有限公司 Double flange pines cover power transmission compensating joint
CN110003869A (en) * 2019-04-29 2019-07-12 西南石油大学 A kind of crack blocking agent based on expanded granular Yu curable particle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112984230A (en) * 2019-12-02 2021-06-18 湖南诚路管业科技有限公司 Plastic pipe convenient to replace and with abrasion prompt function
CN114962827A (en) * 2022-05-26 2022-08-30 北京韩建河山管业股份有限公司湖北分公司 Insulating flange convenient for observing integrity of insulating part
CN114962827B (en) * 2022-05-26 2023-09-22 北京韩建河山管业股份有限公司 Insulating flange convenient for observing integrity of insulating part

Also Published As

Publication number Publication date
CN110410595B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN110410595A (en) A kind of pine set power transmission insulating flange and its surface crack detection method
CN102331328A (en) Field hydrostatic test method for water-proof system of building deformation joint
CN112610755B (en) Waterproof sleeve for horizontal through-wall pipeline and leakage detection method thereof
CN101775980B (en) Quick drainage and hole sealing gas parameter testing system
CN209444898U (en) A kind of natural gas Double-sleeve device
CN104318010A (en) Membrane wall tube inner wall corrosion failure critical judging method
CN110031324B (en) Shield tunnel segment joint waterproof performance test device
CN116556959A (en) Frozen curtain construction device and method applied to broken well wall repair
CN110285266A (en) A kind of pipeline fills out culvert method
CN209804099U (en) Chemical reaction simulator for underground oil pipe slicing
CN209891255U (en) Structure for preventing underground building structure from extending and connecting part from leaking
CN203017611U (en) Cold aerosol fire extinguishing system for large floating roof tank
CN208026452U (en) A kind of multi-functional grouting test model equipment of three-dimensional visualization
CN210033475U (en) Waterproof connecting structure for connecting pipe joint joints of channel by mechanical method
CN218582473U (en) Sealing sleeve convenient to installation
CN216480294U (en) Leakage alarm device for natural gas pipeline
CN202393653U (en) Water pressure experiment machine of PVC welding joint lined in PVC reinforced concrete drain pipe
CN220416435U (en) Pipe network slotting and pipe burying device for municipal construction
CN109432971A (en) A kind of drying tower tower body
CN102353502A (en) Internal liner PVC reinforced concrete drainpipe PVC welded joint hydraulic pressure testing machine
CN220749467U (en) Waterproof protection device for gas pipeline
CN218972021U (en) Waterproof sleeve with self-checking function
CN202181573U (en) Hydrant movable insulation cover
CN219994609U (en) Sleeve type waterproof device for water outlet pipe
CN219413792U (en) Gas through-wall protection pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant