CN110410032A - Tubing plug - Google Patents

Tubing plug Download PDF

Info

Publication number
CN110410032A
CN110410032A CN201810401911.3A CN201810401911A CN110410032A CN 110410032 A CN110410032 A CN 110410032A CN 201810401911 A CN201810401911 A CN 201810401911A CN 110410032 A CN110410032 A CN 110410032A
Authority
CN
China
Prior art keywords
connecting tube
ontology
tubing plug
wall
path bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810401911.3A
Other languages
Chinese (zh)
Inventor
彭斌
陈全柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201810401911.3A priority Critical patent/CN110410032A/en
Publication of CN110410032A publication Critical patent/CN110410032A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/1208Packers; Plugs characterised by the construction of the sealing or packing means

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of tubing plugs, belong to oil-gas mining field.The tubing plug includes: connecting tube, ontology;Connecting tube is set on the body by multiple shear pins, and for connecting with tubing seal;Ontology and the inner wall of connecting tube offset, to block the channel of connecting tube;Wherein, the material of the ontology is solvable water aluminium alloy.The present invention is filled connecting pipe box on the body by shear pin, and ontology and the inner wall of connecting tube offset, and can not only effectively block the lower port in oil pipe, and to Operating Pressure after, ontology can be fallen into pit shaft, to open the channel of oil pipe, be conducive to the development of subsequent job;In addition, ontology can be dissolved in pit shaft, avoid trouble of lost tool in hole by setting solvable water aluminium alloy for the material of ontology, without carrying out fishing, it can guarantee that oil well normally produces.

Description

Tubing plug
Technical field
The present invention relates to oil-gas mining field, in particular to a kind of tubing plug.
Background technique
Operating Pressure refer to keep pit shaft in certain pressure, and no killing well, do not bleed off pressure in the case where carried out lower tubular column A kind of underground work technology.Currently, in order to keep stratum energy, mitigating environmental pollution, usually when carrying out operation to oil field Take Operating Pressure mode.Wherein, Operating Pressure usually requires to block oil pipe.Therefore it provides a kind of tubing plug It is very necessary.
The prior art provides a kind of silk plug, using the blanking plug as oil pipe.The silk plug is arranged threadably In the lower port of oil pipe, and then realize the closure to oil pipe.
The inventor finds that the existing technology has at least the following problems:
After completing to Operating Pressure, the silk plug that the prior art provides can not be opened from the lower port of oil pipe, make oil pipe Channel enclosed not can be carried out subsequent job, for example, the operations such as water filling, operation.
Summary of the invention
The embodiment of the invention provides a kind of tubing plugs, can solve the above problem.The technical solution is as follows:
A kind of tubing plug, the tubing plug include: connecting tube, ontology;
The connecting tube is set on the body by multiple shear pins, and for connecting with oil pipe;
The ontology and the inner wall of the connecting tube offset, to block the channel of the connecting tube;
Wherein, the material of the ontology is solvable water aluminium alloy.
In a kind of possible design, the ontology includes: from top to bottom sequentially connected path bar, large-diameter rod;
The connecting tube is sleeved on the path bar by multiple shear pins, and the roof with the large-diameter rod It offsets.
In a kind of possible design, the path bar and the large-diameter rod integrated molding.
In a kind of possible design, the outer wall of the large-diameter rod lower end is in the arc structure being bent upwards.
In a kind of possible design, multiple shear pins are circumferentially disposed on the path bar;
Each shear pin also offsets with the roof of the connecting tube simultaneously.
In a kind of possible design, the shear pin is threadedly coupled with the path bar.
In a kind of possible design, multiple first sealing rings are provided between the path bar and the connecting tube.
In a kind of possible design, for accommodating first sealing ring is provided on the outer wall of the path bar One holding tank.
In a kind of possible design, on the outer wall of the connecting tube it is axially disposed have it is multiple for accommodate second sealing Second holding tank of circle.
In a kind of possible design, it is provided on the outer wall of the connecting tube compatible with the internal screw thread of the oil pipe External screw thread.
In a kind of possible design, the external screw thread is located at the top of second holding tank.
Technical solution provided in an embodiment of the present invention has the benefit that
Tubing plug provided in an embodiment of the present invention by shear pin by connecting pipe box fill on the body, and ontology with The inner wall of connecting tube offsets, and can not only effectively block the lower port in oil pipe, and to Operating Pressure after, ontology can be fallen Enter to pit shaft, to open the channel of oil pipe, is conducive to the development of subsequent job;In addition, by setting the material of ontology to Ontology, can be dissolved in pit shaft, avoid trouble of lost tool in hole by solvable water aluminium alloy, without carrying out fishing, can guarantee oil well Normal production.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the structural schematic diagram of tubing plug provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of ontology provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of connecting tube provided in an embodiment of the present invention.
Wherein, each label declaration is as follows in attached drawing:
1- connecting tube;
The second holding tank of 101-;
2- ontology;
2a- path bar;
2b- large-diameter rod;
The first sealing ring of 201-;
202- threaded hole;
3- shear pin.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail.
The embodiment of the invention provides a kind of tubing plugs, and as shown in Fig. 1, which includes: connecting tube 1, ontology 2;Connecting tube 1 is sleeved on ontology 2 by multiple shear pins 3, and for being connected to oil pipe;Ontology 2 and connecting tube 1 Inner wall offset, to block the channel of connecting tube 1;Ontology 2 and the inner wall of connecting tube 1 offset, to block the channel of connecting tube 1; Wherein, the material of ontology 2 is solvable water aluminium alloy.
It should be noted that solvable water aluminium alloy refers to the aluminium alloy that can be dissolved in water, the density of such aluminium alloy For 1.7g/cm3~2g/cm3, compressive resistance is 72MPa~78MPa, and degradable temperature is 20 DEG C~160 DEG C, degradation time 2 It~11 days.Such aluminium alloy be it is known in the art, can be obtained by buying pattern, for example, being risen by BeiJing ZhongKe's gold Science and Technology Ltd.'s purchase obtains.
Description is based on regard to the working principle of tubing plug provided in an embodiment of the present invention below:
When carrying out Operating Pressure, first connecting tube 1 is connect with the lower port of oil pipe, and then ontology 2 is made to pass through the company of closure The channel of adapter tube 1, and block the lower port of oil pipe.
After to the end of Operating Pressure, when carrying out subsequent job (such as the operations such as water filling, operation), first add into oil pipe Pressure, until cutting shear pin 3.At this point, ontology 2 is just fallen under gravity into pit shaft since connecting tube 1 is connect with oil pipe It is interior, and then the channel of connecting tube 1 is opened, this also opens the channel of oil pipe.Later, subsequent job can be carried out.
Since the material of ontology 2 is that solvable water aluminium alloy will be with the oil in pit shaft after ontology 2 is fallen into pit shaft Aqueous mixtures contact and, dissolve, and then not will cause trouble of lost tool in hole, guarantee oil well normally produce.
Connecting tube 1 is sleeved on ontology 2 by tubing plug provided in an embodiment of the present invention by shear pin 3, and this Body 2 and the inner wall of connecting tube 1 offset, and can not only effectively block the lower port in oil pipe, and to Operating Pressure after, ontology 2 can fall into pit shaft, to open the channel of oil pipe, be conducive to the development of subsequent job;In addition, by by the material of ontology 2 Matter is set as solvable water aluminium alloy, and ontology 2 can be dissolved in pit shaft, avoid trouble of lost tool in hole, without carrying out fishing, Guarantee that oil well normally produces.
Ontology 2 for blocking the channel of connecting tube 1 can be set to various structures, for example, as shown in Fig. 2, this In inventive embodiments, ontology 2 includes: from top to bottom sequentially connected path bar 2a, large-diameter rod 2b;Connecting tube 1 is cut by multiple It cuts pin 3 to be sleeved on path bar 2a, and offsets with the roof of large-diameter rod 2b.
By being as above arranged, it can both increase the effect that ontology 2 blocks 1 channel of connecting tube, the weight of ontology 2 can also be increased, Be conducive to ontology 2 to fall off out of connecting tube 1.
Wherein, path bar 2a and large-diameter rod 2b integrated molding, it is ensured that the intensity of ontology 2, to extend tubing plug Service life.
For the ease of oil pipe uplink and downlink, as shown in Fig. 2, in the embodiment of the present invention, outside the lower end large-diameter rod 2b Wall is in the arc structure being bent upwards.
By being as above arranged, the resistance of oil pipe uplink and downlink can be reduced, be convenient for, lower oil pipe.
Connecting tube 1 can be configured as a variety of by the mode that shear pin 3 is sleeved on ontology 2, for example, such as attached drawing Shown in 1, in the embodiment of the present invention, multiple shear pins 3 are circumferentially disposed on path bar 2a;Each shear pin 3 It offsets simultaneously with the roof of connecting tube 1.
It should be noted that shear pin 3 is exposed to the length outside path bar 2a less than or equal to 1 side wall of connecting tube Thickness, to guarantee that connecting tube 1 is connect with tubing seal.
In use, first the path bar 2a of ontology 2 is set in connecting tube 1, then by multiple shear pins 3 according to circle Circumferential direction is inserted and fixed to the outer wall of the upper end path bar 2a, so that path bar 2a passes through shear pin 3 in a hanging manner It is set in connecting tube 1.
As it can be seen that, convenient for being arranged path bar 2a in connecting tube 1, reducing the set-up time by being as above arranged.
Wherein, in order to avoid ontology 2 shakes in connecting tube 1, radial distribution of each shear pin 3 along ontology 2.
In addition, above-mentioned multiple shear pins 3 are evenly provided on path bar 2a according to circumferencial direction, so that each shearing 3 uniform force of pin.
It is mainly related with the pressure that can be injected in oil pipe about the installation number of shear pin 3.Wherein, it can be infused in oil pipe The pressure entered is configured according to the requirement of the well depth and operation pressure of construction well, can in oil pipe if the well depth of construction well is bigger The pressure of injection is bigger, then the number that shear pin 3 is installed is more.For example, if injecting the pressure of 15MPa into oil pipe Power, the number of shear pin 3 can be set to 3;If injecting the pressure of 35MPa or 55MPa into oil pipe, of shear pin 3 Number can be set to 4 or 5.
For the ease of replacing shear pin 3, shear pin 3 is threadedly coupled with path bar 2a.Specifically, on shear pin 3 External screw thread is set, multiple threaded holes 202 compatible with the external screw thread of shear pin 3 are set on path bar 2a.
In order to avoid the fluid between oil pipe and oil jacket annulus (referring to the annular space between oil pipe and casing) occurs Channelling is provided with multiple first sealing rings 201 between path bar 2a and connecting tube 1, to seal between path bar 2a and connecting tube 1 Gap.
About the installation site of above-mentioned first sealing ring 201, during the present invention is implemented, on the outer wall of path bar 2a between axial direction Every being provided with the first holding tank for accommodating the first sealing ring 201.By so set, can avoid being arranged in connecting tube 1 Multiple first holding tanks, to guarantee the intensity of connecting tube 1.
It should be noted that the first sealing ring 201 and the first holding tank correspond, i.e., first holding tank accommodates one A first sealing ring 201.And multiple first holding tanks are arranged along the axially spaced-apart of path bar 2a.
Wherein, above-mentioned first sealing ring, 201 Pasting is in corresponding first holding tank, to avoid the first sealing ring 201 Fall.
In addition, settable 4 between path bar 2a and connecting tube 1~6 the first sealing rings 201, the embodiment of the present invention is not Concrete restriction is carried out to the setting number of the first sealing ring 201.
In order to avoid forming channel between oil pipe and pit shaft, multiple second sealing rings are provided between connecting tube 1 and oil pipe.
About the setting position of the second sealing ring, the embodiment of the present invention is reduced in order to avoid carrying out secondary operation to oil pipe It is process time, axially disposed multiple for accommodating the second sealing ring on the outer wall of connecting tube 1 as shown in attached drawing 1 and Fig. 3 Second holding tank 101.
It should be noted that second holding tank 101 accommodates second sealing ring.
By being as above arranged, second sealing ring can be set in above-mentioned second holding tank 101, to increase connecting tube 1 and oil Seal degree between pipe.
Wherein, 2~3 the second holding tanks 101 are set on the outer wall of connecting tube 1, and the embodiment of the present invention is not held to second Receive slot 101 setting number carry out concrete restriction.
For the ease of replacing connecting tube 1, in the embodiment of the present invention, the interior spiral shell with oil pipe is provided on the outer wall of connecting tube 1 The compatible external screw thread of line.
Wherein, as described in attached drawing 3, external screw thread is located at the top of the second holding tank 101, convenient for connecting connecting tube 1 and oil pipe It connects.
To sum up, the construction procedure of tubing plug provided in an embodiment of the present invention is simple, labor intensity is low, operating cost with And preparation expense is low, it is only necessary to 2600 yuan~3000 yuan.
All the above alternatives can form the alternative embodiment of the disclosure, herein no longer using any combination It repeats one by one.
The above is merely for convenience of it will be understood by those skilled in the art that technical solution of the present invention, not to limit The present invention.All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this Within the protection scope of invention.

Claims (11)

1. a kind of tubing plug, which is characterized in that the tubing plug includes: connecting tube (1), ontology (2);
The connecting tube (1) is sleeved on the ontology (2) by multiple shear pins (3), and for connecting with oil pipe;
The ontology (2) and the inner wall of the connecting tube (1) offset, to block the channel of the connecting tube (1);
Wherein, the material of the ontology (2) is solvable water aluminium alloy.
2. tubing plug according to claim 1, which is characterized in that the ontology (2) includes: from top to bottom sequentially to connect Path bar (2a), the large-diameter rod (2b) connect;
The connecting tube (1) is sleeved on the path bar (2a) by multiple shear pins (3), and with the large-diameter rod The roof of (2b) offsets.
3. tubing plug according to claim 2, which is characterized in that the path bar (2a) and the large-diameter rod (2b) Integrated molding.
4. tubing plug according to claim 2, which is characterized in that the outer wall of large-diameter rod (2b) lower end is in upward Curved arc structure.
5. tubing plug according to claim 2, which is characterized in that multiple shear pins (3) are along the circumferential direction It is arranged on the path bar (2a);
Each shear pin (3) also offsets with the roof of the connecting tube (1) simultaneously.
6. tubing plug according to claim 5, which is characterized in that the shear pin (3) and the path bar (2a) is threadedly coupled.
7. tubing plug according to claim 2, which is characterized in that the path bar (2a) and the connecting tube (1) Between be provided with multiple first sealing rings (201).
8. oil line stopper according to claim 7, which is characterized in that be arranged on the outer wall of the path bar (2a) useful In the first holding tank for accommodating first sealing ring (201).
9. tubing plug according to claim 1, which is characterized in that set on the outer wall of the connecting tube (1) along axial direction It is equipped with multiple for accommodating the second holding tank (101) of the second sealing ring.
10. tubing plug according to claim 1, which is characterized in that be provided on the outer wall of the connecting tube (1) with The compatible external screw thread of the internal screw thread of the oil pipe.
11. tubing plug according to claim 10, which is characterized in that the external screw thread is located at second holding tank (101) top.
CN201810401911.3A 2018-04-28 2018-04-28 Tubing plug Pending CN110410032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810401911.3A CN110410032A (en) 2018-04-28 2018-04-28 Tubing plug

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810401911.3A CN110410032A (en) 2018-04-28 2018-04-28 Tubing plug

Publications (1)

Publication Number Publication Date
CN110410032A true CN110410032A (en) 2019-11-05

Family

ID=68357321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810401911.3A Pending CN110410032A (en) 2018-04-28 2018-04-28 Tubing plug

Country Status (1)

Country Link
CN (1) CN110410032A (en)

Similar Documents

Publication Publication Date Title
CN101929317B (en) Undersize-hole oil pipe plugging device
CN102268973B (en) Hole sealing device
CN205605160U (en) Formula of breaking tail pipe blanking plug
CN102278085A (en) Drilling and coring device
CN208830947U (en) Tubing plug
CN203847063U (en) Gradual-cracking bridge plug in horizontal well pipe
CN110410032A (en) Tubing plug
CN209354097U (en) Squeeze cementing bridge plug
CN102041974B (en) Bypass short-circuit structure of abandoned deep water well cutting device and cementing plug method thereof
CN203742505U (en) Floating ball and float collar type prestress well cementation ground anchor assembly
CN201714323U (en) Drilling coring device
CN109026085A (en) A kind of coal mining high tensile steel tube concrete pillar and its application method
CN204571921U (en) Anti-sticking plug is used in well cementation
CN204140106U (en) The meticulous explosion grouted anchor bar of a kind of controlling
CN107268639B (en) Anti- bar hole landslide equipment
CN109322621A (en) A kind of crushable layer consolidates pipe grouting method
CN202546243U (en) Multilayer gas storage well barrel used for high-pressure underground gas storage well
CN108505965A (en) One kind suppressing desealed hydraulic expansion packer and solution encapsulation method
CN102926742A (en) Sand filling pipe
CN202546236U (en) Multi-layer gas storage well barrel for high-pressure underground gas storage well
CN208106375U (en) A kind of down-hole string self-sealing blanking plug
CN102080511B (en) Deepwater abandoned well cutting device having cementing plug and operation method of cementing plug thereof
CN205858275U (en) A kind of Rodless oil extraction system down-hole bleeder
CN200996284Y (en) Spiral impelling solid chemical feeder at wellhead
CN205243429U (en) Edge natural gas well well head protection and mining devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination