CN110409592A - A kind of linking flexible pipeline - Google Patents
A kind of linking flexible pipeline Download PDFInfo
- Publication number
- CN110409592A CN110409592A CN201910757949.9A CN201910757949A CN110409592A CN 110409592 A CN110409592 A CN 110409592A CN 201910757949 A CN201910757949 A CN 201910757949A CN 110409592 A CN110409592 A CN 110409592A
- Authority
- CN
- China
- Prior art keywords
- fixed
- shaft
- rotation
- pipe
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/04—Pipes or fittings specially adapted to sewers
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F7/00—Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
- E03F7/02—Shut-off devices
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F9/00—Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
- E03F9/007—Devices providing a flushing surge
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Transmission Devices (AREA)
- Sewage (AREA)
- Joints Allowing Movement (AREA)
Abstract
A kind of linking flexible pipeline of the invention, including fuselage, the fuselage includes duct chamber, contain the pipeline means of communication for making its connection work by equipment connection both ends pipeline in the duct chamber, rotation is equipped with first pipe in the duct chamber, internal screw thread is fixed in the first pipe, rotation is equipped with second pipe in the first pipe, equipment of the invention can store power by water flow, the power of release storage separates pipelines at different levels when water flow stops, it can also guarantee its leakproofness simultaneously, it will not flow out the water in pipeline to come, in pipe sealing, the presence of equipment does not influence the working condition of pipeline completely, the leakproofness that equipment can also improve pipeline simultaneously makes its performance more safety and stability, work efficiency is high for the throttling process of equipment, integrated degree with higher, pass through the kinetic energy using the water flow in pipeline , equipment is more environmentally friendly, while process safety easy to operate is rapid.
Description
Technical field
The present invention relates to multifunctional pipe field, specially a kind of linking flexible pipeline.
Background technique
With the development of economy, living standard is gradually increased, and the rubbish of people's manufacture is more and more, urban sewage pipeliner
The phenomenon that work amount is increasing, but blow-off line but blocks often, leads to counter-current of sewage, the plugging reason of blow-off line
Usually rubbish or siltation, lead to line clogging, the dismounting of urban duct amount is extremely troublesome, and often a length of tubing is torn open
Unload installment work and require one day or more times, both can not frequently clear up pipeline in this way, for staff for
The maintenance of pipeline and maintenance are also very difficult, it is therefore desirable to design a kind of linking flexible pipeline to solve above-mentioned ask
Topic.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of linking flexible pipelines, can be when water flow stops
Automatically pipeline is separated, the effective integrated equipment that will not also allow the water flow of the inside to come out, the equipment reaction is sensitive, function
It is abundant.
The present invention is achieved through the following technical solutions.
A kind of linking flexible pipeline of the invention, including fuselage, the fuselage include duct chamber;
Contain the pipeline means of communication for making its connection work by equipment connection both ends pipeline, the duct chamber in the duct chamber
Interior rotation is equipped with first pipe, internal screw thread is fixed in the first pipe, rotation is equipped with the second pipe in the first pipe
Road, second pipe right side outer surface are fixed with the external screw thread engaged with the internal screw thread, the first pipe outer surface
It is fixed with rack gear;
Connection is equipped with seal chamber on the downside of the duct chamber, is equipped in the seal chamber through sliding block and coordinating block cooperation blocking pipeline
Blockage mechanism, front and back extends rotation and is equipped with first rotating shaft in the seal chamber, be fixed with convex gear in the first rotating shaft,
First sliding groove is fixed on the upside of the first rotating shaft in the end wall of front and back, is equipped with the first sliding block in the first sliding groove, described the
Rotation is equipped with the second shaft in one sliding block;
Aft bulkhead is fixed with drive cavity on the left of the duct chamber, and the transmission of control whole device operation is equipped in the drive cavity
Mechanism, the duct chamber left end are fixed with drainage pipeline, and the drainage pipeline rotation is equipped with the third shaft that front and back extends, institute
It states and is fixed with water wheels in third shaft.
Further, the pipeline means of communication includes the duct chamber, and rotation is equipped with described first in the duct chamber
Pipeline is fixed with the internal screw thread in the first pipe, and rotation is equipped with the second pipe in the first pipe, described
Outer surface is fixed with the external screw thread engaged with the internal screw thread on the right side of second pipe, and the first pipe outer surface is fixed
Equipped with the rack gear.
Further, sealing compensation block, the duct chamber left side are equipped between the first pipe and the second pipe
It is fixed with second sliding slot, the second pipe slides in the second sliding slot, and the duct chamber aft bulkhead connection is equipped with institute
Power cavity is stated, left and right, which extends to rotate, in the power cavity is equipped with the 4th shaft, is fixed with the first tooth on the right side of the 4th shaft
Wheel, the first gear are engaged with first rack gear, and the 4th shaft left end is fixed with first bevel gear.
Further, the blockage mechanism includes the seal chamber, and front and back extends rotation equipped with described in the seal chamber
First rotating shaft is fixed with the convex gear in the first rotating shaft, is fixed in the end wall of front and back on the upside of the first rotating shaft
The first sliding groove, the first sliding groove is interior to be equipped with first sliding block, the first sliding groove top end wall and first sliding block
Between be equipped with the first spring.
Further, rotation is equipped with second shaft in first sliding block, and second shaft is located at the double wedge
Wheel top is engaged with the convex gear is equipped with second gear, is located on rear side of the second gear in second shaft and is fixed with
Coordinating block, duct chamber upside connection are equipped with slide block chamber, and the slide block chamber top end wall is fixed with third sliding slot, the third
Sliding is equipped with the second sliding block in sliding slot.
Further, the second sliding block sliding block right side is fixed with the second rack gear, and rotation is equipped in the slide block chamber
With the 5th shaft, third gear is fixed in the 5th shaft, the third gear is engaged with second rack gear.
Further, the transmission mechanism includes the drive cavity, and the duct chamber left end is fixed with drainage pipeline, institute
It states drainage pipeline rotation and is equipped with the third shaft that front and back extends, be fixed with water wheels, the third shaft in the third shaft
Rear side is fixed with ratchet, is fixed with ratchet on the ratchet, is fixed with the 4th sliding slot on the upside of the ratchet, and the described 4th
Sliding is equipped with third sliding block in sliding slot.
Further, second spring is equipped between the third sliding block top end face and the 4th sliding slot top end face, it is described
Third sliding block is contacted with the ratchet prevents the ratchet from inverting, and rotates in the drive cavity and is equipped with the 6th shaft, and the described 6th
Shaft front end is fixed with rotating block, and the 5th sliding slot is fixed on the upside of the rotating block, and sliding is equipped in the 5th sliding slot
Four-slider, the 5th sliding slot top are fixed with electromagnet, the electromagnet and the water wheels Electricity Federation, the electromagnet with
Third spring is equipped between the Four-slider top end face.
Further, the through-hole that the Four-slider can protrude into, the rotating block and institute are fixed on the rotating block
It states and is connected with torsional spring between ratchet, be fixed with the first belt pulley in the 5th shaft in the drive cavity, be located at
It is fixed with the second belt pulley in the 6th shaft in the drive cavity, the first rotating shaft in the drive cavity
On be fixed with third belt pulley, rotate and set between first belt pulley and second belt pulley, the third belt pulley
There is belt, being fixed in the 6th shaft on front side of second belt pulley and described in the drive cavity
The second bevel gear of one bevel gear engagement.
Beneficial effects of the present invention: equipment of the invention can store power by water flow, release storage when water flow stops
The power deposited separates pipelines at different levels, while can also guarantee its leakproofness, will not flow out the water in pipeline and comes, in pipe sealing
When equipment presence do not influence the working condition of pipeline completely, while equipment can also improve the leakproofness of pipeline makes its performance more
Add safety and stability, work efficiency is high for the throttling process of equipment, integrated degree with higher, by utilizing the water flow in pipeline
Kinetic energy, equipment is more environmentally friendly, while process safety easy to operate is rapid.
Detailed description of the invention
It, below will be to embodiment or existing in order to illustrate more clearly of inventive embodiments or technical solution in the prior art
Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only to invent
Some embodiments for those of ordinary skill in the art without creative efforts, can also basis
These attached drawings obtain other attached drawings.
Fig. 1 is the mechanical structure schematic diagram of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of D-D in Fig. 1;
Fig. 3 is the structural schematic diagram of A-A in Fig. 2;
Fig. 4 is the structural schematic diagram of B-B in Fig. 2;
Fig. 5 is the structural schematic diagram of C-C in Fig. 2.
Specific embodiment
Below with reference to Fig. 1-5, the present invention is described in detail, for sake of convenience, now such as to hereafter described orientation regulation
Under: hereafter described front-rear direction up and down is consistent with the front-rear direction up and down of Fig. 1 projection relation itself.
A kind of linking flexible pipeline in conjunction with described in attached drawing 1-5, including fuselage 10, the fuselage 10 include duct chamber
57, the duct chamber 57 is interior to contain the pipeline means of communication 90 for making it be connected to work by equipment connection both ends pipeline, the pipe
Rotation is equipped with first pipe 22 in road chamber 57, is fixed with internal screw thread 21 in the first pipe 22, in the first pipe 22
Rotation is equipped with second pipe 24, and the 24 right side outer surface of second pipe is fixed with the external screw thread engaged with the internal screw thread 21
20,22 outer surface of first pipe is fixed with rack gear 19;
Connection is equipped with seal chamber 14 on the downside of the duct chamber 57, is equipped in the seal chamber 14 stifled by sliding block and coordinating block cooperation
The blockage mechanism 91 of pipeline is filled in, front and back, which extends to rotate, in the seal chamber 14 is equipped with first rotating shaft 16, in the first rotating shaft 16
It is fixed with convex gear 17, is fixed with first sliding groove 33, the first sliding groove in the 16 upside front and back end wall of first rotating shaft
The first sliding block 35 is equipped in 33, rotation is equipped with the second shaft 15 in first sliding block 35;
The 57 left side aft bulkhead of duct chamber is fixed with drive cavity 43, and control whole device operation is equipped in the drive cavity 43
Transmission mechanism 93,57 left end of duct chamber is fixed with drainage pipeline 11, and the rotation of drainage pipeline 11 is prolonged equipped with front and back
The third shaft 13 stretched is fixed with water wheels 12 in the third shaft 13.
The pipeline means of communication 90 includes the duct chamber 57, and rotation is equipped with the first pipe in the duct chamber 57
22, the internal screw thread 21 is fixed in the first pipe 22, rotation is equipped with the second pipe in the first pipe 22
24, the 24 right side outer surface of second pipe is fixed with the external screw thread 20 engaged with the internal screw thread 21, and described first
22 outer surface of pipeline is fixed with the rack gear 19, and sealing compensation is equipped between the first pipe 22 and the second pipe 24
Block 23 is fixed with second sliding slot 25 on the left of the duct chamber 57, and the second pipe 24 slides in the second sliding slot 25,
57 aft bulkhead of the duct chamber connection is equipped with the power cavity 43, and left and right extension rotation is equipped with the 4th shaft in the power cavity 43
59, first gear 58 is fixed on the right side of the 4th shaft 59, and the first gear 58 is engaged with first rack gear 19, institute
It states 59 left end of the 4th shaft and is fixed with first bevel gear 60, when the first bevel gear 60 rotation, the first bevel gear
60 drive the 4th shaft 59 rotation, and the 4th shaft 59 rotation drives the first gear 58 to rotate, first tooth
58 rotation of wheel drives the first pipe 22 to rotate by engaging with first rack gear 19, and the rotation of first pipe 21 passes through
The external screw thread 20 is engaged with internal screw thread 21 slides the second pipe 24 to the right, at this point, the pipeline in the duct chamber 57
It disconnects.
The blockage mechanism 91 includes the seal chamber 14, and front and back, which extends to rotate, in the seal chamber 14 is equipped with described first
Shaft 16, is fixed with the convex gear 17 in the first rotating shaft 16, fixed in the 16 upside front and back end wall of first rotating shaft
Equipped with the first sliding groove 33, be equipped with first sliding block 35 in the first sliding groove 33,33 top end wall of first sliding groove with
The first spring 34 is equipped between first sliding block 35, rotation is equipped with second shaft 15 in first sliding block 35, described
Second shaft 15 is located at 17 top of convex gear and is engaged with the convex gear 17 equipped with second gear 18, second shaft 15
Upper that coordinating block 31 is fixed on rear side of the second gear 18, connection is equipped with slide block chamber 30, institute on the upside of the duct chamber 57
It states 30 top end wall of slide block chamber and is fixed with third sliding slot 29, sliding is equipped with the second sliding block 32 in the third sliding slot 29, and described the
Two sliding blocks, 32 sliding block right side is fixed with the second rack gear 28, in the slide block chamber 30 rotation be equipped with the 5th shaft 26,
Third gear 27 is fixed in 5th shaft 26, the third gear 27 is engaged with second rack gear 28, when described
When 5th shaft 26 rotates, the 5th shaft 26 rotation drives the third gear 27 to rotate, and the third gear 27 rotates
32 slide downward of the second sliding block is driven by engaging with second rack gear 28, when the first rotating shaft 16 rotation, institute
Stating first rotating shaft 16 drives the convex gear 17 to rotate, and the rotation of convex gear 17 with the gear of the second gear 18 by nibbling
Crossed belt, which moves the coordinating block 31 and first rotates to hold up, then to move up, and the coordinating block 31 is holded up when moving up with described second
The cooperation of sliding block 32 blocks the drainage pipeline 11.
The transmission mechanism 93 includes the drive cavity 43, and 57 left end of duct chamber is fixed with drainage pipeline 11, institute
It states the rotation of drainage pipeline 11 and is equipped with the third shaft 13 that front and back extends, be fixed with water wheels 12 in the third shaft 13, it is described
It is fixed with ratchet 48 on rear side of third shaft 13, ratchet 47 is fixed on the ratchet 48, fixation is set on the upside of the ratchet 48
There is the 4th sliding slot 44, sliding is equipped with third sliding block 46 in the 4th sliding slot 44,46 top end face of third sliding block and described the
Second spring 45 is equipped between four sliding slots, 44 top end face, the third sliding block 46 is contacted with the ratchet 47 prevents the ratchet 48
Reversion, the interior rotation of the drive cavity 43 are equipped with the 6th shaft 39, and 39 front end of the 6th shaft is fixed with rotating block 56, described
The 5th sliding slot 51 is fixed on the upside of rotating block 56, sliding is equipped with Four-slider 53 in the 5th sliding slot 51, and the described 5th is sliding
51 top of slot is fixed with electromagnet 50, the electromagnet 50 and 12 Electricity Federation of water wheels, the electromagnet 50 and the described 4th
It is equipped with third spring 52 between 53 top end face of sliding block, is fixed with the through-hole that the Four-slider can protrude on the rotating block 56
55, it is connected with torsional spring 61 between the rotating block 56 and the ratchet 48, the 5th shaft in the drive cavity 43
It is fixed with the first belt pulley 42 on 26, is fixed with the second belt in the 6th shaft 39 in the drive cavity 43
Wheel 40, is fixed with third belt pulley 37, first belt pulley in the first rotating shaft 16 in the drive cavity 43
Rotation is equipped with belt 41 between 42 and second belt pulley 40, the third belt pulley 37, in the drive cavity 43
Second engaged with the first bevel gear 60 is fixed in the 6th shaft 39 of 40 front side of the second belt pulley
Bevel gear 38, when the drainage pipeline 11 works normally, the water wheels 12 close the electromagnet 50, and the electromagnet 50 closes
Closing protrudes into the third spring 52 in the through-hole 55 Four-slider 53 by elastic force, at this time 56 nothing of rotating block
Method rotation, the rotation of water wheels 12 drive the third shaft 13 to rotate, and the rotation of third shaft 13 drives the ratchet 48
Rotation, the third sliding block 46 slide up and down under the action of the second spring 45 is with ratchet 47,48 turns of the ratchet
Dynamic that the torsional spring 61 is made to store power, when the drainpipe 11 does not work, the water wheels 12 stop operating, and the water wheels 12 are opened at this time
The electromagnet 50 is opened, the unlatching of electromagnet 50 makes first upper slide of the Four-slider 53 be detached from the through-hole 55, and described turn
Motion block 56 can rotate, and under the action of torsional spring 60, the rotation of rotating block 56 drives the 6th shaft 39 rotation, institute
Stating the rotation of the 6th shaft 39 drives second belt pulley 40 to rotate, and the rotation of the second belt pulley 40 is made described by belt 41
First belt pulley 42 is rotated with the third belt pulley 37, and the rotation of the first belt pulley 42 drives described 26 turns of 5th shaft
Dynamic, the rotation of third belt pulley 37 drives the first rotating shaft 16 to rotate, and the 6th shaft 39 rotation drives described second
Bevel gear 38 rotates, and the rotation of second bevel gear 38 drives the first bevel gear 60 to rotate by gear engagement.
The sequence of the mechanical action of whole device:
1. the first bevel gear 60 drives the 4th shaft 59 to rotate when the first bevel gear 60 rotation, described the
The rotation of four shafts 59 drives the first gear 58 to rotate, and the rotation of first gear 58 with first rack gear 19 by engaging
The first pipe 22 is driven to rotate, described in the rotation of first pipe 21 is engaged with internal screw thread 21 by the external screw thread 20 and made
Second pipe 24 slides to the right, at this point, the pipeline in the duct chamber 57 disconnects;
2. the 5th shaft 26 rotation drives the third gear 27 to rotate when the 5th shaft 26 rotation, described the
The rotation of three gears 27 drives 32 slide downward of the second sliding block by engaging with second rack gear 28, when the first rotating shaft
When 16 rotation, the first rotating shaft 16 drives the convex gear 17 to rotate, the rotation of convex gear 17 by with second tooth
The gear engagement drive coordinating block 31 of wheel 18, which first rotates to hold up, then to move up, and the coordinating block 31, which is holded up, to move up
When with second sliding block 32 cooperation block the drainage pipeline 11;
3. the water wheels 12 close the electromagnet 50 when the drainage pipeline 11 works normally, the electromagnet 50 is closed
Protrude into the third spring 52 in the through-hole 55 Four-slider 53 by elastic force, the rotating block 56 can not at this time
Rotation, the rotation of water wheels 12 drive the third shaft 13 to rotate, and the rotation of third shaft 13 drives described 48 turns of ratchet
Dynamic, the third sliding block 46 slides up and down under the action of the second spring 45 is with ratchet 47;
4. the rotation of ratchet 48 makes the torsional spring 61 store power, when the drainpipe 11 does not work, the water wheels 12 stop turning
Dynamic, the water wheels 12 open the electromagnet 50 at this time, and the unlatching of electromagnet 50 makes the Four-slider 53, and first upper sliding is de-
From the through-hole 55, the rotating block 56 can be rotated, and under the action of torsional spring 60, the rotation of rotating block 56 drives institute
State the rotation of the 6th shaft 39;
5. the 6th shaft 39 rotation drives second belt pulley 40 to rotate, the rotation of the second belt pulley 40 passes through belt
41 rotate first belt pulley 42 with the third belt pulley 37, and the rotation of the first belt pulley 42 drives described 5th turn
Axis 26 rotates;
6. the third belt pulley 37 rotation drives the first rotating shaft 16 to rotate, the 6th shaft 39 rotation drives described the
The rotation of two bevel gears 38, the rotation of second bevel gear 38 drive the first bevel gear 60 to rotate by gear engagement, one
Change degree is high, high degree of automation, and each mechanism driving cooperation is close, and kinetic energy efficiency is high.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with this field technology
Personage can understand the content of present invention and be implemented, and it is not intended to limit the scope of the present invention.It is all according to the present invention
Equivalent change or modification made by Spirit Essence, should be covered by the scope of protection of the present invention.
Claims (9)
1. a kind of linking flexible pipeline of the invention, including fuselage, it is characterised in that: the fuselage includes duct chamber;
Contain the pipeline means of communication for making its connection work by equipment connection both ends pipeline, the duct chamber in the duct chamber
Interior rotation is equipped with first pipe, internal screw thread is fixed in the first pipe, rotation is equipped with the second pipe in the first pipe
Road, second pipe right side outer surface are fixed with the external screw thread engaged with the internal screw thread, the first pipe outer surface
It is fixed with rack gear;
Connection is equipped with seal chamber on the downside of the duct chamber, is equipped in the seal chamber through sliding block and coordinating block cooperation blocking pipeline
Blockage mechanism, front and back extends rotation and is equipped with first rotating shaft in the seal chamber, be fixed with convex gear in the first rotating shaft,
First sliding groove is fixed on the upside of the first rotating shaft in the end wall of front and back, is equipped with the first sliding block in the first sliding groove, described the
Rotation is equipped with the second shaft in one sliding block;
Aft bulkhead is fixed with drive cavity on the left of the duct chamber, and the transmission of control whole device operation is equipped in the drive cavity
Mechanism, the duct chamber left end are fixed with drainage pipeline, and the drainage pipeline rotation is equipped with the third shaft that front and back extends, institute
It states and is fixed with water wheels in third shaft.
2. a kind of linking flexible pipeline according to claim 1, it is characterised in that: the pipeline means of communication includes
The duct chamber, the interior rotation of the duct chamber are equipped with the first pipe, are fixed with the internal screw thread in the first pipe,
Rotation is equipped with the second pipe in the first pipe, and outer surface is fixed with and the internal screw thread on the right side of the second pipe
The external screw thread of engagement, the first pipe outer surface is fixed with the rack gear.
3. a kind of linking flexible pipeline according to claim 2, it is characterised in that: the first pipe and described the
It is equipped with sealing compensation block between two pipelines, is fixed with second sliding slot on the left of the duct chamber, the second pipe slides on institute
It states in second sliding slot, the duct chamber aft bulkhead connection is equipped with the power cavity, and left and right extends rotation and is equipped in the power cavity
4th shaft, the 4th shaft right side are fixed with first gear, and the first gear is engaged with first rack gear, described
4th shaft left end is fixed with first bevel gear.
4. a kind of linking flexible pipeline according to claim 1, it is characterised in that: the blockage mechanism includes described
Seal chamber, the interior front and back of the seal chamber extend rotation and are equipped with the first rotating shaft, be fixed in the first rotating shaft described convex
Gear is fixed with the first sliding groove in the end wall of front and back on the upside of the first rotating shaft, and described the is equipped in the first sliding groove
One sliding block is equipped with the first spring between the first sliding groove top end wall and first sliding block.
5. a kind of linking flexible pipeline according to claim 4, it is characterised in that: rotation is set in first sliding block
There is second shaft, second shaft, which is located to engage above the convex gear with the convex gear, is equipped with second gear, institute
It states to be located on rear side of the second gear in the second shaft and is fixed with coordinating block, connection is equipped with slide block chamber on the upside of the duct chamber,
The slide block chamber top end wall is fixed with third sliding slot, and sliding is equipped with the second sliding block in the third sliding slot.
6. a kind of linking flexible pipeline according to claim 5, it is characterised in that: the second sliding block sliding block right end
Face is fixed with the second rack gear, in the slide block chamber rotation be equipped with the 5th shaft, be fixed in the 5th shaft
Third gear, the third gear are engaged with second rack gear.
7. a kind of linking flexible pipeline according to claim 1, it is characterised in that: the transmission mechanism includes described
Drive cavity, the duct chamber left end are fixed with drainage pipeline, and the drainage pipeline rotation is equipped with the third shaft that front and back extends,
It is fixed with water wheels in the third shaft, is fixed with ratchet on rear side of the third shaft, is fixed with spine on the ratchet
Tooth, the ratchet upside are fixed with the 4th sliding slot, and sliding is equipped with third sliding block in the 4th sliding slot.
8. a kind of linking flexible pipeline according to claim 7, it is characterised in that: the third sliding block top end face with
Second spring is equipped between the 4th sliding slot top end face, the third sliding block is contacted with the ratchet prevents the ratchet anti-
Turn, rotation is equipped with the 6th shaft in the drive cavity, and the 6th shaft front end is fixed with rotating block, the rotating block upside
It is fixed with the 5th sliding slot, sliding is equipped with Four-slider in the 5th sliding slot, and the 5th sliding slot top is fixed with electromagnetism
Iron, the electromagnet and the water wheels Electricity Federation are equipped with third spring between the electromagnet and the Four-slider top end face.
9. a kind of linking flexible pipeline according to claim 8, it is characterised in that: be fixed on the rotating block
The through-hole that the Four-slider can protrude into is connected with torsional spring between the rotating block and the ratchet, is located in the drive cavity
The 5th shaft on be fixed with the first belt pulley, is fixed in the 6th shaft in the drive cavity
Two belt pulleys, are fixed with third belt pulley in the first rotating shaft in the drive cavity, first belt pulley with
Between second belt pulley, the third belt pulley rotation be equipped with belt, in the drive cavity in second skin
The second bevel gear engaged with the first bevel gear is fixed in the 6th shaft on front side of belt wheel.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910757949.9A CN110409592B (en) | 2019-08-16 | 2019-08-16 | Connection type telescopic pipeline |
JP2019217445A JP2021032405A (en) | 2019-08-16 | 2019-11-29 | Extensible and contractible connection type pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910757949.9A CN110409592B (en) | 2019-08-16 | 2019-08-16 | Connection type telescopic pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110409592A true CN110409592A (en) | 2019-11-05 |
CN110409592B CN110409592B (en) | 2020-11-03 |
Family
ID=68367761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910757949.9A Active CN110409592B (en) | 2019-08-16 | 2019-08-16 | Connection type telescopic pipeline |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP2021032405A (en) |
CN (1) | CN110409592B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112575874A (en) * | 2021-01-15 | 2021-03-30 | 成都市新都区是几个商贸有限公司 | Prevent waste water drainage device of jam |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113484139B (en) * | 2021-06-02 | 2024-03-26 | 真兰管业科技有限公司 | Device for stainless steel gas corrugated pipe flattening experiment |
CN113895186A (en) * | 2021-10-28 | 2022-01-07 | 盐城工学院 | Wireless temperature detection device for engineering solid tire |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004046603A1 (en) * | 2002-11-19 | 2004-06-03 | Jtl Australia Pty Ltd | Improved pipe connector |
US7735875B2 (en) * | 2005-05-09 | 2010-06-15 | Andrew Jimenez | Device and method for making and using a pipe coupling device |
CN203905169U (en) * | 2014-02-21 | 2014-10-29 | 武汉圣禹排水系统有限公司 | Spring locking type hydraulic self-flushing impounding gate |
CN204418364U (en) * | 2015-01-27 | 2015-06-24 | 丰顺县梅丰水电发展有限公司 | The rotary air bag plugging structure of power station gutter |
CN207794247U (en) * | 2017-12-13 | 2018-08-31 | 王腾蛟 | A kind of easy-to-dismount sewage conduct |
CN208041398U (en) * | 2018-01-24 | 2018-11-02 | 南京居竹新型材料科技有限公司 | A kind of assembling pipe joint |
CN208586717U (en) * | 2018-04-24 | 2019-03-08 | 广州市汇鹏建设有限公司 | A kind of municipal works drainage pipeline |
CN208884674U (en) * | 2018-07-03 | 2019-05-21 | 河北永德橡塑制品有限公司 | A kind of PVC sewage pipe that can prevent from flowing backwards |
CN110080351A (en) * | 2019-06-03 | 2019-08-02 | 杭州良辰电子商务有限公司 | A kind of rectilinear disconnecting switch combined floodgate |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5439710Y2 (en) * | 1973-12-24 | 1979-11-24 | ||
JP2005336793A (en) * | 2004-05-26 | 2005-12-08 | Kubota Corp | Manhole device and sewer pipe conduit cleaning method |
JP2005336794A (en) * | 2004-05-26 | 2005-12-08 | Kubota Corp | Flush gate |
CN108591651A (en) * | 2018-06-15 | 2018-09-28 | 江苏宝地管业有限公司 | A kind of scalable connecting pipe |
-
2019
- 2019-08-16 CN CN201910757949.9A patent/CN110409592B/en active Active
- 2019-11-29 JP JP2019217445A patent/JP2021032405A/en not_active Revoked
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004046603A1 (en) * | 2002-11-19 | 2004-06-03 | Jtl Australia Pty Ltd | Improved pipe connector |
US7735875B2 (en) * | 2005-05-09 | 2010-06-15 | Andrew Jimenez | Device and method for making and using a pipe coupling device |
CN203905169U (en) * | 2014-02-21 | 2014-10-29 | 武汉圣禹排水系统有限公司 | Spring locking type hydraulic self-flushing impounding gate |
CN204418364U (en) * | 2015-01-27 | 2015-06-24 | 丰顺县梅丰水电发展有限公司 | The rotary air bag plugging structure of power station gutter |
CN207794247U (en) * | 2017-12-13 | 2018-08-31 | 王腾蛟 | A kind of easy-to-dismount sewage conduct |
CN208041398U (en) * | 2018-01-24 | 2018-11-02 | 南京居竹新型材料科技有限公司 | A kind of assembling pipe joint |
CN208586717U (en) * | 2018-04-24 | 2019-03-08 | 广州市汇鹏建设有限公司 | A kind of municipal works drainage pipeline |
CN208884674U (en) * | 2018-07-03 | 2019-05-21 | 河北永德橡塑制品有限公司 | A kind of PVC sewage pipe that can prevent from flowing backwards |
CN110080351A (en) * | 2019-06-03 | 2019-08-02 | 杭州良辰电子商务有限公司 | A kind of rectilinear disconnecting switch combined floodgate |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112575874A (en) * | 2021-01-15 | 2021-03-30 | 成都市新都区是几个商贸有限公司 | Prevent waste water drainage device of jam |
Also Published As
Publication number | Publication date |
---|---|
CN110409592B (en) | 2020-11-03 |
JP2021032405A (en) | 2021-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110409592A (en) | A kind of linking flexible pipeline | |
US10330213B2 (en) | Electromechanical-linkage hydraulic control gate valve actuator | |
CN206093128U (en) | Removable guide rails's electric brake valve | |
CN209196156U (en) | A kind of convenience intercepts water valve member | |
CN108760272A (en) | A kind of water-pump valve simulation experiment system and its simulation experiment method | |
CN103866847A (en) | Floating-ball flow intercepting device | |
CN207961690U (en) | A kind of multi-drive type bevel gear rotary type valve | |
CN203821568U (en) | Device for intercepting float bowl of intercepting well | |
CN206070495U (en) | A kind of horizontal open-close sluice gate structure of roller shutter type | |
CN214222026U (en) | Drain valve for hydraulic engineering | |
CN109013165A (en) | Door for reducing noise | |
CN209339106U (en) | A kind of synchronization is from lift gate | |
CN202610769U (en) | Locking and limiting device of shutter dam | |
CN208348538U (en) | A kind of valve plate opening device of hydraulic control valve | |
CN203113290U (en) | Novel flap valve control system | |
CN103911972A (en) | Novel flap valve control system | |
CN206017975U (en) | Vertical control lead | |
CN112302856A (en) | Can regulate and control radial hydroelectric generator device of pipe wall | |
CN102493408A (en) | Lock limiting device of shutter dam | |
CN220099827U (en) | Gate structure with side water stop device | |
CN206529747U (en) | A kind of hydraulic engineering headstock gear | |
CN216379427U (en) | Gate throttling arrangement for hydraulic engineering | |
CN206280591U (en) | A kind of vertical level Four drive valve manual driving device | |
CN109403281A (en) | A kind of synchronization is from lift gate | |
CN220435433U (en) | Stainless steel electric butterfly valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201012 Address after: 314400 Building 1, No. 6, Danmei Road, Haining Economic Development Zone, Haining City, Jiaxing City, Zhejiang Province Applicant after: ZHEJIANG ZHENGTONG PIPES Co.,Ltd. Address before: 321000 Shantou 2-31, Luxiu Village, Paishui Town, Dongyang City, Jinhua City, Zhejiang Province Applicant before: Dongyang Ayu Machinery Technology Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |