CN110409257A - A kind of body-building by scientific methods prevents joint injury and slows down the health walk of muscular fatigue - Google Patents
A kind of body-building by scientific methods prevents joint injury and slows down the health walk of muscular fatigue Download PDFInfo
- Publication number
- CN110409257A CN110409257A CN201910625913.5A CN201910625913A CN110409257A CN 110409257 A CN110409257 A CN 110409257A CN 201910625913 A CN201910625913 A CN 201910625913A CN 110409257 A CN110409257 A CN 110409257A
- Authority
- CN
- China
- Prior art keywords
- multiple groups
- groups
- ring
- building
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C15/00—Pavings specially adapted for footpaths, sidewalks or cycle tracks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rehabilitation Tools (AREA)
Abstract
The present invention relates to the technical fields of body-building pavement, joint injury is prevented more particularly to a kind of body-building by scientific methods and slows down the health walk of muscular fatigue, it can reduce the phenomenon that user's joint injury and muscular fatigue, and the safety in climbing can be improved, the influence in light rain or sunshine weather, to the usage experience of user can be reduced simultaneously;Including pavement ontology, it further include multiple groups front support rod, multiple groups back support rod, preceding handrail, back hand rail, two groups of front rods, two groups of rear connecting rods, front limit bar, gag lever post afterwards, connection structure, fixed ring, connecting band and elastic reducing-fixing band, it further include multiple groups support shaft, locating shaft, two groups of locating pieces, front limit axis, limit shaft afterwards, rotating ring before multiple groups, rotating ring after multiple groups, multiple groups front apron, multiple groups rear baffle, multiple groups prelocalization ring, positioning ring after multiple groups, fixed link before multiple groups, fixed link after multiple groups, multiple groups front hook, multiple groups aft hook, link after link and multiple groups before multiple groups.
Description
Technical field
The present invention relates to the technical fields of body-building pavement, prevent joint injury more particularly to a kind of body-building by scientific methods and slow down
The health walk of muscular fatigue.
Background technique
It is well known that pavement is the path that only walking cannot be open to traffic, the pavement by road also can refer to.Also refer to green scape
Route is seen, is roamed leisurely therebetween for visitor and cyclist, formation and natural ecological environment married Belt scenery patch corridor,
Generally referred to as green landscape route is built along the natural and artificial gallery such as streamside, trench, ridge, scenic road, irrigation canals and ditches
If roaming leisurely therebetween for visitor and cyclist, formation and natural ecological environment married Belt scenery patch corridor are undertaken
The mobilization of information, energy and substance, promote landscape ecosystem inside Efficient Cycle, while reinforce each close nearly patch it
Between connection can often trim pavement so that people carry out mountain-climbing use, and then can achieve therefore in the places such as park or massif
Certain body-building purpose, but existing pavement is in use, since the resonable degree of its design is poor, be easy to cause people
Joint injury and muscular fatigue the phenomenon that, and its safety in climbing is poor, at the same its in light rain or
When sunshine weather, it is easy to influence the usage experience of user, practicability is poor.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of user's joint injury and muscular fatigue of can reducing
Phenomenon, and the safety in climbing can be improved, while can reduce in light rain or sunshine weather, user is made
With the influence of experience, the body-building by scientific methods for improving practicability prevents joint injury and slows down the health walk of muscular fatigue.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, including pavement sheet
Body, if the stone rank group is made of drystone rank, further includes more if the pavement ontology is made of drystone rank group and several buffer tables
Group front support rod, multiple groups back support rod, preceding handrail, back hand rail, two groups of front rods, two groups of rear connecting rods, front limit bar, rear limit
Position bar, connection structure, fixed ring, connecting band and elastic reducing-fixing band, the multiple groups front support rod and multiple groups back support rod bottom end point
Do not connect with pavement bodies top front-end and back-end, and multiple groups front support rod and multiple groups back support rod top respectively with preceding handrail
It is connected with back hand rail, two groups of front rods and two groups of rear connecting rod bottom ends connect with preceding handrail and back hand rail left and right ends respectively
It connects, and two groups of front rods and two groups of rear connecting rod tops are connect with front limit bar and rear gag lever post left and right ends respectively, institute
Fixed ring is stated to be mounted in connection structure, the connecting band both ends respectively with fixed ring and flexible fastening band connection, the elasticity
Fixing belt head and the tail connect, and the connection structure set is filled on front limit bar, and the connection structure include the first stationary half,
Second stationary half, two groups of locating rings, connecting shaft, fixing axle, the first positioning plate, the second positioning plate, positioning threads bar and positioning
Screwed pipe, two groups of locating rings are mounted on first stationary half one end, the connecting shaft both ends respectively with fixing axle and second
The connection of stationary half one end, the fixing axle rear and front end are each passed through two groups of locating rings, and first positioning plate and second are determined
Position plate is separately mounted to the first stationary half and the second stationary half other end, is provided with through-hole on second positioning plate, institute
It states positioning threads bar left end and is mounted on the first positioning plate right side wall middle section, and positioning threads bar right end passes through through-hole, institute
State positioning threads pipe spiral shell and be filled to positioning threads bar right half area, and positioning threads pipe right end is closed, further include multiple groups support shaft,
Rotating ring, multiple groups front apron, multiple groups after rotating ring, multiple groups before locating shaft, two groups of locating pieces, front limit axis, rear limit shaft, multiple groups
After rear baffle, multiple groups prelocalization ring, multiple groups before positioning ring, multiple groups after fixed link, multiple groups after fixed link, multiple groups front hook, multiple groups
Hook, link, multiple groups support shaft bottom end are installed in pavement bodies top middle section after link and multiple groups before multiple groups, and
And multiple groups support shaft top, with positioning axis connection, two groups of locating pieces are separately mounted to locating shaft two ends, the front limit
Axis and rear limit shaft both ends are connect with two groups of locating pieces respectively, and rotating ring is separately mounted to after rotating ring and multiple groups before the multiple groups
On multiple groups front apron and multiple groups rear baffle, and before multiple groups after rotating ring and multiple groups rotating ring be set with to front limit axis and after
On limit shaft, multiple groups are respectively arranged between rotating ring and front limit axis and rear limit shaft after the preceding rotating ring of the multiple groups and multiple groups
Ball bearing after preceding ball bearing and multiple groups, positioning ring is separately mounted to multiple groups support shaft after the multiple groups prelocalization ring and multiple groups
Upper half area, fixed link one end is respectively arranged with before multiple groups and moves after shift(ing) ring and multiple groups after fixed link and multiple groups before the multiple groups
Ring, shift(ing) ring is connect with positioning ring after multiple groups prelocalization ring and multiple groups respectively after shift(ing) ring and multiple groups before the multiple groups, described more
The fixed link other end is connect with multiple groups front hook and multiple groups aft hook respectively after the preceding fixed link of group and multiple groups, link before the multiple groups
It is separately mounted on multiple groups front apron and multiple groups rear baffle with link after multiple groups.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, further includes connection chain
With two groups of connection rings, two groups of connection rings are separately mounted to the first positioning plate left side wall and positioning threads pipe right end, the company
Chain link both ends are connect with two groups of connection rings respectively.
A kind of body-building by scientific methods of the invention prevents from joint injury and slowing down the health walk of muscular fatigue, before further including multiple groups
Moving handle after moving handle and multiple groups, moving handle is separately mounted to multiple groups front after moving handle and multiple groups before the multiple groups
On plate and multiple groups rear baffle.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, further includes mating formation
Layer, the pave-load layer are mated formation in pavement bodies top.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, the pave-load layer table
Face is provided with multiple groups rhone.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, the pave-load layer
Material is wooden, pitch or gravel.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, the stone rank group
The gradient is 8 °~12 °.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, the buffer table
The gradient is 2 °~5 °.
Compared with prior art the invention has the benefit that the present invention using stone rank in such a way that buffer table combines,
Make sporter's available rest appropriate after the top bar by the short time marks time exercise, so as to reduce user pass
Section damage and the phenomenon that muscular fatigue, and user is in climbing, can be while small with hand steered preceding handrail or back bar
Elastic reducing-fixing band set can be filled on arm by child or old man, and the first stationary half and the second stationary half are bypassed front limit
Bar or rear gag lever post, and by positioning threads bar pass through through-hole, positioning threads pipe spiral shell is filled on positioning threads bar, so as to so that
Connection framework is connect with front limit bar or rear gag lever post, and connection structure can be moved along front limit bar or rear gag lever post, from
And user can be played a certain protective role in user's climbing, and then the peace in climbing can be improved
Quan Xing, while can reduce in light rain or sunshine weather rotates multiple groups front apron and multiple groups rear baffle, make multiple groups front apron and
Multiple groups rear baffle is rotated by rotating ring after the preceding rotating ring of multiple groups and multiple groups along front limit axis and rear limit shaft, and by multiple groups front hanging
After hook and multiple groups aft hook are linked up with respectively to multiple groups front hanging ring and multiple groups on link, so as to pass through fixed link before multiple groups and more
The position of fixed rod support multiple groups front apron and multiple groups rear baffle after group, so as to pass through multiple groups front apron and multiple groups rear baffle
Certain Intercepting effects are played to sunshine or light rain, and then can reduce the influence to the usage experience of user, are improved practical
Property.
Detailed description of the invention
Fig. 1 is partial structure diagram of the invention;
Fig. 2 is part-structure rearview of the invention;
Fig. 3 is the attachment structure schematic diagram of connection structure, fixed ring, connecting band and elastic reducing-fixing band;
Fig. 4 is part-structure right view of the invention;
It is attached marked in the figure: 1, pavement ontology;2, buffer table;3, stone rank;4, front support rod;5, back support rod;6, preceding handrail;
7, back hand rail;8, front rod;9, rear connecting rod;10, front limit bar;11, rear gag lever post;12, fixed ring;13, connecting band;
14, elastic reducing-fixing band;15, the first stationary half;16, the second stationary half;17, locating ring;18, connecting shaft;19, fixing axle;
20, the first positioning plate;21, the second positioning plate;22, positioning threads bar;23, positioning threads pipe;24, support shaft;25, locating shaft;
26, locating piece;27, front limit axis;28, rear limit shaft;29, preceding rotating ring;30, rear rotating ring;31, front apron;32, rear gear
Plate;33, prelocalization ring;34, rear positioning ring;35, preceding fixed link;36, rear fixed link;37, front hook;38, aft hook;39, preceding
Link;40, rear link;41, preceding ball bearing;42, rear ball bearing;43, preceding shift(ing) ring;44, preceding shift(ing) ring;45, connection chain;
46, connection ring;47, preceding moving handle;48, rear moving handle;49, pave-load layer.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below
Example is not intended to limit the scope of the invention for illustrating the present invention.
As shown in Figures 1 to 4, a kind of body-building by scientific methods of the invention prevents joint injury from walking with the health for slowing down muscular fatigue
Road, including pavement ontology 1, if pavement ontology 1 is made of drystone rank group and several buffer tables 2, if stone rank group is by 3 groups of drystone rank
At further including connecting after multiple groups front support rod 4, multiple groups back support rod 5, preceding handrail 6,7, two groups of back hand rail, 8, two groups of front rod
Bar 9, front limit bar 10, rear gag lever post 11, connection structure, fixed ring 12, connecting band 13 and elastic reducing-fixing band 14, multiple groups front support
Bar 4 and 5 bottom end of multiple groups back support rod are connect with 1 top nose of pavement ontology and rear end respectively, and multiple groups front support rod 4 and more
Group 5 top of back support rod is connect with preceding handrail 6 and back hand rail 7 respectively, two groups of front rods 8 and two groups of 9 bottom ends of rear connecting rod point
Do not connect with preceding handrail 6 and 7 left and right ends of back hand rail, and two groups of front rods 8 and two groups of 9 tops of rear connecting rod respectively with it is preceding
Gag lever post 10 is connected with rear 11 left and right ends of gag lever post, and fixed ring 12 is mounted in connection structure, 13 both ends of connecting band respectively with
Fixed ring 12 and elastic reducing-fixing band 14 connect, and elastic reducing-fixing band 14 connects from beginning to end, and connection structure set is filled on front limit bar 10, and
And connection structure includes the first stationary half 15,16, two groups of locating rings 17 of the second stationary half, connecting shaft 18, fixing axle 19, the
One positioning plate 20, the second positioning plate 21, positioning threads bar 22 and positioning threads pipe 23, it is fixed that two groups of locating rings 17 are mounted on first
15 one end of semi-ring, 18 both ends of connecting shaft are connect with fixing axle 19 and 16 one end of the second stationary half respectively, 19 front and back two of fixing axle
End is each passed through two groups of locating rings 17, and the first positioning plate 20 and the second positioning plate 21 are separately mounted to the first stationary half 15 and the
Two stationary halfs, 16 other end is provided with through-hole on the second positioning plate 21, and 22 left end of positioning threads bar is mounted on the first positioning plate
20 right side wall middle sections, and 22 right end of positioning threads bar passes through through-hole, and 23 spiral shell of positioning threads pipe is filled to positioning threads bar 22
Right half area, and 23 right end of positioning threads pipe is closed, and further includes multiple groups support shaft 24,25, two groups of locating pieces 26 of locating shaft, preceding
Rotating ring 30 after rotating ring 29, multiple groups before limit shaft 27, rear limit shaft 28, multiple groups, multiple groups front apron 31, multiple groups rear baffle 32,
Fixed link 36, multiple groups front hook 37, multiple groups after fixed link 35, multiple groups before positioning ring 34, multiple groups after multiple groups prelocalization ring 33, multiple groups
Link 40 after link 39 and multiple groups before aft hook 38, multiple groups, 24 bottom end of multiple groups support shaft is installed in 1 center of top of pavement ontology
Region, and 24 top of multiple groups support shaft is connect with locating shaft 25, and two groups of locating pieces 26 are separately mounted to 25 both ends of locating shaft,
Front limit axis 27 and 28 both ends of rear limit shaft are connect with two groups of locating pieces 26 respectively, rotating ring after rotating ring 29 and multiple groups before multiple groups
30 are separately mounted on multiple groups front apron 31 and multiple groups rear baffle 32, and rotating ring 30 divides after rotating ring 29 and multiple groups before multiple groups
Tao not be filled on front limit axis 27 and rear limit shaft 28, before multiple groups after rotating ring 29 and multiple groups rotating ring 30 and front limit axis 27 and
Ball bearing 42 ball bearing 41 and multiple groups after be respectively arranged with before multiple groups between limit shaft 28 afterwards, multiple groups prelocalization ring 33 and more
Positioning ring 34 is separately mounted to 24 upper half area of multiple groups support shaft after group, 36 one end of fixed link after fixed link 35 and multiple groups before multiple groups
Be respectively arranged with before multiple groups shift(ing) ring 44 after shift(ing) ring 43 and multiple groups, before multiple groups after shift(ing) ring 43 and multiple groups shift(ing) ring 44 respectively with
Positioning ring 34 connects after multiple groups prelocalization ring 33 and multiple groups, before multiple groups after fixed link 35 and multiple groups 36 other end of fixed link respectively with
Multiple groups front hook 37 and multiple groups aft hook 38 connect, and link 40 is separately mounted to multiple groups front apron after link 39 and multiple groups before multiple groups
31 and multiple groups rear baffle 32 on;The present invention in such a way that buffer table combines, makes sporter by the short time using stone rank
Top bar is marked time available rest appropriate after exercise, so as to reduce showing for user's joint injury and muscular fatigue
As, and user is in climbing, can be with hand steered preceding handrail or back bar, while child or old man can be by flexible fastenings
Band set is filled on arm, and the first stationary half and the second stationary half is bypassed front limit bar or rear gag lever post, and will positioning
Threaded rod passes through through-hole, and positioning threads pipe spiral shell is filled on positioning threads bar, so as to so that connection frame structure and front limit bar or
Gag lever post connects afterwards, and connection structure can be moved along front limit bar or rear gag lever post, so as to climb in user
User is played a certain protective role in journey, and then the safety in climbing can be improved, while can be reduced
When light rain or sunshine weather, multiple groups front apron and multiple groups rear baffle are rotated, multiple groups front apron and multiple groups rear baffle is made to pass through multiple groups
Rotating ring is rotated along front limit axis and rear limit shaft after preceding rotating ring and multiple groups, and multiple groups front hook and multiple groups aft hook are distinguished
On hook to link after multiple groups front hanging ring and multiple groups, so as to pass through fixed rod support multiple groups after fixed link before multiple groups and multiple groups
The position of front apron and multiple groups rear baffle, so as to play one to sunshine or light rain by multiple groups front apron and multiple groups rear baffle
Fixed Intercepting effects, and then the influence to the usage experience of user can be reduced, improve practicability.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, further includes connection chain
45 and two groups of connection rings 46, two groups of connection rings 46 be separately mounted to 23 right end of 20 left side wall of the first positioning plate and positioning threads pipe,
45 both ends of connection chain are connect with two groups of connection rings 46 respectively;It can be made between fixed thread pipe and left positioning plate by connection chain in succession
It connects, plays certain restriction effect to the position of fixed thread pipe so as to convenient, reduce the loss of fixed thread pipe.
A kind of body-building by scientific methods of the invention prevents from joint injury and slowing down the health walk of muscular fatigue, before further including multiple groups
Moving handle 48 after moving handle 47 and multiple groups, moving handle 48 is separately mounted to multiple groups after moving handle 47 and multiple groups before multiple groups
On front apron 31 and multiple groups rear baffle 32;When needing to overturn multiple groups front apron and multiple groups rear baffle, multiple groups Forward can be held
Moving handle after dynamic handle and multiple groups, so as to facilitate overturning multiple groups front apron and multiple groups rear baffle.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, further includes pave-load layer
49, pave-load layer 49 is mated formation at 1 top of pavement ontology.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, 49 surface of pave-load layer
It is provided with multiple groups rhone;The convenient discharge to rainwater of the multiple groups rhone for layer surface of mating formation can be passed through.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, the material of pave-load layer 49
Matter is wooden, pitch or gravel;Using wooden, pitch or the pave-load layer of gravel material, the hardness of pavement ontology is reduced, is slowed down
Road surface can reduce ligament and meniscus injury probability to the reaction force in joint, delay cartilage wear, pitch material is because of surface layer
Softer and surface evenness can preferably reduce force feedback, and gravel material can provide slight buffering, wooden material using tiny stone
Impact resistance due to elasticity is larger, has a clear superiority.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, the gradient of stone rank group
It is 8 °~12 °;It is designed to that 8 °~12 ° of stone step road is marked time, so as to so that joint loss when walking with vigorous strides to move is minimum, thus
Mitigate the frictionally damage of knee joint and ankle-joint.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, the slope of buffer table 2
Degree is 2 °~5 °;Not only it can reach the requirement of load intensity when 2 °~5 ° of gradients but also can largely reduce high impact forces to foot
The possibility at bottom is damaged, and ground supports power, shin stock platform force and tough tensile force of belt can reach optimization balance and knee joint punching press at this time
It is smaller and reduce injury of knee joint.
A kind of body-building by scientific methods of the invention prevents joint injury and slows down the health walk of muscular fatigue, using stone rank and delays
The mode that platform combines is rushed, sporter's available rest appropriate after the top bar by the short time marks time exercise is made, from
And the phenomenon that user's joint injury and muscular fatigue can be reduced, and user is in climbing, can be with before hand steered
Handrail or back bar, while elastic reducing-fixing band set can be filled on arm by child or old man, and by the first stationary half and
Two stationary halfs bypass front limit bar or rear gag lever post, and positioning threads bar is passed through through-hole, and it is fixed that positioning threads pipe spiral shell is filled to
On the threaded rod of position, so as to so that connection frame structure is connect with front limit bar or rear gag lever post, and connection structure can be along preceding limit
Position bar or rear gag lever post are mobile, so as to play a certain protective role in user's climbing to user, in turn
The safety in climbing can be improved, while can reduce in light rain or sunshine weather, rotation multiple groups front apron and more
Group rear baffle, make multiple groups front apron and multiple groups rear baffle by rotating ring after rotating ring before multiple groups and multiple groups along front limit axis and after
Limit shaft rotation, and after multiple groups front hook and multiple groups aft hook are linked up with respectively to multiple groups front hanging ring and multiple groups on link, thus
It can be by the position of fixed rod support multiple groups front apron and multiple groups rear baffle after fixed link before multiple groups and multiple groups, so as to logical
It crosses multiple groups front apron and multiple groups rear baffle plays certain Intercepting effects to sunshine or light rain, and then can reduce to user's
The influence of usage experience improves practicability, fixed thread pipe can be made to be indirectly connected with left positioning plate by connection chain, so as to
To facilitate the position to fixed thread pipe to play certain restriction effect, the loss of fixed thread pipe is reduced, it is more when needing to overturn
Group front apron and when multiple groups rear baffle can hold before multiple groups moving handle after moving handle and multiple groups, so as to conveniently turn over
Turn multiple groups front apron and multiple groups rear baffle, can be used by the convenient discharge to rainwater of the multiple groups rhone for layer surface of mating formation
The pave-load layer of wooden, pitch or gravel material reduces the hardness of pavement ontology, slows down road surface to the reaction force in joint, can
To reduce ligament and meniscus injury probability, delay cartilage wear, pitch material is because surface layer is softer and the preferable energy of surface evenness
Reduce force feedback, gravel material can provide slight buffering using tiny stone, and impact resistance due to elasticity is larger of wooden material has
Clear superiority is designed to that 8 °~12 ° of stone step road is marked time, so as to so that joint loss when walking with vigorous strides to move is minimum, thus
The frictionally damage for mitigating knee joint and ankle-joint, both can reach wanting for load intensity when buffer table is designed to 2 °~5 ° of gradients
Ask and can largely reduce high impact forces and the possibility in vola is damaged, at this time ground supports power, shin stock platform force and
Tough tensile force of belt can reach optimization balance and knee joint punching press is smaller and reduce injury of knee joint.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the technical principles of the invention, several improvements and modifications, these improvements and modifications can also be made
Also it should be regarded as protection scope of the present invention.
Claims (8)
1. a kind of body-building by scientific methods prevents joint injury and slows down the health walk of muscular fatigue, which is characterized in that including pavement sheet
Body (1), the pavement ontology (1) drystone rank group and several buffer tables (2) if be made of, if the stone rank group is by drystone rank (3)
Composition, further includes multiple groups front support rod (4), multiple groups back support rod (5), preceding handrail (6), back hand rail (7), two groups of front rods
(8), two groups of rear connecting rods (9), front limit bar (10), rear gag lever post (11), connection structure, fixed ring (12), connecting band (13)
With elastic reducing-fixing band (14), the multiple groups front support rod (4) and multiple groups back support rod (5) bottom end are pushed up with pavement ontology (1) respectively
Portion front-end and back-end connection, and multiple groups front support rod (4) and multiple groups back support rod (5) top respectively with preceding handrail (6) and after
Handrail (7) connection, two groups of front rods (8) and two groups of rear connecting rod (9) bottom ends respectively with preceding handrail (6) and back hand rail
(7) left and right ends connect, and two groups of front rods (8) and two groups of rear connecting rod (9) tops respectively with front limit bar (10) and
Gag lever post (11) left and right ends connect afterwards, and the fixed ring (12) is mounted in connection structure, connecting band (13) both ends point
It is not connect with fixed ring (12) and elastic reducing-fixing band (14), elastic reducing-fixing band (14) head and the tail connect, the connection structure set
It is filled on front limit bar (10), and the connection structure includes the first stationary half (15), the second stationary half (16), two groups
Locating ring (17), connecting shaft (18), fixing axle (19), the first positioning plate (20), the second positioning plate (21), positioning threads bar (22)
With positioning threads pipe (23), two groups of locating rings (17) are mounted on the first stationary half (15) one end, the connecting shaft (18)
Both ends are connect with fixing axle (19) and the second stationary half (16) one end respectively, and fixing axle (19) rear and front end is each passed through
Two groups of locating rings (17), first positioning plate (20) and the second positioning plate (21) be separately mounted to the first stationary half (15) and
Second stationary half (16) other end is provided with through-hole, positioning threads bar (22) left end on second positioning plate (21)
It is mounted on the first positioning plate (20) right side wall middle section, and positioning threads bar (22) right end passes through through-hole, the positioning spiral shell
Line pipe (23) spiral shell is filled to positioning threads bar (22) right half area, and positioning threads pipe (23) right end is closed, and further includes multiple groups branch
Rotating ring before support axis (24), locating shaft (25), two groups of locating pieces (26), front limit axis (27), rear limit shaft (28), multiple groups
(29), fixed after rotating ring (30), multiple groups front apron (31), multiple groups rear baffle (32), multiple groups prelocalization ring (33), multiple groups after multiple groups
Position ring (34), fixed link (36), multiple groups front hook (37), multiple groups aft hook (38), multiple groups after fixed link (35), multiple groups before multiple groups
Link (40) after preceding link (39) and multiple groups, multiple groups support shaft (24) bottom end are installed in pavement ontology (1) center of top
Region, and multiple groups support shaft (24) top is connect with locating shaft (25), and two groups of locating pieces (26) are separately mounted to fixed
Position axis (25) both ends, the front limit axis (27) and rear limit shaft (28) both ends are connect with two groups of locating pieces (26) respectively, described
Rotating ring (30) is separately mounted on multiple groups front apron (31) and multiple groups rear baffle (32) after rotating ring (29) and multiple groups before multiple groups,
And rotating ring (30) is set with to front limit axis (27) and rear limit shaft (28) after the preceding rotating ring of multiple groups (29) and multiple groups,
It is set respectively between rotating ring (30) and front limit axis (27) and rear limit shaft (28) after the preceding rotating ring of multiple groups (29) and multiple groups
Ball bearing (42) after ball bearing (41) and multiple groups, positioning ring after the multiple groups prelocalization ring (33) and multiple groups are equipped with before multiple groups
(34) it is separately mounted to multiple groups support shaft (24) upper half area, fixed link (36) one after fixed link (35) and multiple groups before the multiple groups
End is respectively arranged with before multiple groups shift(ing) ring (44) after shift(ing) ring (43) and multiple groups, and shift(ing) ring (43) and multiple groups move back before the multiple groups
Rotating ring (44) is connect with positioning ring (34) after multiple groups prelocalization ring (33) and multiple groups respectively, fixed link (35) and more before the multiple groups
Fixed link (36) other end is connect with multiple groups front hook (37) and multiple groups aft hook (38) respectively after group, link before the multiple groups
(39) and after multiple groups link (40) is separately mounted on multiple groups front apron (31) and multiple groups rear baffle (32).
2. a kind of body-building by scientific methods as described in claim 1 prevents joint injury and slows down the health walk of muscular fatigue, special
Sign is, further includes connection chain (45) and two groups of connection rings (46), and two groups of connection rings (46) are separately mounted to the first positioning
Plate (20) left side wall and positioning threads pipe (23) right end, connection chain (45) both ends are connect with two groups of connection rings (46) respectively.
3. a kind of body-building by scientific methods as claimed in claim 2 prevents joint injury and slows down the health walk of muscular fatigue, special
Sign is, further includes moving handle (48) after moving handle (47) and multiple groups before multiple groups, before the multiple groups moving handle (47) and
Moving handle (48) is separately mounted on multiple groups front apron (31) and multiple groups rear baffle (32) after multiple groups.
4. a kind of body-building by scientific methods as claimed in claim 3 prevents joint injury and slows down the health walk of muscular fatigue, special
Sign is, further includes pave-load layer (49), and the pave-load layer (49) is mated formation at the top of pavement ontology (1).
5. a kind of body-building by scientific methods as claimed in claim 4 prevents joint injury and slows down the health walk of muscular fatigue, special
Sign is that pave-load layer (49) surface is provided with multiple groups rhone.
6. a kind of body-building by scientific methods as claimed in claim 5 prevents joint injury and slows down the health walk of muscular fatigue, special
Sign is that the material of the pave-load layer (49) is wooden, pitch or gravel.
7. a kind of body-building by scientific methods as claimed in claim 6 prevents joint injury and slows down the health walk of muscular fatigue, special
Sign is that the gradient of the stone rank group is 8 °~12 °.
8. a kind of body-building by scientific methods as claimed in claim 7 prevents joint injury and slows down the health walk of muscular fatigue, special
Sign is that the gradient for further including the buffer table (2) is 2 °~5 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910625913.5A CN110409257B (en) | 2019-07-11 | 2019-07-11 | Healthy footpath for scientifically building body, preventing joint injury and relieving muscle fatigue |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910625913.5A CN110409257B (en) | 2019-07-11 | 2019-07-11 | Healthy footpath for scientifically building body, preventing joint injury and relieving muscle fatigue |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110409257A true CN110409257A (en) | 2019-11-05 |
CN110409257B CN110409257B (en) | 2020-12-15 |
Family
ID=68361135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910625913.5A Active CN110409257B (en) | 2019-07-11 | 2019-07-11 | Healthy footpath for scientifically building body, preventing joint injury and relieving muscle fatigue |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110409257B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205529786U (en) * | 2016-01-21 | 2016-08-31 | 王学如 | Far infrared body -building pavement brick |
CN205617198U (en) * | 2016-05-04 | 2016-10-05 | 北京青山洋溢园林景观工程有限公司 | Prevent tumble injury road |
CN207047645U (en) * | 2017-08-02 | 2018-02-27 | 嘉兴绿能塑胶制品有限公司 | A kind of luminous type body-building pavement |
CN207812230U (en) * | 2018-01-22 | 2018-09-04 | 无锡耘林养老产业投资发展有限公司 | A kind of Novel body building pavement |
CN208884306U (en) * | 2018-06-05 | 2019-05-21 | 河北师范大学 | A kind of body-building by scientific methods prevents joint injury and slows down the health walk of muscular fatigue |
-
2019
- 2019-07-11 CN CN201910625913.5A patent/CN110409257B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205529786U (en) * | 2016-01-21 | 2016-08-31 | 王学如 | Far infrared body -building pavement brick |
CN205617198U (en) * | 2016-05-04 | 2016-10-05 | 北京青山洋溢园林景观工程有限公司 | Prevent tumble injury road |
CN207047645U (en) * | 2017-08-02 | 2018-02-27 | 嘉兴绿能塑胶制品有限公司 | A kind of luminous type body-building pavement |
CN207812230U (en) * | 2018-01-22 | 2018-09-04 | 无锡耘林养老产业投资发展有限公司 | A kind of Novel body building pavement |
CN208884306U (en) * | 2018-06-05 | 2019-05-21 | 河北师范大学 | A kind of body-building by scientific methods prevents joint injury and slows down the health walk of muscular fatigue |
Also Published As
Publication number | Publication date |
---|---|
CN110409257B (en) | 2020-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8398094B1 (en) | Skibob and method for riding a chairlift | |
CN105943314B (en) | A kind of power-assisted leg based on multistage snap-lock mechanism | |
US6676138B1 (en) | Roller skate | |
US20070249472A1 (en) | Exercise Pole for Athletes | |
TW200533549A (en) | Cycle suspension assembly | |
CN110409257A (en) | A kind of body-building by scientific methods prevents joint injury and slows down the health walk of muscular fatigue | |
CN104787205B (en) | A kind of bicycle and its adjustable vehicle frame shock-damping structure | |
CN205796440U (en) | Ride platform | |
CN210186395U (en) | Skiing platform assembly for simulating ski-jump | |
CN102114890A (en) | Multifunctional stationary bike | |
CN206777687U (en) | Body-building recreation bridge | |
CN206853062U (en) | A kind of human body somersault exercise assist | |
US20190160368A1 (en) | Amusement apparatus including a movable playing surface | |
CN202682673U (en) | Bicycle for training coordination ability of human body | |
RU2181610C2 (en) | Cyclist exercising apparatus | |
CN203391928U (en) | Pitching folding scooter | |
Bando et al. | Development of health and medical research for long similar to successful marathon running | |
CN207931875U (en) | Mountain bike handset bracket | |
CN2288743Y (en) | Force exercising apparatus for lower limbs controlled by near fixed locus | |
RU41447U1 (en) | TRANSPORT Sled | |
CN201441806U (en) | Land wheel-type snowboard | |
US20040248703A1 (en) | Method for travelling or sliding types of sport device, in additon to sport installation for carrying out said method | |
CN104399246A (en) | Comprehensive amusement facilities for grass skating and drifting | |
KR100364395B1 (en) | bicycle used on the ice | |
CN1204939C (en) | Semi-suspended platform as running training equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |