CN110401388A - Generating set parallel connection control system and rail engineering automobile - Google Patents

Generating set parallel connection control system and rail engineering automobile Download PDF

Info

Publication number
CN110401388A
CN110401388A CN201910797289.7A CN201910797289A CN110401388A CN 110401388 A CN110401388 A CN 110401388A CN 201910797289 A CN201910797289 A CN 201910797289A CN 110401388 A CN110401388 A CN 110401388A
Authority
CN
China
Prior art keywords
generating set
machine controller
machine
control system
parallel connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910797289.7A
Other languages
Chinese (zh)
Inventor
孟刚刚
常星辰
师海峰
侯小刚
宋明耀
吴庆立
朱红军
赵力
闫昌娟
贠泽
王满成
董青丽
吴艳萍
王西强
张振宁
张蔡博超
刘威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji CRRC Times Engineering Machinery Co Ltd
Original Assignee
Baoji CSR Times Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji CSR Times Engineering Machinery Co Ltd filed Critical Baoji CSR Times Engineering Machinery Co Ltd
Priority to CN201910797289.7A priority Critical patent/CN110401388A/en
Publication of CN110401388A publication Critical patent/CN110401388A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61CLOCOMOTIVES; MOTOR RAILCARS
    • B61C17/00Arrangement or disposition of parts; Details or accessories not otherwise provided for; Use of control gear and control systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B63/00Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices
    • F02B63/04Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices for electric generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/40Synchronising a generator for connection to a network or to another generator
    • H02J3/42Synchronising a generator for connection to a network or to another generator with automatic parallel connection when synchronisation is achieved
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2200/00Type of vehicles
    • B60L2200/26Rail vehicles
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P2101/00Special adaptation of control arrangements for generators
    • H02P2101/25Special adaptation of control arrangements for generators for combustion engines

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Transportation (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of generating set parallel connection control system, including the first generating set, first and machine controller, the first power distribution cabinet and collectively forms the first power packages, wherein first power distribution cabinet setting is manually and machine switch and automatic and machine switch;Further include the second generating set, second and machine controller, the second power distribution cabinet and collectively forms the second power packages;Using described first and machine controller and described second and machine controller pass through bus connecting communication, two generators group is allocated in by the bearing power adjusting to impose a condition the generating set parallel connection control system, to realize that the complete machine power of the generating set parallel connection control system is powered by two generators group and machine and distribution loads automatically, to realize that single, double electric set electric supply automatically switches.The present invention also provides a kind of rail engineering automobiles.Compared with the relevant technologies, generating set parallel connection control system of the invention and track engineering bassinet structure are simple, operate convenient and good reliability.

Description

Generating set parallel connection control system and rail engineering automobile
Technical field
The present invention relates to a kind of generator control system field more particularly to a kind of generating sets for applying to track engineering Parallel operation control system and rail engineering automobile.
Background technique
Recently as the fast development of China railways, with the fast development of railway construction, the increase of new route, iron The line upkeep workload that road department undertakes is increasing, and construction personnel's quantity is also more and more, and power load is got in railcar Come more, bearing power is also increasing, requires generating set capacity higher and higher.
However limited by the vehicle installation space of rail engineering automobile, it can not on the in-orbit road engineering truck of electricity generation unit Installation provides power supply using two small power generator component loads in the related technology, but this mode wiring is complicated, if opens It is worked at the same time with two generating sets, vehicle need to be prejudged in advance and use bearing power, it is inconvenient for operation.
It solves the above problems therefore, it is necessary to provide one kind new generating set parallel connection control system and rail engineering automobile.
Summary of the invention
And a kind of operation convenient and fast generating set parallel connection control simple the technical problem to be solved by the invention is to provide structure System processed and rail engineering automobile.
In order to solve the above technical problems, the present invention provides a kind of generating set parallel connection control systems, comprising: the first power generation Unit;First and machine controller, be electrically connected with first generating set, is adjusted turn for being sent to first generating set Speed and reclosing command, while acquiring voltage signal, current signal, tach signal and the feedback of closing a floodgate of first generating set Signal is to realize the monitoring and control to the first generating set working condition;First voltage adjuster, respectively with described One generating set and the described first simultaneously machine controller electrical connection, the first voltage adjuster receive described first and machine controller First generating set is controlled after the voltage regulating command of transmission realizes that voltage is adjusted;First power distribution cabinet, simultaneously with described first Machine controller electrical connection, first power distribution cabinet includes the first generator for individually controlling first start-stop of generator set Group power switch, and be used, respectively, to initiate the control generating set parallel connection control system and machine operational mode it is manual simultaneously Machine switch and automatic and machine switch;Second motor group;Second and machine controller, be electrically connected with second generating set, use Revolving speed and reclosing command are adjusted in sending to second generating set, while acquiring the voltage letter of second generating set Number, current signal, tach signal and combined floodgate feedback signal with realize monitoring to the second generating set working condition and Control;Second voltage adjuster, respectively with second generating set and described second and machine controller be electrically connected, described second Voltage regulator controls the second generating set realization after receiving described second and the voltage regulating command of machine controller transmission Voltage is adjusted;And second power distribution cabinet, be electrically connected with described second and machine controller, including the second electric set electric supply switchs, For individually controlling the start and stop of second generating set;Described first and machine controller with described second simultaneously machine controller pass through CAN bus realizes communication connection.
Preferably, described first and machine controller and described second and machine controller be also used to acquire monitoring described the respectively Water temperature, oil pressure, frequency, bearing power, the operation time parameters of one generating set and second generating set, and by default rule Then realize to the water temperature of first generating set and second generating set, oil pressure, hypervelocity, under-voltage, over-voltage, overload, three Phase voltage unbalance protection.
Preferably, the generating set parallel connection control system and machine operational mode include: manually and machine powering mode and Automatic and machine powering mode.
It is preferably, described that simultaneously machine powering mode includes: manually
The manual and machine switch is pressed, first generating set or second generating set is manually booted and closes Lock, then second generating set or first generating set are manually booted, to second generating set or described first Generating set closes a floodgate after running smoothly;
Described first and machine controller and described second and machine controller communicated by the CAN bus and detect described the Whether within the set range the voltage difference of one generating set and second generating set, difference on the frequency, detect first power generation Whether the phase angle of unit and second generating set, phase sequence are identical, and are adjusted automatically to directly making within the set time The voltage difference and difference on the frequency of first generating set and second generating set within the set range, and make first hair Motor group is identical with the phase angle of second generating set and phase sequence, then first generating set and second generator Group synchroswitching success;
Described first and machine controller and described second and machine controller control first generating set and described second Generating set distributes bearing power automatically, realizes manually simultaneously machine powering mode.
Preferably, the automatic and machine powering mode includes:
The automatic and machine switch is pressed, by described first and machine controller starts first generating set simultaneously automatically It closes a floodgate, and the load-carrying power of the first generating set described in described first and machine controller real-time monitoring:
If the first generating set actual power is less than the first setting value of its rated power, first generator It organizes work and second generating set does not work;
If the first generating set actual power is greater than the second setting value of its rated power, the described first simultaneously machine control Device processed by the CAN bus to described second and machine controller issue start-up request signal, described second and machine controller open Move second generating set;
Described first and machine controller and described second and machine controller communicated by the CAN bus, detection compare simultaneously It is synchronous with the voltage difference of second generating set, frequency, phase angle and phase sequence realization to automatically adjust first generating set It closes a floodgate, and distributes bearing power automatically for first generating set and second generating set;
When the bearing power of the generating set parallel connection control system is less than first generating set or second hair When the third setting value of the rated power of motor group, the second generating set autostop, the generating set parallel connection control The bearing power of system is transferred to first generating set.
Preferably, first setting value is 40%, and second setting value is 80%, and the third setting value is 40%.
Preferably, first generating set and second generating set are 80Kw diesel generating set.
The present invention also provides a kind of rail engineering automobiles, including above-mentioned generating set parallel connection control system provided by the invention System.
Preferably, the rail engineering automobile includes at least two section compartments, first generating set and second power generation Unit is assemblied in respectively in compartment described in two sections.
Compared to the prior art, generating set parallel connection control system of the invention is equipped with the first generating set, first and machine Controller, the first power distribution cabinet simultaneously collectively form the first power packages, wherein first power distribution cabinet setting manually and machine switch and from Dynamic and machine switch;While equipped with the second generating set, second and machine controller, the second power distribution cabinet and collectively forming the second power Group;Using described first and machine controller and described second and machine controller by bus connecting communication, by imposing a condition institute The bearing power adjusting for stating generating set parallel connection control system is allocated in first generating set and second generating set, To realize that the complete machine power of the generating set parallel connection control system is powered by two generators group and machine and distribution loads automatically, It to realize that single, double electric set electric supply automatically switches, is not only simple in structure, and operates convenient flexible;Pass through described first The manual simultaneously machine of power distribution cabinet switchs and automatic simultaneously machine switchs according to different loads situation realization different mode and machine and adjusts, The drawbacks of avoiding using the operation of high-power generator group long-time low-load, while can reduce using electricity generation unit Fuel consumption, energy conservation and environmental protection.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is the electrical block diagram of generating set parallel connection control system of the present invention;
Fig. 2 is the structural schematic diagram that generating set parallel connection control system of the present invention applies to rail engineering automobile.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that the described embodiments are merely a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
It please join shown in Fig. 1, the present invention provides a kind of generating set parallel connection control systems 100, comprising: the first generating set 1, first and machine controller 2, first voltage adjuster 3, the first power distribution cabinet 4, the second generating set 5, second and machine controller 6, Second voltage adjuster 7, the second power distribution cabinet 8.
In present embodiment, first generating set 1 and second generating set 5 are 80Kw diesel-driven generator Group, certainly, rated power are not limited to this, and the rated power of the two can also be different.
Described first and machine controller 2 with described second and machine controller 6 communication connection is realized by CAN bus.
Described first and machine controller 2 be electrically connected with first generating set 1, be used for first generating set 1 It sends and adjusts revolving speed and reclosing command, while acquiring voltage signal, current signal, the tach signal of first generating set 1 And combined floodgate feedback signal etc. is to realize the monitoring and control to 1 working condition of the first generating set.
More preferably, described first and machine controller 2 be also used to acquire the water temperature for monitoring first generating set 1, oil pressure, The parameters such as frequency, bearing power, runing time, and by preset rules realize to the water temperature of first generating set 1, oil pressure, Hypervelocity, under-voltage, over-voltage, overload, imbalance of three-phase voltage protection, improve the reliable of the generating set parallel connection control system 100 Property.
The first voltage adjuster 3 respectively with first generating set 1 and described first and machine controller 2 be electrically connected It connects.The first voltage adjuster 3 controls described first after receiving described first and the voltage regulating command of the transmission of machine controller 2 Generating set 1 realizes that voltage is adjusted.
First power distribution cabinet 4 is electrically connected with described first and machine controller 2.In this implementation trial work, first distribution Cabinet 4 includes the first electric set electric supply switch 41 for individually controlling 1 start and stop of the first generating set, and is respectively used to Starting the controls the generating set parallel connection control system 100 and manual and machine switch 42 of machine operational mode and automatic simultaneously machine Switch 43.
Described second and machine controller 6 be electrically connected with second generating set 5, be used for second generating set 5 It sends and adjusts revolving speed and reclosing command, while acquiring voltage signal, current signal, the tach signal of second generating set 5 And combined floodgate feedback signal is to realize the monitoring and control to 5 working condition of the second generator.
More preferably, described second and machine controller 6 be also used to acquire respectively monitor second generating set 5 water temperature, Oil pressure, frequency, bearing power, operation time parameters, and the water temperature by preset rules realization to second generating set 5, oil Pressure, hypervelocity, under-voltage, over-voltage, overload, imbalance of three-phase voltage protection, to improve the generating set parallel connection control system 100 Reliability.
Second voltage adjuster 7 respectively with second generating set 5 and described second and machine controller 6 be electrically connected.Institute It states after second voltage adjuster 7 receives described second and the voltage regulating command of the transmission of machine controller 6 and controls second power generation Unit 5 realizes that voltage is adjusted.
Second power distribution cabinet 8 is electrically connected with described second and machine controller 6.In this embodiment party, second power distribution cabinet 8 Including the second electric set electric supply switch 81, for individually controlling the start and stop of second generating set 5.
In present embodiment, the first electric set electric supply switch 41 of first power distribution cabinet 4 can realize described The manual single machine start and stop of one generating set 1.The second electric set electric supply switch 81 of second power distribution cabinet 8 can realize institute State the manual single machine start and stop of the second generating set 5.
In addition to this, the generating set parallel connection control system 100 further includes and machine operational mode described and machine operational mode It include: manual and machine powering mode and automatic and machine powering mode, especially by the manual and machine of first power distribution cabinet 4 Switch 42 and the automatic and machine switch 43 are realized, specific:
It is described that simultaneously the realization step of machine powering mode includes: manually
The first step presses the manual and machine switch 42, manually boots first generating set 1 or second power generation Unit 5 simultaneously closes a floodgate, then manually boots second generating set 5 or first generating set 1, to second generating set 5 or described first generating sets 1 close a floodgate after running smoothly.
Second step, described first and machine controller 2 and described second and machine controller 6 by the CAN bus communication simultaneously The voltage difference that detects first generating set 1 and second generating set 5, difference on the frequency whether within the set range, detection Whether the phase angle of first generating set 1 and second generating set 5, phase sequence are identical, and are adjusted automatically to straight The voltage difference and difference on the frequency for making first generating set 1 and second generating set 5 within the set time are in setting range It is interior, and keep the phase angle of first generating set 1 and second generating set 5 and phase sequence identical, then first power generation Unit 1 and 5 synchroswitching of the second generating set success.
Third step, described first and machine controller 2 and described second and machine controller 6 control first generating set 1 Bearing power is distributed automatically with second generating set 5, realizes manually simultaneously machine powering mode.
It is described that simultaneously the realization step of machine powering mode includes: automatically
The first step presses the automatic and machine switch 43, and by described first and machine controller 2 starts described first automatically Generating set 1 simultaneously closes a floodgate, and the load-carrying power of the first generating set 2 described in described first and 2 real-time monitoring of machine controller:
If 1 actual power of the first generating set is less than the first setting value of its rated power, first power generation Unit 1 works and second generating set 2 does not work.For example first setting value is 40%.
If 1 actual power of the first generating set is greater than the second setting value of its rated power, described first and machine Controller 2 by the CAN bus to described second and machine controller 6 issue start-up request signal, described second and machine control Device 6 starts second generating set 5.For example, second setting value is 80%.
Second step, described first and machine controller 2 and described second and machine controller 6 communicated by the CAN bus, inspection Survey voltage difference, frequency, phase angle and the phase for comparing and automatically adjusting first generating set 1 and second generating set 5 Sequence realizes synchroswitching, and distributes bearing power automatically for first generating set 1 and second generating set 5.
Third step, when the generating set parallel connection control system 100 bearing power be less than first generating set 1 or When the third setting value of the rated power of second generating set 2,5 autostop of the second generating set, the power generation The bearing power of unit parallel operation control system 100 is transferred to first generating set 1.For example, the third setting value is 40%.
When the generating set parallel connection control system 100 runs on rail engineering automobile, rail engineering automobile is in different operating conditions Under, when vehicle bearing power is less than 40% separate unit rated output of generating set, You Yitai electric set electric supply, when vehicle loads When power is greater than separate unit rated output of generating set 80%, two generating sets are automatic and machine is powered, and distribution load automatically.
Certainly, first setting value, second setting value, the third setting value are not limited to this.
In above structure, the generating set parallel connection control system 100 passes through the manual simultaneously machine of realization and automatic simultaneously two kinds of machine And machine mode, the drawbacks of running using high-power generator group long-time low-load is avoided, while can reduce using high-power The fuel consumption of generating set, energy conservation and environmental protection.
It will be including provided by the invention above-mentioned in conjunction with shown in ginseng Fig. 2, the present invention also provides a kind of rail engineering automobile 200 Generating set parallel connection control system 100.Specifically, the rail engineering automobile 200 includes at least two section compartments, A vehicle and B vehicle, institute It states the first generating set 1 and second generating set 5 is assemblied in respectively in two section compartment of A vehicle and B vehicle.
Compared to the prior art, generating set parallel connection control system of the invention is equipped with the first generating set, first and machine Controller, the first power distribution cabinet simultaneously collectively form the first power packages, wherein first power distribution cabinet setting manually and machine switch and from Dynamic and machine switch;While equipped with the second generating set, second and machine controller, the second power distribution cabinet and collectively forming the second power Group;Using described first and machine controller and described second and machine controller by bus connecting communication, by imposing a condition institute The bearing power adjusting for stating generating set parallel connection control system is allocated in first generating set and second generating set, To realize that the complete machine power of the generating set parallel connection control system is powered by two generators group and machine and distribution loads automatically, It to realize that single, double electric set electric supply automatically switches, is not only simple in structure, and operates convenient flexible;Pass through described first The manual simultaneously machine of power distribution cabinet switchs and automatic simultaneously machine switchs according to different loads situation realization different mode and machine and adjusts, The drawbacks of avoiding using the operation of high-power generator group long-time low-load, while can reduce using electricity generation unit Fuel consumption, energy conservation and environmental protection.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (9)

1. a kind of generating set parallel connection control system characterized by comprising
First generating set;
First and machine controller, be electrically connected with first generating set, is adjusted turn for being sent to first generating set Speed and reclosing command, while acquiring voltage signal, current signal, tach signal and the feedback of closing a floodgate of first generating set Signal is to realize the monitoring and control to the first generating set working condition;
First voltage adjuster, respectively with first generating set and described first and machine controller be electrically connected, described first Voltage regulator controls the first generating set realization after receiving described first and the voltage regulating command of machine controller transmission Voltage is adjusted;
First power distribution cabinet is electrically connected with described first and machine controller, and first power distribution cabinet includes for described in individually control First electric set electric supply of the first start-stop of generator set switchs, and is used, respectively, to initiate the control generating set parallel connection control System processed and machine operational mode manual and machine switch and automatic and machine switch;
Second motor group;
Second and machine controller, be electrically connected with second generating set, is adjusted turn for being sent to second generating set Speed and reclosing command, while acquiring voltage signal, current signal, tach signal and the feedback of closing a floodgate of second generating set Signal is to realize the monitoring and control to the second generating set working condition;
Second voltage adjuster, respectively with second generating set and described second and machine controller be electrically connected, described second Voltage regulator controls the second generating set realization after receiving described second and the voltage regulating command of machine controller transmission Voltage is adjusted;And
Second power distribution cabinet is electrically connected with described second and machine controller, including the second electric set electric supply switch, for individually controlling Make the start and stop of second generating set;
Described first and machine controller is with described second and machine controller by CAN bus realizes communication connection.
2. generating set parallel connection control system according to claim 1, which is characterized in that described first and machine controller and Described second and machine controller be also used to acquire respectively monitor first generating set and second generating set water temperature, Oil pressure, frequency, bearing power, operation time parameters, and realize by preset rules to first generating set and described second The water temperature of generating set, oil pressure, hypervelocity, under-voltage, over-voltage, overload, imbalance of three-phase voltage protection.
3. generating set parallel connection control system according to claim 1, which is characterized in that the generating set parallel connection control System and machine operational mode include: manually and machine powering mode and automatic and machine powering mode.
4. generating set parallel connection control system according to claim 3, which is characterized in that the manual and machine powering mode Include:
The manual and machine switch is pressed, first generating set or second generating set is manually booted and closes a floodgate, then Second generating set or first generating set are manually booted, to second generating set or first generator Group is closed a floodgate after running smoothly;
Described first and machine controller and described second and machine controller communicated by the CAN bus and detect it is described first send out Whether within the set range motor group and the voltage difference of second generating set, difference on the frequency, detect first generating set It is whether identical with the phase angle of second generating set, phase sequence, and be adjusted automatically described to directly making within the set time The voltage difference and difference on the frequency of first generating set and second generating set within the set range, and make first generator Group is identical with the phase angle of second generating set and phase sequence, then first generating set and second generating set are same Walk closing success;
Described first simultaneously machine controller and the described second simultaneously machine controller control first generating set and second power generation Unit distributes bearing power automatically, realizes manually simultaneously machine powering mode.
5. generating set parallel connection control system according to claim 3, which is characterized in that the automatic and machine powering mode Include:
The automatic and machine switch is pressed, by described first and machine controller starts first generating set automatically and closes Lock, and the load-carrying power of the first generating set described in described first and machine controller real-time monitoring:
If the first generating set actual power is less than the first setting value of its rated power, the first generating set work Make and second generating set does not work;
If the first generating set actual power is greater than the second setting value of its rated power, described first and machine controller By the CAN bus to described second and machine controller issue start-up request signal, described second and machine controller start institute State the second generating set;
Described first and machine controller and described second and machine controller communicated by the CAN bus, detection compare simultaneously it is automatic Voltage difference, frequency, phase angle and the phase sequence for adjusting first generating set and second generating set realize synchroswitching, And bearing power is distributed for first generating set and second generating set automatically;
When the bearing power of the generating set parallel connection control system is less than first generating set or second generator When the third setting value of the rated power of group, the second generating set autostop, the generating set parallel connection control system Bearing power be transferred to first generating set.
6. generating set parallel connection control system according to claim 5, which is characterized in that first setting value is 40%, second setting value is 80%, and the third setting value is 40%.
7. generating set parallel connection control system according to claim 1, which is characterized in that first generating set and institute Stating the second generating set is 80Kw diesel generating set.
8. a kind of rail engineering automobile, which is characterized in that including the generating set parallel connection as described in claim 1~7 any one Control system.
9. rail engineering automobile according to claim 8, which is characterized in that the rail engineering automobile includes at least two section vehicles Compartment, first generating set and second generating set are assemblied in respectively in compartment described in two sections.
CN201910797289.7A 2019-08-27 2019-08-27 Generating set parallel connection control system and rail engineering automobile Pending CN110401388A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910797289.7A CN110401388A (en) 2019-08-27 2019-08-27 Generating set parallel connection control system and rail engineering automobile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910797289.7A CN110401388A (en) 2019-08-27 2019-08-27 Generating set parallel connection control system and rail engineering automobile

Publications (1)

Publication Number Publication Date
CN110401388A true CN110401388A (en) 2019-11-01

Family

ID=68329224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910797289.7A Pending CN110401388A (en) 2019-08-27 2019-08-27 Generating set parallel connection control system and rail engineering automobile

Country Status (1)

Country Link
CN (1) CN110401388A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112421684A (en) * 2020-10-13 2021-02-26 东莞市唯美装饰材料有限公司 Control method of power generation equipment, power generation equipment and storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104348183A (en) * 2013-08-05 2015-02-11 广东西电动力科技股份有限公司 Power supplying system with multiple large-power high-voltage diesel generating sets in parallel operation
CN204835555U (en) * 2015-06-08 2015-12-02 中国电信股份有限公司江苏分公司 Generator parallel machine system of artificial intelligence ization
CN206272248U (en) * 2016-12-28 2017-06-20 雷天动力设备(苏州)有限公司 High-power high voltage and machine diesel generating set
CN207234423U (en) * 2017-09-11 2018-04-13 深圳市沃尔奔达新能源股份有限公司 Generating set parallel connection system and electricity generation system
CN108199416A (en) * 2018-02-24 2018-06-22 李卫东 Digital electricity generating system with simultaneously machine synchronizing function
CN207926202U (en) * 2018-02-01 2018-09-28 浙江幸福航天科技有限公司 The automatic combining system of diesel oil power frequency square cabin station and diesel oil power frequency square cabin station
US20180287392A1 (en) * 2017-03-30 2018-10-04 Honda Motor Co., Ltd. Power generator system
CN110011353A (en) * 2019-03-19 2019-07-12 上海唐银投资发展有限公司 A kind of parallel operation control system and method for diesel-driven generator power supply-distribution system
CN210297586U (en) * 2019-08-27 2020-04-10 宝鸡中车时代工程机械有限公司 Parallel operation control system of generator set and rail engineering vehicle

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104348183A (en) * 2013-08-05 2015-02-11 广东西电动力科技股份有限公司 Power supplying system with multiple large-power high-voltage diesel generating sets in parallel operation
CN204835555U (en) * 2015-06-08 2015-12-02 中国电信股份有限公司江苏分公司 Generator parallel machine system of artificial intelligence ization
CN206272248U (en) * 2016-12-28 2017-06-20 雷天动力设备(苏州)有限公司 High-power high voltage and machine diesel generating set
US20180287392A1 (en) * 2017-03-30 2018-10-04 Honda Motor Co., Ltd. Power generator system
CN207234423U (en) * 2017-09-11 2018-04-13 深圳市沃尔奔达新能源股份有限公司 Generating set parallel connection system and electricity generation system
CN207926202U (en) * 2018-02-01 2018-09-28 浙江幸福航天科技有限公司 The automatic combining system of diesel oil power frequency square cabin station and diesel oil power frequency square cabin station
CN108199416A (en) * 2018-02-24 2018-06-22 李卫东 Digital electricity generating system with simultaneously machine synchronizing function
CN110011353A (en) * 2019-03-19 2019-07-12 上海唐银投资发展有限公司 A kind of parallel operation control system and method for diesel-driven generator power supply-distribution system
CN210297586U (en) * 2019-08-27 2020-04-10 宝鸡中车时代工程机械有限公司 Parallel operation control system of generator set and rail engineering vehicle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112421684A (en) * 2020-10-13 2021-02-26 东莞市唯美装饰材料有限公司 Control method of power generation equipment, power generation equipment and storage medium
CN112421684B (en) * 2020-10-13 2023-05-12 东莞市唯美陶瓷工业园有限公司 Control method of power generation equipment, power generation equipment and storage medium

Similar Documents

Publication Publication Date Title
CN102971927B (en) For the system and method for parallel generator
CN104471818B (en) For the power system stability system of aircraft
US8106633B2 (en) Generator set control system
CN210297586U (en) Parallel operation control system of generator set and rail engineering vehicle
US11142332B2 (en) Power supply and method having series-arranged units
CN106068591B (en) The electric conversion and compartment system of aircraft
CN105163975A (en) Device for operating at least one electrical consumer of a rail vehicle
CN108565959A (en) A kind of Service Battery charging controller and method for caravan power supply
US11462937B2 (en) Method and apparatus for no-break power transfer in a power distribution system
CN205232076U (en) Air conditioning system and centrifugal unit and variable frequency control device thereof
US8536729B2 (en) Hybrid electric power architecture for a vehicle
CN205945056U (en) Unmanned aerial vehicle's power supply system and unmanned aerial vehicle
CN110401388A (en) Generating set parallel connection control system and rail engineering automobile
CN109131380B (en) Main and auxiliary transmission system of diesel locomotive and diesel locomotive
CN204993077U (en) Diesel locomotive assists deflector
CN205901433U (en) On -vehicle power take -off generate electricity power supply system
CN204055775U (en) Battery trolley locomotive controller, control system and Dual-energy source subway engineering car
CN110249494A (en) The distribution system of moving body
CN209757090U (en) Power centralized type diesel multiple unit train power supply system
CN109774480A (en) A kind of airport ground special vehicle mixed power supply system and method for controlling power supply
EP3772791B1 (en) System and method for adding a high voltage dc source to a power bus
WO2018099353A1 (en) Traction control circuit for double-headed locomotives employed upon failure of one locomotive
CN211893112U (en) Direct current power generation and power management system for engineering vehicle
RU194413U1 (en) STATIONARY FLYWHEEL SYSTEM FOR STORAGE OF RECEIVED ELECTRIC ENERGY WHEN BRAKING ELECTRIC MOBILE COMPOSITION
KR101619668B1 (en) Controlling systen of hybrid vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination