CN110401198A - A kind of railway station low pressure change distribution intelligent monitor system - Google Patents

A kind of railway station low pressure change distribution intelligent monitor system Download PDF

Info

Publication number
CN110401198A
CN110401198A CN201910688171.0A CN201910688171A CN110401198A CN 110401198 A CN110401198 A CN 110401198A CN 201910688171 A CN201910688171 A CN 201910688171A CN 110401198 A CN110401198 A CN 110401198A
Authority
CN
China
Prior art keywords
voltage
level
workload
supercapacitor
bleeder mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910688171.0A
Other languages
Chinese (zh)
Other versions
CN110401198B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI HUI QI ELECTRIC TECHNOLOGY DEVELOPMENT Co.,Ltd.
Original Assignee
Changsha Erdao New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=68326367&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN110401198(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Changsha Erdao New Energy Technology Co Ltd filed Critical Changsha Erdao New Energy Technology Co Ltd
Priority to CN201910688171.0A priority Critical patent/CN110401198B/en
Publication of CN110401198A publication Critical patent/CN110401198A/en
Application granted granted Critical
Publication of CN110401198B publication Critical patent/CN110401198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Abstract

The present invention relates to a kind of railway station low pressure to become distribution intelligent monitor system, it include: power module and several operational modules, power module includes external cable, transformer, distribution box, and operational module includes several breakers, several clock signal devices, several workloads, several supercapacitors, level-one bleeder mechanism, several second level bleeder mechanisms, computer;Second level bleeder mechanism is used to superfluous level-one branch pressure voltage carrying out second divided voltage and is respectively allocated to workload and supercapacitor;The present invention is defined voltage waveform by clock signal identical with voltage waveform same period and period internal structure, so that if there is voltage fluctuation, station can voluntarily carry out the adjustment of voltage when outer bound pair station is powered.

Description

A kind of railway station low pressure change distribution intelligent monitor system
Technical field
Become field of power distribution the present invention relates to low pressure more particularly to a kind of railway station low pressure becomes distribution intelligent monitor system.
Background technique
Still with the fast development and continuous improvement of people's living standards of rail transportation system, either staff Passenger, safety and comfort to environment such as traffic, trip, work, rests require higher and higher.In order to meet people this A little demands realize energy-saving target more in order to which the safety in production for improving railway enterprise is horizontal and modern management is horizontal, Along Railway important building, such as all kinds of electromechanical equipments of station, MTU depot (institute), office block etc., such as electric power, illuminate, to Draining, Heating,Ventilating and Air Conditioning, Escalator, EPS etc., should use advanced computer technology, control technology and the communication technology, to they into Row is automatic to be monitored, control and manages, to achieve the purpose that save the energy, save manpower, raising level of security and management level.
The transformation and distribution system of the rail facilities such as station, station, complex building, comprehensive maintenance depot, tunnel, bridge mainly includes 35KV or 10KV distribution facility, transformer, low-voltage distribution facility and the power-supply device for providing diesel-driven generator and each type load for oneself Deng.In general, low pressure electric substation, panel switches circuit, provide for oneself diesel-driven generator, all kinds of power-supply devices include communication, signal, ticketing Equal important loads power-supply device and diesel generating set, EPS, UPS equipment and solar-energy photo-voltaic cell etc. are used as electromechanical equipment Monitored object.
Transformation and distribution system includes high-tension apparatus, potential device, low-voltage equipment, generating equipment, power cabinet etc..Transformation and distribution system It is the heart of entire intelligent building, especially in the special building such as passenger station, tunnel, needs transformation and distribution system that there is height Power supply reliability needs transformation and distribution system energy-saving, and transformation and distribution system is needed to reduce accident potential.
Summary of the invention
Goal of the invention:
For the problems in above-mentioned background technology, the present invention provides a kind of railway station low pressure change distribution intelligent monitoring system System.
Technical solution:
A kind of railway station low pressure change distribution intelligent monitor system, comprising: power module and several operational modules, it is described Power module includes external cable, transformer, distribution box, and the operational module includes several breakers, several clock signals dress It sets, several workloads, several supercapacitors, level-one bleeder mechanism, several second level bleeder mechanisms, computer;
The external cable connects the transformer, and the transformer connects the distribution box, and the transformer is to described The electric power that external cable provides is depressured, and the distribution box distributes the voltage after decompression into the operational module, described Operational module is respectively arranged with the range of corresponding operating voltage total value, and the distribution box is dividing according to the voltage total value range Result with voltage is adjusted;
The clock signal device connects the breaker, workload, distribution box and level-one bleeder mechanism, the work It loads, connected between breaker and level-one bleeder mechanism by inside cable, the computer connects the clock signal Device and second level bleeder mechanism, the distribution box include voltage regulator circuit, by the voltage regulator circuit, the power module supply Voltage of voltage regulation, the level-one bleeder mechanism pass through the workload needed for voltage to the electricity stable via the voltage regulator circuit Pressure carries out level-one partial pressure, and the computer obtains the waveform of level-one branch pressure voltage, and the clock signal device provides clock signal Variation, the clock signal provide the level-one branch pressure voltage the corresponding low and high level signal of waveform and the pressure stabilizing electricity The corresponding low and high level signal of the waveform of pressure;The level-one bleeder mechanism carries out pressure stabilizing electricity when the voltage of voltage regulation is in 0 hint The partial pressure of pressure;
The breaker connects the workload and the supercapacitor, and the supercapacitor connects the work It loads, the waveform of level-one branch pressure voltage described in the computer-made decision turns beyond low and high level provided by the clock signal Determine that level-one branch pressure voltage is superfluous when changing situation, the second level bleeder mechanism starting, the second level bleeder mechanism is used for will be superfluous Level-one branch pressure voltage carry out second divided voltage and being respectively allocated to the workload and the supercapacitor;
The second level bleeder mechanism has the partial pressure limit, when point of the level-one branch pressure voltage beyond the second level bleeder mechanism When pressing the limit, the breaker disconnects super described in the connection of the second level bleeder mechanism and the workload, breaking part The connection of capacitor and the second level bleeder mechanism, disconnect be still connected to the supercapacitor of the second level bleeder mechanism with it is described The connection of workload, the supercapacitor connecting with the second level bleeder mechanism that disconnects provide electricity to the workload Source, the supercapacitor for being still connected to the second level bleeder mechanism are charged by the second level bleeder mechanism.
As a kind of preferred embodiment of the invention, the computer passes through the clock signal when obtaining voltage of voltage regulation The low and high level for the clock signal that device issues is defined the waveform of the voltage of voltage regulation, i.e., passes through under continuous waveform Continuous low and high level carries out the corresponding decomposition of voltage of voltage regulation;
After the level-one bleeder mechanism divides the voltage of voltage regulation, the computer obtains branch pressure voltage, by described The low and high level for the clock signal that clock signal device issues is defined the waveform of the branch pressure voltage, i.e., in continuous wave The corresponding decomposition of branch pressure voltage is carried out by continuous low and high level under shape.
As a kind of preferred embodiment of the invention, when the corresponding waveform of the level signal of the branch pressure voltage of level-one bleeder mechanism When longitudinal translation occurs, presently described branch pressure voltage is superfluous;When and bleeder mechanism branch pressure voltage level signal it is corresponding When transverse translation occurs for waveform, presently described branch pressure voltage generates oscillation, and the clock signal device and the computer are again It is corresponding with low and high level to carry out voltage.
As a kind of preferred embodiment of the invention, the clock signal device generates corresponding level according to voltage waveform and turns In the period changed, when voltage generates oscillation, the clock signal device re-starts the change in level conversion period.
It further include load divider, the load divider is for disconnecting load as a kind of preferred embodiment of the invention Between connection, the supercapacitor includes breaking connector, and the open circuit connector is for connecting by load segmentation The workload that device disconnects connects the supercapacitor by the breaking connector, and the supercapacitor connects to disconnection The workload connect provides voltage.
As a kind of preferred embodiment of the invention, the computer passes through the corresponding branch pressure voltage between high period The minimum value of the corresponding branch pressure voltage carries out brownout judgement between maximum value and low period;
Operating voltage range is arranged in the workload, and the computer passes through operating voltage range and partial pressure electricity The minimum value being pressed between the maximum value and low period between high period determines voltage form.
As a kind of preferred embodiment of the invention, the workload is provided with compensation capacitor, the compensation capacitor Inner looping is constituted with the workload, the compensation capacitor is connect always with the workload, the compensation capacitor The second level bleeder mechanism is commonly connected to the workload.
As a kind of preferred embodiment of the invention, two poles are provided between the compensation capacitor and the supercapacitor Pipe, the diode guarantee that supercapacitor is connected to the direction of the compensation capacitor;
The compensation capacitor carries out voltage compensation when the supercapacitor is powered to the workload.
It further include communication module as a kind of preferred embodiment of the invention, the communication module includes several signal conversions Transmitter, several first time sets, several second time sets and long-distance monitorng device, the signal conversion transmitter with And first time set connects the breaker and the long-distance monitorng device, the first time set record open circuit Device working time point, second time set connect the workload and the long-distance monitorng device, second meter When device record the power-on time that the workload receives the supercapacitor and/or the compensation capacitor.
As a kind of preferred embodiment of the invention, the long-distance monitorng device passes through the dress of the first timing described in historical data Set the comparison of the comparison of timing time and history timing time and the time of second time set and history timing time The state for carrying out the second level bleeder mechanism of each breaker connection determines.
The present invention realize it is following the utility model has the advantages that
1. the present invention is by clock signal identical with voltage waveform same period and period internal structure to voltage waveform It is defined, so that if there is voltage fluctuation, station can voluntarily carry out voltage when outer bound pair station is powered Adjustment.
2. passing through the connection side of setting supercapacitor and supercapacitor and workload and second level potential device Formula utilizes the variation of supercapacitor and the connection type of workload and second level potential device when voltage fluctuation occurs Workload is powered by supercapacitor to workload when system is adjusted voltage fluctuation, is made Obtaining workload can persistently work.
3. supercapacitor is divided into two parts, second level bleeder mechanism, part supercapacitor are disconnected in breaker And the connection between workload, so that second level bleeder mechanism and workload are separately connected part supercapacitor, no Supercapacitor with part executes the effect for continuing charging and powering to workload respectively, so that supercapacitor energy Enough guarantee workload power supply while guarantee second level potential device distribution voltage be fully utilized, avoid into Need in the solution of row voltage fluctuation by dump and caused by station work can not carry out or action lag Situation.
4. workload is accessed using compensation capacitor, so that workload can obtain electricity in the case where undertension The compensation of pressure.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows the implementation for meeting the disclosure Example, and consistent with the instructions for explaining the principles of this disclosure.
Fig. 1 is the system module figure that a kind of railway station low pressure provided by the invention becomes distribution intelligent monitor system;
Fig. 2 is the system construction drawing that a kind of railway station low pressure provided by the invention becomes distribution intelligent monitor system;
Fig. 3 is that the workload that a kind of railway station low pressure provided by the invention becomes distribution intelligent monitor system is schemed side by side;
Fig. 4 is the macrostructure schematic diagram that a kind of railway station low pressure provided by the invention becomes distribution intelligent monitor system.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Embodiment one
With reference to Fig. 1-4.A kind of railway station low pressure change distribution intelligent monitor system, comprising: power module 1 and several works Make module 2, the power module 1 includes external cable 3, transformer 4, distribution box 5, and the operational module 2 includes several open circuits Device 6, several clock signal devices 7, several workloads 8, several supercapacitors 9, level-one bleeder mechanism 10, several two fractions Pressure device 11, computer 12.
The external cable 3 connects the transformer 4, and the transformer 4 connects the distribution box 5, and the transformer 4 is right The electric power that the external cable 3 provides is depressured, and the distribution box 5 distributes the voltage after decompression to the operational module 2 In, the operational module 2 is respectively arranged with the range of corresponding operating voltage total value, and the distribution box 5 is total according to the voltage Value range is adjusted in the result of distribution voltage.
The clock signal device 7 connects the breaker 6, workload 8, distribution box 5 and level-one bleeder mechanism 10, It is connected between the workload 8, breaker 6 and level-one bleeder mechanism 10 by inside cable, the computer 12 connects The clock signal device 7 and second level bleeder mechanism 11, the distribution box 5 includes voltage regulator circuit, by the voltage regulator circuit, The voltage of voltage regulation that the power module 1 supplies, voltage needed for the level-one bleeder mechanism 10 passes through the workload 8 to via The stable voltage of the voltage regulator circuit carries out level-one partial pressure, and the computer 12 obtains the waveform of level-one branch pressure voltage, when described Clock signal device 7 provides the variation of clock signal, and the clock signal provides the corresponding height of waveform of the level-one branch pressure voltage The corresponding low and high level signal of the waveform of low level signal and the voltage of voltage regulation;The level-one bleeder mechanism 10 is described steady Piezoelectricity carries out the partial pressure of voltage of voltage regulation when being pressed in 0 hint.
The breaker 6 connects the workload 8 and the supercapacitor 9, and the supercapacitor 9 connects institute Workload 8 is stated, the computer 12 determines the waveform of the level-one branch pressure voltage beyond height provided by the clock signal Determine that level-one branch pressure voltage is superfluous when low transition situation, the second level bleeder mechanism 11 starts, the second level bleeder mechanism 11 for carrying out second divided voltage for superfluous level-one branch pressure voltage and being respectively allocated to the workload 8 and the super electricity Container 9.
The second level bleeder mechanism 11 has the partial pressure limit, when the level-one branch pressure voltage exceeds the second level bleeder mechanism 11 The partial pressure limit when, the breaker 6 disconnects the connection of the second level bleeder mechanism 11 and the workload 8, breaking part The supercapacitor 9 and connection, the disconnection of the second level bleeder mechanism 11 are still connected to the super of the second level bleeder mechanism 11 The connection of grade capacitor 9 and the workload 8, it is described to disconnect the supercapacitor 9 connecting with the second level bleeder mechanism 11 Power supply is provided to the workload 8, the supercapacitor 9 for being still connected to the second level bleeder mechanism 11 passes through described two Grade bleeder mechanism 11 charges.
As a kind of preferred embodiment of the invention, the computer 12 is believed when obtaining voltage of voltage regulation by the clock The low and high level for the clock signal that number device 7 issues is defined the waveform of the voltage of voltage regulation, i.e., under continuous waveform The corresponding decomposition of voltage of voltage regulation is carried out by continuous low and high level.
After the level-one bleeder mechanism 10 divides the voltage of voltage regulation, the computer 12 obtains branch pressure voltage, passes through The low and high level for the clock signal that the clock signal device 7 issues is defined the waveform of the branch pressure voltage, i.e., even The corresponding decomposition of branch pressure voltage is carried out by continuous low and high level under continuous waveform.
As a kind of preferred embodiment of the invention, when the corresponding wave of the level signal of the branch pressure voltage of level-one bleeder mechanism 10 When longitudinal translation occurs for shape, presently described branch pressure voltage is superfluous;When and bleeder mechanism branch pressure voltage level signal it is corresponding Waveform when transverse translation occurs, presently described branch pressure voltage generates oscillation, the clock signal device 7 and the computer 12 It is corresponding with low and high level to re-start voltage.
As a kind of preferred embodiment of the invention, the clock signal device 7 generates corresponding level according to voltage waveform In the period of conversion, when voltage generates oscillation, the clock signal device 7 re-starts the change in level conversion period.
In the specific implementation process, when system carries out change distribution, electricity that external cable 3 supplies external power supply unit Pressure is applied to transformer 4, and the transformer 4 at station is voltage to be fixed transformation, the electricity that transformer 4 provides external cable 3 In normal range (NR) corresponding to low-voltage distribution of the pressure drop down to station;After being depressured via transformer 4, distribution box 5 is to all connections Distribution is carried out in the operational module 2 of power module 1.
For each operational module 2, staff according to operational module 2 in previous historical record when different Between carry out each operational module 2 under section and different external world situations needed for distribution voltage supposition, for estimation result, work Module 2 is recorded by computer 12.
Wherein, within the common period, operational module 2 relatively stable can work under an operating voltage, thus So that the distribution voltage of each operational module 2 keeps stablizing;And when there are some specific situations, such as pull in, Distribution voltage needed for certain operational modules 2 will increase, and before train enters the station, train can inform station, and station connects Information that train enters the station is transmitted to corresponding operational module 2 after receiving train signal, such as when No.1 track has train to enter the station, column Vehicle sends information to the corresponding operational module 2 of No.1 track, and the voltage total value range of the corresponding operational module 2 of No.1 track can root Increased voltage carries out corresponding adjustment when entering the station accordingly toward identical train, so that distribution needed for the operational module 2 is electric Pressure increases.
After distribution box 5 distributes voltage to operational module 2, illustrated with an operational module 2, if having in operational module 2 It works load 8, such as has workload 8A, workload 8B, workload 8C respectively, workload 8A is connected with breaker 6A, second level bleeder mechanism 11A and supercapacitor 9A, workload 8B be connected with breaker 6B, second level bleeder mechanism 11B with And supercapacitor 9B, workload 8C are connected with breaker 6C, second level bleeder mechanism 11C and supercapacitor 9C.
When normal operating voltage, which occurs, in workload 8A to be risen, such as when train enters the station, distribution box 5 can be according to this The change situation of the model judgement partial pressure of train, i.e., distribute No.1 operational module 2 corresponding to No.1 track obtained voltage Carry out raising to a certain extent;For improve No.1 operational module 2 branch pressure voltage, can when total line is set Multiple rheostats are arranged in total line to be divided, to reduce variable resistance when some operational module 2 needs to improve branch pressure voltage The partial pressure of device, so that the voltage that operational module 2 obtains improves.
After No.1 operational module 2 improves voltage, the corresponding level-one bleeder mechanism 10 of No.1 operational module 2 can be according to work Raising on 2 voltage of module divides voltage required for workload 8, for example, if when current train enters the station, train into The workload 8A to stand in corresponding operational module 2 enters the station to train and works with system to a certain extent, at this point, work is negative It carries voltage required for 8A to increase, level-one bleeder mechanism 10 judges that No.1 operational module 2 is facing according to the model of the secondary train The promotion of secondary train operating voltage required for provided working condition when entering the station, since distribution box 5 is for train Corresponding No.1 operational module 2 carries out voltage increment distribution when entering the station, therefore level-one bleeder mechanism 10 can be directly in No.1 work Make to divide the voltage value that workload 8A is connected into again in module 2.
And after train is completely outbound and is detached from the process range at current station, it just judges needed for time train enters the station The extra work to be carried out terminates, at this point, restored for the voltage of workload 8A and No.1 operational module 2, into When row restores, the voltage reduction of distribution box 5 is first carried out, after voltage reduction, then carries out the distribution voltage of level-one bleeder mechanism 10 also It is former.
When not having train to enter the station when the power supply of external cable 3 generates certain fluctuation, external cable 3 is straight The transformation voltage of the transformer 4 connect in succession also will appear it is certain stir, provided due to the reduced external cable 3 of transformer 4 The fluctuation situation of gap between the maximum and minimum of voltage, the transformation voltage of 4 final output of transformer can be than external electricity The fluctuation situation for the voltage value that cable 3 is directly fed is smaller;Distribution box 5 is during distribution, since supply voltage change is wink Duration, and distribution box 5 is adjusted according to the range of the voltage total value of operational module 2 with certain hysteresis quality, therefore, Distribution box 5 can still have fluctuation to the distribution of the voltage of each operational module 2.
Since supercapacitor 9 and workload 8 are connected to level-one bleeder mechanism 10, pass through in workload 8 When the voltage that level-one bleeder mechanism 10 is divided and provided is worked, also carried out with work clothes in corresponding supercapacitor 9 Charging, when there is voltage to when high voltage fluctuation, level-one bleeder mechanism 10 also has one to the voltage that each workload 8 is distributed Determine it is higher in degree, when deviation is in stability range, i.e., under the partial pressure limit of second level bleeder mechanism 11, second level partial pressure Device 11 distributes superfluous a part of voltage to supercapacitor 9, to guarantee that workload 8 can continue work.
It is noted that being divided into two parts, for example, right for the corresponding supercapacitor 9 of each workload 8 In the corresponding supercapacitor 9A of workload 8A, it is divided into supercapacitor 9A-1 and supercapacitor 9A-2, when voltage is inclined When difference is more than stability range, for example, level-one bleeder mechanism 10, which is distributed to the voltage of workload 8A, to be surpassed for workload 8A The partial pressure limit of second level bleeder mechanism 11A is crossed, at this point, breaker 6A disconnects second level bleeder mechanism 11A's and workload 8A Connection, disconnects supercapacitor 9A-2 and workload 8A at the connection for disconnecting supercapacitor 9A-1 and second level bleeder mechanism 11A Connection.
At this point, second level bleeder mechanism 11A is also attached to supercapacitor 9A-2, supercapacitor 9A-1 is also attached to work 8A is loaded, therefore, supercapacitor 9A-1 and workload 8A are formed into a loop, and supercapacitor 9A-1 can discharge, i.e., super electricity Container 9A-1 case workload 8A is powered, and workload 8A is able to continue to execute work, and supercapacitor 9A-2 can be after The voltage of second level bleeder mechanism 11A distribution is received in continued access, is charged;For supercapacitor 9, breakdown voltage is greater than transformer 4 Maximum transformation value therefore for supercapacitor 9A-1 and supercapacitor 9A-2, can individually receive second level well The voltage of bleeder mechanism 11A distribution.
And for supercapacitor 9A-1 and supercapacitor 9A-2, one is individually connected to workload 8A wherein Afterwards, when discharge process will enter coda, i.e. the charge retained on supercapacitor 9A-1 or supercapacitor 9A-2 will be used When complete, breaker 6A is by supercapacitor 9A-1 and supercapacitor 9A-2 and second level bleeder mechanism 11A and workload The connection state of 8A is exchanged.
In practical applications, DC communication electrical switching device can be connected in supercapacitor 9, thus by super capacitor The direct current that device 9 issues when powering is converted to alternating current.
Wherein, for the fluctuation of voltage, judged by clock signal.By voltage regulator circuit by level-one bleeder mechanism 10 The voltage of distribution is stablized, and the voltage waveform after stablizing levels off to the SIN function of standard, and therefore, the waveform of voltage has In one fixed period, under stable period, clock signal device 7 can generate the level signal in corresponding period according to the period and convert Situation, setting real-time voltage be higher than 0 when be used as high level, and real-time voltage be 0 when as low level, therefore, in the status of criterion Under, voltage cycle is consistent with the level translation period, and in one cycle, the duration of high level and the electricity for being higher than 0 The continuous time consistency of pressure holding, low level duration are consistent with the voltage-duration lower than 0.
Therefore, voltage waveform in the individual period is subjected to corresponding in real time, the process with clock signal level change over condition That is the low and high level of the clock signal of the sending of clock signal device 7 is defined the waveform of branch pressure voltage, and branch pressure voltage includes The partial pressure of distribution box 5 and the partial pressure of level-one bleeder mechanism 10.
In voltage output, computer 12 obtains clock signal and voltage waveform simultaneously, since clock signal is stable , computer 12 directly judges the situation of voltage at this time by correspondence situation of the control voltage waveform under clock signal, for example, When clock signal is high level and when time point is N, judge that the phase angle of the corresponding voltage of time point N does not change, and it is electric When the value of pressure becomes larger, the voltage in judgement overall at this time power module 1 and operational module 2 is larger, and voltage occurs longitudinal flat It moves;
And when judging the phase angle lead of the corresponding voltage of time N or falling behind, directly voltage occurs laterally at this time for judgement Translation;For the time point of certain voltage translation situation occurs, system reaches the partial pressure limit according to above-mentioned second level bleeder mechanism 11 When counter-measure coped with, wherein when there is horizontal line translation, further judgement is vibrated, processing vibrate after when carrying out Clock signal and the record again in level conversion period, and alternate simultaneously.
Embodiment two
With reference to Fig. 1-4.Compared with embodiment one, difference place is the present embodiment:
It further include load divider 13, the load divider 13 is for disconnecting as a kind of preferred embodiment of the invention Connection between load, the supercapacitor 9 include breaking connector 14, and the open circuit connector 14 is described for connecting The workload 8 that divider 13 disconnects is loaded, the supercapacitor 9 is connected by the breaking connector 14, it is described super Capacitor 9 provides voltage to the workload 8 disconnected.
As a kind of preferred embodiment of the invention, the computer 12 passes through the corresponding branch pressure voltage between high period Maximum value and low period between the corresponding branch pressure voltage minimum value carry out brownout judgement.
Operating voltage range is arranged in the workload 8, and the computer 12 passes through operating voltage range and described point Piezoelectricity is pressed in the minimum value between the maximum value and low period between high period and determines voltage form.
As a kind of preferred embodiment of the invention, the workload 8 is provided with compensation capacitor 15, the compensating electric capacity Device 15 and the workload 8 constitute inner looping, and the compensation capacitor 15 is connect always with the workload 8, the benefit It repays capacitor 15 and the workload 8 is commonly connected to the second level bleeder mechanism 11.
As a kind of preferred embodiment of the invention, it is provided between the compensation capacitor 15 and the supercapacitor 9 Diode, the diode guarantee that supercapacitor 9 is connected to the direction of the compensation capacitor 15.
The compensation capacitor 15 carries out voltage compensation when the supercapacitor 9 is powered to the workload 8.
It further include communication module 16 as a kind of preferred embodiment of the invention, the communication module 16 includes several signals Conversion transmitter 17, several first time sets 18, several second time sets 19 and long-distance monitorng device 20, the signal Conversion transmitter 17 and first time set 18 connect the breaker 6 and the long-distance monitorng device 20, described First time set 18 records 6 working time of breaker point, and second time set 19 connects the workload 8 and institute State long-distance monitorng device 20, second time set 19 record the workload 8 receive the supercapacitor 9 and/or The power-on time of the compensation capacitor 15.
As a kind of preferred embodiment of the invention, the long-distance monitorng device 20 passes through the first timing described in historical data The comparison of 18 timing time of device and history timing time and the time of second time set 19 and history timing time Comparison carry out the state of the second level bleeder mechanism 11 that each breaker 6 connects and determine.
In the specific implementation process, when second level bleeder mechanism 11 is beyond the partial pressure limit, sometimes workload 8A and work It is connection between load 8B, needs for workload 8A and workload 8B to be split at this time, loads divider 13 for work The connection relationship made between load 8A and workload 8B temporarily disconnects, and corresponding short circuit connector is by workload 8A and work Make load 8B and be connected respectively to corresponding supercapacitor 9A or supercapacitor 9B, thus the above-mentioned second level of further progress Work countermeasure when bleeder mechanism 11 is beyond the partial pressure limit.
In addition, in one the not period of transverse translation, can directly by voltage max whether be more than it is previous just Maximum value in the normal period judges whether the longitudinal translation for voltage occur, if so, directly passing through above-mentioned second level bleeder mechanism 11 Work countermeasure when beyond the partial pressure limit is adjusted;Further, since voltage exists reversely, and reversed voltage exists 0 line part below is shown as in waveform diagram, i.e., voltage is negative when reversed, when judge voltage minimum be higher than normal cycle in When minimum value, undertension at this time is judged.
When judging undertension, such as when computer 12 judges the voltage value deficiency of workload 8A, due to work Making load 8A and persistently receives voltage, the corresponding compensation capacitor 15A of workload 8A is also during being constantly in charging, when When the voltage of workload 8A reduces, the real-time voltage of compensation capacitor 15A is also reduced, still, in practice, compensation capacitor The value of the electromotive force of the pole plate of 15A is still under normal voltage, i.e., compensation capacitor 15A builtin voltage is greater than compensating electric capacity Real-time voltage outside device 15A, therefore compensation capacitor 15A really discharges outward, and the object that discharges is exactly be attached thereto Workload 8A, therefore, workload 8A obtains certain voltage compensation.
And for compensation capacitor 15, since compensation capacitor 15 is also connected to second level bleeder mechanism 11, compensation electricity It, therefore, can be in compensation capacitor 15 and supercapacitor 9 there is also there is connection relationship between container 15 and supercapacitor 9 Between set up diode, and diode guarantees that supercapacitor 9 is connected to the direction of compensation capacitor 15, to guarantee compensation electricity Container 15 will not be powered to supercapacitor 9.
Communication for system, the first time set 18 record the 6 open circuit work of each breaker start time point and Time point is terminated, and calculates the duration that breaker 6 works by two time points, when computer 12 judges 6 work of breaker When the overlong time of work, then the signal for needing to overhaul is provided, staff is notified to overhaul;And time set records super electricity Time or supercapacitor 9 that container 9 or compensation capacitor 15 are powered to the workload 8 of connection and compensation capacitor 15 are together For the time that workload 8 is powered, it is right to determine supercapacitor 9 or compensation capacitor 15 after voltage accident occur by the time The respond of voltage accident.
The above embodiments merely illustrate the technical concept and features of the present invention, and the purpose is to allow the skill for being familiar with the technical field Art personnel can understand the content of the present invention and implement it accordingly, and can not be limited the scope of the invention with this.All bases Equivalent changes or modifications made by spirit of the invention, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of railway station low pressure becomes distribution intelligent monitor system characterized by comprising power module (1) and several Operational module (2), the power module (1) include external cable (3), transformer (4), distribution box (5), the operational module It (2) include several breakers (6), several clock signal devices (7), several workloads (8), several supercapacitors (9), one Grade bleeder mechanism (10), several second level bleeder mechanisms (11), computer (12);
The external cable (3) connects the transformer (4), and the transformer (4) connects the distribution box (5), the transformation The electric power that device (4) provides the external cable (3) is depressured, and the distribution box (5) distributes the voltage after decompression to institute It states in operational module (2), the operational module (2) is respectively arranged with the range of corresponding operating voltage total value, the distribution box (5) result according to the voltage total value range in distribution voltage is adjusted;
The clock signal device (7) connects the breaker (6), workload (8), distribution box (5) and level-one partial pressure dress It sets (10), is connected between the workload (8), breaker (6) and level-one bleeder mechanism (10) by inside cable, it is described Computer (12) connects the clock signal device (7) and second level bleeder mechanism (11), and the distribution box (5) includes pressure stabilizing electricity Road, by the voltage regulator circuit, the voltage of voltage regulation of power module (1) supply, the level-one bleeder mechanism (10) passes through institute Voltage needed for stating workload (8) carries out level-one partial pressure, the computer (12) to via the stable voltage of the voltage regulator circuit The waveform of level-one branch pressure voltage is obtained, the clock signal device (7) provides the variation of clock signal, and the clock signal provides The corresponding low and high level of waveform of the corresponding low and high level signal of the waveform of the level-one branch pressure voltage and the voltage of voltage regulation Signal;The level-one bleeder mechanism (10) carries out the partial pressure of voltage of voltage regulation when the voltage of voltage regulation is in 0 hint;
The breaker (6) connects the workload (8) and the supercapacitor (9), and the supercapacitor (9) is even It connects the workload (8), the computer (12) determines that the waveform of the level-one branch pressure voltage exceeds the clock signal institute Determine that level-one branch pressure voltage is superfluous when the low and high level transformation condition of offer, second level bleeder mechanism (11) starting, described two Grade bleeder mechanism (11) is used to superfluous level-one branch pressure voltage carrying out second divided voltage and is respectively allocated to the workload (8) And the supercapacitor (9);
The second level bleeder mechanism (11) has the partial pressure limit, when the level-one branch pressure voltage exceeds the second level bleeder mechanism (11) The partial pressure limit when, the breaker (6) disconnects the connection, disconnected of the second level bleeder mechanism (11) and the workload (8) Open the connection of the part supercapacitor (9) and the second level bleeder mechanism (11), disconnection is still connected to the second level partial pressure The supercapacitor (9) of device (11) and the connection of the workload (8), the disconnection and the second level bleeder mechanism (11) Supercapacitor (9) the Xiang Suoshu workload (8) of connection provides power supply, described to be still connected to the second level bleeder mechanism (11) Supercapacitor (9) charged by the second level bleeder mechanism (11).
2. a kind of railway station low pressure according to claim 1 becomes distribution intelligent monitor system, it is characterised in that: the meter For calculation machine (12) when obtaining voltage of voltage regulation, the low and high level of the clock signal issued by the clock signal device (7) is to institute The waveform for stating voltage of voltage regulation is defined, i.e., carries out corresponding point of voltage of voltage regulation by continuous low and high level under continuous waveform Solution;
After the level-one bleeder mechanism (10) divides the voltage of voltage regulation, the computer (12) obtains branch pressure voltage, passes through The low and high level for the clock signal that the clock signal device (7) issues is defined the waveform of the branch pressure voltage, that is, exists The corresponding decomposition of branch pressure voltage is carried out by continuous low and high level under continuous waveform.
3. a kind of railway station low pressure according to claim 2 becomes distribution intelligent monitor system, it is characterised in that: work as level-one When longitudinal translation occurs for the level signal of the branch pressure voltage of bleeder mechanism (10) corresponding waveform, presently described branch pressure voltage mistake It is surplus;When and the corresponding waveform of level signal of branch pressure voltage of bleeder mechanism transverse translation occurs when, presently described partial pressure is electric Pressure generates oscillation, and the clock signal device (7) and the computer (12) re-start the corresponding of voltage and low and high level.
4. a kind of railway station low pressure according to claim 3 becomes distribution intelligent monitor system, it is characterised in that: when described Clock signal device (7) generates the period of corresponding level conversion according to voltage waveform, when voltage generates oscillation, the clock letter Number device (7) re-starts the change in level conversion period.
5. a kind of railway station low pressure according to claim 1 becomes distribution intelligent monitor system, it is characterised in that: further include It loads divider (13), load divider (13) is used to disconnect the connection between load, and the supercapacitor (9) includes Breaking connector (14), the open circuit connector (14) are used to connect the workload disconnected by load divider (13) (8), the supercapacitor (9) is connected by the breaking connector (14), the supercapacitor (9) is to what is disconnected The workload (8) provides voltage.
6. a kind of railway station low pressure according to claim 5 becomes distribution intelligent monitor system, it is characterised in that: the meter The corresponding partial pressure between maximum value and low period that calculation machine (12) passes through the corresponding branch pressure voltage between high period The minimum value of voltage carries out brownout judgement;
Operating voltage range is arranged in the workload (8), and the computer (12) passes through operating voltage range and described point Piezoelectricity is pressed in the minimum value between the maximum value and low period between high period and determines voltage form.
7. a kind of railway station low pressure according to claim 6 becomes distribution intelligent monitor system, it is characterised in that: the work (8) are loaded to be provided with compensation capacitor (15), the compensation capacitor (15) and the workload (8) constitute inner looping, The compensation capacitor (15) connect always with the workload (8), the compensation capacitor (15) and the workload (8) it is commonly connected to the second level bleeder mechanism (11).
8. a kind of railway station low pressure according to claim 7 becomes distribution intelligent monitor system, it is characterised in that: the benefit Repay and be provided with diode between capacitor (15) and the supercapacitor (9), the diode guarantee supercapacitor (9) to The direction of the compensation capacitor (15) is connected;
The compensation capacitor (15) carries out voltage compensation when the supercapacitor (9) Xiang Suoshu workload (8) is powered.
9. a kind of railway station low pressure according to claim 8 becomes distribution intelligent monitor system, it is characterised in that: further include Communication module (16), the communication module (16) include several signal conversion transmitters (17), several first time sets (18), Several second time sets (19) and long-distance monitorng device (20), the signal conversion transmitter (17) and first meter When device (18) connect the breaker (6) and the long-distance monitorng device (20), the first time set (18) record Breaker (6) working time point, second time set (19) connect the workload (8) and the long-range monitoring dress It sets (20), second time set (19) records the workload (8) and receives the supercapacitor (9) and/or described The power-on time of compensation capacitor (15).
10. a kind of railway station low pressure according to claim 9 becomes distribution intelligent monitor system, it is characterised in that: described Pair that long-distance monitorng device (20) passes through the first time set (18) timing time and history timing time described in historical data Than and the comparison of time and history timing time of second time set (19) carry out each breaker (6) and connect Second level bleeder mechanism (11) state determine.
CN201910688171.0A 2019-07-29 2019-07-29 Intelligent monitoring system for low-voltage transformer substation of railway station Active CN110401198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910688171.0A CN110401198B (en) 2019-07-29 2019-07-29 Intelligent monitoring system for low-voltage transformer substation of railway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910688171.0A CN110401198B (en) 2019-07-29 2019-07-29 Intelligent monitoring system for low-voltage transformer substation of railway station

Publications (2)

Publication Number Publication Date
CN110401198A true CN110401198A (en) 2019-11-01
CN110401198B CN110401198B (en) 2021-02-09

Family

ID=68326367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910688171.0A Active CN110401198B (en) 2019-07-29 2019-07-29 Intelligent monitoring system for low-voltage transformer substation of railway station

Country Status (1)

Country Link
CN (1) CN110401198B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110994404A (en) * 2020-01-06 2020-04-10 新昌次长电子科技有限公司 Self-adjusting stable power distribution system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201945846U (en) * 2011-01-07 2011-08-24 蒋正坤 Comprehensive monitoring system of low voltage electric transformer and distribution for high speed railway
CN202333983U (en) * 2011-10-31 2012-07-11 中铁二十局集团电气化工程有限公司 Comprehensive automatic system for railway power substation
CN104242472A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Intelligent monitoring system for low-voltage transformer substation of railway station
CN104260763A (en) * 2014-10-17 2015-01-07 成都四为电子信息股份有限公司 Railway station comprehensive monitoring system and design method thereof
US20170324272A1 (en) * 2016-05-05 2017-11-09 Ig Soo Kwon Power blackout sensing system with a phantom voltage detector

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201945846U (en) * 2011-01-07 2011-08-24 蒋正坤 Comprehensive monitoring system of low voltage electric transformer and distribution for high speed railway
CN202333983U (en) * 2011-10-31 2012-07-11 中铁二十局集团电气化工程有限公司 Comprehensive automatic system for railway power substation
CN104242472A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Intelligent monitoring system for low-voltage transformer substation of railway station
CN104260763A (en) * 2014-10-17 2015-01-07 成都四为电子信息股份有限公司 Railway station comprehensive monitoring system and design method thereof
CN104242472B (en) * 2014-10-17 2016-08-24 成都四为电子信息股份有限公司 A kind of railway station low buckling distribution intelligent monitor system
US20170324272A1 (en) * 2016-05-05 2017-11-09 Ig Soo Kwon Power blackout sensing system with a phantom voltage detector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110994404A (en) * 2020-01-06 2020-04-10 新昌次长电子科技有限公司 Self-adjusting stable power distribution system

Also Published As

Publication number Publication date
CN110401198B (en) 2021-02-09

Similar Documents

Publication Publication Date Title
CN103427430B (en) A kind of energy management method of mixed energy storage system in microgrid
CN103997046B (en) Box energy storage transformer station energy-storage units switching control method
CN102983589B (en) Control method of grid friendly type distributed power source based on hybrid energy storage
CN102882268B (en) Undisturbed uninterruptible power supply device
CN103595063B (en) A kind of energy accumulation current converter and battery energy storage system thereof
US20130049471A1 (en) Multipurpose, universal Converter with battery control and real-time Power Factor Correction.
CN104184151B (en) A kind of dynamic electric voltage recovery device realizing the different operational mode of microgrid and take over seamlessly
CN106240405B (en) Single phase power supply device, electric railway traction power supply system and its control method
US11139675B2 (en) Hybrid energy storage system
CN102545200A (en) Multi-port direct-current distribution network system based on voltage source converter
CN103219726A (en) Microgrid topology structure based on energy storage
CN104362656A (en) Control method based on hybrid energy storage voltage source inverter (VSI) stabilizing microgrid power fluctuation
CN109904866A (en) A kind of the micro-grid connection control method for coordinating and its system of polynary energy storage
CN109149554B (en) Flywheel energy storage two stage power transformation system and control method
CN108494072A (en) A kind of modularization accumulator aviation startup power supply system
CN206790103U (en) A kind of voltage dip/temporarily rise controlling device
CN106059229B (en) Induction generation system and train
CN105652116B (en) Back-to-back test circuit based on DC/DC converter
CN110401198A (en) A kind of railway station low pressure change distribution intelligent monitor system
CN108879789A (en) Bidirectional energy-storage Variable flow control device and method
CN105939024A (en) Intelligent distributed type wind power generation system capable of adjusting voltage and power
CN106787111A (en) A kind of timesharing bi-directional voltage stabilizing hybrid inverter and its control method
CN206049416U (en) Single phase power supply device, electric railway traction power supply system
CN105762913A (en) Micro grid system
CN108336744A (en) A kind of static reactive generator device with photovoltaic generation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Deju

Inventor after: Zhang Zhixin

Inventor after: Chen Yisi

Inventor after: Other inventor requests not to publish the name

Inventor before: Request for anonymity

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20210122

Address after: 710048 room 10902, building 4, Ivy garden, Xingqing Road, Beilin District, Xi'an City, Shaanxi Province

Applicant after: SHAANXI HUI QI ELECTRIC TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: Room a7130, 7 / F, building 9, phase I, Changsha CLP Software Park, No. 39, Jianshan Road, Changsha high tech Development Zone, Changsha City, Hunan Province

Applicant before: CHANGSHA ERDAO NEW ENERGY TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant