CN110399153A - Method for upgrading system, device, terminal and computer readable storage medium - Google Patents

Method for upgrading system, device, terminal and computer readable storage medium Download PDF

Info

Publication number
CN110399153A
CN110399153A CN201910679663.3A CN201910679663A CN110399153A CN 110399153 A CN110399153 A CN 110399153A CN 201910679663 A CN201910679663 A CN 201910679663A CN 110399153 A CN110399153 A CN 110399153A
Authority
CN
China
Prior art keywords
terminal
upgraded
subregion
upgrading
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910679663.3A
Other languages
Chinese (zh)
Other versions
CN110399153B (en
Inventor
郑健平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Oppo Mobile Telecommunications Corp Ltd
Original Assignee
Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Oppo Mobile Telecommunications Corp Ltd filed Critical Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority to CN201910679663.3A priority Critical patent/CN110399153B/en
Publication of CN110399153A publication Critical patent/CN110399153A/en
Application granted granted Critical
Publication of CN110399153B publication Critical patent/CN110399153B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/28Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1415Saving, restoring, recovering or retrying at system level
    • G06F11/1433Saving, restoring, recovering or retrying at system level during software upgrading
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Computer Security & Cryptography (AREA)
  • Quality & Reliability (AREA)
  • Stored Programmes (AREA)

Abstract

The application belongs to field of communication technology, more particularly to a kind of method for upgrading system, device, terminal and computer readable storage medium, wherein, the method for upgrading system includes: to detect whether the terminal occurs the event powered off for triggering the terminal before the current subregion to be upgraded to the terminal upgrades;If the event for triggering the terminal power-off occurs for the terminal, pause upgrades the current subregion to be upgraded;After reducing terminal upgrade failure, the probability that can not be restarted improves the safety of system upgrade.

Description

Method for upgrading system, device, terminal and computer readable storage medium
Technical field
The application belongs to field of communication technology more particularly to a kind of method for upgrading system, device, terminal and computer-readable Storage medium.
Background technique
System upgrade refers to the operation for being updated or replacing by system of certain method to terminal.
However, after usually will appear terminal upgrade failure, can not be restarted when the system to terminal upgrades Phenomenon greatly affected the use of terminal.
Summary of the invention
The embodiment of the present application provides a kind of method for upgrading system, device, terminal and computer readable storage medium, can drop After the failure of low terminal upgrade, the probability that can not restart.
The embodiment of the present application first aspect provides a kind of method for upgrading system, comprising:
Before the current subregion to be upgraded to the terminal upgrades, detect whether the terminal occurs for triggering The event of the terminal power-off;
If the event for triggering the terminal power-off occurs for the terminal, pause to the current subregion to be upgraded into Row upgrading.
The embodiment of the present application second aspect provides a kind of system upgrade device, comprising:
Detection unit, for before the current subregion to be upgraded to the terminal upgrades, detecting the terminal to be The no event occurred for triggering the terminal power-off;
Upgrade unit, if the event for triggering the terminal power-off occurs for the terminal, pause is worked as to described Preceding subregion to be upgraded is upgraded.
The embodiment of the present application third aspect provides a kind of terminal, including memory, processor and storage are in memory And the computer program that can be run on a processor, when processor executes computer program the step of the realization above method.
The embodiment of the present application fourth aspect provides a kind of computer readable storage medium, computer-readable recording medium storage The step of having computer program, the above method is realized when computer program is executed by processor.
In the embodiment of the present application, it is by before the current subregion to be upgraded to terminal upgrades, first detecting terminal The no event occurred for triggering terminal power-off, and when the event for triggering terminal power-off occurs for terminal, suspend to current Subregion to be upgraded is upgraded, and is avoided when the important subregion to terminal upgrades, is powered off, and terminal is caused to occur to rise Grade failure, and the problem of can not restart, after reducing terminal upgrade failure, the probability that can not be restarted is improved The safety of terminal system upgrading.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is a kind of first implementation flow schematic diagram of method for upgrading system provided by the embodiments of the present application;
Fig. 2 is a kind of operating principle schematic diagram of method for upgrading system provided by the embodiments of the present application;
Fig. 3 is a kind of the second implementation process schematic diagram of method for upgrading system provided by the embodiments of the present application;
Fig. 4 is a kind of specific implementation flow schematic diagram of method for upgrading system step 102 provided by the embodiments of the present application;
Fig. 5 is the structural schematic diagram of system upgrade device provided by the embodiments of the present application;
Fig. 6 is the structural schematic diagram of terminal provided by the embodiments of the present application.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, and It is not used in restriction the application.Meanwhile in the description of the present application, term " first ", " second " etc. are only used for distinguishing description, without It can be interpreted as indication or suggestion relative importance.
It should be appreciated that ought use in this specification and in the appended claims, term " includes " instruction is described special Sign, entirety, step, operation, the presence of element and/or component, but be not precluded one or more of the other feature, entirety, step, Operation, the presence or addition of element, component and/or its set.
It is also understood that mesh of the term used in this present specification merely for the sake of description specific embodiment And be not intended to limit the application.As present specification and it is used in the attached claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singular, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in present specification and the appended claims is Refer to any combination and all possible combinations of one or more of associated item listed, and including these combinations.
Currently, the system upgrade of terminal is realized by being upgraded to each subregion.Skill is being downloaded using space When the upgrade methods such as art (Over-the-Air, OTA) upgrade terminal system, if user forces pressing, power key shutdown is disconnected Electricity, and terminal is carrying out the upgrading of important subregion at this time, it is likely that it can be because the upgrading interruption of important subregion causes to rise Grade failure, causes terminal that can not restart and become brick, greatly affected the use of terminal.
Based on these problems, the embodiment of the present application provides a kind of method for upgrading system, device, terminal and computer-readable deposits Storage media, after terminal upgrade failure can be reduced, the probability that can not be restarted, in order to illustrate the technical solution of the application, under Face is illustrated by specific embodiment.
A kind of implementation process schematic diagram of method for upgrading system provided by the embodiments of the present application as shown in figure 1, this method Applied to terminal, can be executed by the system upgrade device configured in terminal, suitable for the feelings of system upgrade safety need to be improved Shape.Wherein, above-mentioned terminal can be the intelligent terminals such as mobile phone, tablet computer, wearable device, and above system upgrade method can be with Including step 101 to step 102.
Step 101, before the current subregion to be upgraded to terminal upgrades, whether detection terminal occurs for triggering The event of terminal power-off.
Wherein, current subregion to be upgraded refers to the subregion for starting to upgrade not yet and to be ready starting upgrading.
Since the above-mentioned event for triggering terminal power-off may include long-pressing entity power key, touch entity electricity for a long time The events such as the virtual control (for example, clicking virtual shutdown control) of source key and triggering for powering off terminal, that is, Ke Yitong Long-pressing entity power key is crossed, touch entity power key for a long time and triggers the modes such as the virtual control for powering off terminal and is touched Send out terminal power-off.Therefore, in some embodiments of the application, the above-mentioned current subregion to be upgraded to terminal upgrades Before, whether detection terminal occurs for the event that triggering terminal powers off to may include: in the current subregion to be upgraded to terminal Before being upgraded, whether the power key for detecting terminal is in pressing state;And/or it detects the power key of terminal and whether is in Touch condition;And/or whether the virtual control detected for powering off terminal is triggered;If the power key of terminal is in Pressing state, and/or, the power key of terminal is in touch condition, and/or, the virtual control quilt for powering off terminal Triggering, it is determined that the event for triggering terminal power-off occurs for terminal.
It should be noted that being herein only that the event powered off for triggering terminal is illustrated, it is not offered as For the limitation to the application protection scope, all events that terminal can be made to power off can be adapted for the application.
For example, the above-mentioned event for triggering terminal power-off can also include eventually in some embodiments of the application The electricity at end is lower than the event of default electricity.Correspondingly, whether above-mentioned detection terminal occurs the event powered off for triggering terminal It include: to detect the electricity of terminal whether to be lower than default electricity, if the electricity of terminal is lower than default electricity, it is determined that terminal is used In the event of triggering terminal power-off.
For the convenience of description, being said so that the above-mentioned event for triggering terminal power-off is long-pressing power key as an example below It is bright.
Step 102, if the event for triggering terminal power-off occurs for terminal, pause rises current subregion to be upgraded Grade.
When the event for triggering terminal power-off occurs due to terminal, it is possible to cause terminal to be forced shutdown power-off, because This can first detect whether terminal occurs to break for triggering terminal before the current subregion to be upgraded to terminal upgrades The event of electricity, to suspend to the current to be upgraded of terminal when detecting that the event for triggering terminal power-off occurs for terminal Subregion is upgraded, and is avoided when the important subregion to terminal upgrades, is powered off, cause terminal that can not restart And the problem of becoming brick, after reducing terminal upgrade failure, the probability that can not be restarted improves the safety of system upgrade.
For example, when detecting that terminal supplying power key is in pressing state, then suspend to the current subregion to be upgraded of terminal into Row upgrading, to avoid when the important subregion to terminal upgrades, powers off, causes terminal that can not restart and become brick The problem of.
It should be noted that upgrading duration is usually less than long-pressing power supply since the data volume of important subregion is usually smaller The duration that key causes terminal closedown to power off therefore in the embodiment of the present application, can be by carrying out to current subregion to be upgraded Before upgrading, whether detection power key is in pressing state, can be to current to be upgraded if power key is not in pressing state Subregion is upgraded, also, in the escalation process, is pressed even if there is power key, can also be complete before terminal power-off At the upgrading of important subregion.It avoids when the important subregion to terminal upgrades, powers off, cause terminal can not be again The problem of starting and becoming brick.
For example, as illustrated in fig. 2, it is assumed that subregion 3 is important subregion, and assume that the upgrading duration of subregion 3 needs 2s, and power supply Key needs long-pressing 6s that can just terminal be made to power off.If power key has been long pressed 5s and has still located before the upgrading for carrying out subregion 3 In pressing state, then it can detecte power key before the upgrading for carrying out subregion 3 at this time and be in pressing state, it therefore, can be with By stopping upgrading subregion 3, to avoid subregion 3 when being upgraded to 1s, terminal power-off causes terminal that can not restart And become brick.
Specifically, to terminal carry out system upgrade when, can generally be related to loader subregion, recovery subregion and File partition etc.;Wherein, loader subregion is located at first sector of disk, for disk lead into operating system or Person's recovery subregion, this subregion are generally not necessarily to upgrade;Recovery subregion is for restoring/the guidance that uses of upgrade-system Subregion, when terminal carries out system upgrade, loader subregion guidance system enters recovery subregion, specific upgrade function by Recovery subregion is completed, and therefore, recovery subregion belongs to important subregion in system upgrade;And recovery subregion also needs Upgraded.
Currently, if there is upgrading failure in recovery subregion, it is likely that the system that will appear terminal can not restart The case where, and for other subregions, if there is upgrading failure, terminal can carry out system upgrade from the beginning again.
Therefore, in some embodiments of the application, above-mentioned steps 101, the current subregion to be upgraded to terminal into Row upgrading before, detect terminal power key whether be in pressing state can also include: to each of terminal currently wait rise Before grade subregion (both including important subregion, also include other subregions in addition to important subregion) is upgraded, terminal is detected Power key whether be in pressing state.
That is, whether the power key for being intended to detection terminal is in pressing shape before upgrading each subregion to be upgraded State.
In addition, in some embodiments of the application, above-mentioned steps 101, the current subregion to be upgraded to terminal into Before row upgrading, whether detection terminal occurs include: in current subregion to be upgraded for the event that triggering terminal powers off When subregion (important subregion) for that cannot interrupt upgrading, whether detection terminal occurs the event powered off for triggering terminal.
That is, only when current subregion to be upgraded is that cannot interrupt the subregion of upgrading, it just can be to currently wait rise Before grade subregion is upgraded, whether detection terminal occurs the event powered off for triggering terminal, and to upgrading can be interrupted Subregion when being upgraded, then do not need detection terminal and whether occur the event powered off for triggering terminal, but directly to can Upgraded with interrupting the subregion of upgrading.This mode is relative to before upgrading each current subregion to be upgraded, Whether detection terminal occurs for the event powered off for triggering terminal, it is possible to reduce whether detection terminal occurs for triggering end Hold the number of the event of power-off.
For example, as shown in figure 3, above system upgrade method may include: step 301 to step 303.
Step 301, before the current subregion to be upgraded to terminal upgrades, detect current subregion to be upgraded whether be The subregion of upgrading cannot be interrupted;
Step 302, if current subregion to be upgraded is the subregion that cannot interrupt upgrading, detect whether terminal occurs for touching Send out the event of terminal power-off;
Step 303, if the event for triggering terminal power-off occurs for terminal, pause rises current subregion to be upgraded Grade.
Wherein, the above-mentioned subregion that cannot interrupt upgrading refers to during upgrading to the subregion, occurs powering off Situation will cause the subregion that terminal can not restart.
For example, the above-mentioned subregion that cannot interrupt upgrading may include recovery in some embodiments of the application Subregion.
In the embodiment of the present application, when detecting that the event for triggering terminal power-off occurs for terminal, suspend to current Subregion to be upgraded is upgraded, therefore, it is possible to prevente effectively from, because of power-off, occurring when upgrading to the important subregion of terminal The problem of terminal can not restart and become brick, after reducing terminal upgrade failure, the probability that can not be restarted improves and is The safety of system upgrading.
In some embodiments of the application, as shown in figure 3, detecting current subregion to be upgraded in above-mentioned steps 301 It can also include step 304 after whether being the subregion that cannot interrupt upgrading.
Step 304, if current subregion to be upgraded is the subregion that can interrupt upgrading, directly to the current to be upgraded of terminal Subregion is upgraded.
Due to when current subregion to be upgraded is that can interrupt the subregion of upgrading, during upgrading to it, even if It powers off, will not cause terminal that can not restart, and at most only terminal is caused to need to re-start system upgrade, because This can directly carry out the current subregion to be upgraded of terminal when current subregion to be upgraded is that can interrupt the subregion of upgrading Upgrading, without detecting whether terminal occurs the event powered off for triggering terminal in advance.
In some embodiments of the application, as shown in figure 4, carrying out upgrading it to current subregion to be upgraded in pause It afterwards, can also include: step 401 to step 402.
Step 401, whether detection has terminated for the event of triggering terminal power-off;
Step 402, if the event for triggering terminal power-off has terminated, the current subregion to be upgraded of terminal is risen Grade.
For example, whether detection power key is in pressing state again;If power key is not in pressing state, to currently to Upgrading subregion is upgraded.
When being in pressing state due to power key, it is possible to which user only wishes to unlock screen locking, or maloperation occurs and lead It causes power key to be pressed, is not intended to the shutdown of long-pressing power key, so, the duration that power key is in pressing state should be able to compare It is shorter, therefore, detect whether power key is in pressing again after pause upgrades the current subregion to be upgraded of terminal State, it is possible to it can detect that power key is not in pressing state, at this point, since terminal is not shut down power-off, it can be right Current subregion to be upgraded is upgraded.
It should be noted that since terminal is during system carries out system upgrade, it can be on the display interface of terminal The prompt information that do not shut down is asked in display, also, does not also allow software control to shut down, power-off of shutting down caused by long-pressing power key It is the shutdown power-off on hardware, is to complete moment.Therefore, if terminal can also detect that power key is not in pressing state, Then indicate that user does not trigger pressure power-off, it is possible to continue to upgrade to current subregion to be upgraded.
In presently filed embodiment, in order to improve the system upgrade efficiency of terminal, as shown in figure 4, in above-mentioned steps 401 It later, can also include: step 403 to step 404.
Step 403, if the event for triggering terminal power-off is not finished, the total duration of event generation is obtained, and is judged Whether total duration is greater than preset duration;
Step 404, if total duration is greater than preset duration, restart terminal, and system upgrade is carried out to terminal again.
For example, obtaining the total duration that power key is in pressing state, and judge power supply if power key is in pressing state Whether the total duration that key is in pressing state is greater than default pressing duration;If the duration that power key is in pressing state is greater than default Duration is pressed, then restarts terminal, and system upgrade is carried out to terminal again.
In some embodiments of the application, the total duration that power key is in pressing state refers to be pressed from power key Time duration afterwards.Above-mentioned default pressing duration is less than the duration for causing terminal closedown power-off to need to press power key.For example, eventually End shutdown power-off needs to press the when a length of 6s of power key, then the default pressing duration is less than 6s.It is pressed by being in power key When pressure condition, judges that power key is in the total duration of pressing state and whether is greater than default pressing duration, can determine that terminal is closed A possibility that machine powers off.
Wherein, when the duration that power key is in pressing state is greater than default pressing duration, terminal closedown power-off is indicated Possibility is larger.It therefore, can be by triggering instruction of restarting, directly restarting to terminal, and in terminal before terminal powers off After restarting, system upgrade is carried out to terminal again, to avoid occurring leading to terminal closedown because maloperation occurs in the power key of terminal The problem of powering off, being unable to complete system upgrade, improves the upgrading efficiency of terminal system.
Optionally, in order to further increase the system upgrade efficiency of terminal, above-mentioned steps 404, if total duration be greater than it is default Duration then restarts terminal, if may include: that total duration is greater than preset duration, after establishing upgrading program, restarts end End;Upgrading program is used to store the identification information of current subregion to be upgraded.Correspondingly, above-mentioned steps 404, again to terminal into Row system upgrade may include: to carry out system upgrade to terminal since the corresponding subregion to be upgraded of identification information.
That is, can be by establishing the mode of upgrading program, avoiding terminal before controlling terminal is restarted automatically When upgrading again, need that whole subregions are restarted to upgrade.And current to be upgraded point of completion can not be upgraded before restart Area starts to upgrade, and shortens the system upgrade time of terminal, improves the system upgrade efficiency of terminal.
It, can be with before the current subregion to be upgraded to terminal upgrades in some embodiments of the application Include: detection upgrading data that the current subregion to be upgraded of terminal is upgraded whether with the data in currently subregion to be upgraded It is identical;If the upgrading data upgraded to the current subregion to be upgraded of terminal are identical as the data in current subregion to be upgraded, Then enter the upgrading to next subregion to be upgraded of terminal.
The data in upgrading data and current subregion to be upgraded upgraded due to the current subregion to be upgraded to terminal When identical, indicate that the current subregion to be upgraded can not need to be upgraded, therefore, in order to further increase the liter of terminal system Stage efficiency is identical as the data in current subregion to be upgraded in the upgrading data that the current subregion to be upgraded to terminal is upgraded When, the upgrading to next subregion to be upgraded can be directly entered.
It should be noted that can use OTA upgrading mode pair during the above-mentioned system to terminal upgrades The system of terminal is upgraded.
Wherein, OTA upgrading refers to the standard software upgrading mode that android system provides, mainly automatic by network OTA upgrade package, automatic upgrading are downloaded, alternatively, carrying out system upgrade after OTA upgrade package is downloaded to flash memory.
In the embodiment of the present application, to the system upgrade mode of terminal without limiting.In addition to utilizing OTA upgrade method to end Except end is upgraded, terminal can also be upgraded in the way of other upgradings.
For example, during the above-mentioned system to terminal upgrades, can receive to the same type of brush machine of terminal The system of equipment carries out the upgrade package for being packaged generation, is upgraded using system of the upgrade package to terminal.
For example, above-mentioned terminal is mobile phone A, when above-mentioned brush machine equipment is mobile phone B same type of with mobile phone A, then mobile phone A can To receive the upgrade package for carrying out being packaged generation to the system of mobile phone B, upgraded using system of the upgrade package to mobile phone A.It is logical When crossing this mode to terminal progress system upgrade, without downloading upgrade package in advance from network, it is only necessary to guarantee brush machine equipment System be intact system, and can be adapted with terminal, have the characteristics that system upgrade mode is simple and fast.
In some embodiments of the application, after obtaining upgrade package, it can upgrade according to the subregion in upgrade package List is upgraded using the upgrade file in upgrade package by each subregion to be upgraded of ordered pair terminal.The subregion upgrades list note Record the upgrading sequence of the subregion to be upgraded in need upgraded and each subregion to be upgraded.
In addition, avoiding to further increase the upgrading efficiency of terminal system and safety because of the data in upgrade package There is mistake, and terminal upgrade is caused to fail, can not restart, it, can also be to upgrade package after above-mentioned acquisition upgrade package Type, the correctness of data transmission are verified, to reduce the probability of upgrading failure.
For example, the upgrade package that terminal receives is compared with the upgrade package that brush machine equipment is sent, judge to receive Whether upgrade package and the upgrade package that brush machine equipment is sent are consistent, if the upgrading that upgrade package and brush machine equipment that terminal receives are sent Wrap the upgrade package inconsistent, then that reception brush machine equipment is sent again, and the upgrade package and the transmission of brush machine equipment received in terminal Upgrade package it is consistent when, the subregion to be upgraded of terminal is upgraded.
Specifically, due in data transmission procedure, affected by various factors, the brush machine equipment that the processor of terminal receives It is inconsistent that the upgrade package of transmission is possible to the upgrade package sent with brush machine equipment, that is, mistake occurs in transmission process in upgrade package Accidentally, therefore, in order to avoid because data transmit occur mistake caused by system upgrade fail, improve system upgrade efficiency, the application Some embodiments in, before the subregion to be upgraded to terminal upgrades, the upgrade package that can first receive terminal The upgrade package sent with brush machine equipment is compared, judge upgrade package that the upgrade package received and brush machine equipment are sent whether one It causes.
For example, terminal processes can be verified using cyclic redundancy check (Cyclic Redundancy Check, CRC) Whether the upgrade package that device receives and the upgrade package that brush machine equipment is sent are consistent.However, those skilled in the art can also use The data verification methods such as direct comparison method, even-odd check method, exclusive or check method, hamming code check come what verification processing device received Whether upgrade package and the upgrade package that brush machine equipment is sent are consistent, these should belong to the design of the application.
It should be noted that for the various method embodiments described above, for simple description, therefore, it is stated as a series of Combination of actions, but those skilled in the art should understand that, the present invention is not limited by the sequence of acts described because According to the present invention, certain steps can be carried out using other sequences.
Fig. 5 shows a kind of structural schematic diagram of system upgrade device 500 provided by the embodiments of the present application, the system upgrade Device 500 is configured at terminal, including detection unit 501 and upgrade unit 502.
Detection unit 501, for before the current subregion to be upgraded to terminal upgrades, whether detection terminal to occur Event for triggering terminal power-off;
Upgrade unit 502, if the event for triggering terminal power-off occurs for terminal, pause is to be upgraded point current Area is upgraded.
In some embodiments of the application, above-mentioned detection unit 501 is also used to current to be upgraded point of terminal Before area is upgraded, whether the power key for detecting terminal is in pressing state;And/or it detects the power key of terminal and whether locates In touch condition;And/or whether the virtual control detected for powering off terminal is triggered;If at the power key of terminal In pressing state, and/or, the power key of terminal is in touch condition, and/or, the virtual control for powering off terminal It is triggered, it is determined that the event for triggering terminal power-off occurs for terminal.
In some embodiments of the application, whether above-mentioned detection unit 501 is also used to be used in detection terminal Before the event of triggering terminal power-off, detect whether current subregion to be upgraded is the subregion that cannot interrupt upgrading;Above-mentioned upgrading list Member 502 detects whether terminal occurs for triggering end if being also used to current subregion to be upgraded is the subregion that cannot interrupt upgrading Hold the event of power-off.
In some embodiments of the application, above-mentioned upgrade unit 502, be also used to be detecting current subregion to be upgraded After the no subregion for upgrading cannot be interrupted, if current subregion to be upgraded is the subregion that can interrupt upgrading, directly to terminal Current subregion to be upgraded upgraded.
In some embodiments of the application, above-mentioned detection unit 501 is also used in pause to current subregion to be upgraded After being upgraded, whether event of the detection for triggering terminal power-off has terminated;If the event for triggering terminal power-off is Terminate, then the current subregion to be upgraded of terminal is upgraded.
In some embodiments of the application, above-mentioned detection unit 501 is also used to power off in detection for triggering terminal Event whether terminated after, if for triggering terminal power-off event be not finished, obtain the total duration of generation event, and Judge whether total duration is greater than preset duration;Above-mentioned upgrade unit 502 is restarted if being also used to total duration greater than preset duration Terminal, and system upgrade is carried out to terminal again.
In some embodiments of the application, above-mentioned upgrade unit 502, if being also used to total duration is greater than preset duration, Then after establishing upgrading program, terminal is restarted;Upgrading program is used to store the identification information of current subregion to be upgraded;From The corresponding subregion to be upgraded of identification information starts to carry out system upgrade to terminal.
In some embodiments of the application, above-mentioned upgrade unit 502 is also used to current to be upgraded point of terminal Before area is upgraded, detect upgrading data that the current subregion to be upgraded of terminal is upgraded whether with it is to be upgraded point current Data in area are identical;If in the upgrading data and current subregion to be upgraded that upgraded to the current subregion to be upgraded of terminal Data are identical, then enter the upgrading to next subregion to be upgraded of terminal.
It should be noted that for convenience and simplicity of description, the specific works mistake of the system upgrade device 500 of foregoing description Journey, can be with reference to the corresponding process of method described in above-mentioned Fig. 1 to Fig. 4, and details are not described herein.
As shown in fig. 6, the application provides a kind of terminal for realizing above system upgrade method, which be can wrap Include: processor 61, memory 62, one or more input equipments 63 (one is only shown in Fig. 6) and one or more outputs are set Standby 64 (one is only shown in Fig. 6).Processor 61, memory 62, input equipment 63 and output equipment 64 are connected by bus 65.
It should be appreciated that in the embodiment of the present application, alleged processor 61 can be central processing unit (Central Processing Unit, CPU), which can also be other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic Device, discrete gate or transistor logic, discrete hardware components etc..General processor can be microprocessor or this at Reason device is also possible to any conventional processor etc..
Input equipment 63 may include that dummy keyboard, Trackpad, fingerprint adopt sensor (for acquiring the finger print information of user With the directional information of fingerprint), microphone etc., output equipment 64 may include display, loudspeaker etc..
Memory 62 may include read-only memory and random access memory, and provide instruction sum number to processor 61 According to.Part or all of memory 62 can also include nonvolatile RAM.For example, memory 62 can be with The information of storage device type.
Above-mentioned memory 62 is stored with computer program, and above-mentioned computer program can be run on above-mentioned processor 61, example Such as, above-mentioned computer program is the program of method for upgrading system.Above-mentioned processor 61 is realized when executing above-mentioned computer program State the step in method for upgrading system embodiment, such as step 101 shown in FIG. 1 is to step 102.Alternatively, above-mentioned processor 61 The function of each unit in above-mentioned apparatus embodiment, such as unit 601 to 602 shown in Fig. 6 are realized when executing above-mentioned computer program Function.
Above-mentioned computer program can be divided into one or more module/units, and said one or multiple modules/mono- Member is stored in above-mentioned memory 62, and is executed by above-mentioned processor 61, to complete the application.Said one or multiple moulds Block/unit can be the series of computation machine program instruction section that can complete specific function, the instruction segment by describe it is above-mentioned based on Implementation procedure of the calculation machine program in the first terminal of above-mentioned carry out system upgrade.For example, above-mentioned computer program can be divided It is cut into detection unit and upgrade unit, each unit concrete function is as follows:
Detection unit, for before the current subregion to be upgraded to terminal upgrades, whether detection terminal to be used In the event of triggering terminal power-off;
Upgrade unit, if the event for triggering terminal power-off occurs for terminal, pause is to current subregion to be upgraded Upgraded.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each function Can unit, module division progress for example, in practical application, can according to need and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of above-mentioned apparatus is divided into different functional unit or module, more than completing The all or part of function of description.Each functional unit in embodiment, module can integrate in one processing unit, can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units, it is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.In addition, each function list Member, the specific name of module are also only for convenience of distinguishing each other, the protection scope being not intended to limit this application.Above system The specific work process of middle unit, module, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in detail or remembers in some embodiment The part of load may refer to the associated description of other embodiments.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually It is implemented in hardware or software, the specific application and design constraint depending on technical solution.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed Scope of the present application.
In embodiment provided herein, it should be understood that disclosed device/terminal and method can pass through Other modes are realized.For example, device/terminal embodiment described above is only schematical, for example, above-mentioned module or The division of unit, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units Or component can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, institute Display or the mutual coupling or direct-coupling or communication connection discussed can be through some interfaces, device or unit INDIRECT COUPLING or communication connection can be electrical property, mechanical or other forms.
Above-mentioned unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If above-mentioned integrated module/unit be realized in the form of SFU software functional unit and as independent product sale or In use, can store in a computer readable storage medium.Based on this understanding, the application realizes above-mentioned implementation All or part of the process in example method, can also instruct relevant hardware to complete, above-mentioned meter by computer program Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, above-mentioned computer program includes computer program code, above-mentioned computer program generation Code can be source code form, object identification code form, executable file or certain intermediate forms etc..Above-mentioned computer-readable medium It may include: any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic that can carry above-mentioned computer program code Dish, CD, computer storage, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that above-mentioned meter The content that calculation machine readable medium includes can carry out increase and decrease appropriate according to the requirement made laws in jurisdiction with patent practice, It such as does not include electric carrier signal and telecommunications according to legislation and patent practice, computer-readable medium in certain jurisdictions Signal.
Above above-described embodiment is only to illustrate the technical solution of the application, rather than its limitations;Although referring to aforementioned reality Example is applied the application is described in detail, those skilled in the art should understand that: it still can be to aforementioned each Technical solution documented by embodiment is modified or equivalent replacement of some of the technical features;And these are modified Or replacement, the spirit and scope of each embodiment technical solution of the application that it does not separate the essence of the corresponding technical solution should all Comprising within the scope of protection of this application.

Claims (11)

1. a kind of method for upgrading system is applied to terminal characterized by comprising
Before the current subregion to be upgraded to the terminal upgrades, detect the terminal whether occur it is described for triggering The event of terminal power-off;
If the event for triggering the terminal power-off occurs for the terminal, pause rises the current subregion to be upgraded Grade.
2. the system as claimed in claim 1 upgrade method, which is characterized in that described to current to be upgraded point of the terminal Before area is upgraded, detect whether the terminal occurs the event powered off for triggering the terminal, comprising:
Before the current subregion to be upgraded to the terminal upgrades, whether the power key for detecting the terminal is in pressing State;And/or it detects the power key of the terminal and whether is in touch condition;And/or detection is described for making the terminal Whether the virtual control powered off is triggered;
If the power key of the terminal is in pressing state, and/or, the power key of the terminal is in touch condition, and/or, Virtual control for powering off the terminal is triggered, it is determined that the terminal occurs for triggering the terminal power-off Event.
3. method for upgrading system as claimed in claim 1 or 2, which is characterized in that whether occur in the detection terminal Before event for triggering the terminal power-off, comprising:
Detect whether the current subregion to be upgraded is the subregion that cannot interrupt upgrading;
Whether the detection terminal occurs the event for triggering the terminal power-off, comprising:
If the current subregion to be upgraded is the subregion that cannot interrupt upgrading, detect whether the terminal occurs for triggering State the event of terminal power-off.
4. method for upgrading system as claimed in claim 3, which is characterized in that be in the detection current subregion to be upgraded After the no subregion for upgrading cannot be interrupted, comprising:
If the current subregion to be upgraded is the subregion that can interrupt upgrading, directly to the current subregion to be upgraded of the terminal Upgraded.
5. the system as claimed in claim 1 upgrade method, which is characterized in that in the pause to the current subregion to be upgraded After being upgraded, comprising:
Whether the detection event for triggering the terminal power-off has terminated;
If the event for triggering the terminal power-off has terminated, the current subregion to be upgraded of the terminal is risen Grade.
6. method for upgrading system as claimed in claim 5, which is characterized in that for triggering the terminal described in the detection After whether the event of power-off has terminated, comprising:
If the event for triggering the terminal power-off is not finished, the total duration that the event occurs is obtained, and judge Whether the total duration is greater than preset duration;
If the total duration is greater than the preset duration, the terminal is restarted, and system upgrade is carried out to the terminal again.
7. method for upgrading system as claimed in claim 6, which is characterized in that if the total duration is greater than described default It is long, then restart the terminal, comprising:
If the total duration is greater than the preset duration, after establishing upgrading program, the terminal is restarted;The upgrading Program is used to store the identification information of the current subregion to be upgraded;
It is described that system upgrade is carried out to the terminal again, comprising:
System upgrade is carried out to the terminal since the corresponding subregion to be upgraded of the identification information.
8. the system as claimed in claim 1 upgrade method, which is characterized in that the current subregion to be upgraded to the terminal into Before row upgrading, comprising:
Detect upgrading data that the current subregion to be upgraded of the terminal is upgraded whether with the current subregion to be upgraded In data it is identical;
If the number in the upgrading data and the current subregion to be upgraded that upgraded to the current subregion to be upgraded of the terminal According to identical, then enter the upgrading to next subregion to be upgraded of the terminal.
9. a kind of system upgrade device, is configured at terminal characterized by comprising
Detection unit, for detecting whether the terminal is sent out before the current subregion to be upgraded to the terminal upgrades The raw event powered off for triggering the terminal;
Upgrade unit, if occurring the event for triggering terminal power-off for the terminal, pause to it is described currently to Upgrading subregion is upgraded.
10. a kind of terminal, including memory, processor and storage can be run in the memory and on the processor Computer program, which is characterized in that the processor is realized when executing the computer program as claim 1 to 8 is any The step of one the method.
11. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In realization is such as the step of claim 1 to 8 any one the method when the computer program is executed by processor.
CN201910679663.3A 2019-07-25 2019-07-25 System upgrading method, device, terminal and computer readable storage medium Active CN110399153B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910679663.3A CN110399153B (en) 2019-07-25 2019-07-25 System upgrading method, device, terminal and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910679663.3A CN110399153B (en) 2019-07-25 2019-07-25 System upgrading method, device, terminal and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN110399153A true CN110399153A (en) 2019-11-01
CN110399153B CN110399153B (en) 2023-11-03

Family

ID=68325938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910679663.3A Active CN110399153B (en) 2019-07-25 2019-07-25 System upgrading method, device, terminal and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN110399153B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111104137A (en) * 2019-12-06 2020-05-05 山东信通电子股份有限公司 OTA equipment upgrading method and device
CN111586484A (en) * 2020-04-30 2020-08-25 深圳Tcl数字技术有限公司 Method, device and equipment for upgrading auxiliary screen system of display equipment and storage medium
CN111694608A (en) * 2020-06-08 2020-09-22 北京百度网讯科技有限公司 System upgrading method and device for terminal equipment, electronic equipment and terminal equipment
CN113296442A (en) * 2021-05-21 2021-08-24 研祥智能科技股份有限公司 Power supply control device, power supply control method and system
CN113672297A (en) * 2021-07-23 2021-11-19 荣耀终端有限公司 Restarting method and terminal in recovery mode upgrading process

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540899A (en) * 2003-04-22 2004-10-27 ����˹�Ѷ���ʽ���� Wireless communicator, wireless communication network, software updating method
KR20060092669A (en) * 2005-02-18 2006-08-23 삼성전자주식회사 Apparatus and method for upgrading the software of settop box
KR20090074621A (en) * 2008-01-02 2009-07-07 주식회사 대우일렉트로닉스 Method of upgrading a software
KR20100052329A (en) * 2008-11-10 2010-05-19 엘에스산전 주식회사 Firmware upgrade apparatus for static electricity meter and method thereof
CN101719072A (en) * 2009-11-23 2010-06-02 青岛海信宽带多媒体技术有限公司 Embedded type terminal equipment software upgrading method and upgrading device
CN102508686A (en) * 2011-11-30 2012-06-20 苏州希图视鼎微电子有限公司 Method and system for realizing safe upgrading of system
CN103677947A (en) * 2014-01-03 2014-03-26 深圳英飞拓科技股份有限公司 Equipment dual-system protection method and equipment dual-system upgrading method on basis of linux
WO2015176454A1 (en) * 2014-05-19 2015-11-26 中兴通讯股份有限公司 Method and device for upgrading software
CN105357579A (en) * 2015-10-13 2016-02-24 深圳创维数字技术有限公司 Online upgrading method for set top box, related device and set top box
CN105812936A (en) * 2014-12-30 2016-07-27 Tcl集团股份有限公司 Modular television upgrading method and modular television upgrading device
WO2016145679A1 (en) * 2015-03-16 2016-09-22 宇龙计算机通信科技(深圳)有限公司 Terminal upgrade method and device
WO2016183951A1 (en) * 2015-05-15 2016-11-24 中兴通讯股份有限公司 System upgrade method and terminal
CN106487550A (en) * 2015-08-26 2017-03-08 中兴通讯股份有限公司 A kind of method and apparatus for device software edition upgrading
CN107145282A (en) * 2017-05-04 2017-09-08 北京奇虎科技有限公司 The brush machine method and apparatus of smart machine based on Android operation system
CN107765585A (en) * 2016-08-23 2018-03-06 南京中兴新软件有限责任公司 The upgrade method of digital power, apparatus and system
CN109086078A (en) * 2017-06-14 2018-12-25 展讯通信(上海)有限公司 Android system upgrade method, device, server and mobile terminal
CN109753297A (en) * 2018-12-28 2019-05-14 深圳创维-Rgb电子有限公司 Method for upgrading software, device and readable storage medium storing program for executing when terminal standby
CN109766119A (en) * 2019-01-24 2019-05-17 努比亚技术有限公司 Restore subregion upgrade method, terminal and computer readable storage medium
CN109803177A (en) * 2018-12-06 2019-05-24 安徽站乾科技有限公司 A kind of set-top box quickly loads and upgrade method
CN109947449A (en) * 2019-03-18 2019-06-28 Oppo广东移动通信有限公司 Method for upgrading system, device, storage medium and electronic equipment

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540899A (en) * 2003-04-22 2004-10-27 ����˹�Ѷ���ʽ���� Wireless communicator, wireless communication network, software updating method
US20040216099A1 (en) * 2003-04-22 2004-10-28 Koichi Okita Wireless communication apparatus, wireless communication network and software upgrading method
KR20060092669A (en) * 2005-02-18 2006-08-23 삼성전자주식회사 Apparatus and method for upgrading the software of settop box
KR20090074621A (en) * 2008-01-02 2009-07-07 주식회사 대우일렉트로닉스 Method of upgrading a software
KR20100052329A (en) * 2008-11-10 2010-05-19 엘에스산전 주식회사 Firmware upgrade apparatus for static electricity meter and method thereof
CN101719072A (en) * 2009-11-23 2010-06-02 青岛海信宽带多媒体技术有限公司 Embedded type terminal equipment software upgrading method and upgrading device
CN102508686A (en) * 2011-11-30 2012-06-20 苏州希图视鼎微电子有限公司 Method and system for realizing safe upgrading of system
CN103677947A (en) * 2014-01-03 2014-03-26 深圳英飞拓科技股份有限公司 Equipment dual-system protection method and equipment dual-system upgrading method on basis of linux
WO2015176454A1 (en) * 2014-05-19 2015-11-26 中兴通讯股份有限公司 Method and device for upgrading software
CN105812936A (en) * 2014-12-30 2016-07-27 Tcl集团股份有限公司 Modular television upgrading method and modular television upgrading device
WO2016145679A1 (en) * 2015-03-16 2016-09-22 宇龙计算机通信科技(深圳)有限公司 Terminal upgrade method and device
WO2016183951A1 (en) * 2015-05-15 2016-11-24 中兴通讯股份有限公司 System upgrade method and terminal
CN106487550A (en) * 2015-08-26 2017-03-08 中兴通讯股份有限公司 A kind of method and apparatus for device software edition upgrading
CN105357579A (en) * 2015-10-13 2016-02-24 深圳创维数字技术有限公司 Online upgrading method for set top box, related device and set top box
CN107765585A (en) * 2016-08-23 2018-03-06 南京中兴新软件有限责任公司 The upgrade method of digital power, apparatus and system
CN107145282A (en) * 2017-05-04 2017-09-08 北京奇虎科技有限公司 The brush machine method and apparatus of smart machine based on Android operation system
CN109086078A (en) * 2017-06-14 2018-12-25 展讯通信(上海)有限公司 Android system upgrade method, device, server and mobile terminal
CN109803177A (en) * 2018-12-06 2019-05-24 安徽站乾科技有限公司 A kind of set-top box quickly loads and upgrade method
CN109753297A (en) * 2018-12-28 2019-05-14 深圳创维-Rgb电子有限公司 Method for upgrading software, device and readable storage medium storing program for executing when terminal standby
CN109766119A (en) * 2019-01-24 2019-05-17 努比亚技术有限公司 Restore subregion upgrade method, terminal and computer readable storage medium
CN109947449A (en) * 2019-03-18 2019-06-28 Oppo广东移动通信有限公司 Method for upgrading system, device, storage medium and electronic equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JUNPENG CHEN ETAL.: "Improvements in Upgrading Xen-Virtualized Large Computer Systems", 《2014 ENTERPRISE SYSTEMS CONFERENCE》 *
崔竞飞等: "同轴接入设备的系统升级机制设计", 《北京航空航天大学学报》, vol. 40, no. 10 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111104137A (en) * 2019-12-06 2020-05-05 山东信通电子股份有限公司 OTA equipment upgrading method and device
CN111104137B (en) * 2019-12-06 2023-10-20 山东信通电子股份有限公司 OTA equipment upgrading method and device
CN111586484A (en) * 2020-04-30 2020-08-25 深圳Tcl数字技术有限公司 Method, device and equipment for upgrading auxiliary screen system of display equipment and storage medium
CN111694608A (en) * 2020-06-08 2020-09-22 北京百度网讯科技有限公司 System upgrading method and device for terminal equipment, electronic equipment and terminal equipment
CN113296442A (en) * 2021-05-21 2021-08-24 研祥智能科技股份有限公司 Power supply control device, power supply control method and system
CN113672297A (en) * 2021-07-23 2021-11-19 荣耀终端有限公司 Restarting method and terminal in recovery mode upgrading process

Also Published As

Publication number Publication date
CN110399153B (en) 2023-11-03

Similar Documents

Publication Publication Date Title
CN110399153A (en) Method for upgrading system, device, terminal and computer readable storage medium
US20220066862A1 (en) Recovery Method for Terminal Device Startup Failure and Terminal Device
EP2990906B9 (en) Function controlling method and electronic device supporting the same
CN105138347A (en) Difference upgrade patch generating method, software upgrading method and corresponding apparatus
CN109582325A (en) Method for upgrading software, robot and the computer readable storage medium of robot
CN106528097A (en) Version synchronization method for two pieces of BIOS (Basic Input/ Output System) firmware, and electronic equipment
CN104765466A (en) Key control method and device for mobile terminal
CN104850427B (en) A kind of code upgrade method and device
CN103870356A (en) Information processing method and electronic equipment
CN105117110A (en) Method and device for displaying user equipment state on preset interface of application program
CN107920161A (en) Terminal control method and device, terminal and readable storage medium storing program for executing
CN110569058B (en) System upgrading method, device, terminal and computer readable storage medium
WO2024078218A1 (en) System booting method and electronic device
CN108646577B (en) Client operation management method and client
CN108121560A (en) Difference bag upgrade method, device, terminal and computer readable storage medium
CN107370874A (en) Startup method, mobile terminal and the storage medium of application
CN107145282A (en) The brush machine method and apparatus of smart machine based on Android operation system
CN106569907B (en) System startup file checking and compiling method
CN112463199A (en) System upgrading method and terminal
CN105739771A (en) Display interface management method and device as well as terminal
CN108920704A (en) File access pattern method, file restoring device and mobile terminal
CN108156310A (en) A kind of method and system of finger prints processing, terminal device and computer-readable medium
CN111026651B (en) Test method, device, storage medium and electronic equipment
CN104750375A (en) Interface display method and device
CN107145405A (en) The baseboard management controller of server and its operating method and control circuit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant