CN110397413A - The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method - Google Patents

The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method Download PDF

Info

Publication number
CN110397413A
CN110397413A CN201910680918.8A CN201910680918A CN110397413A CN 110397413 A CN110397413 A CN 110397413A CN 201910680918 A CN201910680918 A CN 201910680918A CN 110397413 A CN110397413 A CN 110397413A
Authority
CN
China
Prior art keywords
drilling
dedusting
dust
pipe
funnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910680918.8A
Other languages
Chinese (zh)
Inventor
冯啸
张思峰
孔祥辉
赵全满
宋曙光
胡文军
于晓桦
殷敬敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201910680918.8A priority Critical patent/CN110397413A/en
Publication of CN110397413A publication Critical patent/CN110397413A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B12/00Accessories for drilling tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/01Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
    • E21B21/015Means engaging the bore entrance, e.g. hoods for collecting dust

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of hybrid dedusting denoising device of drilling orifice and drilling equipment and working methods, including dedusting noise reduction pipeline, the dedusting noise reduction pipeline includes outer tube and the profiled inner for being nested in outer tube, sound-absorbing member is equipped between outer tube and profiled inner, multiple spray nozzles are arranged in the profiled inner tube wall, spray nozzle is connected to automatic water-supplying device, and water collecting funnel is arranged relative to spray nozzle in profiled inner tube wall, and water collecting funnel is connected to foul water tank;The profiled inner tube wall also sets up suction inlet, and dust suction funnel is arranged relative to suction inlet in profiled inner tube wall, and suction inlet, dust suction funnel are connected to dust catcher.The device without the use of rubber seal, can recycle depositing dust sewage and probing rock slag, can active depositing dust and can absorb drilling noise, with achieve the purpose that purify air with reduction noise, be conducive to construct safety and personnel health.

Description

The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method
Technical field
This disclosure relates to the dedusting noise reduction field that drills, and in particular to a kind of hybrid dedusting denoising device of drilling orifice and brill Into equipment and working method.
Background technique
With the fast development of Chinese national economy and foundation engineering, mine working engineering, underground tunnel project and outdoor The engineerings such as exploitation are increasing, and all kinds of drillings of constructing are frequently necessary in engineering construction, as geological prospecting borehole, hydrological observation are bored Hole, exploitation drilling and blasting boreholes etc., at present mode used by drilling construction be generally divided into rotary, rotary-percussion and Impact type.
Rotary-percussion and impact type are relatively suitable for that Drilling is harder, complete rock stratum, have the advantages that construction is quick, but It is that this two kinds of bore modes are easily accompanied by industrial dust during rock drilling, the aerial dispersion degree of dust is higher, outstanding The floating time is longer, reduces the visibility of Work places, increases the risk of construction operation.Importantly, if constructor The long-term sucking industrial dust of member may cause pneumoconiosis or other Pulmonary Diseases.In addition, drill bit is in impact solid rock process In, biggish noise can be generated, construction personnel's neurasthenia can be caused by noise pollution for a long time, or even causes personal pathologic Variation, and the noise in Work places may also interfere with communication, influence working efficiency, Yi Yinfa contingency.With people The continuous enhancing of body health and environmental consciousness, existing part research achievement is dedicated to the fugitive dust for solving construction site and noise is asked Topic.
Chinese patent ZL 20092029847.1 discloses dust reducing device for gas drainage hole in coal mine, and drilling rod is movably placed in brill It inside the ventilative pipe of bar, and is connected with the rubber seal for being embedded in the right inner end of the ventilative pipe of drilling rod, it is ventilative that connecting tube is connected to drilling rod The lower middle part of pipe, lower end are connected and fixed plate, and depositing dust cabinet top is fixed by bolts in fixed plate, and lower dust-exhausting port is arranged in depositing dust Middle part, baffle are tilted a certain angle device internal upper part of lower bottom part and lower dust-exhausting port in depositing dust cabinet, water spray dust under cabinet Middle part is arranged in depositing dust cabinet in mechanism.The comprehensive analysis dust reducing device for gas drainage hole in coal mine, has the following disadvantages it Place:
1. drilling rod is connected with the rubber seal of the right inner end of the ventilative pipe of drilling rod, the two can not be fitted closely, and drilling rod Rotation can wear rubber seal, reduce dust removing effects;
2. carry out depositing dust using water storage ball and water-supply-pipe, the moisture storage capacity of water storage ball is limited and the water that sprays can secondary pollution make Industry place deteriorates site operation environment;
3. the device is passive device for reducing dust, dust landing accumulation can only be waited, and be easily piled up in the dead of the ventilative pipe of drilling rod At angle.
Chinese patent ZL 201210356533.4 discloses a kind of drilling dust-proof, which is column structure, Its axis direction is provided with the through-hole to protrude into drilling rod, and end is provided with the water inlet for connecting with extraneous watering.It should The inner wall and outer wall of device are provided with multiple spray orifices, and spray orifice is connected with water inlet.The comprehensive analysis drilling dust-proof, is deposited In following shortcoming:
1. water spray dust is used only in the drilling dust-proof, amount of water sprayed can not be adjusted and the sewage after depositing dust deteriorates scene Environment;
2. the drilling dust-proof need to be placed in drilling, it can be touched in one side drilling rod rotation process and grind the device, another party The face device influences the discharge of rock slag in drilling;
3. lacking the measure of noise punishment.
Chinese patent ZL 201320577847.7 discloses a kind of underground coal mine bore for deslagging by wind force device for reducing dust, including Air compressor, air supply pipe, water supplying pipe, gas water mixing box and air water delivery pipe, air compressor are mixed by air supply pipe and air water Mould assembling connection, water supplying pipe are connected to gas water mixing box, and the exit of water supplying pipe is equipped with hydraulic spray nozzle in gas water mixing box, and air water is mixed Mould assembling is connected to by air water delivery pipe with the centre bore of drilling rod.The comprehensive analysis underground coal mine bore for deslagging by wind force device for reducing dust, It has the following disadvantages:
1. the device mixes compressed air and atomized water in gas water mixing box, if when drilling depth is larger, mixing Water mist need to transport relatively long distance after get at drill bit, therefore over long distances transport after water mist dust fall effect decaying;
2. drill bit end can spray pressure-air, cause water mist that can not reach when being drilled using air hammer At drill bit, depositing dust can only be carried out in drilling rear.
Chinese patent ZL 201220627814.4 discloses a kind of drilling atomizing de-dusting apparatus, mainly by air compressor machine, pressure-bearing Water tank, fog-spray nozzle composition, it is characterized in that air compressor machine is connected to press-bearing water tank by the defeated pressure pipeline of water tank, press-bearing water tank and fog-spray nozzle by Aqueduct connection.Using the air pressure more than needed of the existing air compressor machine of down-the-hole drill in the patent, it is connected to by the defeated pressure pipeline of water tank, into Enter press-bearing water tank, pressurized water flow reaches fog-spray nozzle by aqueduct, and fog-spray nozzle is arranged at hell.Comprehensive analysis The drilling spraying device, has the following disadvantages:
It is connect 1. air compressor machine only passes through the defeated pressure pipeline of water tank with press-bearing water tank, is not adjustable volume of air supply, so that not being adjustable Fog-spray nozzle amount of water sprayed.
2. press-bearing water tank be it is sealed, the operation for increasing water into press-bearing water tank in the construction process is relatively complicated.
3. the setting angle of fog-spray nozzle is 90 °, it is only applicable to vertical hole, when dip angle of hole changes, the spray of fog-spray nozzle Mist dust-laying effect is restricted.
Summary of the invention
The purpose of disclosure is to overcome above-mentioned the deficiencies in the prior art, to provide a kind of hybrid dedusting noise reduction dress of drilling orifice It sets and drilling equipment and working method;The device is without the use of rubber seal, can recycle depositing dust sewage and drill rock slag, can lead It moves depositing dust and drilling noise can be absorbed, to achieve the purpose that purify air and reduce noise, be conducive to the safety constructed and personnel Health.
The purpose of first invention of the disclosure is to propose a kind of hybrid dedusting denoising device of drilling orifice, to realize above-mentioned mesh , the disclosure adopts the following technical solutions:
A kind of hybrid dedusting denoising device of drilling orifice, including dedusting noise reduction pipeline, the dedusting noise reduction pipeline include Outer tube and the profiled inner for being nested in outer tube are equipped with sound-absorbing member, the profiled inner between outer tube and profiled inner Multiple spray nozzles are arranged in tube wall, and spray nozzle is connected to automatic water-supplying device, and leakage of catchmenting is arranged relative to spray nozzle in profiled inner tube wall Bucket, water collecting funnel are connected to foul water tank;The profiled inner tube wall also sets up suction inlet, and profiled inner tube wall is relative to suction inlet Dust suction funnel is set, and suction inlet, dust suction funnel are connected to dust catcher.
As further technical solution, sparge pipe, the sparge pipe are connected between the spray nozzle and automatic water-supplying device Flow control valve and flowmeter are set.
As further technical solution, setting pressure gauge and pressure switch at the top of the automatic water-supplying device.
As further technical solution, the automatic water-supplying device is connected to by input pipe with air compressor, air pressure Aeration valve is arranged in connecting pipeline between contracting machine and input pipe.
As further technical solution, the input pipe is also connected to water tank, the communicating pipe between water tank and input pipe Check-valves is arranged in road, and connecting pipeline is connect with clarified water pump.
As further technical solution, the upper open end of the water collecting funnel is connect with profiled inner, water collecting funnel Lower ending opening end connect with outer tube, and the lower ending opening end of water collecting funnel is connect with sewage pipe, and sewage pipe extends to foul water tank It is interior.
As further technical solution, the diameter of the upper open end of the water collecting funnel is greater than water collecting funnel lower end and opens The diameter at mouth end.
As further technical solution, the upper open end of the dust suction funnel is connect with profiled inner, dust suction funnel Lower ending opening end connect with outer tube, and the lower ending opening end of dust suction funnel is connect with sweep-up pipe, and sweep-up pipe is connected to dust catcher, And control valve is arranged in sweep-up pipe.
As further technical solution, the diameter of the upper open end of the dust suction funnel is greater than dust suction funnel lower end and opens The diameter at mouth end.
As further technical solution, the outer tube is noise reduction stainless steel tube.
As further technical solution, the sound-absorbing member is wave crest acoustical cotton.
Second goal of the invention of the disclosure proposes a kind of drilling equipment, including dedusting denoising device as described above, dedusting Noise reduction pipeline one end is connect by ring flange with orifice tube, and the dedusting noise reduction pipeline other end is protruded into for drilling rod.
The third goal of the invention of the disclosure proposes a kind of working method of hybrid dedusting denoising device of drilling orifice, including Following steps:
Dedusting noise reduction pipeline one end is connect by ring flange with orifice tube, drilling rod is stretched by the other end of dedusting noise reduction pipeline Enter, passes sequentially through dedusting noise reducing pipe and orifice tube, and crept into drilling terminal;
In drilling process, by spray nozzle into profiled inner water spray dust, the sewage and rock slag of generation are by water collecting funnel It is collected into foul water tank;
Meanwhile starting dust catcher, by the dust in profiled inner by suction inlet, dust suction collection funnel, further progress is removed Dirt;
The combination of outer tube and sound-absorbing member carries out noise reduction to the noise absorption generated in drilling process.
The disclosure has the beneficial effect that
1. the dust/noise-reducing device of the disclosure does not block drilling rod using rubber seal, which is guaranteeing dust removing effects While the working order of drilling rod can be observed in real time, grasp drilling dynamic.
2. the dust/noise-reducing device of the disclosure uses water spray dust and dust catcher active dust suction two ways, improves Dust removing effects have purified air, ensure that the health of human body of construction personnel.
3. the dust/noise-reducing device of the disclosure, is provided with water collecting funnel and foul water tank, sewage after depositing dust can be recycled and Rock slag avoids the secondary pollution of Work places.
4. the dust/noise-reducing device of the disclosure is provided with wave crest acoustical cotton and wear-resisting noise reduction stainless steel outer tube, it can absorb and bores Noise during hole, and the service life of two kinds of sound-absorbing materials is longer.
5. the dust/noise-reducing device of the disclosure uses automatic water-supplying device and supplies simultaneously so that the amount of water sprayed of spray nozzle is adjustable Water is automatic, quick, has saved working hour, has reduced construction cost.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is the overall structure diagram of dust/noise-reducing device disclosed in one embodiment;
In figure, 1. orifice tubes, 2. ring flanges, 3. outer tubes, 4. profiled inners, 5. wave crest acoustical cottons, 6. spray nozzles, 7. are catchmented Funnel, 8. sewage pipes, 9. foul water tanks, 10. flow control valves, 11. sparge pipes, 12. flowmeters, 13. pressure gauges, 14. pressure are opened Pass, 15. automatic water-supplying devices, 16. input pipes, 17. aeration valves, 18. air compressors, 19. check-valves, 20. water tanks, 21. water purifications Pump, 22. suction inlets, 23. dust suction funnels, 24. control valves, 25. sweep-up pipes, 26. dust catchers, 27. drilling machine racks, 28. drilling rods, 29. rig operations platform.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination;
In order to facilitate narration, if there is "upper", "lower", " left side " " right side " printed words in the disclosure, only indicate and attached drawing itself Upper and lower, left and right direction it is consistent, not to structure rise restriction effect, it is only for convenient for description the disclosure and simplification retouch It states, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, and be constructed and operated in a specific orientation, Therefore it should not be understood as the limitation to the disclosure.
As background technique is introduced, inventors have found that there are drilling rods to rotate abrasion rubber for existing device for reducing dust generated by drilling The problems such as glue sealing ring, depositing dust sewage secondary pollution Work places, the passive depositing dust of device for reducing dust and drilling noise are unable to control, In order to solve technical problem as above, present applicant proposes a kind of hybrid dedusting denoising devices of drilling orifice.
This application provides a kind of hybrid dedusting denoising device of drilling orifice, including dedusting noise reduction pipeline, the dedustings Noise reduction pipeline includes outer tube and the profiled inner for being nested in outer tube, and sound-absorbing member is equipped between outer tube and profiled inner, Multiple spray nozzles are arranged in the profiled inner tube wall, and spray nozzle is connected to automatic water-supplying device, and profiled inner tube wall is relative to spraying Water collecting funnel is arranged in mouth, and water collecting funnel is connected to foul water tank;The profiled inner tube wall also sets up suction inlet, profiled inner tube wall Dust suction funnel is set relative to suction inlet, suction inlet, dust suction funnel are connected to dust catcher.
Embodiment 1
Dust/noise-reducing device disclosed in 1 pair of the present embodiment is described further with reference to the accompanying drawing;
Referring to shown in attached drawing 1, the hybrid dedusting denoising device of drilling orifice, mainly by orifice tube 1, ring flange 2, outer tube 3, Profiled inner 4, wave crest acoustical cotton 5, spray nozzle 6, water collecting funnel 7, sewage pipe 8, foul water tank 9, flow control valve 10, sparge pipe 11, flowmeter 12, pressure gauge 13, pressure switch 14, automatic water-supplying device 15, input pipe 16, aeration valve 17, air compressor 18, Check-valves 19, water tank 20, clarified water pump 21, suction inlet 22, dust suction funnel 23, control valve 24, sweep-up pipe 25, dust catcher 26 form.
Outer tube 3 and profiled inner 4 constitute dedusting noise reduction pipeline, and profiled inner 4 is nested in inside outer tube 3, and outer tube 3 and different It is filled between type inner tube 4 and is equipped with sound-absorbing member, in the present embodiment, sound-absorbing member uses wave crest acoustical cotton 5.
Profiled inner 4, model DN110 open up the circular hole of 3 diameter 25mm in its upper right quarter, pacify at these circular holes If spray nozzle 6;1 water collecting funnel 7 of welding is processed in its right lower quadrant, water collecting funnel 7 and spray nozzle 6 are relatively arranged on profiled inner 4 tube walls;1 diameter 50mm circular hole, as suction inlet 22 are opened up in its upper left quarter, welds 1 dust suction leakage in the processing of its lower left quarter Bucket 23, dust suction funnel 23 and suction inlet 22 are relatively arranged on 4 tube wall of profiled inner;Water collecting funnel 7, the depth of dust suction funnel 23 are equal For 10mm.
Outer tube 3 is cooperated with wave crest acoustical cotton 5, is become dual sound-silencing measures using wear-resisting noise reduction stainless steel tube, can be with Greatly reduce noise decibel;Wear-resisting noise reduction stainless steel tube is using existing product, and details are not described herein;Outer tube model DN150, The circular hole that 3 diameter 25mm are opened up at its upper right quarter and 4 upper right quarter circular hole opposite position of profiled inner, its right lower quadrant with 1 diameter 50mm circular hole is opened up at 4 water collecting funnel of profiled inner, 7 opposite position, is leaked in its lower left quarter and 4 dust suction of profiled inner It struggles against and opens up 1 diameter 50mm circular hole at 23 opposite positions.
The hybrid dedusting denoising device of the disclosure, in use, the dedusting noise reducing pipe that outer tube 3 and profiled inner 4 are constituted Road is arranged with direction initialization, is located below water collecting funnel 7, dust suction funnel 23, and spray nozzle 6, suction inlet 22 are located above, and is convenient for It catchments and dust suction.
Spray nozzle 6, diameter 25mm, length 25mm.
11 one end of sparge pipe is connected to 15 outlet end of automatic water-supplying device, and the other end is connected to spray nozzle 6, sets on sparge pipe 11 It is equipped with flow control valve 10 and flowmeter 12.
Automatic water-supplying device 15 is provided with pressure gauge 13 and pressure switch 14.The input end and input pipe of automatic water-supplying device 15 16 connections, input pipe 16 are connected to clarified water pump 21, air compressor 18, on the connecting pipeline of air compressor 18 and input pipe 16 Aeration valve 17 is set, and air compressor 18 applies pressure to the water in automatic water-supplying device 15, hydraulic pressure is gone out;Clarified water pump 21 and defeated Enter setting check-valves 19, clarified water pump 21 on the connecting pipeline of pipe 16 to be set in water tank 20, clarified water pump 21 is automatic water-supplying device 15 Water is provided.
The upper open end of water collecting funnel 7 and 4 tube wall of profiled inner are welded to connect, the lower ending opening end of water collecting funnel 7 with Outer tube 3 connects, and at the corresponding circular hole opened up to 3 right lower quadrant of outer tube in lower ending opening end of water collecting funnel 7, under water collecting funnel 7 End opening end is connect with sewage pipe 8, and sewage pipe 8 extends in foul water tank 9,8 diameter 50mm of sewage pipe.Disclosure setting is catchmented Funnel and foul water tank can collect sewage while depositing dust, avoid construction site sewage crossing current, improve construction environment.
The diameter of the upper open end of water collecting funnel 7 is greater than the diameter at 7 lower ending opening end of water collecting funnel.
The upper open end and 4 tube wall of profiled inner of dust suction funnel 23 are welded to connect, the lower ending opening end of dust suction funnel 23 It is connect with outer tube 3, and at the corresponding circular hole opened up to outer tube lower left quarter in lower ending opening end of dust suction funnel 23, dust suction funnel 23 Lower ending opening end is connect with sweep-up pipe 25, and sweep-up pipe 25 is connected to dust catcher 26;Suction inlet 22 is connected to suction also by sweep-up pipe Dirt device 26, dust suction funnel, which is disposed below, can be convenient collection, and suction inlet is arranged in top, start dust catcher, suction inlet and dust suction Dust suction is carried out simultaneously at funnel, pick-up performance can be improved.25 diameter 50mm of sweep-up pipe, is provided with control valve 24, control The opening and closing of sweep-up pipe.
The diameter of the upper open end of dust suction funnel 23 is greater than the diameter at 23 lower ending opening end of dust suction funnel.
The implementation method of the hybrid dedusting denoising device of the disclosure, comprising the following steps:
A. the technique for using oxygen-acetylene gas cutting opens up the circle that 3 diameters are 25mm at DN110 steel pipe upper right quarter interval Hole, processes the water collecting funnel 7 of depth of weld 10mm within the scope of its corresponding right lower quadrant, and 7 lower end diameter of water collecting funnel is 50mm;The circular hole that diameter is 50mm is opened up in DN110 steel pipe upper left quarter, suction inlet 22 is formed, in corresponding lower left quarter range The dust suction funnel 23 of interior processing depth of weld 10mm, 23 lower end diameter of dust suction funnel is 50mm, finally constitutes profiled inner 4;
B. by 5 tight of wave crest acoustical cotton in 4 outside of profiled inner, position and ruler corresponding to 4 aperture of profiled inner It is very little, the circular hole of same size is opened up at the corresponding position of wave crest acoustical cotton 5;
C. the profiled inner 4 for being wrapped wave crest acoustical cotton 5 is placed in outer tube 3, the position corresponding to 4 aperture of profiled inner It sets and size, the circular hole of same size is opened up at the corresponding position of outer tube 3;
D. the upper right quarter of outer tube 3 after combining installs 3 diameter 25mm spray nozzles 6;In right lower quadrant by diameter 50mm's Sewage pipe 8 is connected with water collecting funnel 7, and 8 other end of sewage pipe is placed in foul water tank 9;In left part by the sweep-up pipe of diameter 50mm 25 are connected with suction inlet 22, dust suction funnel 23, and the other end of sweep-up pipe 25 is connected to dust catcher 26 by control valve 24;
E., clarified water pump 21 and air compressor 18 are connected to the input end of automatic water-supplying device 15 using input pipe 16, used Spray nozzle 6 is connected by sparge pipe 11 with 15 outlet end of automatic water-supplying device, and flow control valve 10 and flow are installed on sparge pipe 11 Meter 12.
The dust/noise-reducing device of the disclosure uses water spray dust and dust catcher active dust suction two ways, improves dedusting Effect;The rock slag generated in sewage and drilling process after depositing dust can be recycled, avoids the secondary pollution of Work places;It can inhale The noise in boring procedure is received, the service life of sound-absorbing material is longer;The amount of water sprayed of spray nozzle is adjustable, supplies water quick, each component It is easy to connect, save working hour.The most importantly better effect of dedusting and noise reduction, ensure that construction personnel health of human body and The clean and tidy safety of Work places.Device therefor and material are largely existing known product in the device, and each component connection is simple It is convenient.
The disclosure gives a kind of drilling equipment, including dedusting denoising device as described above, dedusting noise reduction pipeline it is outer 3 one end of pipe is connect by ring flange 2 with orifice tube 1, and 3 other end of outer tube is protruded into for drilling rod 28, and drilling rod 28 protrudes into dedusting noise reducing pipe In the profiled inner 4 on road, and it extend into rock and is drilled.In optimal case, 3 right end of outer tube (namely set close to spray nozzle The one end set) it is connect with ring flange 2,3 left end of outer tube enters for drilling rod 28, and the dust generated to drilling first carries out atomizing de-dusting, Absorption dedusting is then carried out by dust catcher in left end.Drilling rod 28 is set on drilling machine rack 27, and drilling machine rack 27 is fixed on brill On machine station 29, drilling rod is drilled by drilling machine drive.
The disclosure gives the working method of the hybrid dedusting denoising device of above-mentioned drilling orifice, comprising the following steps:
3 one end of outer tube of dedusting noise reduction pipeline is connect by ring flange 2 with orifice tube 1, drilling rod 28 is by dedusting noise reducing pipe The road other end inserts into the inner portion, passes sequentially through dedusting noise reduction pipeline and orifice tube 1, and crept into drilling terminal;
In drilling process, by spray nozzle 6, into profiled inner 4, water spray dust, the sewage and rock slag of generation are leaked by catchmenting Bucket 7 enters foul water tank 9 and collects;
Meanwhile starting dust catcher 26, the dust in profiled inner 4 is collected by suction inlet 22, dust suction funnel 23, further It is dusted;
The combination of outer tube 3 and wave crest acoustical cotton 5 carries out noise reduction to the noise absorption generated in drilling process.
The disclosure has studied fugitive dust and noise problem during drilling construction, solves drilling rod rotation abrasion rubber seal It the problems such as circle, depositing dust sewage secondary pollution Work places, the passive depositing dust of device for reducing dust and drilling noise control, is studied with forefathers It compares, engineering adaptability is higher, and dedusting noise reduction effect is more preferably.
Although above-mentioned be described in conjunction with specific embodiment of the attached drawing to the disclosure, model not is protected to the disclosure The limitation enclosed, those skilled in the art should understand that, on the basis of the technical solution of the disclosure, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within the protection scope of the disclosure.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (10)

1. a kind of hybrid dedusting denoising device of drilling orifice, characterized in that including dedusting noise reduction pipeline, the dedusting noise reducing pipe Road includes outer tube and the profiled inner for being nested in outer tube, and sound-absorbing member is equipped between outer tube and profiled inner, described different Multiple spray nozzles are arranged in type inner pipe wall, and spray nozzle is connected to automatic water-supplying device, and profiled inner tube wall is arranged relative to spray nozzle Water collecting funnel, water collecting funnel are connected to foul water tank;The profiled inner tube wall also sets up suction inlet, profiled inner tube wall relative to Dust suction funnel is arranged in suction inlet, and suction inlet, dust suction funnel are connected to dust catcher.
2. the hybrid dedusting denoising device of drilling orifice as described in claim 1, characterized in that the spray nozzle and automatic confession Sparge pipe, the sparge pipe setting flow control valve and flowmeter are connected between hydrophone;Setting pressure at the top of the automatic water-supplying device Power table and pressure switch.
3. the hybrid dedusting denoising device of drilling orifice as described in claim 1, characterized in that the automatic water-supplying device passes through Input pipe is connected to air compressor, and aeration valve is arranged in the connecting pipeline between air compressor and input pipe.
4. the hybrid dedusting denoising device of drilling orifice as claimed in claim 3, characterized in that the input pipe also with water tank Check-valves is arranged in connection, the connecting pipeline between water tank and input pipe, and connecting pipeline is connect with clarified water pump.
5. the hybrid dedusting denoising device of drilling orifice as described in claim 1, characterized in that the upper end of the water collecting funnel Open end is connect with profiled inner, and the lower ending opening end of water collecting funnel is connect with outer tube, and the lower ending opening end of water collecting funnel with Sewage pipe connection, sewage pipe extend in foul water tank;The diameter of the upper open end of the water collecting funnel is greater than under water collecting funnel The diameter at end opening end.
6. the hybrid dedusting denoising device of drilling orifice as described in claim 1, characterized in that the upper end of the dust suction funnel Open end is connect with profiled inner, and the lower ending opening end of dust suction funnel is connect with outer tube, and the lower ending opening end of dust suction funnel with Sweep-up pipe connection, sweep-up pipe are connected to dust catcher, and control valve is arranged in sweep-up pipe.
7. the hybrid dedusting denoising device of drilling orifice as claimed in claim 6, characterized in that the upper end of the dust suction funnel The diameter of open end is greater than the diameter at dust suction funnel lower ending opening end.
8. the hybrid dedusting denoising device of drilling orifice as described in claim 1, characterized in that the outer tube is that noise reduction is stainless Steel pipe;The sound-absorbing member is wave crest acoustical cotton.
9. a kind of drilling equipment, characterized in that including the hybrid dedusting drop of such as described in any item drilling orifices of claim 1-8 It makes an uproar device, dedusting noise reduction pipeline one end is connect by ring flange with orifice tube, and the dedusting noise reduction pipeline other end is protruded into for drilling rod.
10. such as the working method of the hybrid dedusting denoising device of the described in any item drilling orifices of claim 1-8, feature It is, comprising the following steps:
Dedusting noise reduction pipeline one end is connect by ring flange with orifice tube, drilling rod is protruded by the other end of dedusting noise reduction pipeline, Dedusting noise reducing pipe and orifice tube are passed sequentially through, and is crept into drilling terminal;
In drilling process, by spray nozzle, into profiled inner, water spray dust, the sewage and rock slag of generation are entered by water collecting funnel Foul water tank is collected;
Meanwhile starting dust catcher, by the dust in profiled inner by suction inlet, dust suction collection funnel, further progress dedusting;
The combination of outer tube and sound-absorbing member carries out noise reduction to the noise absorption generated in drilling process.
CN201910680918.8A 2019-07-26 2019-07-26 The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method Pending CN110397413A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910680918.8A CN110397413A (en) 2019-07-26 2019-07-26 The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910680918.8A CN110397413A (en) 2019-07-26 2019-07-26 The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method

Publications (1)

Publication Number Publication Date
CN110397413A true CN110397413A (en) 2019-11-01

Family

ID=68326111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910680918.8A Pending CN110397413A (en) 2019-07-26 2019-07-26 The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method

Country Status (1)

Country Link
CN (1) CN110397413A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764676A (en) * 2020-07-07 2020-10-13 北京启顺京腾科技有限责任公司 Wall stripping off device for construction with dust fall falls function of making an uproar

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010030090A (en) * 2008-07-28 2010-02-12 Shibuya:Kk Water treatment pad for drilling tool
CN102145316A (en) * 2010-02-04 2011-08-10 山东大学 Synergistic spray charging and electrostatic dust collecting method and device
CN202689980U (en) * 2012-06-27 2013-01-23 冀中能源邯郸矿业集团有限公司 Drilling de-dusting device
CN104879158A (en) * 2015-04-09 2015-09-02 山东大学 Dry type drilled hole orifice dust elimination and noise reduction device and implementation method thereof
CN206554836U (en) * 2017-01-11 2017-10-13 河南铁福来装备制造股份有限公司 A kind of orifice blowout prevention collection device for coal mine drilling
CN206917626U (en) * 2017-06-14 2018-01-23 河北百方通用机械有限公司 Take out type gas prevention and gush out drilling hole dust collector device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010030090A (en) * 2008-07-28 2010-02-12 Shibuya:Kk Water treatment pad for drilling tool
CN102145316A (en) * 2010-02-04 2011-08-10 山东大学 Synergistic spray charging and electrostatic dust collecting method and device
CN202689980U (en) * 2012-06-27 2013-01-23 冀中能源邯郸矿业集团有限公司 Drilling de-dusting device
CN104879158A (en) * 2015-04-09 2015-09-02 山东大学 Dry type drilled hole orifice dust elimination and noise reduction device and implementation method thereof
CN206554836U (en) * 2017-01-11 2017-10-13 河南铁福来装备制造股份有限公司 A kind of orifice blowout prevention collection device for coal mine drilling
CN206917626U (en) * 2017-06-14 2018-01-23 河北百方通用机械有限公司 Take out type gas prevention and gush out drilling hole dust collector device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764676A (en) * 2020-07-07 2020-10-13 北京启顺京腾科技有限责任公司 Wall stripping off device for construction with dust fall falls function of making an uproar

Similar Documents

Publication Publication Date Title
CN103147708A (en) Through type down hole hammer reverse circulation drilling dust collection device
CN203296725U (en) Through type DTH hammer reverse circulation drilling dust collecting device
CN108661566B (en) RJP (reactive JP) process and MJS (MJS) process universal drill bit and construction process thereof
CN209855849U (en) Gas drainage drilling hole orifice prevention device
CN204691658U (en) rotary drilling rig down-hole hammer construction special working device
CN110965955A (en) Dust and blowout prevention device for coal mine gas drainage
CN109537714A (en) A kind of consolidation pipeline inside dredger
CN110397413A (en) The hybrid dedusting denoising device of drilling orifice and drilling equipment and working method
CN209761380U (en) Coal mine underground drilling blowout prevention and dust removal device
CN209703678U (en) A kind of consolidation pipeline inside dredger
CN202001050U (en) Gas dust catcher for coal mine
CN107524415A (en) Coal bed drilling dust arrester and rig
CN206121354U (en) Environment -friendly drill carriage dust collecting device
CN208416443U (en) A kind of reacting cycle formula list drill bit pneumatic down-hole hammer rotary digging environmental protection direct exhaust device
CN206539324U (en) Aperture rapid fixing and the equipment for mash gas pumping drilling
CN104879158A (en) Dry type drilled hole orifice dust elimination and noise reduction device and implementation method thereof
CN115012867A (en) Wellhead blowout prevention, noise reduction, dust removal and sampling device applied to air drilling
CN213836633U (en) Multipurpose drill bit for underground grouting pile formation
CN101881177A (en) Foam dust removing system of wind power slag-discharging coal mine
CN114320147A (en) Dust fall device
CN208564472U (en) A kind of coal mine drilling magnetized foam cyclone system
CN207526523U (en) The closed dedusting extraction integrated device of drilling in coal
CN202767919U (en) Mining drilling drainage and dust removal device
CN207144894U (en) Mine coal drilling pressure release blowout prevention flushing device
CN217327246U (en) Anchor rope pore-forming dust device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101

RJ01 Rejection of invention patent application after publication