CN110397145A - A kind of interim room drainage arrangement in construction site - Google Patents

A kind of interim room drainage arrangement in construction site Download PDF

Info

Publication number
CN110397145A
CN110397145A CN201910722187.9A CN201910722187A CN110397145A CN 110397145 A CN110397145 A CN 110397145A CN 201910722187 A CN201910722187 A CN 201910722187A CN 110397145 A CN110397145 A CN 110397145A
Authority
CN
China
Prior art keywords
fixedly connected
iron pipe
support iron
pipe frame
telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910722187.9A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Baoyi Information Technology Co Ltd
Original Assignee
Zhengzhou Baoyi Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Baoyi Information Technology Co Ltd filed Critical Zhengzhou Baoyi Information Technology Co Ltd
Priority to CN201910722187.9A priority Critical patent/CN110397145A/en
Publication of CN110397145A publication Critical patent/CN110397145A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0407Floor drains for indoor use

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The invention discloses a kind of interim room drainage arrangements in construction site, it is related to building field, including support iron pipe frame and telescopic, adjusting rod is slidably connected on the inside of the telescopic, telescopic and adjusting rod outer end have been respectively fixedly connected with the first magnet, first magnet and support iron pipe frame are attracted, waterproof layer is fixedly connected with below the telescopic, drainage duct is fixedly connected with below waterproof layer, rhone is offered above drainage duct, the drainage duct left end is fixedly connected with flexible connecting leg, flexible connecting leg left end is fixedly connected with pipe fitting, pipe fitting is connect with support iron pipe frame.Compared with prior art, the beneficial effects of the present invention are: the configuration of the present invention is simple, it is easy to use, by the way that the pumping equipment that catchments is arranged on support iron pipe frame when use, thus from domestic water can be discharged downwards along support iron pipe frame, the case where avoiding life water sinuous flow caused by directly splashing and sprinkling people, is worthy to be popularized.

Description

A kind of interim room drainage arrangement in construction site
Technical field
The present invention relates to building field, specifically a kind of interim room drainage arrangement in construction site.
Background technique
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also be with It says it is various lines on design drawing, in specified place, becomes process in kind, it includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc., the place of construction operation is known as " construction site " or cries " construction site ", is also named building site.
The interim inhabitation that the interim room in building site is generally used for construction personnel is used, and wherein the interim room in building site is one kind using light steel as bone Frame, using battenboard as cladding, and if the movable dwellings that is formed by fixedly connecting of use bolt stem, mostly two or three layer, interim room Outside mostly can build iron pipe support.
Chinese patent (Authorization Notice No.: CN109826460A) discloses a kind of interim room in easy-to-dismount building site, though it should Interim room is easy to assemble, but existing interim room is not provided with sewerage mostly, and spillage is lived directly down from interim room With water, what one side sewage was splashed is everywhere, on the other hand is also easy to splash to passerby, be inconvenient.
Summary of the invention
The purpose of the present invention is to provide a kind of interim room drainage arrangements in construction site, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the invention provides the following technical scheme:
A kind of interim room drainage arrangement in construction site, including support iron pipe frame and telescopic, the telescopic inside are slidably connected There is adjusting rod, telescopic and adjusting rod outer end have been respectively fixedly connected with the first magnet, and the first magnet and support iron pipe frame are attracted, It is fixedly connected with waterproof layer below the telescopic, drainage duct is fixedly connected with below waterproof layer, is opened up above drainage duct There is rhone, the drainage duct left end is fixedly connected with flexible connecting leg, and flexible connecting leg left end is fixedly connected with pipe fitting, and pipe connects Head is connect with support iron pipe frame.
As a further solution of the present invention: the waterproof layer is water proof nonwoven cloth.
As further scheme of the invention: the waterproof layer is silica gel material.
As further scheme of the invention: the telescoping catheter other end is fixedly connected with the second magnet, the second magnetic Iron and support iron pipe frame are attracted and connect.
As further scheme of the invention: being fixedly connected with rib on front side of the rhone.
As further scheme of the invention: offering drainage hole on the support iron pipe frame, pipe fitting passes through draining It is connected on the inside of hole and support iron pipe frame.
As further scheme of the invention: being fixedly connected with strainer above the rhone.
Compared with prior art, the beneficial effects of the present invention are: the configuration of the present invention is simple, easy to use, when use, passes through The pumping equipment that catchments is set on support iron pipe frame, to avoid from domestic water can be discharged downwards along support iron pipe frame Life water sinuous flow caused by directly splashing and the case where sprinkle people, is worthy to be popularized.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the interim room drainage arrangement in construction site;
Fig. 2 is the partial enlargement structural representation in a kind of interim room drainage arrangement in construction site;
Fig. 3 is the structural schematic diagram of drainage duct in a kind of interim room drainage arrangement in construction site;
Fig. 4 is the structural schematic diagram of pipe fitting in a kind of interim room drainage arrangement in construction site;
In figure: 1- supports iron pipe frame, 2- telescopic, 3- adjusting rod, the first magnet of 4-, 5- waterproof layer, 6- drainage duct, 7- draining Slot, 8- flexible connecting leg, 9- pipe fitting, the second magnet of 10-, 11- rib, 12- strainer.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
Embodiment one: Fig. 1-4, a kind of interim room drainage arrangement in construction site, including support iron pipe frame 1 are please referred to and is stretched 2 are covered, adjusting rod 3 is slidably connected on the inside of the telescopic 2, telescopic 2 and 3 outer end of adjusting rod have been respectively fixedly connected with the first magnetic Iron 4, the first magnet 4 and support iron pipe frame 1 are attracted, by stretching adjusting rod 3, enable first magnet 4 and branch at both ends Iron brace pipe support 1 is attracted to the fixation above realization device;
It is fixedly connected with waterproof layer 5 below the telescopic 2, drainage duct 6, drainage duct 6 are fixedly connected with below waterproof layer 5 Top offers rhone 7, and 6 left end of drainage duct is fixedly connected with flexible connecting leg 8, and flexible 8 left end of connecting leg is fixedly connected There is pipe fitting 9, pipe fitting 9 is connect with support iron pipe frame 1, and sewage can directly splash to waterproof layer 5, in leading for waterproof layer 5 Flow downward under stream effect, enter in drainage duct 6 by the rhone 7 on drainage duct 6, later by flexible connecting leg 8 into Enter pipe fitting 9, pipe fitting 9 is the art common knowledge, is connect by pipe fitting 9 with support iron pipe frame 1, so that sewage edge Iron pipe outer surface flowing, flowing to ground.
The waterproof layer 5 is water proof nonwoven cloth.
The waterproof layer 5 is silica gel material.
The telescoping catheter other end is fixedly connected with the second magnet 10, and the second magnet 10 is attracted with support iron pipe frame 1 to be connected It connects.
Drainage hole is offered on the support iron pipe frame 1, pipe fitting 9 passes through to be connected on the inside of drainage hole and support iron pipe frame 1, Directly flexible connecting leg 8 is directly connected to support iron pipe frame 1 by pipe fitting 9, can directly be exported water downwards by iron pipe.
Strainer 12 is fixedly connected with above the rhone 7.
Embodiment two: the present embodiment is further improved as a upper embodiment: being fixedly connected on front side of the rhone 7 Rib 11, rib 11 can reduce the case where domestic water excessively goes out from preceding effluent.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. a kind of interim room drainage arrangement in construction site, including support iron pipe frame (1) and telescopic (2), the telescopic (2) are interior Slideslip is connected with adjusting rod (3), and telescopic (2) and adjusting rod (3) outer end have been respectively fixedly connected with the first magnet (4), and first Magnet (4) and support iron pipe frame (1) are attracted, which is characterized in that waterproof layer (5) are fixedly connected with below the telescopic (2), It is fixedly connected with drainage duct (6), is offered rhone (7) above drainage duct (6), the draining is led below waterproof layer (5) Pipe (6) left end is fixedly connected with flexible connecting leg (8), and flexible connecting leg (8) left end is fixedly connected with pipe fitting (9), pipe fitting (9) with Support iron pipe frame (1) connection.
2. the interim room drainage arrangement in construction site according to claim 1, which is characterized in that the waterproof layer (5) is anti- Water non-woven fabrics.
3. the interim room drainage arrangement in construction site according to claim 1, which is characterized in that the waterproof layer (5) is silicon Glue material matter.
4. the interim room drainage arrangement in construction site according to claim 1 to 3, which is characterized in that the telescoping catheter The other end is fixedly connected with the second magnet (10), and the second magnet (10) and support iron pipe frame (1) are attracted and connect.
5. the interim room drainage arrangement in construction site according to claim 4, which is characterized in that on front side of the rhone (7) It is fixedly connected with rib (11).
6. the interim room drainage arrangement in construction site according to claim 1, which is characterized in that the support iron pipe frame (1) On offer drainage hole, pipe fitting (9) is connected to by drainage hole with support iron pipe frame (1) inside.
7. the interim room drainage arrangement in construction site according to claim 1, which is characterized in that above the rhone (7) It is fixedly connected with strainer (12).
CN201910722187.9A 2019-08-06 2019-08-06 A kind of interim room drainage arrangement in construction site Pending CN110397145A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910722187.9A CN110397145A (en) 2019-08-06 2019-08-06 A kind of interim room drainage arrangement in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910722187.9A CN110397145A (en) 2019-08-06 2019-08-06 A kind of interim room drainage arrangement in construction site

Publications (1)

Publication Number Publication Date
CN110397145A true CN110397145A (en) 2019-11-01

Family

ID=68327522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910722187.9A Pending CN110397145A (en) 2019-08-06 2019-08-06 A kind of interim room drainage arrangement in construction site

Country Status (1)

Country Link
CN (1) CN110397145A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2268738Y (en) * 1995-07-25 1997-11-26 黄春记 Combined roof
JPH10121539A (en) * 1996-08-24 1998-05-12 Ikuo Inafune Drain pipe structure of building and method of cleaning drain pipe
CN202390895U (en) * 2011-12-27 2012-08-22 山西四建集团有限公司 External assembly type drainage channel
CN207144071U (en) * 2017-08-28 2018-03-27 上海宝冶集团南京建筑有限公司 One kind faces board house floor domestic living waste water treater greatly
CN207194116U (en) * 2017-09-01 2018-04-06 江苏沪武建设集团有限公司 A kind of construction site assembled temporary drain

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2268738Y (en) * 1995-07-25 1997-11-26 黄春记 Combined roof
JPH10121539A (en) * 1996-08-24 1998-05-12 Ikuo Inafune Drain pipe structure of building and method of cleaning drain pipe
CN202390895U (en) * 2011-12-27 2012-08-22 山西四建集团有限公司 External assembly type drainage channel
CN207144071U (en) * 2017-08-28 2018-03-27 上海宝冶集团南京建筑有限公司 One kind faces board house floor domestic living waste water treater greatly
CN207194116U (en) * 2017-09-01 2018-04-06 江苏沪武建设集团有限公司 A kind of construction site assembled temporary drain

Similar Documents

Publication Publication Date Title
CN106638906A (en) Water seal ratio deodorizing floor drain
CN110397145A (en) A kind of interim room drainage arrangement in construction site
CN202430780U (en) Improved assembly of indoor water drainage system
CN212053018U (en) Energy-saving wash basin for public places
CN211547908U (en) Secondary drainage water draining and draining device for kitchen and bathroom
CN2832016Y (en) Folding bathtub
CN211080429U (en) Novel toilet water supply and drainage pipe packaging structure
CN208339448U (en) A kind of falling-resistant shower house
CN203684334U (en) Water cycling system
CN206101108U (en) A heat sink for linking a formula warmhouse booth
CN203296151U (en) Urinal
CN213869542U (en) Shower door of shower room with storage rack
CN219863222U (en) Anti-seepage structure for floor drain in kitchen and bathroom is repacked and repacked
CN204645734U (en) A kind of chassis of integral bathroom
CN207461577U (en) A kind of inversion type umbrella body structure for landscape umbrella
CN209874574U (en) Toilet on bathtub
CN204401772U (en) Multifunctional floor drain cover plate
CN203208435U (en) Continuous flushing device for general surgery department
CN103230239B (en) Shower room
CN204410675U (en) A kind of double type multifunctional bathtub
CN220301498U (en) Stone floor drain
CN209384331U (en) A kind of washbowl and floor drain co-layer draining structure
CN220394768U (en) Movable outdoor shower bath room drainage mechanism
CN201175298Y (en) Simple integration bathing housee
CN219315897U (en) Parent-child hand washing table

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101