CN110388190A - A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery - Google Patents

A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery Download PDF

Info

Publication number
CN110388190A
CN110388190A CN201910743279.5A CN201910743279A CN110388190A CN 110388190 A CN110388190 A CN 110388190A CN 201910743279 A CN201910743279 A CN 201910743279A CN 110388190 A CN110388190 A CN 110388190A
Authority
CN
China
Prior art keywords
temperature
superhigh
drill
pressure
centralizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910743279.5A
Other languages
Chinese (zh)
Inventor
李中
郭永宾
罗鸣
陈江华
韩成
李炎军
陈浩东
张万栋
张超
李文拓
邓文彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201910743279.5A priority Critical patent/CN110388190A/en
Publication of CN110388190A publication Critical patent/CN110388190A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1078Stabilisers or centralisers for casing, tubing or drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B25/00Apparatus for obtaining or removing undisturbed cores, e.g. core barrels or core extractors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B25/00Apparatus for obtaining or removing undisturbed cores, e.g. core barrels or core extractors
    • E21B25/10Formed core retaining or severing means

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery, it includes from bottom to top, pass sequentially through screw thread composite polycrystal-diamond core bit interconnected, first centralizer, high temperature and pressure core barrel, second centralizer, high temperature float valve, first drill collar, leak stopping pipe nipple, second drill collar, bumper jar, heavy weight drill pipe, drop-in check valve seated connection head, heavy weight drill pipe and common drilling rod, it is superhigh temperature resistant metalwork, temperature resistance ability is more than 200 DEG C, first drill collar is equipped with 1, second drill collar is equipped with 6 and respectively successively axial interconnection.The present invention can reduce superhigh-temperature and-pressure well coring well control risk, realize the safe coring of superhigh-temperature and-pressure well.

Description

A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery
Technical field
The present invention relates to prospect pit drilling technology field, in particular to a kind of brills suitable for superhigh-temperature and-pressure well drilling and coring delivery Tool combination.
Background technique
Yingqiong basin is one of big high temperature and pressure area in the world three, and petroleum resources are abundant, but difficulties in exploration is very big, in recent years warbler The superhigh-temperature and-pressure prospect pit of fine jade basin is found that the following superhigh-temperature and-pressure drilling and coring delivery is also brought into schedule.Drilling well takes The heart pair and the formulation of gas field Reserves Assessment and gas field development program are of great significance.But Present Global rarely has superhigh-temperature and-pressure The case of success coring, domestic superhigh-temperature and-pressure well drilling and coring delivery is also in technological gap.This is mainly due to superhigh-temperature and-pressure well Safe pressure window narrows are easy to happen complex situations such as leakage, bit freezing etc., drilling and coring delivery operation well control risk pole during coring Height, furthermore current coring tool temperature resistance ability does not reach requirement.
Conventional core drill combination only has the combination such as simple coring tool, centralizer and heavy weight drill pipe, and coring tool is anti- Superhigh temperature requirement is not achieved in warm ability, is unable to satisfy superhigh-temperature and-pressure well drilling and coring delivery well control requirement, and conventional core drill The ability of the complex situations such as leakage, bit freezing is not coped with.To carry out superhigh-temperature and-pressure drilling and coring delivery, needs to invent one kind and be suitable for The drill assembly of superhigh-temperature and-pressure well drilling and coring delivery reduces well control risk, while improving the anti-sticking ability of leakproof.
Summary of the invention
The present invention provides a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery, reduces superhigh-temperature and-pressure well and takes Heart well control risk realizes the safe coring of superhigh-temperature and-pressure well.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is that:
A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery comprising from bottom to top, pass sequentially through screw thread Composite polycrystal-diamond core bit interconnected, the first centralizer, high temperature and pressure core barrel, the second centralizer, high temperature Float valve, the first drill collar, leak stopping pipe nipple, the second drill collar, bumper jar, heavy weight drill pipe, drop-in check valve seated connection head, heavy weight drill pipe and Common drilling rod is superhigh temperature resistant metalwork, and temperature resistance ability is more than 200 DEG C, and first drill collar is equipped with 1, the second drill collar Equipped with 6 and difference is successively axially connected with each other.
The outer diameter of the composite polycrystal-diamond core bit is 212.7mm, the outer diameter of the first centralizer is 177.8mm, the second centralizer outer diameter be 177.8mm, the first drill collar is outer diameter 203.2mm, the outer diameter of the second drill collar is 203.2mm, bumper jar outer diameter be 203.2mm.
The high temperature and pressure core barrel, which uses, exempts from pitching structure.
The high temperature float valve is interior jet-preventing tool.
The high temperature and pressure core barrel is equipped with outer cylinder and inner cylinder, and outer cylinder is set with inner cylinder, the annular clearance between inside and outside cylinder Distance is 7.5mm.
The high temperature and pressure core barrel uses steel inner cylinder, and temperature resistance ability is more than 200 DEG C.
The outer diameter of first righting strip is 178mm.
The high temperature float valve is float valve fuse, and temperature resistance ability is more than 200 DEG C.
Distance is more than 10m between first centralizer and the second centralizer.
The beneficial effects of the present invention are: realizing superhigh-temperature and-pressure drilling and coring delivery, the complexity such as leakage, bit freezing can be effectively prevent The generation of accident significantly reduces well control risk.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
In figure: 1 composite polycrystal-diamond core bit, 2 first centralizers, 3 high temperature and pressure core barrels, 4 high temperature float valves, 5 first drill collars, 6 leak stopping pipe nipples, 7 bumper jars, 8 heavy weight drill pipes, 9 drop-in check valve seated connection heads, 10 heavy weight drill pipes, 11 common brills Bar, 12 second centralizers, 13 second drill collars.
Specific embodiment
Present invention is further described in detail with specific embodiment with reference to the accompanying drawing.
As shown in Figure 1, a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery, the drilling well suitable for target zone Coring operation comprising from bottom to top, pass sequentially through screw thread composite polycrystal-diamond core bit 1, first interconnected Centralizer 2, high temperature and pressure core barrel 3, the second centralizer 12, high temperature float valve 4, the first drill collar 5, leak stopping pipe nipple 6, the second drill collar 13, bumper jar 7, heavy weight drill pipe 8, drop-in check valve seated connection head 9, heavy weight drill pipe 10 and common drilling rod 11, are superhigh temperature resistant Metalwork, temperature resistance ability are more than 200 DEG C, and first drill collar 5 is equipped with 1, and the second drill collar 13 is equipped with 6 and distinguishes successively axis To interconnection.
The outer diameter of the composite polycrystal-diamond core bit 1 is 212.7mm, the outer diameter of the first centralizer 2 is 177.8mm, the second centralizer 12 outer diameter be 177.8mm, the outer diameter that the first drill collar 5 is outer diameter 203.2mm, the second drill collar 13 Outer diameter for 203.2mm, bumper jar 7 is 203.2mm.
The high temperature and pressure core barrel 3 avoids the generation spark in high-temperature stratum pitching from causing using pitching structure is exempted from Down hole problem.
The high temperature float valve 4 is interior jet-preventing tool, can reduce well control risk, while can also add in drill assembly Other interior jet-preventing tools except high temperature float valve 4 reduce well control risk.
The high temperature and pressure core barrel 3 is equipped with outer cylinder and inner cylinder, and outer cylinder is set with inner cylinder, the annular space between inside and outside cylinder When stand-off distance is from complex situations occur for 7.5mm, in coring operation, can effectively avoid causes to suppress pump or drilling well because annular clearance is too small The complex situations such as liquid charging is limited.
The high temperature and pressure core barrel 3 uses steel inner cylinder, and temperature resistance ability is more than 200 DEG C.
The outer diameter of first righting strip 2 is 178mm, for replacing the spiral centering device of traditional outer diameter 210mm, thus Effectively reduce the risk of bit freezing during coring operation.
The high temperature float valve 4 is that float valve fuse temperature resistance ability is more than 200 DEG C.
Distance is more than 10m between first centralizer 2 and the second centralizer 12, can effectively reduce the cross of core drill To vibration, prevent from blocking up the complex situations such as heart bit freezing caused by the broken heart.
Working principle:
The present invention in application, by using leak stopping pipe nipple 6 carry out throw kick off, closes ball, batching sphere realize switch, kick off, close Ball, batching sphere must suitably be caught by lower part ball cylinder capture, catch ball cylinder can directly under in this tool in the following, can also be below more The position of lower section, it is bigger than the outer diameter of ball this requires being had in all drilling tool internal diameters for catching ball cylinder or more.
It throws and kicks off first out of wellhead column, top can be connect after investment of kicking off and drive turn on pump release, during this period if possible Words, it is proposed that only movable drilling tool, record ball reach total strokes per minute when ball seat, the reference for next pitching.When ball reaches ball seat Afterwards, can be appreciated that vertical pressure can be risen, at this time should not termination of pumping pressure release, continue to be slowly increased pressure, until reaching pressure of catching 1100psi, pressure stabilizing 30s are in order to which tool interior component having time runs to next position in this way.It is slowly increased to be pumped to and push away Shear pressure value 1600psi, pressure stabilizing 30s clock are recommended, if can't see pump pressure decline, then pump pressure 500psi is improved, continues 30s, often Secondary increase will continue 30s, until being observed that pump pressure decline, show that by-pass prot is opened, can establish circulation.It is existing by comparing The opening state of tool is confirmed in the pump pressure (pump pressure of same displacement before pitching) that pump pressure is recorded with before.At this point, leak stopping Material can be from by-pass prot direct circulation, can also be from 6 or less drilling tool of leak stopping pipe nipple, such as: flow through the first drill collar 5, high temperature float valve 4, Circulation in second centralizer 12, high temperature and pressure core barrel 3, the first centralizer 2, composite polycrystal-diamond core bit 1, i.e., from Core bit circulation outflow.It does not find that plugging material blocks 6 or less drilling tool of leak stopping pipe nipple, batching sphere can be thrown in well head, launched Before batching sphere, the pressure in drilling tool is checked, if having any sign underbalance or having reflux, by extra plugging material or thick Plug, which recycles, to be come, and is prevented sundries from being entered in coring pipe string by open by-pass prot, when pumping batching sphere, to be kicked off to make with pumping With same discharge capacity, batching sphere reaches ball seat, and with same operation of kicking off, 6 or less drilling tool of leak stopping pipe nipple, Zhi Nengtong is thus isolated Cross leak stopping pipe nipple circulation port carry out circulation be pumped into plugging material.After plugging operations, Guan Qiuhou is thrown in well head again, is closed other Through-hole restores normal circulation channel, recycles below drill bit.
Can repeatedly pitching, repeatedly switched and be isolated, in this way can in the case where leakage occurs, pitching opening by Through-hole injects leak stopping slurry into well, while can isolate leak stopping pipe nipple lower part, avoids leak stopping slurry to the erosion of rock core and to work The influence of tool.
Application example:
Certain extra large superhigh-temperature and-pressure well of the step 1. THE WESTERN SOUTH CHINA SEA songs of the oriole, coring depth 3632m, formation temperature are 187 DEG C, ground Being laminated force coefficient is 2.1, and pit shaft drilling fluid density is 2.15g/cm when coring3, before lower core drill, static observation pit shaft is needed Liquid level stabilizing.
Step 2. by using the first centralizer of Ф 212.7mm composite polycrystal-diamond core bit+Ф 177.8mm+ The second centralizer of Ф 171.5mm high temperature and pressure core barrel+Ф 177.8mm+core barrel top connection+cooperation connector (411*630)+height + 6 the second drill collars of Ф 203.2mm of+1 Ф 203.2mm the first drill collar+Ф 203.2mm leak stopping pipe nipple of warm float valve (high temperature spool)+ The Ф 203.2mm hydraulic shock device+Ф 139.7mm of cooperation connector (631*520)+1 heavy weight drill pipe+drop-in check valve seated connection head + 13 common drilling rods of Ф 139.7mm heavy weight drill pipe+Ф 139.7mm, are successively interconnected and fixed.
When step 3. determines coring bed, accurate recording well depth, tidal range, and to common drilling rod and heavy weight drill pipe drilling rod into Row is measured;Tool must steadily go up rig floor;Tool enters and leaves well head, must use hook lifting, and use safety slip;Decentralization drilling tool will be put down Surely;Slacking off must not exceed 3t, under not handy core bit reaming is strong;It is bored in going down process middle sleeve by high temperature and pressure underground It is required that turn on pump top leads to drilling tool, Open-Hole Section logical and next cylindrical drill bar every 200~300m turn on pump top since casing out;Under get into bottom Afterwards, the abundant circulating fluid of spudding up and down cleans shaft bottom, surveys aftereffect;Drill bit is controlled apart from bottom hole location in 2m or so;One Ready rear detecting shaft bottom is cut, and measures drilling tool and lifts from the top and puts down suspending weight.
Step 4. starts pith, 1~2t of bit pressure, 40~60rpm of revolving speed, 1000~1300L/min of discharge capacity;Pith 0.3- After 0.5m, normal parameter core-drilling, 4~8t of bit pressure, 40~60rpm of revolving speed, 1200~1500L/min of discharge capacity are gradually added to; Judged according to stratum advance notice with when boring, is preferably selected and cuts the heart on stratum preferable at column and less hard, first ground when cutting the heart Heart operation crosses and mentions 17t, above mentions drilling tool 5m, transfer to bottom and be not hampered, and confirmation rock core is cut off.
Step 5. deck goes out the heart, rock core length 8.9m, cored interval 3632m~3640.9m, drilling depth 8.9m, coring harvest Rate 100%.
Finally it should be noted that the above content is merely illustrative of the technical solution of the present invention, rather than the present invention is protected The limitation of range, the simple modification or equivalent replacement that those skilled in the art carry out technical solution of the present invention, All without departing from the spirit and scope of technical solution of the present invention.

Claims (9)

1. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery, it is characterised in that: it includes from bottom to top, successively Pass through screw thread composite polycrystal-diamond core bit (1) interconnected, the first centralizer (2), high temperature and pressure core barrel (3), the second centralizer (12), high temperature float valve (4), the first drill collar (5), leak stopping pipe nipple (6), the second drill collar (13), bumper jar (7), heavy weight drill pipe (8), drop-in check valve seated connection head (9), heavy weight drill pipe (10) and common drilling rod (11), are superhigh temperature resistant Metalwork, temperature resistance ability are more than 200 DEG C, first drill collar (5) be equipped with 1, the second drill collar (13) be equipped with 6 and respectively according to Secondary axial interconnection.
2. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 1, it is characterised in that: The outer diameter of the composite polycrystal-diamond core bit (1) is 212.7mm, the outer diameter of the first centralizer (2) is 177.8mm, the second centralizer (12) outer diameter be 177.8mm, the first drill collar (5) is outer diameter 203.2mm, the second drill collar (13) Outer diameter be 203.2mm, the outer diameter of bumper jar (7) is 203.2mm.
3. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 1, it is characterised in that: The high temperature and pressure core barrel (3), which uses, exempts from pitching structure.
4. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 1, it is characterised in that: The high temperature float valve (4) is interior jet-preventing tool.
5. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 1, it is characterised in that: The high temperature and pressure core barrel (3) is equipped with outer cylinder and inner cylinder, and outer cylinder is set with inner cylinder, the annular clearance distance between inside and outside cylinder For 7.5mm.
6. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 5, it is characterised in that: The high temperature and pressure core barrel (3) uses steel inner cylinder, and temperature resistance ability is more than 200 DEG C.
7. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 1, it is characterised in that: The outer diameter of first righting strip (2) is 178mm.
8. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 1, it is characterised in that: The high temperature float valve (4) is float valve fuse, and temperature resistance ability is more than 200 DEG C.
9. a kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery according to claim 1, it is characterised in that: Distance is more than 10m between first centralizer (2) and the second centralizer (12).
CN201910743279.5A 2019-08-13 2019-08-13 A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery Pending CN110388190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910743279.5A CN110388190A (en) 2019-08-13 2019-08-13 A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910743279.5A CN110388190A (en) 2019-08-13 2019-08-13 A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery

Publications (1)

Publication Number Publication Date
CN110388190A true CN110388190A (en) 2019-10-29

Family

ID=68288577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910743279.5A Pending CN110388190A (en) 2019-08-13 2019-08-13 A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery

Country Status (1)

Country Link
CN (1) CN110388190A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350466A (en) * 2020-04-22 2020-06-30 中化明达生态环境治理有限公司 Sampling method for improving sampling rate of oil sand layer

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1267779A (en) * 1999-03-19 2000-09-27 陕西省一八六煤田地质勘探队 Combined drilling tool and drilling process for coal bed gas well
CN201125690Y (en) * 2007-11-20 2008-10-01 大庆石油管理局 Horizontal well horizontal segment increased slanting core drill tool combination
US20130113487A1 (en) * 2011-11-09 2013-05-09 Halliburton Energy Services, Inc. Instrumented core barrels and methods of monitoring a core while the core is being cut
CN103410446A (en) * 2013-08-20 2013-11-27 中国海洋石油总公司 Reaming inclinometry way-type drilling unit
WO2014053012A1 (en) * 2012-10-05 2014-04-10 Minnovare Pty Ltd Core orientation apparatus
CN204024550U (en) * 2014-08-22 2014-12-17 中国石油化工集团公司 A kind of drilling and coring delivery way-type drilling unit
CN207829814U (en) * 2018-02-08 2018-09-07 中国石油化工股份有限公司 A kind of single tube circulation temperature lowering core bit

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1267779A (en) * 1999-03-19 2000-09-27 陕西省一八六煤田地质勘探队 Combined drilling tool and drilling process for coal bed gas well
CN201125690Y (en) * 2007-11-20 2008-10-01 大庆石油管理局 Horizontal well horizontal segment increased slanting core drill tool combination
US20130113487A1 (en) * 2011-11-09 2013-05-09 Halliburton Energy Services, Inc. Instrumented core barrels and methods of monitoring a core while the core is being cut
WO2014053012A1 (en) * 2012-10-05 2014-04-10 Minnovare Pty Ltd Core orientation apparatus
CN103410446A (en) * 2013-08-20 2013-11-27 中国海洋石油总公司 Reaming inclinometry way-type drilling unit
CN204024550U (en) * 2014-08-22 2014-12-17 中国石油化工集团公司 A kind of drilling and coring delivery way-type drilling unit
CN207829814U (en) * 2018-02-08 2018-09-07 中国石油化工股份有限公司 A kind of single tube circulation temperature lowering core bit

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张俊良等: "高含硫气井安全高效钻完井配套技术-以川东北罗家寨气田为例", 《天然气工业》 *
李中等: "南海西部地区异常高压气井套管防磨技术", 《石油钻采工艺》 *
李佩武等: "密闭取心技术在超深井元坝123井应用", 《钻采工艺》 *
集团公司井控培训教材编写组编: "《钻井井控工艺技术》", 31 July 2008, 东营:中国石油大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350466A (en) * 2020-04-22 2020-06-30 中化明达生态环境治理有限公司 Sampling method for improving sampling rate of oil sand layer

Similar Documents

Publication Publication Date Title
CN202731865U (en) Switchable fracturing sliding sleeve
CN104405281B (en) One crosses goaf casing drilling process
US9670750B2 (en) Methods of operating well bore stimulation valves
CN110029938B (en) Gas reverse circulation well drilling method
US6491103B2 (en) System for running tubular members
CN208792974U (en) A kind of dual-grip, can bore remove, solvable bridge plug
CN103603625A (en) Casing coring drilling tool and casing coring drilling method
CN103452542A (en) Switchable fracturing sliding sleeve
CN111779464B (en) Double-layer pipe double-gradient pressure control drilling underground blowout preventer
CN208816084U (en) A kind of solvable bridge plug of single deck tape-recorder watt short noresidue
US10662728B2 (en) Method and apparatus for stuck pipe mitigation
CN112627755A (en) Lifting drilling type large-diameter well bottom in-situ pressure maintaining coring drilling tool
MXPA01003767A (en) Drilling method.
CN101392633B (en) Mechanical and hydraulic double-acting expansion sieve tube hanger
CN113107426A (en) Device and method for releasing blockage of coal mine underground long-borehole hydraulic fracturing packer
CN101122220A (en) Swelling type screen pipe suspension method and swelling type screen pipe hanger
CN110388190A (en) A kind of drill assembly suitable for superhigh-temperature and-pressure well drilling and coring delivery
CN203570241U (en) Casing coring drilling tool
CN205858311U (en) A kind of bore hole staged fracturing completion tubular column
CN204312004U (en) A kind of novel gas well drift size gauge tool
CN204371262U (en) A kind of balancing throttle device
CN116733421A (en) Hydraulic ball throwing device for well drilling coring and well drilling coring process
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
CN205908266U (en) Whirl sand removal ware
CN115162992A (en) Small-diameter pipe column cutting and fishing integrated fishing device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191029