- CN110388057A CN110388057A CN201810348699.9A CN201810348699A CN110388057A CN 110388057 A CN110388057 A CN 110388057A CN 201810348699 A CN201810348699 A CN 201810348699A CN 110388057 A CN110388057 A CN 110388057A
- Authority
- CN
- China
- Prior art keywords
- discharge hole
- storage chamber
- wall
- push plate
- axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses the quetsch for being applied to wall, including memory block, in the storage chamber of memory block being internally provided with for concrete, one end on the side side wall of memory block close to bottom surface is provided with the discharge hole being connected to storage chamber, one end in storage chamber far from discharge hole is open end, and one end in storage chamber far from discharge hole is provided with sequentially connected push plate and pushing ram, push plate is located in storage chamber, axis of the push plate perpendicular to discharge hole, the axis of pushing ram is parallel to discharge hole, one end is from open end insertion storage chamber, and it is connect with one end in push plate far from discharge hole, sealing ring is arranged on the side wall of push plate, the axis of sealing ring is parallel to the axis of discharge hole, and the outer wall of sealing ring is contacted with the cavity wall of storage chamber, sealing ring is in compressive state, push push plate that can make to be located at storage chamber to discharge hole In and the fluid between push plate and discharge hole flowed out from discharge hole.The present invention improves the efficiency that building is built.
Description
Technical field
The present invention relates to building fields, and in particular to the quetsch applied to wall.
Background technique
Architecture from be broadly research building and its environment subject.Architecture be one across engineering technology and
The subject of humanities and art.The art of architecture and Building technology involved in architecture and the art of architecture institute as utility art
Including aesthetics and it is practical while, though they have specific different but maintain close ties with, and its component is with specific
Situation and the difference of building and differ widely.
In the build of each building body, there are many build modes of cavity, such as passes through cement and one layer one of wall body brick
Layer is built, and perhaps passes through steel reinforcement cage casting concrete or is spliced into wall etc. by module board.Passing through concrete and wall
The main raw material(s)s such as body brick carry out in the build of wall, and the smearing of every layer concrete is carried out by worker, and since human subjective grasps
The reasons such as make, it is inconsistent to will lead to the concrete layer thickness smeared every time, and Reusability horizontal ruler is not only needed to carry out wall body brick
The Level-adjusting of upper surface, and when concrete is applied to wall body brick edge, it is also necessary to the concrete at edge is smeared with trowel
It removes, it is avoided to be adhered to the side of wall.
Summary of the invention
It is an object of that present invention to provide the quetsch for being applied to wall, the painting that every layer concrete is carried out by worker is solved
It smears, and due to human subjective's operation etc., it is inconsistent to will lead to the concrete layer thickness smeared every time, not only needs to make repeatedly
The Level-adjusting of wall body brick upper surface is carried out with horizontal ruler, and the problem of low efficiency.
The present invention is achieved through the following technical solutions:
Applied to the quetsch of wall, including memory block, in being internally provided with for concrete for the memory block
Storage chamber, one end on the side side wall of memory block close to bottom surface are provided with the discharge hole being connected to storage chamber, the storage
Be in communication with the outside to form open end far from one end of discharge hole on chamber, and one end in storage chamber far from discharge hole be provided with according to
The push plate of secondary connection and pushing ram, the push plate are located in storage chamber, push plate perpendicular to discharge hole axis, the pushing ram
Axis is parallel to discharge hole, and one end is connect, In from open end insertion storage chamber with one end in push plate far from discharge hole
Be arranged with sealing ring on the side wall of push plate, the axis of the sealing ring is parallel to the axis of discharge hole, and the outer wall of sealing ring with
The cavity wall of storage chamber contacts, and sealing ring is in compressive state, pushes push plate that can make to be located in storage chamber and be located to discharge hole and pushes away
Fluid between plate and discharge hole is flowed out from discharge hole.
It is every built one layer of wall body brick after, first concrete is fitted into storage chamber, then the present invention is erected at and is being repaired
The top for the wall built, and make to contact at the top of the bottom of memory block and wall, the axis of discharge port is parallel to the wall surface of wall,
Then memory block is pulled, moves memory block to one end far from discharge hole along wall, meanwhile, it is pushed to discharge hole
Bar, to reduce the spacing between push plate and discharge hole, to concrete be released from discharge hole, while with the shifting of memory block
Dynamic, the concrete in storage chamber is then successively mixed what is be just laid at the top for being successively laid on the wall built
Wall body brick is put on solidifying soil top, carries out the build of wall.
A layer concrete can not only be rapidly laid at the top of wall through the invention, is improved work efficiency, work is not necessarily to
People repeatedly smear from concrete bucket by feeding, and the concrete layer thickness that the present invention is laid with is uniform, horizontal without Reusability
Ruler carries out the Level-adjusting of wall body brick upper surface, while will not be routed on the side wall of wall body brick.
The setting of push plate can successfully strike off the concrete in storage chamber cavity wall, avoid the waste of concrete.
Further, several idler wheels are provided on the bottom surface of memory block, the respective rotation axis of idler wheel is vertical
In discharge hole axis and be parallel to the bottom surface of memory block.
Sliding friction between memory block and wall is become rolling friction by the setting of idler wheel, reduces frictional force and friction
Loss.
Further, the idler wheel is successively spaced uniformly along the axis of discharge hole, and with far from discharge hole, idler wheel
Outer diameter is sequentially increased.
The outer diameter of idler wheel is sequentially increased, so that height of the discharge port apart from ground is lower than discharge port one end separate in memory block
Height also reduced so that the concrete positioned at storage chamber bottom not only be enable to flow out from discharge hole under the effect of gravity
Power needed for pushing push plate, reduces the labor intensity of worker.
Further, the open end is provided with sequentially connected support plate and supports cylinder, it is separate in the support plate
One end of bearing cylinder is connect with memory block, and the axis of the bearing cylinder is overlapped with the axis of pushing ram, and supports the center on cylinder
Support plate is run through in hole, after one end of the pushing ram initially passes through centre bore and support plate, from open end insertion storage chamber, and
It is connect with one end in push plate far from discharge hole.
The setting of cylinder is supported, so that the free end of catch bar is only capable of moving along the axis of bearing cylinder when pushing push plate,
Protect the connecting portion between catch bar and push plate.
Further, one end on the side wall of the memory block far from bottom surface is provided with the charging being connected to storage chamber
Hole is provided with blocking in feed opening.
When concrete is fitted into storage chamber, it can charge from discharge port, but in the present invention, preferably from feed opening
Middle feeding.
Compared with prior art, the present invention having the following advantages and benefits:
1, the present invention is applied to the quetsch of wall, and a layer concrete can not only be rapidly laid at the top of wall, is mentioned
High working efficiency, without worker, feeding is smeared from concrete bucket repeatedly, and the concrete layer thickness that the present invention is laid with is equal
It is even, the Level-adjusting of wall body brick upper surface is carried out without Reusability horizontal ruler, while the side wall of wall body brick will not be routed to
On;
2, the present invention is applied to the quetsch of wall, and the setting of push plate can be successfully by the concrete in storage chamber cavity wall
It strikes off, avoids the waste of concrete;
3, the present invention is applied to the quetsch of wall, supports the setting of cylinder, so that catch bar hangs when pushing push plate
Dead end is only capable of moving along the axis of bearing cylinder, protects the connecting portion between catch bar and push plate.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application
Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram when present invention looks up;
Fig. 3 is cross-sectional view of the invention.
Label and corresponding parts title in attached drawing:
1- memory block, 2- storage chamber, 3- discharge hole, 4- idler wheel, 5- pushing ram, 6- sealing ring, 7- push plate, 8- support plate,
9- supports cylinder, 10- blocking.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made
For limitation of the invention.
Embodiment 1
As shown in Figure 1-Figure 3, the present invention is applied to the quetsch of wall, including memory block 1, in the memory block 1
It is internally provided with the storage chamber 2 for concrete, one end on the side side wall of memory block 1 close to bottom surface is provided with and stores
The discharge hole 3 that chamber 2 is connected to, one end in the storage chamber 2 far from discharge hole 3 is in communication with the outside to form open end, and is storing
One end on chamber 2 far from discharge hole 3 is provided with sequentially connected push plate 7 and pushing ram 5, and the push plate 7 is located in storage chamber 2,
Perpendicular to the axis of discharge hole 3, the axis of the pushing ram 5 is parallel to discharge hole 3 for push plate 7, and one end is deposited from open end insertion
It in storage chamber 2, and is connect with one end in push plate 7 far from discharge hole 3, sealing ring 6 is arranged on the side wall of push plate 7, it is described close
The axis of seal 6 is parallel to the axis of discharge hole 3, and the outer wall of sealing ring 6 is contacted with the cavity wall of storage chamber 2, and sealing ring 6 is in
Compressive state, to discharge hole 3 push push plate 7 can make to be located in storage chamber 2 and fluid between push plate 7 and discharge hole 3 from
It is flowed out in discharge hole 3.
It is every built one layer of wall body brick after, first concrete is fitted into storage chamber 2, then the present invention is erected at and is being repaired
The top for the wall built, and make to contact at the top of the bottom of memory block 1 and wall, the axis of discharge port 3 is parallel to the wall of wall
Then face pulls memory block 1, move memory block 1 to one end far from discharge hole 3 along wall, meanwhile, it is pushed away to discharge hole 3
Dynamic catch bar 5, with the spacing reduced between push plate 7 and discharge hole 3, so that concrete is released from discharge hole 3, while with
The movement of memory block 1, the concrete in storage chamber 2 is at the top for being successively laid on the wall built, then successively
Wall body brick is put on the concrete top being just laid with, carries out the build of wall.
A layer concrete can not only be rapidly laid at the top of wall through the invention, is improved work efficiency, work is not necessarily to
People repeatedly smear from concrete bucket by feeding, and the concrete layer thickness that the present invention is laid with is uniform, horizontal without Reusability
Ruler carries out the Level-adjusting of wall body brick upper surface, while will not be routed on the side wall of wall body brick.
The setting of push plate 7 can successfully strike off the concrete in 2 cavity wall of storage chamber, avoid the waste of concrete.
Further, several idler wheels 4 are provided on the bottom surface of memory block 1, the respective rotation axis of the idler wheel 4 hangs down
Directly in the axis of discharge hole 3 and it is parallel to the bottom surface of memory block 1.
Sliding friction between memory block 1 and wall is become rolling friction by the setting of idler wheel 4, is reduced frictional force and is rubbed
It wears consumption.
Further, the idler wheel 4 is successively spaced uniformly along the axis of discharge hole 3, and with far from discharge hole 3, rolling
The outer diameter of wheel 4 is sequentially increased.
The outer diameter of idler wheel 4 is sequentially increased, so that height of the discharge port 3 apart from ground is lower than discharge port 3 separate in memory block 1
The height of one end, to not only enable the concrete positioned at 2 bottom of storage chamber flow out from discharge hole 3 under the effect of gravity, also
Power needed for pushing push plate 7 is reduced, the labor intensity of worker is reduced.
Further, the open end is provided with sequentially connected support plate 8 and supports cylinder 9, it is remote in the support plate 8
One end from bearing cylinder 9 is connect with memory block 1, and the axis of the bearing cylinder 9 is overlapped with the axis of pushing ram 5, and is supported on cylinder 9
Centre bore run through support plate 8, after one end of the pushing ram 5 initially passes through centre bore and support plate 8, from open end insertion deposit
In storage chamber 2, and it is connect with one end in push plate 7 far from discharge hole 3.
The setting of cylinder 9 is supported, so that the free end of catch bar 5 is only capable of the axis along bearing cylinder 9 when pushing push plate 7
It is mobile, protect the connecting portion between catch bar 5 and push plate 7.
Further, one end on the side wall of the memory block 1 far from bottom surface is provided with the charging being connected to storage chamber 2
Hole is provided with blocking 10 in feed opening.
When concrete is fitted into storage chamber 2, it can charge from discharge port, but in the present invention, preferably from charging
Feeding in hole.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects
It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention
Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include
Within protection scope of the present invention.
Claims (5)
1. being applied to the quetsch of wall, it is characterised in that: including memory block (1), be arranged in the inside of the memory block (1)
There is the storage chamber (2) for concrete, one end on the side side wall of memory block (1) close to bottom surface is provided with and storage chamber
(2) discharge hole (3) being connected to, one end on the storage chamber (2) far from discharge hole (3) are in communication with the outside to form open end, and
One end on storage chamber (2) far from discharge hole (3) is provided with sequentially connected push plate (7) and pushing ram (5), the push plate
(7) it is located in storage chamber (2), perpendicular to the axis of discharge hole (3), the axis of the pushing ram (5) is parallel to discharging for push plate (7)
Hole (3), one end connect from open end insertion storage chamber (2), and with one end on push plate (7) far from discharge hole (3), are pushing away
It is arranged on the side wall of plate (7) sealing ring (6), the axis of the sealing ring (6) is parallel to the axis of discharge hole (3), and seals
The outer wall of circle (6) is contacted with the cavity wall of storage chamber (2), and sealing ring (6) is in compressive state, pushes push plate (7) to discharge hole (3)
It can make to be located in storage chamber (2) and the fluid between push plate (7) and discharge hole (3) is flowed out from discharge hole (3).
2. the quetsch according to claim 1 applied to wall, it is characterised in that: on the bottom surface of memory block (1)
It is provided with several idler wheels (4), the respective rotation axis of the idler wheel (4) is deposited perpendicular to the axis and being parallel to of discharge hole (3)
Store up the bottom surface of block (1).
3. the quetsch according to claim 2 applied to wall, it is characterised in that: the idler wheel (4) is along discharging
The axis in hole (3) is successively spaced uniformly, and as the outer diameter far from discharge hole (3), idler wheel (4) is sequentially increased.
4. the quetsch according to claim 1 applied to wall, it is characterised in that: the open end be provided with according to
The support plate (8) of secondary connection and bearing cylinder (9), one end and memory block (1) on the support plate (8) far from bearing cylinder (9) are even
It connects, the axis of bearing cylinder (9) is overlapped with the axis of pushing ram (5), and is supported the centre bore on cylinder (9) and run through support plate
(8), after one end of the pushing ram (5) initially passes through centre bore and support plate (8), from open end insertion storage chamber (2), and
It is connect with one end on push plate (7) far from discharge hole (3).
5. the quetsch according to claim 1 applied to wall, it is characterised in that: in the side of the memory block (1)
One end on wall far from bottom surface is provided with the feed opening being connected to storage chamber (2), and blocking (10) are provided in feed opening.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810348699.9A CN110388057A (en) | 2018-04-18 | 2018-04-18 | Quetsch applied to wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810348699.9A CN110388057A (en) | 2018-04-18 | 2018-04-18 | Quetsch applied to wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110388057A true CN110388057A (en) | 2019-10-29 |
Family
ID=68283763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810348699.9A Withdrawn CN110388057A (en) | 2018-04-18 | 2018-04-18 | Quetsch applied to wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110388057A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111456442A (en) * | 2020-04-22 | 2020-07-28 | 四川省商业建设有限责任公司 | Pore grouting auxiliary device and grouting process |
-
2018
- 2018-04-18 CN CN201810348699.9A patent/CN110388057A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111456442A (en) * | 2020-04-22 | 2020-07-28 | 四川省商业建设有限责任公司 | Pore grouting auxiliary device and grouting process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201649671U (en) | Sliding device for fixed synchronous type rotary sliding construction | |
CN102535823A (en) | Flat jet flow nozzle and special coating machine | |
CN110388057A (en) | Quetsch applied to wall | |
CN101892860A (en) | Method for entry retaining for walling at sides of road in steel cylinder support mode | |
CN202441038U (en) | Flat jet flow nozzle and dedicated coating machine | |
CN207348604U (en) | Light steel barracks enclosure wall of quick installation | |
CN110388071A (en) | Cement slurry method for sizing applied to wall | |
CN203664088U (en) | Spraying and powder recycling device for epoxy coated steel bars | |
CN110388068A (en) | Improve the device that wall builds efficiency | |
CN216380601U (en) | Movable concrete pouring chute device | |
CN103394427B (en) | A kind of spray equipment of magnesium phosphate protective materials and spraying method | |
CN205857636U (en) | A kind of Mortar spraying machine with elevating function | |
CN110388072A (en) | Improve the method that wall builds efficiency | |
CN113718790B (en) | Combined sand box unloading device | |
CN204510861U (en) | Whole building mobile route ground anti-settling structure | |
CN212556331U (en) | Movable tool type material stacking and transporting device | |
CN204080821U (en) | A kind of steel work foundation ditch support replacement device | |
CN210195773U (en) | Steel mould trolley grouting device for rock wall grouting | |
CN103967208B (en) | The light steel of Z-section-timber with small diameter combination bearing column and making method | |
CN209395846U (en) | Handling device for building site | |
CN110388069A (en) | Build wall slurry spreading device | |
CN110388070A (en) | Improve the method that wall builds quality | |
CN208619107U (en) | A kind of coal mine shaft lining shaft wall structure | |
CN103541743A (en) | Uniform friction device of concrete injection machine rubber friction block | |
CN204266209U (en) | Compound bamboo tube stone pile for foundation pit supporting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191029 |