CN110362362A - Method for scheduling task and device, storage medium, electronic device - Google Patents
Method for scheduling task and device, storage medium, electronic device Download PDFInfo
- Publication number
- CN110362362A CN110362362A CN201910672920.0A CN201910672920A CN110362362A CN 110362362 A CN110362362 A CN 110362362A CN 201910672920 A CN201910672920 A CN 201910672920A CN 110362362 A CN110362362 A CN 110362362A
- Authority
- CN
- China
- Prior art keywords
- task
- scheduling system
- operating status
- case
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/445—Program loading or initiating
- G06F9/44505—Configuring for program initiating, e.g. using registry, configuration files
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
Abstract
The present invention provides a kind of method for scheduling task and device, storage medium, electronic devices, this method comprises: in the case where being restarted after determining that task scheduling system exits extremely, Detection task dispatches the operating status of the task after system restarts in database, wherein, task scheduling system is used for scheduler task, database is connect with task scheduling system, is used for store tasks;Task is scheduled according to the operating status of task.Through the invention, it solves after task scheduling system exits extremely and restarts task, achieve the effect that the availability of raising task.
Description
Technical field
The present invention relates to computer fields, in particular to a kind of method for scheduling task and device, storage medium, electricity
Sub-device.
Background technique
Existing task scheduling system has the dispatching of single task and periodic task, but suffers from one altogether
The abnormal cases such as the defect of property, exactly exits task dispatch extremely, and machine crashes suddenly, and computer room powers off suddenly it is fault-tolerant
Ability is poor.So that after disaster generation, after task scheduling system is restarted, task status entanglement and task execution situation with appoint
Situations such as business state does not correspond to generates.
In view of the above technical problems, it not yet puts forward effective solutions in the related technology.
Summary of the invention
The embodiment of the invention provides a kind of method for scheduling task and device, storage medium, electronic devices, at least to solve
The problem of task is restarted after task scheduling system exits extremely in the related technology.
According to one embodiment of present invention, a kind of method for scheduling task is provided, comprising: determining task scheduling system
In the case that exception restarts after exiting, the operation of the task after above-mentioned task scheduling system restarts in database is detected
State, wherein for dispatching above-mentioned task, above-mentioned database is connect above-mentioned task scheduling system with above-mentioned task scheduling system,
For storing above-mentioned task;Above-mentioned task is scheduled according to the operating status of above-mentioned task.
Optionally, in the case where restarting after determining that task scheduling system exits extremely, above-mentioned task schedule is detected
The operating status of task after system restarting in database, comprising: after determining that task scheduling system exits extremely again
In the case where starting, the program file of the task of the storage in above-mentioned database is detected;Occur in the program file of above-mentioned task
In the case where variation, it is abnormal to determine that the operating status of above-mentioned task occurs.
Optionally, above-mentioned task is scheduled according to the operating status of above-mentioned task, comprising: be in fortune in above-mentioned task
In the case where capable state, it is abnormal to determine that above-mentioned task occurs;Restart above-mentioned task.
Optionally, above-mentioned task is scheduled according to the operating status of above-mentioned task, comprising: be in fortune in above-mentioned task
In the case where capable state, it is abnormal to determine that above-mentioned task occurs;Restart above-mentioned task.
Optionally, above-mentioned task is scheduled according to the operating status of above-mentioned task, comprising: be in above-mentioned task etc.
In the case where state to be run, by above-mentioned task schedule to task waiting list, so that above-mentioned task is waited in above-mentioned task dispatching
It is waited in queue scheduled.
Optionally, above-mentioned task is scheduled according to the operating status of above-mentioned task, comprising: be in above-mentioned task etc.
In the case where state to be run, by above-mentioned task schedule to task waiting list, so that above-mentioned task is waited in above-mentioned task dispatching
It is waited in queue scheduled.
According to another embodiment of the invention, a kind of task scheduling apparatus is provided, comprising: first detection module is used
After in the case where restarting after determining that task scheduling system exits extremely, detecting above-mentioned task scheduling system restarting
The operating status of task in database, wherein above-mentioned task scheduling system for dispatching above-mentioned task, above-mentioned database with it is upper
Task scheduling system connection is stated, for storing above-mentioned task;First scheduler module, for the operating status pair according to above-mentioned task
Above-mentioned task is scheduled.
According to still another embodiment of the invention, a kind of storage medium is additionally provided, meter is stored in the storage medium
Calculation machine program, wherein the computer program is arranged to execute the step in any of the above-described embodiment of the method when operation.
According to still another embodiment of the invention, a kind of electronic device, including memory and processor are additionally provided, it is described
Computer program is stored in memory, the processor is arranged to run the computer program to execute any of the above-described
Step in embodiment of the method.
Through the invention, due to after determining that task scheduling system exits extremely restart in the case where, Detection task
The operating status of task after the restarting of scheduling system in database, wherein task scheduling system is used for scheduler task, data
Library is connect with task scheduling system, is used for store tasks;Task is scheduled according to the operating status of task.It therefore, can be with
It solves to restart task after task scheduling system exits extremely, achievees the effect that the availability of raising task.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair
Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of hardware block diagram of the mobile terminal of method for scheduling task of the embodiment of the present invention;
Fig. 2 is the flow chart of method for scheduling task according to an embodiment of the present invention;
Fig. 3 is the overall flow figure of the alternative embodiment in the present embodiment;
Fig. 4 is the structural block diagram of task scheduling apparatus according to an embodiment of the present invention.
Specific embodiment
Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and in combination with Examples.It should be noted that not conflicting
In the case of, the features in the embodiments and the embodiments of the present application can be combined with each other.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.
Embodiment of the method provided by the embodiment of the present application can be in mobile terminal, terminal or similar operation
It is executed in device.For running on mobile terminals, Fig. 1 is a kind of mobile end of method for scheduling task of the embodiment of the present invention
The hardware block diagram at end.As shown in Figure 1, mobile terminal 10 may include one or more (only showing one in Fig. 1) processing
Device 102 (processing unit that processor 102 can include but is not limited to Micro-processor MCV or programmable logic device FPGA etc.) and
Memory 104 for storing data, optionally, above-mentioned mobile terminal can also include the transmission device for communication function
106 and input-output equipment 108.It will appreciated by the skilled person that structure shown in FIG. 1 is only to illustrate, simultaneously
The structure of above-mentioned mobile terminal is not caused to limit.For example, mobile terminal 10 may also include it is more than shown in Fig. 1 or less
Component, or with the configuration different from shown in Fig. 1.
Memory 104 can be used for storing computer program, for example, the software program and module of application software, such as this hair
The corresponding computer program of method for scheduling task in bright embodiment, processor 102 are stored in memory 104 by operation
Computer program realizes above-mentioned method thereby executing various function application and data processing.Memory 104 may include
High speed random access memory, may also include nonvolatile memory, as one or more magnetic storage device, flash memory or its
His non-volatile solid state memory.In some instances, memory 104 can further comprise remotely setting relative to processor 102
The memory set, these remote memories can pass through network connection to mobile terminal 10.The example of above-mentioned network includes but not
It is limited to internet, intranet, local area network, mobile radio communication and combinations thereof.
Transmitting device 106 is used to that data to be received or sent via a network.Above-mentioned network specific example may include
The wireless network that the communication providers of mobile terminal 10 provide.In an example, transmitting device 106 includes a Network adaptation
Device (Network Interface Controller, referred to as NIC), can be connected by base station with other network equipments to
It can be communicated with internet.In an example, transmitting device 106 can for radio frequency (Radio Frequency, referred to as
RF) module is used to wirelessly be communicated with internet.
A kind of method for scheduling task is provided in the present embodiment, and Fig. 2 is task schedule side according to an embodiment of the present invention
The flow chart of method, as shown in Fig. 2, the process includes the following steps:
Step S202, in the case where being restarted after determining that task scheduling system exits extremely, Detection task scheduling system
The operating status of task after system restarting in database, wherein task scheduling system is used for scheduler task, database with appoint
Scheduling system of being engaged in connection, is used for store tasks;
Step S204 is scheduled task according to the operating status of task.
Through the above steps, since in the case where restarting after determining that task scheduling system exits extremely, detection is appointed
The operating status of task after scheduling system of being engaged in restarting in database, wherein task scheduling system is used for scheduler task, number
It is connect according to library with task scheduling system, is used for store tasks;Task is scheduled according to the operating status of task.It realizes and appoints
The purpose of the operating status starting task of business.Therefore, it can solve after task scheduling system exits extremely and restart task, reach
To the effect of the availability of the task of raising.
Optionally, the executing subject of above-mentioned steps can be terminal etc., but not limited to this.
Optionally, in the present embodiment, the method for scheduling task of above-mentioned picture can be, but not limited to be applied to task
In the scene of scheduling.Wherein, task scheduling system can be, but not limited to the systems for falling on the ground function with task to be various, for example,
Window Windows system, linux system etc..Specifically, can be, but not limited in the scene for being applied to restart Windows system,
Or can with but be not limited to be applied to from the scene of new starting linux system, to improve the availability of task.Above-mentioned is only one
Example is planted, does not do any restriction to this in the present embodiment.
Optionally, in the present embodiment, task includes but is not limited to application program, such as: browser, music software, view
Frequency software etc..
Optionally, task scheduling system exits including but not limited to that machine crashes suddenly, computer room powers off suddenly extremely.
In an alternative embodiment, in the case where being restarted after determining that task scheduling system exits extremely, inspection
Survey the operating status of the task after task scheduling system restarts in database, comprising:
S1, in the case where being restarted after determining that task scheduling system exits extremely, storage in Test database
The program file of task;
It is abnormal to determine that the operating status of task occurs in the case where the program file of task changes by S2.
Optionally, in the present embodiment, the program file of task includes but is not limited to the program for being starting task, for example,
Script file in program file etc..
Through this embodiment, it whether abnormal is gone out on missions, can accurately be determined by the detection determination to program file
The state of task.
In an alternative embodiment, task is scheduled according to the operating status of task, comprising:
It is abnormal to determine that task occurs in the case where task is in the state of operation by S1;
S2 restarts task.
Optionally, in the present embodiment, task is determined in the case where running background, and it is abnormal to determine that task occurs.
Through this embodiment, by restarting task in operating status, it is ensured that improve task scheduling system
Redundancy ability and task availability.
In an alternative embodiment, task is scheduled according to the operating status of task, comprising:
It is abnormal to determine that task occurs in the case where task is in the state of operation by S1;
S2 restarts task.
Optionally, in the present embodiment, in the case where exception occurs in task, task status in database is revised as different
Often, task is restarted manually.Task in operating status includes but is not limited to the program in running background.
Through this embodiment, by restarting task in operating status, it is ensured that improve task scheduling system
Redundancy ability and task availability.
In an alternative embodiment, task is scheduled according to the operating status of task, comprising:
S1, in the case where task is in the state for waiting operation, by task schedule to task waiting list, so that task
It is waited in task waiting list scheduled.
Optionally, in the present embodiment, when being restarted after task scheduling system exits extremely, appointing in waiting list
The startup program of business has been destroyed, and can not normally be started, if continued in task waiting list, will not be activated, be accounted for
Use resource.
Through this embodiment, by will be in wait operation state task reschedule into task waiting list into
Row scheduling, improves the availability of task and the efficiency of task start.
In an alternative embodiment, task is scheduled according to the operating status of task, comprising:
S1 restarts the periodic scheduling thread of periodic duty in the case where task is periodic duty, so that the period appoints
Business is periodically dispatched.
Optionally, in the present embodiment, periodic duty includes but is not limited to being period starting of the task, for example, antivirus journey
Sequence etc..
Through this embodiment, by the scheduling of the scheduling thread to periodic duty, normally opening for periodic duty may be implemented
It is dynamic.
Fig. 3 is the overall flow figure of the alternative embodiment in the present embodiment, comprising the following steps:
S301: Server Restart checks the operating status of all existing tasks.
S302: being exception by all running task flaggings, these tasks need manually to restart operation.
S303: to all waiting tasks, program is automatically added to waiting list, and program scheduler is waited to execute.
S304: periodic task, program restore periodic scheduling thread automatically and carry out periodic scheduling execution to task.
S305: terminate.
In conclusion the task detection and task after being restarted by task scheduling system restore logic automatically, improves and appoint
The redundancy ability for scheduling system of being engaged in and the availability of program.
Through the above description of the embodiments, those skilled in the art can be understood that according to above-mentioned implementation
The method of example can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but it is very much
In the case of the former be more preferably embodiment.Based on this understanding, technical solution of the present invention is substantially in other words to existing
The part that technology contributes can be embodied in the form of software products, which is stored in a storage
In medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal device (can be mobile phone, calculate
Machine, server or network equipment etc.) execute method described in each embodiment of the present invention.
A kind of task scheduling apparatus is additionally provided in the present embodiment, and the device is real for realizing above-described embodiment and preferably
Mode is applied, the descriptions that have already been made will not be repeated.As used below, the soft of predetermined function may be implemented in term " module "
The combination of part and/or hardware.Although device described in following embodiment is preferably realized with software, hardware, or
The realization of the combination of software and hardware is also that may and be contemplated.
Fig. 4 is the structural block diagram of task scheduling apparatus according to an embodiment of the present invention, as shown in figure 4, the device includes:
First detection module 42, for detecting in the case where being restarted after determining that task scheduling system exits extremely
The operating status of task after task scheduling system restarting in database, wherein task scheduling system is used for scheduler task,
Database is connect with task scheduling system, is used for store tasks;
First scheduler module 44, for being scheduled according to the operating status of task to task.
Through the invention, due to after determining that task scheduling system exits extremely restart in the case where, Detection task
The operating status of task after the restarting of scheduling system in database, wherein task scheduling system is used for scheduler task, data
Library is connect with task scheduling system, is used for store tasks;Task is scheduled according to the operating status of task.Realization and task
Operating status starting task purpose.Therefore, it can solve after task scheduling system exits extremely and restart task, reach
The effect of the availability of raising task.
Optionally, in the present embodiment, the method for scheduling task of above-mentioned picture can be, but not limited to be applied to task
In the scene of scheduling.Wherein, task scheduling system can be, but not limited to the systems for falling on the ground function with task to be various, for example,
Window Windows system, linux system etc..Specifically, can be, but not limited in the scene for being applied to restart Windows system,
Or can with but be not limited to be applied to from the scene of new starting linux system, to improve the availability of task.Above-mentioned is only one
Example is planted, does not do any restriction to this in the present embodiment.
Optionally, in the present embodiment, task includes but is not limited to application program, such as: browser, music software, view
Frequency software etc..
Optionally, task scheduling system exits including but not limited to that machine crashes suddenly, computer room powers off suddenly extremely.
In an alternative embodiment, first detection module 42, comprising:
First detection unit, for after determining that task scheduling system exits extremely restart in the case where, testing number
According to the program file of the task of the storage in library;
First determination unit, for determining the operating status of task in the case where the program file of task changes
Occur abnormal.
Optionally, in the present embodiment, the program file of task includes but is not limited to the program for being starting task, for example,
Script file in program file etc..
Through this embodiment, it whether abnormal is gone out on missions, can accurately be determined by the detection determination to program file
The state of task.
In an alternative embodiment, the first scheduler module 44, comprising:
In the case where for being in the state of operation in task, it is abnormal to determine that task occurs for second determination unit;
First start unit, for restarting task.
Optionally, in the present embodiment, task is determined in the case where running background, and it is abnormal to determine that task occurs.
Through this embodiment, by restarting task in operating status, it is ensured that improve task scheduling system
Redundancy ability and task availability.
In an alternative embodiment, the first scheduler module 44, comprising:
In the case where for being in the state of operation in task, it is abnormal to determine that task occurs for third determination unit;
Second start unit, for restarting task.
Optionally, in the present embodiment, in the case where exception occurs in task, task status in database is revised as different
Often, task is restarted manually.Task in operating status includes but is not limited to the program in running background.
Through this embodiment, by restarting task in operating status, it is ensured that improve task scheduling system
Redundancy ability and task availability.
In an alternative embodiment, the first scheduler module 44, comprising:
First scheduling unit, in the case where for being in the state of waiting operation in task, by task schedule to task dispatching
To queue, it is scheduled so that task waits in task waiting list.
Optionally, in the present embodiment, when being restarted after task scheduling system exits extremely, appointing in waiting list
The startup program of business has been destroyed, and can not normally be started, if continued in task waiting list, will not be activated, be accounted for
Use resource.
Through this embodiment, by will be in wait operation state task reschedule into task waiting list into
Row scheduling, improves the availability of task and the efficiency of task start.
In an alternative embodiment, the first scheduler module 44, comprising:
Third start unit, for restarting the periodic scheduling of periodic duty in the case where task is periodic duty
Thread, so that periodic duty is periodically dispatched.
Optionally, in the present embodiment, periodic duty includes but is not limited to being period starting of the task, for example, antivirus journey
Sequence etc..
Through this embodiment, by the scheduling of the scheduling thread to periodic duty, normally opening for periodic duty may be implemented
It is dynamic.
It should be noted that above-mentioned modules can be realized by software or hardware, for the latter, Ke Yitong
Following manner realization is crossed, but not limited to this: above-mentioned module is respectively positioned in same processor;Alternatively, above-mentioned modules are with any
Combined form is located in different processors.
The embodiments of the present invention also provide a kind of storage medium, computer program is stored in the storage medium, wherein
The computer program is arranged to execute the step in any of the above-described embodiment of the method when operation.
Optionally, in the present embodiment, above-mentioned storage medium can be set to store by executing based on following steps
Calculation machine program:
S1, in the case where restarting after determining that task scheduling system exits extremely, Detection task dispatches system again
The operating status of task after starting in database, wherein task scheduling system is used for scheduler task, database and task schedule
System connection, is used for store tasks;
S2 is scheduled task according to the operating status of task.
Optionally, in the present embodiment, above-mentioned storage medium can include but is not limited to: USB flash disk, read-only memory (Read-
Only Memory, referred to as ROM), it is random access memory (Random Access Memory, referred to as RAM), mobile hard
The various media that can store computer program such as disk, magnetic or disk.
The embodiments of the present invention also provide a kind of electronic device, including memory and processor, stored in the memory
There is computer program, which is arranged to run computer program to execute the step in any of the above-described embodiment of the method
Suddenly.
Optionally, above-mentioned electronic device can also include transmission device and input-output equipment, wherein the transmission device
It is connected with above-mentioned processor, which connects with above-mentioned processor.
Optionally, in the present embodiment, above-mentioned processor can be set to execute following steps by computer program:
S1, in the case where restarting after determining that task scheduling system exits extremely, Detection task dispatches system again
The operating status of task after starting in database, wherein task scheduling system is used for scheduler task, database and task schedule
System connection, is used for store tasks;
S2 is scheduled task according to the operating status of task.
Optionally, the specific example in the present embodiment can be with reference to described in above-described embodiment and optional embodiment
Example, details are not described herein for the present embodiment.
Obviously, those skilled in the art should be understood that each module of the above invention or each step can be with general
Computing device realize that they can be concentrated on a single computing device, or be distributed in multiple computing devices and formed
Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored
It is performed by computing device in the storage device, and in some cases, it can be to be different from shown in sequence execution herein
Out or description the step of, perhaps they are fabricated to each integrated circuit modules or by them multiple modules or
Step is fabricated to single integrated circuit module to realize.In this way, the present invention is not limited to any specific hardware and softwares to combine.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.It is all within principle of the invention, it is made it is any modification, etc.
With replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (8)
1. a kind of method for scheduling task characterized by comprising
In the case where restarting after determining that task scheduling system exits extremely, the task scheduling system restarting is detected
The operating status of task in database afterwards, wherein the task scheduling system for dispatching the task, the database with
The task scheduling system connection, for storing the task;
The task is scheduled according to the operating status of the task.
2. the method according to claim 1, wherein being restarted after determining that task scheduling system exits extremely
In the case where, detect the operating status of the task after the task scheduling system restarts in database, comprising:
In the case where restarting after determining that task scheduling system exits extremely, the task of the storage in the database is detected
Program file;
In the case where the program file of the task changes, it is abnormal to determine that the operating status of the task occurs.
3. the method according to claim 1, wherein the operating status according to the task carries out the task
Scheduling, comprising:
In the case where the task is in the state of operation, it is abnormal to determine that the task occurs;
Restart the task.
4. the method according to claim 1, wherein the operating status according to the task carries out the task
Scheduling, comprising:
In the case where the task is in the state of operation, it is abnormal to determine that the task occurs;
Restart the task.
5. the method according to claim 1, wherein the operating status according to the task carries out the task
Scheduling, comprising:
In the case where the task is in the state for waiting operation, by the task schedule to task waiting list, so that institute
State task waited in the task waiting list it is scheduled.
6. a kind of task scheduling apparatus characterized by comprising
First detection module, for appointing described in detection in the case where being restarted after determining that task scheduling system exits extremely
The operating status of task after scheduling system of being engaged in restarting in database, wherein the task scheduling system is for dispatching institute
Task is stated, the database is connect with the task scheduling system, for storing the task;
First scheduler module is scheduled the task for the operating status according to the task.
7. a kind of storage medium, which is characterized in that be stored with computer program in the storage medium, wherein the computer
Program is arranged to execute method described in any one of claim 1 to 5 when operation.
8. a kind of electronic device, including memory and processor, which is characterized in that be stored with computer journey in the memory
Sequence, the processor are arranged to run the computer program to execute side described in any one of claim 1 to 5
Method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672920.0A CN110362362A (en) | 2019-07-24 | 2019-07-24 | Method for scheduling task and device, storage medium, electronic device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910672920.0A CN110362362A (en) | 2019-07-24 | 2019-07-24 | Method for scheduling task and device, storage medium, electronic device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110362362A true CN110362362A (en) | 2019-10-22 |
Family
ID=68220062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910672920.0A Pending CN110362362A (en) | 2019-07-24 | 2019-07-24 | Method for scheduling task and device, storage medium, electronic device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110362362A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111913796A (en) * | 2020-08-12 | 2020-11-10 | 杭州安恒信息技术股份有限公司 | Method for generating time interval of delay scheduling of off-line system and delay scheduling method |
CN112667384A (en) * | 2020-12-31 | 2021-04-16 | 青岛海尔科技有限公司 | Task flow scheduling method, device, storage medium and electronic device |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060167951A1 (en) * | 2005-01-21 | 2006-07-27 | Vertes Marc P | Semantic management method for logging or replaying non-deterministic operations within the execution of an application process |
CN102981904A (en) * | 2011-09-02 | 2013-03-20 | 阿里巴巴集团控股有限公司 | Task scheduling method and system |
CN103139245A (en) * | 2011-11-25 | 2013-06-05 | 中兴通讯股份有限公司 | Method and device for updating network elements |
CN103309733A (en) * | 2013-06-07 | 2013-09-18 | 深圳中兴网信科技有限公司 | Task scheduling information persistence device and task scheduling information persistence method |
CN103716182A (en) * | 2013-12-12 | 2014-04-09 | 中国科学院信息工程研究所 | Failure detection and fault tolerance method and failure detection and fault tolerance system for real-time cloud platform |
CN103942034A (en) * | 2014-03-21 | 2014-07-23 | 深圳华大基因科技服务有限公司 | Task scheduling method and electronic device implementing method |
CN104346215A (en) * | 2013-08-07 | 2015-02-11 | 中兴通讯股份有限公司 | Task scheduling service system and method |
CN104410698A (en) * | 2014-12-03 | 2015-03-11 | 天津南大通用数据技术股份有限公司 | Initiation node abnormity processing method and device of share nothing cluster |
CN104462370A (en) * | 2014-12-09 | 2015-03-25 | 北京百度网讯科技有限公司 | Distributed task scheduling system and method |
US20170090824A1 (en) * | 2015-09-24 | 2017-03-30 | International Business Machines Corporation | Layered queue based coordination of potentially destructive actions in a dispersed storage network memory |
CN107016479A (en) * | 2016-01-28 | 2017-08-04 | 五八同城信息技术有限公司 | Task scheduling and managing method, apparatus and system |
US20170255473A1 (en) * | 2016-03-02 | 2017-09-07 | Amplidata N.V. | Non-Intrusive Restart of a Task Manager |
CN107704314A (en) * | 2017-11-09 | 2018-02-16 | 北京百度网讯科技有限公司 | Method and apparatus for migrating virtual machine |
US20180260240A1 (en) * | 2013-05-17 | 2018-09-13 | Coherent Logix, Incorporated | Dynamic Reconfiguration of Applications on a Multi-Processor Embedded System |
CN108829533A (en) * | 2018-05-22 | 2018-11-16 | 中国科学技术大学苏州研究院 | A kind of fault-tolerance detection method of intelligent computer systems |
CN108833131A (en) * | 2018-04-25 | 2018-11-16 | 北京百度网讯科技有限公司 | System, method, equipment and the computer storage medium of distributed data base cloud service |
US20180349179A1 (en) * | 2017-05-31 | 2018-12-06 | Linkedin Corporation | Centralized flexible deployment system |
US20190132203A1 (en) * | 2017-10-31 | 2019-05-02 | Myndshft Technologies, Inc. | System and method for configuring an adaptive computing cluster |
CN109814991A (en) * | 2018-12-25 | 2019-05-28 | 北京明略软件系统有限公司 | A kind of data administer in task management method and device |
-
2019
- 2019-07-24 CN CN201910672920.0A patent/CN110362362A/en active Pending
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060167951A1 (en) * | 2005-01-21 | 2006-07-27 | Vertes Marc P | Semantic management method for logging or replaying non-deterministic operations within the execution of an application process |
CN102981904A (en) * | 2011-09-02 | 2013-03-20 | 阿里巴巴集团控股有限公司 | Task scheduling method and system |
CN103139245A (en) * | 2011-11-25 | 2013-06-05 | 中兴通讯股份有限公司 | Method and device for updating network elements |
US20180260240A1 (en) * | 2013-05-17 | 2018-09-13 | Coherent Logix, Incorporated | Dynamic Reconfiguration of Applications on a Multi-Processor Embedded System |
CN103309733A (en) * | 2013-06-07 | 2013-09-18 | 深圳中兴网信科技有限公司 | Task scheduling information persistence device and task scheduling information persistence method |
CN104346215A (en) * | 2013-08-07 | 2015-02-11 | 中兴通讯股份有限公司 | Task scheduling service system and method |
CN103716182A (en) * | 2013-12-12 | 2014-04-09 | 中国科学院信息工程研究所 | Failure detection and fault tolerance method and failure detection and fault tolerance system for real-time cloud platform |
CN103942034A (en) * | 2014-03-21 | 2014-07-23 | 深圳华大基因科技服务有限公司 | Task scheduling method and electronic device implementing method |
CN104410698A (en) * | 2014-12-03 | 2015-03-11 | 天津南大通用数据技术股份有限公司 | Initiation node abnormity processing method and device of share nothing cluster |
CN104462370A (en) * | 2014-12-09 | 2015-03-25 | 北京百度网讯科技有限公司 | Distributed task scheduling system and method |
US20170090824A1 (en) * | 2015-09-24 | 2017-03-30 | International Business Machines Corporation | Layered queue based coordination of potentially destructive actions in a dispersed storage network memory |
CN107016479A (en) * | 2016-01-28 | 2017-08-04 | 五八同城信息技术有限公司 | Task scheduling and managing method, apparatus and system |
US20170255473A1 (en) * | 2016-03-02 | 2017-09-07 | Amplidata N.V. | Non-Intrusive Restart of a Task Manager |
US20180349179A1 (en) * | 2017-05-31 | 2018-12-06 | Linkedin Corporation | Centralized flexible deployment system |
US20190132203A1 (en) * | 2017-10-31 | 2019-05-02 | Myndshft Technologies, Inc. | System and method for configuring an adaptive computing cluster |
CN107704314A (en) * | 2017-11-09 | 2018-02-16 | 北京百度网讯科技有限公司 | Method and apparatus for migrating virtual machine |
CN108833131A (en) * | 2018-04-25 | 2018-11-16 | 北京百度网讯科技有限公司 | System, method, equipment and the computer storage medium of distributed data base cloud service |
CN108829533A (en) * | 2018-05-22 | 2018-11-16 | 中国科学技术大学苏州研究院 | A kind of fault-tolerance detection method of intelligent computer systems |
CN109814991A (en) * | 2018-12-25 | 2019-05-28 | 北京明略软件系统有限公司 | A kind of data administer in task management method and device |
Non-Patent Citations (1)
Title |
---|
利尤: "《实时系统(翻译版)》", 31 December 2003, 高等教育出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111913796A (en) * | 2020-08-12 | 2020-11-10 | 杭州安恒信息技术股份有限公司 | Method for generating time interval of delay scheduling of off-line system and delay scheduling method |
CN111913796B (en) * | 2020-08-12 | 2024-03-26 | 杭州安恒信息技术股份有限公司 | Method for generating delay scheduling time interval of off-line system and delay scheduling method |
CN112667384A (en) * | 2020-12-31 | 2021-04-16 | 青岛海尔科技有限公司 | Task flow scheduling method, device, storage medium and electronic device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9329983B2 (en) | Computer program testing | |
US8954579B2 (en) | Transaction-level health monitoring of online services | |
CN112416581B (en) | Distributed calling system for timed tasks | |
CN108270837B (en) | Distributed task scheduling method and system using idle resources | |
US20160283356A1 (en) | Event-driven automation testing for mobile devices | |
CN110362362A (en) | Method for scheduling task and device, storage medium, electronic device | |
CN111526049B (en) | Operation and maintenance system, operation and maintenance method, electronic device and storage medium | |
WO2015131542A1 (en) | Data processing method, device and system | |
CN113382056A (en) | Data reporting method, device, equipment, storage medium and system | |
CN115328741A (en) | Exception handling method, device, equipment and storage medium | |
CN111611086A (en) | Information processing method, information processing apparatus, electronic device, and medium | |
CN113391902B (en) | Task scheduling method and device and storage medium | |
CN115981871B (en) | GPU resource scheduling method, device, equipment and storage medium | |
CN108829516B (en) | Resource virtualization scheduling method for graphic processor | |
CN115525568A (en) | Code coverage rate inspection method and device, computer equipment and storage medium | |
CN110764911A (en) | Resource scheduling method, device and control system based on order | |
CN115437766A (en) | Task processing method and device | |
US20220276901A1 (en) | Batch processing management | |
CN112181443B (en) | Automatic service deployment method and device and electronic equipment | |
CN112148420B (en) | Abnormal task processing method based on container technology, server and cloud platform | |
US10444744B1 (en) | Decoupled load generation architecture | |
CN111767125A (en) | Task execution method and device, electronic equipment and storage medium | |
CN110737572A (en) | Big data platform resource preemption test method, system, terminal and storage medium | |
WO2015037975A1 (en) | System and method for self-maintaining the cloud system | |
Lumpp et al. | Enabling Kubernetes Orchestration of Mixed-Criticality Software for Autonomous Mobile Robots |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20230929 |
|
AD01 | Patent right deemed abandoned |