CN110361053A - The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas - Google Patents

The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas Download PDF

Info

Publication number
CN110361053A
CN110361053A CN201910685676.1A CN201910685676A CN110361053A CN 110361053 A CN110361053 A CN 110361053A CN 201910685676 A CN201910685676 A CN 201910685676A CN 110361053 A CN110361053 A CN 110361053A
Authority
CN
China
Prior art keywords
exhaust gas
master controller
environmental protection
electricity consumption
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910685676.1A
Other languages
Chinese (zh)
Inventor
徐少晨
王杰
张玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Pilongtian Environmental Protection Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910685676.1A priority Critical patent/CN110361053A/en
Publication of CN110361053A publication Critical patent/CN110361053A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D7/00Indicating measured values
    • G01D7/02Indicating value of two or more variables simultaneously
    • G01D7/08Indicating value of two or more variables simultaneously using a common indicating element for two or more variables
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/17Function evaluation by approximation methods, e.g. inter- or extrapolation, smoothing, least mean square method

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computational Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Mathematical Physics (AREA)
  • Theoretical Computer Science (AREA)
  • Algebra (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

The linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas, comprising: environmental protection equipment operation detection unit, the first communication unit, master controller, exhaust gas monitor unit on-line, and the second communication unit produces total electricity consumption detection unit, control platform;The electric current of master controller monitoring power in environmental protection equipment, voltage and power consumption, master controller monitors the exhaust gas flow of exhaust gas on-line monitoring equipment operation, exhaust gas constituents and exhaust gas total displacement, master controller has memory and arithmetic unit, master controller stores the power information and exhaust gas information that the environmental protection equipment of acquisition is run into memory, arithmetic unit passes through operation, show that environmental protection facility electricity consumption accounts for the ratio of production total electricity consumption, and the ratio and exhaust gas on-line monitoring capacity are associated, and association results are wirelessly transmitted to control host by first communication module, it controls host and relevant information is shown environmental protection equipment operation conditions and exhaust gas on-line monitoring equipment operation conditions by monitor, and provide normal or warning.

Description

The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas
Technical background
Waste gas purification (Flue gas purification) is primarily referred to as the industrial waste gas generated for industrial site such as The work that dust particle, flue gas flue dust, gas with foreign flavor, toxic and harmful gas are administered.Common waste gas purification has factory Fume and exhaust gas purifying, workshop dust waste gas purification, organic waste-gas purification, the purification of exhaust gas peculiar smell, acid-base waste gas purifying, chemical emission Purification etc..Common industrial waste gas processing mainly passes through active carbon adsorption, Production by Catalytic Combustion Process, catalytic oxidation, acid-base neutralization The a variety of pairs of industrial tail gas such as method, plasma method are handled or are purified, and are then discharged by exhaust pipe or chimney.Industry Waste at present As long as the method that gas disposal is implemented has following several: (1) heat accumulating type heating power oxidation technology principle is to add organic exhaust gas (VOCs) Heat makes the VOCs oxygenolysis in exhaust gas at CO2 and H2O, aoxidizes the high-temperature gas of generation using ceramic honey comb to 760 DEG C or more Heat storage carries out energy storage, and is used to preheat the organic exhaust gas of subsequent entrance, when VOCs concentration reaches certain value in exhaust gas, System can not consume additional fuel and self-balancing (2) zeolite runner concentration+heat accumulating type heating power oxidation technology of reaction is maintained to use The VOCs exhaust gas of relatively middle low concentration, middle Wind Volume is condensed into the exhaust gas of smaller air quantity, high concentration by zeolite runner, is then introduced and is stored The oxidation of hot type heating power carries out high-temperature oxydation, and for regenerating zeolite runner, another part is used for the part energy generated after oxidation Maintain the self-balancing of heat accumulating type heating power oxidation reaction.(3) activated carbon adsorption+catalytic combustion process is using extraordinary cellular active carbon Adsorption cleaning, clean air high altitude discharge atmosphere are carried out to organic exhaust gas.Again by Catalytic oxidation furnace (280 400 DEG C) to suction The active carbon of attached saturation carries out parsing regeneration, and compared to tradition, individually activity may be reused in activated carbon adsorption purification, the technique Charcoal (avoids frequent replacement active carbon), is suitable for the operating conditions such as VOCs concentration is lower, production status is discontinuous, has adsorbance Greatly, the advantages that treatment effeciency is high.(4) photocatalysis/low-temperature plasma, non-thermal plasma trap are to puncture gas by electrion Body, a kind of technology at normal temperature decomposing VOCs;Photocatalysis technology is irradiated with the high energy UV ultraviolet beam of specific wavelength Organic exhaust gas and foul gas change the technology that its molecular chain structure reaches clean-up effect under the action of photocatalyst;Two kinds of skills Art can synergistic application.For industrial waste gas purifying, there are also ACF condensing recovery technique, biological dripping and filtering system technique and plasma exhaust gas Treatment process etc. is no longer enumerated here.By above process method, no matter we are not difficult to find out using which kind of exhaust-gas treatment Mode all be unable to do without certain dynamical system and processing equipment, and class processing scheme of such as burning can't do without air blast and induced draught system, liquid Body, which absorbs class, can't do without absorbing liquid pump, and absorption class technique can't do without gas conveying fan etc., that is to say, that any at present Industrial waste gas processing method will consume certain electric energy as dynamic foundation, that is to say, that industrial waste gas administers the energy of consumption Industrial certain proportion is occupied, this is inevitable irreplaceable.
For the real-time electricity consumption of put into operation situation and the environmental protection facility of environmental protection facility, this is considerable in environment protection treating It is existing not changed in real time with our human activities, then, the reality of the environmental protection facility of any environment-friendly treating process When electricity consumption and discharge amount of exhaust gas all there is certain connection, that is to say, that within a certain period of time environmental protection facility electricity consumption increase Illustrate the exhausted air quantity of processing with regard to big, that is to say, that discharge amount of exhaust gas up to standard is increased as processing exhaust gas facility electricity consumption increases , with the increase of exhausted air quantity up to standard, the product yield of enterprise is also increasing., whereas if the product yield of enterprise increases, give up Gas discharge capacity increases and the synchronous increase of environmental protection facility electricity consumption or increase are seldom, this illustrates that enterprise's waste gas pollution control and treatment exists and asks Topic, it may be possible to relate to dirty discharge enterprise, emphasis to supervise.But there is presently no environmental protection facilities of the enterprise electricity consumptions and exhaust gas to discharge The technical solution of the linkage of amount.Therefore, the linkage supervision for reinforcing environmental protection facilities of the enterprise electricity consumption and discharge amount of exhaust gas is environmentally friendly prison The task of top priority of pipe, and one of the necessary technology of control enterprise's qualified discharge, it would be highly desirable to solve.
Summary of the invention
In order to overcome the linkage of existing enterprise's environmental protection facility electricity consumption and discharge amount of exhaust gas not in time, it is unstable, do not analyze, The problems such as not early warning, reinforces the supervision of environmental protection facilities of the enterprise operating status, it is ensured that enterprise's exhaust gas qualified discharge, the invention discloses A kind of linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas, comprising: environmental protection equipment runs detection unit, and first is logical Believe that unit, master controller, exhaust gas monitor unit on-line, the second communication unit produces total electricity consumption detection unit, control platform;Institute The control platform stated, including for monitor environmental protection equipment operation control host, monitor, control host by wireless signal with First communication module is connected and is existed by the environmental protection equipment operation data information and exhaust gas of communication module acquisition master controller monitoring The data information of the discharge exhaust gas of line monitoring device detection, master controller and the power facility for protecting equipment operation are believed by signal wire Breath connection;Master controller monitors electric current, voltage and the power consumption of power in environmental protection equipment, while when monitoring the operation of environmental protection equipment Between, the electric power data and runing time information that master controller runs the environmental protection equipment detected are by passing through first communication module It is wirelessly transmitted to control host;Master controller monitors exhaust gas flow, exhaust gas constituents and the exhaust gas of exhaust gas on-line monitoring equipment operation Total displacement, while the runing time of online equipment is monitored, master controller runs the exhaust gas on-line monitoring equipment detected useless Destiny evidence and runing time information are by being wirelessly transmitted to control host by first communication module;Master controller have memory and The power information and exhaust gas information that the environmental protection equipment of acquisition is run are stored the arithmetic unit into memory by arithmetic unit, master controller By operation, show that environmental protection facility electricity consumption accounts for the ratio of production total electricity consumption, and ratio storage into memory, and handle The ratio is associated with the exhaust gas on-line monitoring capacity in memory in same time period, and association results are passed through first Communication module is wirelessly transmitted to control host, controls host relevant information and shows environmental protection equipment operation conditions by monitor With exhaust gas on-line monitoring equipment operation conditions, and normal or warning is provided.
The environmental protection equipment runs detection unit, it is characterised in that environmental protection equipment include: environmental protection equipment power motor or The current sensor of static current consuming apparatus (such as electrostatic precipitation), voltage sensor and, the current transformer of load current sensor Sample range 0-1000A, electric current have a current sensor, the electricity that current sensor runs motor or static current consuming apparatus Stream size information is fed to master controller in real time, and stores in memory;The voltage transformer sample range of voltage sensor 0-1000V, voltage have a voltage transformer, and the voltage swing information of motor operation is fed to master by voltage sensor in real time Controller, each environmental protection facility motor or the static equal device of current consuming apparatus of environmental protection have electrical energy measurement sensor, environmental protection equipment The electric energy of operation consumption is fed to master controller in real time, and stores in memory.
The environmental protection equipment runs detection unit, it is characterised in that power in environmental protection equipment is the air inducing for waste gas pollution control and treatment Machine, air blower, clarified water pump, gas compressor, scavenging solution circulating pump, at least one of sewage (waste water) recirculating pump;Environmentally friendly static state is set The standby electrostatic precipitator for for waste gas pollution control and treatment, the electric-control system of plasma exhaust processor and environmental protection facility.
The total electricity consumption detection unit of the production, it is characterised in that the electrical energy measurement unit for producing total electricity consumption is existing skill Art, total electric energy meter are intelligent telemetering electric meter, which passes through 485 interfaces and modbus communication protocol and second communication module Connection, second communication module obtain the electricity consumption energy information of total electric energy meter, and are fed to master controller, and master controller obtains It produces total power information and stores it in memory.
The exhaust gas monitors unit on-line, and it includes exhaust gas constituents on-line computing model and waste gas stream that exhaust gas, which monitors unit on-line, One of meter, it is characterised in that exhaust gas on-line computing model is the prior art, and the technical program exhaust gas on-line monitoring equipment is The ETMS-100 on-line monitoring system of optically focused science and technology, the system communicate mould with second by 485 interfaces and modbus communication protocol Block connection, second communication module obtain the exhaust gas data information of on-line monitoring system and are fed to master controller, and master controller obtains It takes the exhaust gas data information of on-line monitoring system and stores it in memory;Exhaust gas flow is calculated as;Exhaust gas flow is calculated as existing There is technology, the technical program exhaust gas flow is calculated as DQZ waste gas stream meter, the stream provided by Duo Qin instrument (Shanghai) Co., Ltd. For meter by 485 interfaces and modbus communication protocol and second communication module connection, second communication module obtains on-line monitoring system The exhaust gas data information of system is simultaneously fed to master controller, and master controller obtains the exhaust gas data information of on-line monitoring system and it Storage is in memory.
First communication unit, it is characterised in that the first communication unit includes for providing the GPS of GPS positioning information Device, communication module are one of NB-IOT communication module and 5G communication module, the first communication unit and main controller circuit Connection, and fed back with master controller information, the first communication unit receives master controller instruction, and the information that master controller is stored It is sent to long-range control host machine in wireless form, meanwhile, the first communication unit receives the control that control platform courses host is sent System instruction, and the control instruction is fed back to master controller, master controller is managed and controls to environmental protection facility motor operation.
Second communication unit, it is characterised in that the second communication unit includes for providing the GPS of GPS positioning information Device, communication module are one of LoRa communication module or zigbee communication module, the second communication unit and master controller without Line connection, and fed back with master controller information, the second communication unit is monitored on-line by network interface and interface protocol and exhaust gas Equipment connection, obtains the exhaust gas data information of on-line monitoring system and is fed to master controller.
A kind of application method of the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas, specifically includes following step It is rapid:
S1: starting environmental protection facility dynamical system starts environmentally friendly static device, starts total electric energy detection unit, starts linked system, Each functional unit and sensor module enter working condition;
S2: master controller writes down the starting time of current environmental protection facility system and working time, master controller are obtained by signal wire The electric power and electricity consumption of environmental protection facility power-equipment and static device are taken, and power environmental protection equipment and electricity consumption add up Summarize and stores in memory, meanwhile, remote monitoring platform is fed to by first communication module;
S3: master controller produces total electricity consumption detection unit by signal wire connection, and obtains production total electricity consumption information, main control The arithmetic unit of device show that environmental protection facility electricity consumption accounts for the ratio of production total electricity consumption by operation, and ratio storage to depositing In reservoir;
S4: second communication module connection, second communication module obtain on-line monitoring system or useless to master controller by wireless communication The exhaust gas data information of air-flow meter is simultaneously fed to master controller, and master controller obtains the exhaust gas constituents and stream of on-line monitoring system The exhaust gas flow data information of data information or waste gas stream meter is measured, and is stored it in memory, meanwhile, it is logical by first Letter module is fed to remote monitoring platform;
S5: electricity, instrument linkage, master controller is by arithmetic unit, the environmental protection facility electricity consumption and production total electricity consumption in S3 step Ratio in S4 step exhaust gas total flow foundation be associated with corresponding relationship, and set be associated with corresponding relationship threshold value of warning, be more than Threshold value of warning, then master controller is sent a warning message, and is sent to control platform by the first communication unit;
S6: the control host of control platform accesses remote server, obtains electric current, the electricity of each functional unit in S2, S3, S4 step Pressure, power and electricity consumption numerical quantity obtain the working time of S5 step total early warning value and each functional unit, draw each function list First electricity consumption curve, exhaust gas total displacement curve establish electricity, instrument relating dot discrete models, using linear fit method, draw Exhaust gas discharges exceeded point curve figure out, prejudges abscission ring guarantor's facility operation state according to curve graph and the possible exhaust gas occurred discharges and surpasses Probability is marked, and is shown by monitor or monitoring large-size screen monitors;
S7: environmentally friendly supervision and check personnel check control platform, understanding exhaust gas emission behaviour and environmental protection facility operating condition and may The probability of malfunction of appearance, the running position and working node for obtaining the environmental protection equipment are safeguarded or are located in advance to environmental protection equipment Reason, to prevent environmental protection equipment failure from causing to exhaust gas discharge beyond standards and environmental pollution.
Remarkable result of the invention:
The present invention gets up the real-time electricity consumption of environmental protection facility and discharge amount of exhaust gas linkage, and it is difficult thoroughly to solve environment protection standard discharge supervision The problem of, it realizes the interaction relation between environmental protection facility open amount and production, environmental protection facility operation is fulfilled, favorably In environmental protection cause development and Sustainable Development of Enterprises.
Detailed description of the invention
Fig. 1 is system composed structure schematic diagram of the invention;
Fig. 2 is the application method flow chart of the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas of the present invention;
In figure: 1, environmental protection equipment runs detection unit, 11, environmental protection facility power-equipment, 12, environmental protection facility static device, and 2, the One communication unit, 3, master controller, 4, exhaust gas on-line monitoring unit, the 5, second communication unit, 6, the total electricity consumption detection unit of production, 7, control platform, 71, control host, 72, monitor.
Specific embodiment
The embodiment of technical solution of the present invention is described in detail below in conjunction with attached drawing 1 and Fig. 2.Following embodiment It is only used for clearly illustrating technical solution of the present invention, therefore is intended only as example, and cannot be used as a limitation the limitation present invention Protection scope.
A kind of linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas, comprising: environmental protection equipment operation detection is single Member 1, the first communication unit 2, master controller 3, exhaust gas monitor unit 4 on-line, and the second communication unit 5 produces always with electro-detection list Member 6, control platform 7;The control platform 7, including for monitor environmental protection equipment operation control host 71, monitor 72, Control host 71 is connected with first communication module 2 by wireless signal and obtains the ring that master controller 3 monitors by communication module The data information of the discharge exhaust gas of equipment operating data information and the detection of exhaust gas on-line monitoring equipment is protected, master controller 3 is set with guarantor The power facility 11 of received shipment row is connected by signal wire information;Master controller 3 monitor the electric current of power in environmental protection equipment 11, voltage and Power consumption, while monitoring the runing time of environmental protection equipment, the electric power data of master controller 3 environmental protection equipments operations detected and Runing time information is by being wirelessly transmitted to control host 71 by first communication module 2;Master controller 3 monitors exhaust gas and supervises online Exhaust gas flow, exhaust gas constituents and the exhaust gas total displacement of measurement equipment operation, while monitoring the runing time of online equipment, master controller The exhaust gas data and runing time information that 3 exhaust gas on-line monitoring equipments detected are run pass through through first communication module 2 It is wirelessly transmitted to control host 71;Master controller 3 has memory and arithmetic unit, and master controller runs the environmental protection equipment of acquisition Into memory, arithmetic unit show that environmental protection facility electricity consumption accounts for the total use of production by operation for power information and the storage of exhaust gas information The ratio of electricity, and ratio storage into memory, and the exhaust gas in the ratio and memory in same time period is existed Line monitoring capacity is associated, and association results are wirelessly transmitted to control host 71, control master by first communication module 2 Relevant information is shown environmental protection equipment operation conditions and exhaust gas on-line monitoring equipment operation conditions by monitor 72 by machine 71, and Provide normal or warning.
The environmental protection equipment runs detection unit, it is characterised in that environmental protection equipment includes: environmental protection equipment power motor 11 Or static state current consuming apparatus 12(such as electrostatic precipitation) current sensor, voltage sensor and, the electric current of load current sensor is mutual Sensor sample range 0-1000A, electric current have a current sensor, and current sensor runs motor or static current consuming apparatus Size of current information be fed to master controller 3 in real time, and store in memory;The voltage transformer of voltage sensor samples Range 0-1000V, voltage have a voltage transformer, and voltage sensor in real time feeds the voltage swing information of motor operation To master controller 3, each environmental protection facility motor 11 or the static equal device of current consuming apparatus 12 of environmental protection have electrical energy measurement sensor, The electric energy of environmental protection equipment operation consumption is fed to master controller 3 in real time, and stores in memory.
The environmental protection equipment runs detection unit, it is characterised in that power in environmental protection equipment 11 is drawing for waste gas pollution control and treatment Blower, air blower, clarified water pump, gas compressor, scavenging solution circulating pump, at least one of sewage (waste water) recirculating pump;It is environmentally friendly static Equipment 12 is the electrostatic precipitator for waste gas pollution control and treatment, the electric-control system of plasma exhaust processor and environmental protection facility.
The total electricity consumption detection unit of the production, it is characterised in that the electrical energy measurement unit 6 for producing total electricity consumption is existing skill Art, total electric energy meter are intelligent telemetering electric meter, which passes through 485 interfaces and modbus communication protocol and second communication module 5 connection, second communication module obtain the electricity consumption energy information of total electric energy meter, and are fed to master controller 3, master controller 3 It obtains and produces total power information and store it in memory.
The exhaust gas monitors unit on-line, and it includes exhaust gas constituents on-line computing model and exhaust gas that exhaust gas, which monitors unit 4 on-line, One of flowmeter, it is characterised in that exhaust gas on-line computing model is the prior art, the technical program exhaust gas on-line monitoring equipment For the ETMS-100 on-line monitoring system of optically focused science and technology, which is communicated by 485 interfaces and modbus communication protocol with second 5 connection of module, second communication module 5 obtain the exhaust gas data information of on-line monitoring system and are fed to master controller 3, main control Device 3 obtains the exhaust gas data information of on-line monitoring system and stores it in memory;Exhaust gas flow is calculated as;Waste gas stream meter For the prior art, the technical program exhaust gas flow is calculated as DQZ waste gas stream meter provided by Duo Qin instrument (Shanghai) Co., Ltd., The flowmeter is obtained online by 485 interfaces and modbus communication protocol and 5 connection of second communication module, second communication module 5 The exhaust gas data information of monitoring system is simultaneously fed to master controller 3, and master controller 3 obtains the exhaust gas data letter of on-line monitoring system It ceases and stores it in memory.
First communication unit, it is characterised in that the first communication unit 2 includes for providing GPS positioning information GPS device, communication module are one of NB-IOT communication module and 5G communication module, the first communication unit 2 and master controller Circuit connection, and fed back with 3 information of master controller, the first communication unit 2 receives master controller 3 and instructs, and master controller 3 is deposited The information of storage is sent to long-range control host machine 71 in wireless form, meanwhile, the first communication unit 2 receives the control of control platform 7 The control instruction that host 71 is sent, and the control instruction is fed back to master controller 3, master controller 3 transports environmental protection facility motor Row is managed and controlled.
Second communication unit, it is characterised in that the second communication unit 5 includes for providing GPS positioning information GPS device, communication module are one of LoRa communication module or zigbee communication module, the second communication unit 5 and main control Device 3 is wirelessly connected, and is fed back with 3 information of master controller, and the second communication unit 5 is existed by network interface and interface protocol and exhaust gas The connection of line monitoring device, obtains the exhaust gas data information of on-line monitoring system and is fed to master controller.
A kind of application method of the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas, specific embodiment include Following steps:
S1: starting environmental protection facility dynamical system, power in environmental protection system are air blower and air-introduced machine, start environmentally friendly static device, quiet State environmental protection equipment is electrostatic precipitator, starts total electric energy detection unit, starts linked system, and exhaust gas flow monitoring unit is exhaust gas Flowmeter, exhaust gas flow are calculated as each functional unit of DQZ waste gas stream meter and biography provided by Duo Qin instrument (Shanghai) Co., Ltd. Sensor module enters working condition;
S2: master controller 3 writes down air blower, air-introduced machine, the working time of electrostatic precipitator and general supply current electric quantity, master control Device 3 processed is 110KW by the power that signal wire obtains environmental protection facility power-equipment air blower, and the power of air-introduced machine is 90KW and quiet The power of state equipment electrostatic precipitator is 10KW, and current run time is 1 hour, the power and use of current 1 hour environmental protection equipment Electricity is cumulative to summarize, and wherein the production total electricity consumption of environmental protection facility is 210KWh, and in memory the storage of current power amount, Meanwhile remote monitoring platform is fed to by first communication module 2;
S3: master controller 2 produces total electricity consumption detection unit by signal wire connection, and obtains production this implementation of total electricity consumption information The current total 2100KWh of example, the arithmetic unit of master controller 3 show that environmental protection facility electricity consumption accounts for production total electricity consumption by operation Ratio, operational formula are as follows: environmental protection equipment electricity consumption ÷ production production total electricity consumption=ring electricity ratio, the present embodiment ring electricity compare for 210 ÷ 2100=0.1, and ratio storage into memory;
S4: 5 connection of second communication module, second communication module 5 provide GPS positioning information to master controller 3 by wireless communication GPS device, communication module are LoRa communication module, and LoRa module obtains instrument of admiring by 485 interfaces and modbus communication protocol more The exhaust gas data information of DQZ waste gas stream meter provided by table (Shanghai) Co., Ltd. is simultaneously fed to master controller 3, master controller The 3 exhaust gas flow data information exhaust gas flows for obtaining waste gas stream meter are 15000m3/ h, and store it in memory, together When, remote monitoring platform 7 is fed to by first communication module 2;
S5: electricity, instrument linkage, master controller is by arithmetic unit, the environmental protection facility electricity consumption and production total electricity consumption in S3 step Ratio 0.1 and S4 step in exhaust gas total flow 15000m3/ h establishes association corresponding relationship, i.e., 0.1 corresponding 15000m3/ h, and Setting association corresponding relationship threshold value of warning, i.e. early warning value are 11000~15000m3/ h, that is to say, that be lower than 11000m3/ h's is pre- When alert threshold value, illustrate that the environmental protection facility currently produced operation is abnormal, at this moment then master controller 3 is sent a warning message, and is passed through First communication unit 2 is sent to control platform 7;
S6: the control host 71 of control platform 7 accesses remote server, obtains the electricity of each functional unit in S2, S3, S4 step It is 0.1 that stream, voltage, power, electricity consumption numerical quantity and ring electricity, which compare, obtains the total 11000~15000m of early warning value of S5 step3/ h, and The working time of each functional unit is 1 hour, draws each functional unit electricity consumption curve, exhaust gas total displacement curve, establishes electricity, instrument Relating dot discrete models are drawn out exhaust gas and discharge exceeded point curve figure, prejudged according to curve graph using linear fit method Abscission ring protects facility operation state and the exhaust gas that may occur discharges exceeded probability, and the early warning value of the present embodiment is 11000~ 15000m3/ h, that is to say, that be lower than 11000m3When the threshold value of warning of/h, illustrate that the environmental protection facility currently produced operation is abnormal, Monitor supervision platform 7 is simultaneously shown by monitor 72 or monitoring large-size screen monitors;
S7: environmentally friendly supervision and check personnel check control platform 7, understanding exhaust gas emission behaviour and environmental protection facility operating condition and may The probability of malfunction of appearance, the running position and working node for obtaining the environmental protection equipment are safeguarded or are located in advance to environmental protection equipment Reason, to prevent environmental protection equipment failure from causing to exhaust gas discharge beyond standards and environmental pollution.
Above-described embodiment only illustrates technical concepts and features of the invention, and the purpose is to allow the ordinary skill people of this field Member can understand the features of the present invention and implement accordingly, and it is not intended to limit the scope of the present invention.It is all according to this hair The equivalent change or modification that the essence of bright content is carried out should all cover in protection scope of the present invention.

Claims (9)

1. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas, comprising: environmental protection equipment operation detection unit, first Communication unit, master controller, exhaust gas monitor unit on-line, and the second communication unit produces total electricity consumption detection unit, control platform; It is characterized in that the control platform, including control host, the monitor for monitoring environmental protection equipment operation, control host is logical Cross the environmental protection equipment operation data that wireless signal is connected with first communication module and obtains master controller monitoring by communication module The data information of information and the discharge exhaust gas of exhaust gas on-line monitoring equipment detection, master controller and the power facility for protecting equipment operation It is connected by signal wire information;
Master controller monitors electric current, voltage and the power consumption of power in environmental protection equipment, while monitoring the runing time of environmental protection equipment, main Controller passes through the electric power data and runing time information of the environmental protection equipment operation detected wireless by first communication module It is transmitted to control host;
Master controller monitors exhaust gas flow, exhaust gas constituents and the exhaust gas total displacement of exhaust gas on-line monitoring equipment operation, monitors simultaneously The runing time of online equipment, the exhaust gas data and runing time that master controller runs the exhaust gas on-line monitoring equipment detected Information is by being wirelessly transmitted to control host by first communication module;Master controller has memory and arithmetic unit, master controller The power information and exhaust gas information that the environmental protection equipment of acquisition is run are stored into memory, arithmetic unit obtains ring by operation The ratio that facility electricity consumption accounts for production total electricity consumption is protected, and ratio storage into memory, and the ratio and memory In be associated in the exhaust gas on-line monitoring capacity of same time period, and association results are wirelessly passed by first communication module Control host is transported to, relevant information is shown that environmental protection equipment operation conditions and exhaust gas are monitored on-line by monitor by control host Equipment operation condition, and provide normal or warning.
2. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas according to claim 1, it is characterised in that Environmental protection equipment includes: current sensor, the voltage sensor of environmental protection equipment power motor or static current consuming apparatus (such as electrostatic precipitation) Device and, the current transformer sample range 0-1000A of load current sensor, electric current has a current sensor, and electric current passes The size of current information of motor or static current consuming apparatus operation is fed to master controller by sensor in real time, and is stored in memory In;The voltage transformer sample range 0-1000V of voltage sensor, voltage have a voltage transformer, voltage sensor handle The voltage swing information of motor operation is fed to master controller, each environmental protection facility motor or the static current consuming apparatus of environmental protection in real time Equal device has electrical energy measurement sensor, the electric energy of environmental protection equipment operation consumption is fed to master controller in real time, and be stored in In reservoir.
3. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas according to claim 1, it is characterised in that Power in environmental protection equipment is the air-introduced machine for waste gas pollution control and treatment, air blower, clarified water pump, gas compressor, scavenging solution circulating pump, dirt At least one of water-circulating pump;Environmentally friendly static device is the electrostatic precipitator for waste gas pollution control and treatment, plasma exhaust processor And the electric-control system of environmental protection facility.
4. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas according to claim 1, it is characterised in that The electrical energy measurement unit for producing total electricity consumption is the prior art, and total electric energy meter is intelligent telemetering electric meter, which connects by 485 Mouth and modbus communication protocol and second communication module connection, second communication module obtain the electricity consumption electric energy letter of total electric energy meter Breath, and it is fed to master controller, master controller, which obtains, to be produced total power information and stores it in memory.
5. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas according to claim 1, it is characterised in that It includes one of exhaust gas constituents on-line computing model and waste gas stream meter that exhaust gas, which monitors unit on-line, and exhaust gas on-line computing model is existing There is technology, the technical program exhaust gas on-line monitoring equipment is the ETMS-100 on-line monitoring system of optically focused science and technology, which passes through 485 interfaces and modbus communication protocol and second communication module connection, second communication module obtain the exhaust gas of on-line monitoring system Data information is simultaneously fed to master controller, and master controller obtains the exhaust gas data information of on-line monitoring system and stores it in and deposits In reservoir.
6. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas according to claim 1, it is characterised in that Exhaust gas flow is calculated as the prior art, and the technical program exhaust gas flow is calculated as DQZ provided by Duo Qin instrument (Shanghai) Co., Ltd. Waste gas stream meter, the flowmeter pass through 485 interfaces and modbus communication protocol and second communication module connection, second communication module It obtains the exhaust gas data information of on-line monitoring system and is fed to master controller, master controller obtains the exhaust gas of on-line monitoring system Data information simultaneously stores it in memory.
7. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas according to claim 1, it is characterised in that First communication unit includes for providing the GPS device of GPS positioning information, and communication module is that NB-IOT communication module and 5G are communicated One of module, the first communication unit are connect with main controller circuit, and are fed back with master controller information, the first communication unit Master controller instruction is received, and the information that master controller stores is sent to long-range control host machine in wireless form, meanwhile, the One communication unit receives the control instruction that control platform courses host is sent, and the control instruction is fed back to master controller, main Controller is managed and controls to environmental protection facility motor operation.
8. the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas according to claim 1, it is characterised in that Second communication unit includes for providing the GPS device of GPS positioning information, and communication module is that LoRa communication module or zigbee are logical Believe one of module, the second communication unit and master controller are wirelessly connected, and are fed back with master controller information, the second communication unit Member is connect by network interface and interface protocol with exhaust gas on-line monitoring equipment, and the exhaust gas data information of on-line monitoring system is obtained And it is fed to master controller.
9. a kind of application method of the linked system of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas, specifically includes following step It is rapid:
S1: starting environmental protection facility dynamical system starts environmentally friendly static device, starts total electric energy detection unit, starts linked system, Each functional unit and sensor module enter working condition;
S2: master controller writes down the starting time of current environmental protection facility system and working time, master controller are obtained by signal wire The electric power and electricity consumption of environmental protection facility power-equipment and static device are taken, and power environmental protection equipment and electricity consumption add up Summarize and stores in memory, meanwhile, remote monitoring platform is fed to by first communication module;
S3: master controller produces total electricity consumption detection unit by signal wire connection, and obtains production total electricity consumption information, main control The arithmetic unit of device show that environmental protection facility electricity consumption accounts for the ratio of production total electricity consumption by operation, and ratio storage to depositing In reservoir;
S4: second communication module connection, second communication module obtain on-line monitoring system or useless to master controller by wireless communication The exhaust gas data information of air-flow meter is simultaneously fed to master controller, and master controller obtains the exhaust gas constituents and stream of on-line monitoring system The exhaust gas flow data information of data information or waste gas stream meter is measured, and is stored it in memory, meanwhile, it is logical by first Letter module is fed to remote monitoring platform;
S5: electricity, instrument linkage, master controller is by arithmetic unit, the environmental protection facility electricity consumption and production total electricity consumption in S3 step Ratio in S4 step exhaust gas total flow foundation be associated with corresponding relationship, and set be associated with corresponding relationship threshold value of warning, be more than Threshold value of warning, then master controller is sent a warning message, and is sent to control platform by the first communication unit;
S6: the control host of control platform accesses remote server, obtains electric current, the electricity of each functional unit in S2, S3, S4 step Pressure, power and electricity consumption numerical quantity obtain the working time of S5 step total early warning value and each functional unit, draw each function list First electricity consumption curve, exhaust gas total displacement curve establish electricity, instrument relating dot discrete models, using linear fit method, draw Exhaust gas discharges exceeded point curve figure out, prejudges abscission ring guarantor's facility operation state according to curve graph and the possible exhaust gas occurred discharges and surpasses Probability is marked, and is shown by monitor or monitoring large-size screen monitors;
S7: environmentally friendly supervision and check personnel check control platform, understanding exhaust gas emission behaviour and environmental protection facility operating condition and may The probability of malfunction of appearance, the running position and working node for obtaining the environmental protection equipment are safeguarded or are located in advance to environmental protection equipment Reason, to prevent environmental protection equipment failure from causing to exhaust gas discharge beyond standards and environmental pollution.
CN201910685676.1A 2019-07-28 2019-07-28 The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas Withdrawn CN110361053A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910685676.1A CN110361053A (en) 2019-07-28 2019-07-28 The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910685676.1A CN110361053A (en) 2019-07-28 2019-07-28 The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas

Publications (1)

Publication Number Publication Date
CN110361053A true CN110361053A (en) 2019-10-22

Family

ID=68222115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910685676.1A Withdrawn CN110361053A (en) 2019-07-28 2019-07-28 The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas

Country Status (1)

Country Link
CN (1) CN110361053A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110849421A (en) * 2019-11-26 2020-02-28 浙江省环境科技有限公司 Regional industrial gaseous pollutant monitoring method and system
CN113552834A (en) * 2021-09-22 2021-10-26 广东浩迪智云技术有限公司 Distributed sewage treatment station monitoring system and method based on electricity utilization information

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110849421A (en) * 2019-11-26 2020-02-28 浙江省环境科技有限公司 Regional industrial gaseous pollutant monitoring method and system
CN113552834A (en) * 2021-09-22 2021-10-26 广东浩迪智云技术有限公司 Distributed sewage treatment station monitoring system and method based on electricity utilization information

Similar Documents

Publication Publication Date Title
CN202800634U (en) Multifunctional working table
CN110361053A (en) The linked system and application method of off-gas cleaning equipment electricity consumption and discharge amount of exhaust gas
CN105772309A (en) Environment-friendly spraying chamber operation monitoring and control system and monitoring and control method thereof
CN204557175U (en) The intelligent coordinated control system of garbage-incineration smoke purifying multi-pollutant
CN205641354U (en) Purify ventilation unit
CN203916427U (en) Photocatalysis organic waste gas treatment system
CN104654452A (en) Multifunctional indoor air quality monitoring system
CN206198936U (en) A kind of lacquer spraying waste gas wet processing apparatus
CN208591711U (en) A kind of waste gas pollution control and treatment system
CN204008584U (en) Denitrating catalyst demercuration performance testing device
CN210466127U (en) Monitoring system of distributing type exhaust-gas treatment efficiency and emission
CN108954671A (en) A kind of the air quality method for early warning and device of fresh air system
CN208678804U (en) A kind of intelligence UV photooxidation catalysis organic waste-gas purification equipment
CN204648484U (en) A kind of Intelligent purifying sterilizing and air treating apparatus
CN108379983A (en) A kind of biomass incinerator exhaust gas treating method
CN110376996A (en) It is a kind of distribution exhaust treatment efficiency and discharge monitoring method and system
CN205360958U (en) Modular integrated device of flue gas desulfurization denitration decarbonization
CN208465617U (en) A kind of purification system for VOCs treatment
CN218782535U (en) Waste gas treatment system
CN210774142U (en) Linkage system for power consumption and exhaust emission of exhaust gas purification equipment
CN215233307U (en) High-efficient processing system of volatile organic compounds
CN114002991A (en) Control system and method for air dust removal device in tunnel
CN210729115U (en) Chemistry and chemical engineering type experiment exhaust treatment device
CN207137694U (en) A kind of decentralised adsorption concentrates the VOC processing systems of regeneration
CN204016929U (en) The UV photodissociation oxidation gaseous effluent blood processor of powering stable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210712

Address after: 230000 Room 401, 4th floor, 1-03 Liandong u Valley, 1499 Zhenxing Road, Shushan new industrial park, Shushan District, Hefei City, Anhui Province

Applicant after: Anhui pilongtian Environmental Protection Technology Co.,Ltd.

Address before: 236810 room 205, No.1 laboratory building, Bozhou vocational and technical college, 1625 Yaodu Avenue, Qiaocheng District, Bozhou City, Anhui Province

Applicant before: Wang Jie

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20191022