CN110353500A - A kind of integral type Moca coffee pot pedestal and its integral formation method - Google Patents

A kind of integral type Moca coffee pot pedestal and its integral formation method Download PDF

Info

Publication number
CN110353500A
CN110353500A CN201910663718.1A CN201910663718A CN110353500A CN 110353500 A CN110353500 A CN 110353500A CN 201910663718 A CN201910663718 A CN 201910663718A CN 110353500 A CN110353500 A CN 110353500A
Authority
CN
China
Prior art keywords
refining
chamber
coffee pot
fixedly connected
moca coffee
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910663718.1A
Other languages
Chinese (zh)
Other versions
CN110353500B (en
Inventor
胡连升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Creation Kitchenware Co Ltd
Original Assignee
Zhejiang Creation Kitchenware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Creation Kitchenware Co Ltd filed Critical Zhejiang Creation Kitchenware Co Ltd
Priority to CN201910663718.1A priority Critical patent/CN110353500B/en
Publication of CN110353500A publication Critical patent/CN110353500A/en
Application granted granted Critical
Publication of CN110353500B publication Critical patent/CN110353500B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J27/00Cooking-vessels
    • A47J27/21Water-boiling vessels, e.g. kettles
    • A47J27/21008Water-boiling vessels, e.g. kettles electrically heated
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J27/00Cooking-vessels
    • A47J27/21Water-boiling vessels, e.g. kettles
    • A47J27/21166Constructional details or accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings
    • B22C9/24Moulds for peculiarly-shaped castings for hollow articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D35/00Equipment for conveying molten metal into beds or moulds
    • B22D35/04Equipment for conveying molten metal into beds or moulds into moulds, e.g. base plates, runners
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C21/00Alloys based on aluminium
    • C22C21/02Alloys based on aluminium with silicon as the next major constituent
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/002Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working by rapid cooling or quenching; cooling agents used therefor
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/04Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon
    • C22F1/043Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of aluminium or alloys based thereon of alloys with silicon as the next major constituent

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Food Science & Technology (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Apparatus For Making Beverages (AREA)
  • Furnace Details (AREA)

Abstract

The present invention relates to a kind of integral type Moca coffee pot pedestal and its integral formation methods, including ontology, the ontology includes the opening portion of bottom, side wall, inner cavity and face bottom, it is characterised in that: the diameter of the bottom is greater than opening portion diameter, passes through casting one-pass molding between bottom and side wall;Wherein, the longitudinal cross-section of the ontology is trapezoidal;Beneficial effects of the present invention: the Moca coffee pot pedestal produced by integrally formed method, advantage not high there is only structural strength, in Moca coffee pot in use, the heating effect to Moca coffee pot can be improved in integrally formed Moca coffee pot pedestal, also there is the variation of " matter " in quality.

Description

A kind of integral type Moca coffee pot pedestal and its integral formation method
Technical field
The present invention relates to the technical field of extrusion forming, the big Moca coffee pot pedestal in especially a kind of small bottom of mouth diameters Disposal molding mold and forming method.
Background technique
Significant points of the Moca coffee pot pedestal as Moca coffee pot electromagnetic heating, in the market for big different in the small bottom of mouth diameters Shape part be formed by split type structure, but the structure (production model comprising the structure) still have it is following do not attain improve place:
First, not only structural strength is lower for the structure, when used for a long time, there is some potential safety problems (such as: it is each It will form certain gap in use between fission and cause leak, there is the possibility for further causing safety accident Property), also, there is also biggish defects on heating conduction for split type structure, and bulging process can not meet outside very much See design.
Second, in the actual production process, often encountering pyramidal structure casting it is characterized in that opening size is small In closed bottom end size.In knockout course, casting is separated into a difficult point with cast-internal type core;It is cast for this kind Part difficult the case where separating compared with type core, solves usually using sand core.When needing to carry out cast casting, make in advance it is multiple at The sand core of type cast-internal structure.When cast casting demoulds, casting is taken out together with sand core.After slightly being cooled down to casting, The sand core of cast-internal is broken up, pours out the molding sand in casting to obtain casting;However, every time during one casting of molding, It requires using a sand core, and sand core cannot be reused, opposite production how many cast product just need to make phase The sand core of quantity is answered, production sand core process significantly increases worker's workload, while using the fallout pattern core during sand core Also environment and workers ' health can be impacted;
Moreover, often there is each crucial transfer position blocking during " filling mould " in traditional casting technique Situation easily influences the efficiency of production, and during " fill mould ", can not accomplish in the feeding mold of molten metal equilibrium, The quality of " Cheng Mo " is caused to decline.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of integral type Moca coffee pot pedestal and one Body formed method, it is intended to solve the problem in above-mentioned background technique.
The technical scheme of the present invention is realized as follows: a kind of integral type Moca coffee pot pedestal, including ontology, the ontology Including bottom, side wall, inner cavity and face bottom opening portion, it is characterised in that: the diameter of the bottom be greater than opening portion it is straight Diameter passes through casting one-pass molding between bottom and side wall;Wherein, the longitudinal cross-section of the ontology is trapezoidal.
It is preferred that are as follows: it is fixedly connected with a circle reinforcing ring between the bottom of chamber edge and interior chamber inner sidewall of the inner cavity, and inside The reinforcement block that cross sectional shape is " triangle " and connect with reinforcing ring is fixedly connected on each inner sidewall of chamber.
In addition, the present invention also provides a kind of integral formation method suitable for above-mentioned integral type Moca coffee pot pedestal, feature It is, includes the following steps:
(1) raw material melts: preparing corresponding aluminium as in smelting furnace, the temperature in smelting furnace is heated to 650-710 DEG C, is added Enter refining agent, obtain aluminum water, carefully stir, wherein iron-content is that 0.66%, copper content is not more than 0.18% in aluminum water, contains manganese Amount is 0.23%, magnesium content are as follows: 0.28%, nickel content 0.013%, and silicon content 11.88%, zinc content 0.173%, lead tolerance It is 0.004%, stanniferous amount is 0.06%, and titaniferous amount is 0.043%;
(2) mold prepares and pours: the aluminum water in step (1) being poured into mold, placing temperature 1650-1850 DEG C, pouring the time is 30-35s, after the completion of pouring, keeps 30-35min;
(3) cooling: after the aluminum water in step (2) is cooled to room temperature, take out molding Moca coffee pot pedestal, to its surface into Row cleaning polishes and obtains Moca coffee pot pedestal idiosome;
(4) it is heat-treated: molded blank is heat-treated, hardening heat control exists in 750-850 DEG C, tempering temperature control 620-650℃。
It is preferred that are as follows: the aluminium in the step (1) can be aluminium sheet, aluminium scrap block and aluminum strip.
It is preferred that are as follows: the smelting furnace in the step (1) includes for melting the electric smelting furnace of the aluminium, being set to electric smelting furnace Bottom and the furnace seat being firmly connected with it, the mold mounting assembly for being fixedly connected on furnace seat bottom and it is set to connection electric heating Smelting furnace and mold mounting assembly and the pipette for being used to shift molten aluminum;Wherein, the furnace seat include furnace seat ontology and it is multiple from On the furnace seat ontology and run through furnace seat ontology from top to bottom and be used to install the installation cavity of pipette, each installation cavity is with furnace seat sheet Body center, which is that the center of circle is circumferentially equidistant, to be spaced apart, and the electrode for heating to pipette is equipped in each installation cavity;It is described Mold mounting assembly include be fixedly connected with the furnace seat and the middle drum body of hollow setting, be set to inner barrel and with each shifting The liquid filling module of liquid pipe connection and the lifting platform for going up and down by Driven by Hydraulic Cylinder and be used to install the step (2) mold, when When the lifting platform rises, the output end in contact of mold Yu liquid filling module can be made.
It is preferred that are as follows: each liquid filling module includes sealing the liquid relief being connected at the top of middle drum body and with each pipette output end Mouthful, seal the tank body that is connected to the liquid relief mouth output end, the tank body is " curved " and spaced the by longitudinal cross-section One plate body and stock guide and the second plate body being fixedly connected between the first plate body and stock guide two sides are constituted, first plate The guide chamber being connected to liquid relief mouth is formed between body, stock guide and each second plate body;Wherein, fixed on each second plate body The fixed plate that oriented separate first plate body direction extends is connected, and lateral rotation is connected with through PLC electricity between each fixed plate The transmission shaft of machine driving, the lateral wall of the transmission shaft are fixedly connected with that there are two be provided at circumferentially spaced and longitudinal cross-section is " L shape " Refining module;The refining module includes the connecting plate being fixedly connected with the transmission shaft outer wall and is fixedly connected with connecting plate And shape is the refining box of " cylinder ", each refining box is equipped with the refining chamber from recess setting clockwise, and in refining Side outer wall of the box far from connecting plate, which longitudinally extends to be equipped with, passes through the movable groove of tank body, the slot of the movable groove for refining box Bottom is equipped with the charging notch for extending from accent to lower recess and being connected to the guide chamber output end, and in each refining box far from even The side of material chamber is fixedly connected with annular blanking set, is formed with blanking chamber between the annular blanking set and refining box, and in blanking The bottom of chamber of chamber is equipped with the refining hole that a circle is distributed as circular, circumferential equidistant interval using the bottom of chamber center and is connected to the refining chamber.
It is preferred that are as follows: the lifting platform is equipped with multiple mounting grooves for corresponding and being used for installation mold with each blanking chamber, And each mounting groove is located at close to lifting platform center side and for refining hole of polishing equipped with multiple on the lifting platform Honing device;Wherein, the honing device includes being fixedly connected by support rod with lifting platform and spaced with lifting platform Gear installation base is rotatablely connected by main rotary shaft and gear installation base top center and passes through motor-driven master gear And by rotation connection at the top of secondary rotation axis and gear installation base and using master gear as the center of circle it is circumferentially equidistant be spaced apart and with The pinion of master gear engagement, each pinion are fixedly connected to polishing axis, the polishing axis far from the center of gear installation base The connecting pin of the diameter of axle of free end from its free end Xiang Qiyu pinion is gradually reduced.
It is preferred that are as follows: the mold in the step (2) includes the first ladder block that can be put into mounting groove and the first ladder block The second ladder block for being tightly connected far from mounting groove side and with the second ladder block far from one side contacts of the first ladder block the Three ladder blocks, the top center of the third ladder block to the first ladder Block direction concave shape at have through the second ladder block at Type chamber, the bottom of chamber of the forming cavity be fixedly connected with longitudinal cross-section be " trapezoidal " and with the spaced cover half block of forming cavity, institute The transversal cross-section for stating cover half block is " regualr decagon ".
It is preferred that are as follows: the cover half block includes first for being fixedly connected with the bottom of chamber center of the forming cavity and longitudinally extending Point and six pieces of second parts for being distributed in first part's outer circumferential wall and being contacted with first part, each second part and first The fixture block and card slot being mutually adapted, edge of each second part far from one side end face of forming cavity bottom of chamber are respectively equipped between part Internally recess is equipped with the reinforcement recess portion that cross section is " sector ", and each reinforcement recess portion on each second part is on the side of cover half block Edge, which is formed, reinforces annular groove, and each second part is equipped with far from forming cavity bottom of chamber side sunken end face and extends through second outward The strengthening groove of portion outboard wall.
It is preferred that are as follows: the forming cavity is fixedly connected with a circle snap ring close to the inner sidewall of accent, in the forming cavity accent Place, which is equipped with, is placed on snap ring and simultaneously partially exposes with first part and the setting of second part interval the chuck outside forming cavity, described Concentric is provided with a ring shape refining slot with its center on chuck, and in the slot bottom equidistant interval of annular refining slot equipped with multiple With each refining hole and from top to bottom through the through-hole of chuck.
The beneficial effects of the present invention are:
First, the safety and reliability by the way that shaped piece ensure that product using integrally formed technique, molding Method carries out machine-shaping using the plate of various materials, can satisfy the appearance requirement of various special-shaped product structures;
Second, the structural strength of Moca coffee pot pedestal can be improved by reinforcing ring and reinforcement block, so that improving it uses the longevity Life;
Third, conveniently obtaining effective " expansion " in induction, it may be assumed that the bottom of from due to by the way of integrated extrusion forming Portion extends to each side, therefore the advantage strong there are heating effect;
Fourth, and form intracavitary cover half block it can be used repeatedly, can directly reduce the consumption of sand core, reduce worker Workload, while also avoiding that worker is caused to damage.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of Moca coffee pot pedestal in the specific embodiment of the invention;
Fig. 2 is the A-A cross-sectional view in Fig. 1;
Fig. 3 is the structural schematic diagram of smelting furnace in the specific embodiment of the invention;
Fig. 4 is the portion the A enlarged drawing in Fig. 3;
Fig. 5 is the B-B cross-sectional view in Fig. 4;
Fig. 6 is the portion the C enlarged drawing in Fig. 4;
Fig. 7 is the structural schematic diagram of mold in the specific embodiment of the invention;
Fig. 8 is the C-C cross-sectional view in Fig. 7;
Fig. 9 is the D-D cross-sectional view in Fig. 7;
Figure 10 is D in Fig. 7 to schematic diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Fig. 1~Figure 10, the invention discloses a kind of integral type Moca coffee pot pedestal, including ontology 1, the ontologies Opening portion 13 including bottom 10, side wall 11, inner cavity 12 and face bottom, in the specific embodiment of the invention, the bottom 10 diameter is greater than 13 diameter of opening portion, passes through casting one-pass molding between bottom 10 and side wall;Wherein, the ontology 1 is vertical It is trapezoidal to section.
In the specific embodiment of the invention, it is fixedly connected between 12 inner sidewall of bottom of chamber edge and inner cavity of the inner cavity 12 One circle reinforcing ring 14, and be fixedly connected with cross sectional shape on each inner sidewall of inner cavity 12 and be " triangle " and connect with reinforcing ring 14 The reinforcement block 15 connect.
In addition, being suitable for the integral formation method of above-mentioned integral type Moca coffee pot pedestal, include the following steps:
(1) raw material melts: preparing corresponding aluminium as in smelting furnace, the temperature in smelting furnace is heated to 680 DEG C, essence is added Agent is refined, aluminum water is obtained, is carefully stirred, wherein iron-content is that 0.66%, copper content is not more than 0.18% in aluminum water, and manganese content is 0.23%, magnesium content are as follows: 0.28%, nickel content 0.013%, silicon content 11.88%, zinc content 0.173%, lead tolerance is 0.004%, stanniferous amount is 0.06%, and titaniferous amount is 0.043%;
(2) mold prepares and pours: the aluminum water in step (1) being poured into mold, placing temperature is 1850 DEG C, is poured Time is 33s, after the completion of pouring, keeps 35min;
(3) cooling: after the aluminum water in step (2) is cooled to room temperature, take out molding Moca coffee pot pedestal, to its surface into Row cleaning polishes and obtains Moca coffee pot pedestal idiosome;
(4) it is heat-treated: molded blank is heat-treated, hardening heat control is in 830 DEG C, tempering temperature control 650 ℃。
In the specific embodiment of the invention, the aluminium in the step (1) can be aluminium sheet.
In the specific embodiment of the invention, the smelting furnace in the step (1) includes the electric heating melting for melting the aluminium Furnace 2, set on 2 bottom of electric smelting furnace and be firmly connected with it furnace seat 20, be fixedly connected on 20 bottom of furnace seat mold peace Arrangement 3 and set on connection electric smelting furnace 2 and mold mounting assembly 3 and for shifting the pipette 4 of molten aluminum;Wherein, described Furnace seat 20 includes furnace seat ontology 200 and multiple through furnace seat ontology 200 and is used for from the furnace seat ontology 200 and from top to bottom The installation cavity 201 of pipette 4 is installed, each installation cavity 201 is spaced apart using 200 center of furnace seat ontology as the center of circle is circumferentially equidistant, And the electrode 202 for heating to pipette 4 is equipped in each installation cavity 201;The mold mounting assembly 3 include with it is described Furnace seat 20 is fixedly connected and the middle drum body 30 of hollow setting, multiple fillings for being set to 30 inside of cylinder and being connected to each pipette 4 Liquid module 31 and pass through the driving of hydraulic cylinder 32 lifting and for installing the lifting platform 33 of the step (2) mold, when the lifting When platform 33 rises, the output end in contact of mold 5 Yu liquid filling module 31 can be made.
In the specific embodiment of the invention, each liquid filling module 31 includes at the top of middle drum body 30 and defeated with each pipette The liquid relief mouth 310 of outlet sealing connection, with the tank body 311 that is connected to of 310 output end of liquid relief mouth sealing, the tank body 311 by Longitudinal cross-section is " curved " and spaced first plate body 311a and stock guide 311b and is fixedly connected on the first plate body The second plate body 311c between 311a and the two sides stock guide 311b is constituted, the first plate body 311a, stock guide 311b and each The guide chamber 311d being connected to liquid relief mouth 310 is formed between second plate body 311c;Wherein, fixed on each second plate body 311c The fixed plate 311e that oriented separate first direction plate body 311a extends is connected, and lateral rotation connects between each fixed plate 311e Have through the motor-driven transmission shaft 311f of PLC, the lateral wall of transmission shaft 311f is fixedly connected there are two being provided at circumferentially spaced And longitudinal cross-section is the refining module 311g of " L shape ";The refining module 311g includes fixing with the transmission shaft 311f outer wall The connecting plate 311h of connection and be fixedly connected with connecting plate 311h and shape be " cylinder " refining box 311j, each refining box 311j is equipped with the refining chamber 311k from recess setting clockwise, and in side of the refining box 311j far from connecting plate 311h Outer wall, which longitudinally extends to be equipped with, can pass through the movable groove of tank body 311 around transmission shaft 311g revolution activity for refining box 311j The slot bottom of 311m, the movable groove 311m be equipped with from refining chamber 311k accent to lower recess extend and with the guide chamber 311d The charging notch 311n of output end connection, and annular blanking is fixedly connected with far from the side of refining chamber 311k in each refining box 311j 311p is covered, is formed with blanking chamber 311q between the annular blanking set 311p and refining box 311j, and in the chamber of blanking chamber 311q Bottom is equipped with the refining hole that a circle is distributed as circular, circumferential equidistant interval using the bottom of chamber center and is connected to the refining chamber 311k 311r。
In the specific embodiment of the invention, the lifting platform 33 is equipped with multiple and each blanking chamber 311q and corresponds and use Each mounting groove 330 is located at close to lifting equipped with multiple in the mounting groove 330 of installation mold 5, and on the lifting platform 33 The honing device 331 of 33 center side of platform and the refining hole 311r that is used to polish;Wherein, the honing device 331 includes passing through branch Strut 3310 be fixedly connected with lifting platform 33 and with the spaced gear installation base 3311 of lifting platform 33, pass through main rotary shaft 3312 are rotatablely connected with 3311 top center of gear installation base and by motor-driven master gear 3313 and pass through pair It is rotatablely connected at the top of rotation axis 3314 and gear installation base 3311 and is spaced apart simultaneously with master gear 3313 for the center of circle is circumferentially equidistant The pinion 3315 engaged with master gear 3313, each pinion 3315 are fixedly connected to far from the center of gear installation base 3311 The diameter of axle of polishing axis 3316, polishing 3316 free end of axis gradually contracts from its free end to the connecting pin of its pinion 3315 It is small.
In the specific embodiment of the invention, the mold 5 in the step (2) includes can be put into mounting groove 330 first Ladder block 51, the second ladder block 52 being tightly connected with the first ladder block 51 far from 330 side of mounting groove and with the second ladder Third ladder block 53 of the block 52 far from 51 1 side contacts of the first ladder block, the top center of the third ladder block 53 is to the first rank Terraced 51 direction of block recess is formed through the forming cavity 54 of the second ladder block 52, and the bottom of chamber of the forming cavity 54 is fixedly connected with vertical To section be " trapezoidal " and with the spaced cover half block 55 of forming cavity 54, the transversal cross-section of the cover half block 55 is " positive odd plots of land that can be cultivated Shape ".
In the specific embodiment of the invention, the cover half block 55 includes being fixedly connected with the bottom of chamber center of the forming cavity 54 And the first part 551 longitudinally extended and six pieces are distributed in 551 outer circumferential wall of first part and contact with first part 551 Second part 552, the fixture block 553 and card slot being mutually adapted are respectively equipped between each second part 552 and first part 551 554, internally recess is equipped with cross section as " sector " at edge of each second part 552 far from 54 bottom of chamber of forming cavity, one side end face Reinforcement recess portion 552a, each reinforcement recess portion 552a on each second part 552 is formed at the edge of cover half block reinforces annular groove 552b, each second part 552 are equipped with far from 54 bottom of chamber side sunken end face of forming cavity and extend through outside second part outward The strengthening groove 552c of side wall.
In the specific embodiment of the invention, the forming cavity 54 is fixedly connected with a circle snap ring 6 close to the inner sidewall of accent, It is equipped at 54 accent of forming cavity and is placed on snap ring 6 and simultaneously portion is set with first part 551 and the interval of second part 552 Point expose the chuck 60 outside forming cavity 54, its center concentric is provided with a ring shape refining slot 600 on the chuck 60, and It is equipped in the slot bottom equidistant interval of annular refining slot 600 multiple with each refining hole 311r and from top to bottom through the through-hole of chuck 60 601。
With reference to FIG. 1 to FIG. 2, the beneficial effects of the present invention are:
First, the safety and reliability by the way that shaped piece ensure that product using integrally formed technique, molding Method carries out machine-shaping using the plate of various materials, can satisfy the appearance requirement of various special-shaped product structures;
Second, the structural strength of Moca coffee pot pedestal can be improved by reinforcing ring and reinforcement block, so that improving it uses the longevity Life;
Third, conveniently obtaining effective " expansion " in induction, it may be assumed that the bottom of from due to by the way of integrated extrusion forming Portion extends to each side, therefore there are the strong advantage of heating effect (compared to more split type);
Fourth, and form intracavitary cover half block it can be used repeatedly, can directly reduce the consumption of sand core, reduce worker Workload, while also avoiding that worker is caused to damage;
In more detail:
With reference to Fig. 3, first raw material are got out (i.e. the material of step one kind) and are put into electric smelting furnace melt, After the operation of step 1, electric smelting furnace is discharged by pipette in the aluminum water melted and passes through the guidance of guide chamber It has flowed to the charging notch being arranged on refining box to enter in refining box, and has been arranged by refining cassette bottom portion (that is: refining chamber bottom of chamber) Refining hole be discharged refining box, then the through-hole by being arranged on chuck is discharged into completing perfusion operation in forming cavity;
It should be understood that
First, the refining hole being arranged on refining chamber and the through-hole being arranged on chuck can make the aluminium entered in forming cavity Water distribution it is average, and then guarantee Aluminum Forming Quality;
Second, the case where blocking in filling process in order to avoid aluminum water, the electrode being arranged on furnace seat can be right The aluminum water solidified in pipette melts again, to avoid occurring the case where Aluminum blocking in pipette;
Third, the case where in order to avoid being blocked in refining box (that is: refining hole plug), in the process of lifting of lifting table In, the honing device installed on lifting platform (that is: polishing axis) can be entered in each refining hole, and pass through the main tooth of motor driven It takes turns and the polishing axis being arranged on each pinion is driven to rotate, and then the aluminum water being solidified to refining hole inner part is polished, from And the case where avoiding refining hole from blocking;
Fourth, with reference to Fig. 3~Fig. 5, guide chamber has the first plate body, stock guide and the second plate body to constitute longitudinal cross-section to be " arcuate shape ", the aluminum water being discharged from pipette can flow to charging indentation, there by the guidance of guide chamber, and due to The guide chamber of " arcuate shape " can provide " the flowing range " when aluminum water output, it is ensured that aluminum water can be lacked smoothly by charging Mouth enters in refining box;
Fifth, PLC can be passed through in " the neutral gear time " of pipette after a refining box participates in " transfer " aluminum water wherein Motor control transmission shaft (can rotate clockwise and anticlockwise) cooperates another refining box and guide chamber, and has neither part nor lot in The refining box of " transfer " aluminum water can be located at honing device top, can by polishing axis to the refining hole on refining box into Row polishing;And diminishing purpose is the diameter of axle for axis free end of polishing from top to bottom: polishing axis is smoothly entered In refining hole;
Sixth, the movable groove being arranged on refining box lateral wall can avoid refining box and tank body when transmission shaft rotates Bump against and (refer to Fig. 5), guarantees the smoothness run between each device;
Seventh, being provided with chuck at the accent of forming cavity, chuck can enter blanking during working as lifting of lifting table It is intracavitary, and make the through-hole being arranged on chuck corresponding with each refining hole, and the annular refining slot due to being arranged on chuck, it can be with Guarantee the aluminum water that be discharged from refining hole flowed into forming cavity to each through-hole (be further arranged may is that by adjacent through-holes it Between the slot bottom of annular refining slot be recessed from middle part to through hole setting);
Eighth, the reinforcement annular groove being arranged on cover half block forms the reinforcing ring after aluminum water molding, the strengthening groove exists The reinforcement block is formed after aluminum water molding, the connection between Moca coffee pot base bottom and side wall can be improved in reinforcing ring and reinforcement block Intensity guarantees the structural strength of Moca coffee pot, improves its service life;
Ninth, each second part can be detached to first part (that is: by card slot and fixture block, reference after aluminum water sizing The taking-up to Moca coffee pot pedestal can Fig. 9) be completed, and then is not necessarily to sand core, reduces the workload of worker, decreases simultaneously It is injured caused by worker.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of integral type Moca coffee pot pedestal, including ontology, the ontology includes bottom, side wall, inner cavity and face bottom Opening portion, it is characterised in that: the diameter of the bottom be greater than opening portion diameter, between bottom and side wall by casting once at Type;Wherein, the longitudinal cross-section of the ontology is trapezoidal.
2. a kind of integral type Moca coffee pot pedestal according to claim 1, it is characterised in that: the bottom of chamber edge of the inner cavity with It is fixedly connected with a circle reinforcing ring between interior chamber inner sidewall, and is fixedly connected with cross sectional shape on each inner sidewall of inner cavity and is " triangle " and the reinforcement block being connect with reinforcing ring.
3. a kind of integral formation method suitable for above-mentioned integral type Moca coffee pot pedestal, which comprises the steps of:
(1) raw material melts: preparing corresponding aluminium as in smelting furnace, the temperature in smelting furnace is heated to 650-710 DEG C, essence is added Agent is refined, aluminum water is obtained, is carefully stirred, wherein iron-content is that 0.66%, copper content is not more than 0.18% in aluminum water, and manganese content is 0.23%, magnesium content are as follows: 0.28%, nickel content 0.013%, silicon content 11.88%, zinc content 0.173%, lead tolerance is 0.004%, stanniferous amount is 0.06%, and titaniferous amount is 0.043%;
(2) mold prepares and pours: the aluminum water in step (1) being poured into mold, placing temperature is 1650-1850 DEG C, is poured Building the time is 30-35s, after the completion of pouring, keeps 30-35min;
(3) cooling: after the aluminum water in step (2) is cooled to room temperature, to take out molding Moca coffee pot pedestal, its surface is carried out clear It manages, polish and obtain Moca coffee pot pedestal idiosome;
(4) it is heat-treated: molded blank is heat-treated, hardening heat control is in 750-850 DEG C, tempering temperature control in 620- 650℃。
4. a kind of integral formation method of integral type Moca coffee pot pedestal according to claim 3, it is characterised in that: the step Suddenly the aluminium in (1) can be aluminium sheet, aluminium scrap block and aluminum strip.
5. a kind of integral formation method of integral type Moca coffee pot pedestal according to claim 3 or 4, it is characterised in that: institute Stating the smelting furnace in step (1) includes for melting the electric smelting furnace of the aluminium, set on electric smelting furnace bottom and the company of being secured to The furnace seat that connects, the mold mounting assembly for being fixedly connected on furnace seat bottom and it is set to connection electric smelting furnace and mold installation group Part and the pipette for being used to shift molten aluminum;Wherein, the furnace seat include furnace seat ontology and it is multiple from the furnace seat ontology and from The upper and lower installation cavity through furnace seat ontology and for installing pipette, each installation cavity is using furnace seat body central as center of circle circumferential direction Equidistant interval is distributed, and the electrode for heating to pipette is equipped in each installation cavity;The mold mounting assembly includes It is fixedly connected with the furnace seat and the middle drum body of hollow setting, multiple set on inner barrel and the liquid filling that is connected to each pipette Module and the lifting platform for going up and down by Driven by Hydraulic Cylinder and be used to install the step (2) mold, when the lifting platform rises, It can make the output end in contact of mold Yu liquid filling module.
6. a kind of integral formation method of integral type Moca coffee pot pedestal according to claim 5, it is characterised in that: each liquid filling Module includes sealing the liquid relief mouth being connected to and the liquid relief mouth output end at the top of middle drum body and with each pipette output end The tank body of connection is sealed, the tank body is " curved " and spaced first plate body and stock guide and fixation by longitudinal cross-section The second plate body being connected between the first plate body and stock guide two sides is constituted, first plate body, stock guide and each second plate The guide chamber being connected to liquid relief mouth is formed between body;Wherein, oriented separate first plate body is fixedly connected on each second plate body The fixed plate that direction extends, and lateral rotation is connected with through the motor-driven transmission shaft of PLC, the transmission between each fixed plate The lateral wall of axis be fixedly connected there are two be provided at circumferentially spaced and longitudinal cross-section be " L shape " refining module;The refining module It is fixedly connected including the connecting plate being fixedly connected with the transmission shaft outer wall and with connecting plate and shape is the even of " cylinder " Magazine, each refining box are equipped with the refining chamber from recess setting clockwise, and outside side of the refining box far from connecting plate Wall, which longitudinally extends, to be equipped with for refining box through the movable groove of tank body, and the slot bottom of the movable groove is equipped with from accent to lower recess The charging notch for extending and being connected to the guide chamber output end, and ring is fixedly connected with far from the side of refining chamber in each refining box Shape blanking set is formed with blanking chamber, and is equipped with a circle in the bottom of chamber of blanking chamber with this between the annular blanking set and refining box Bottom of chamber center is the refining hole that circular, circumferential equidistant interval is distributed and is connected to the refining chamber.
7. a kind of integral formation method of integral type Moca coffee pot pedestal according to claim 6, it is characterised in that: the liter Drop platform is equipped with multiple mounting grooves for corresponding and being used for installation mold with each blanking chamber, and equipped with more on the lifting platform A honing device for being located at each mounting groove close to lifting platform center side and for refining hole of polishing;Wherein, the grinding out Device include be fixedly connected by support rod with lifting platform and with the spaced gear installation base of lifting platform, pass through main rotary shaft It is rotatablely connected with gear installation base top center and by motor-driven master gear and by secondary rotation axis and gear It is rotatablely connected at the top of mounting base and using master gear as the circumferentially equidistant pinion being spaced apart and engaged with master gear in the center of circle, each pair Gear is fixedly connected to polishing axis far from the center of gear installation base, the diameter of axle of the polishing axis free end from its free end to The connecting pin of itself and pinion is gradually reduced.
8. a kind of integral formation method of integral type Moca coffee pot pedestal according to claim 7, it is characterised in that: the step Suddenly the mold in (2) includes that the first ladder block that can be put into mounting groove and the first ladder block connect far from one side seal of mounting groove The second ladder block connect and the third ladder block with the second ladder block far from one side contacts of the first ladder block, the third ladder The top center of block is to the first ladder Block direction concave shape at the forming cavity having through the second ladder block, the bottom of chamber of the forming cavity Be fixedly connected with longitudinal cross-section be " trapezoidal " and with the spaced cover half block of forming cavity, the transversal cross-section of the cover half block is " regualr decagon ".
9. a kind of integral formation method of integral type Moca coffee pot pedestal according to claim 8, it is characterised in that: described fixed Module includes being fixedly connected with the bottom of chamber center of the forming cavity and the first part longitudinally extended and six pieces are distributed in first Partially circumferentially lateral wall and the second part contacted with first part are respectively equipped with mutually between each second part and first part The fixture block and card slot of adaptation, edge of each second part far from one side end face of forming cavity bottom of chamber are internally recessed equipped with transversal Face is the reinforcement recess portion of " sector ", and each reinforcement recess portion on each second part is formed at the edge of cover half block reinforces annular groove, respectively Second part is equipped with the strengthening groove for extending through second part lateral wall outward far from forming cavity bottom of chamber side sunken end face.
10. a kind of integral formation method of integral type Moca coffee pot pedestal according to claim 9, it is characterised in that: described Forming cavity is fixedly connected with a circle snap ring close to the inner sidewall of accent, at the forming cavity accent be equipped be placed on snap ring and With first part and the setting of second part interval and the chuck outside forming cavity is exposed in part, on the chuck with its center concentric Be provided with a ring shape refining slot, and the slot bottom equidistant interval of annular refining slot be equipped with it is multiple with each refining hole and from top to bottom Through the through-hole of chuck.
CN201910663718.1A 2019-07-23 2019-07-23 Integrated mocha kettle base and integrated forming method thereof Active CN110353500B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910663718.1A CN110353500B (en) 2019-07-23 2019-07-23 Integrated mocha kettle base and integrated forming method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910663718.1A CN110353500B (en) 2019-07-23 2019-07-23 Integrated mocha kettle base and integrated forming method thereof

Publications (2)

Publication Number Publication Date
CN110353500A true CN110353500A (en) 2019-10-22
CN110353500B CN110353500B (en) 2021-01-08

Family

ID=68220589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910663718.1A Active CN110353500B (en) 2019-07-23 2019-07-23 Integrated mocha kettle base and integrated forming method thereof

Country Status (1)

Country Link
CN (1) CN110353500B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605206A (en) * 2012-03-29 2012-07-25 天津千鑫有色金属制品有限公司 Aluminium alloy casting manufacturing process
WO2017144996A1 (en) * 2016-02-26 2017-08-31 Mokha' S.R.L. Valve for dispensing infusion with foam for a moka-type coffee machine and coffee machine comprising said valve
CN108788100A (en) * 2018-07-03 2018-11-13 永康市给乐电器有限公司 A kind of processing mold and casting method of Moca coffee pot lower body
CN208590891U (en) * 2017-10-20 2019-03-12 浙江创建厨具有限公司 A kind of aluminum Moca coffee pot pot seat
CN209074227U (en) * 2018-08-06 2019-07-09 上海六滴智能科技有限公司 A kind of two-tube storage water storage unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605206A (en) * 2012-03-29 2012-07-25 天津千鑫有色金属制品有限公司 Aluminium alloy casting manufacturing process
WO2017144996A1 (en) * 2016-02-26 2017-08-31 Mokha' S.R.L. Valve for dispensing infusion with foam for a moka-type coffee machine and coffee machine comprising said valve
CN208590891U (en) * 2017-10-20 2019-03-12 浙江创建厨具有限公司 A kind of aluminum Moca coffee pot pot seat
CN108788100A (en) * 2018-07-03 2018-11-13 永康市给乐电器有限公司 A kind of processing mold and casting method of Moca coffee pot lower body
CN209074227U (en) * 2018-08-06 2019-07-09 上海六滴智能科技有限公司 A kind of two-tube storage water storage unit

Also Published As

Publication number Publication date
CN110353500B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN105436474B (en) A kind of modified forged steel roll neck bainite ductile iron composite roll manufacturing process and equipment
CN105401059B (en) A kind of modified forged steel roll neck high-nickel-chromium molybdenum alloy cast iron composite roll manufacturing process and equipment
CN105522126B (en) The compound roll shaft manufacturing process of high-performance and equipment
CN105522138B (en) A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus
CN105562647B (en) A kind of forged steel roll neck indefinite chill high-nickel-chromium molybdenum composite roll Processes and apparatus
CN105397067B (en) Forged steel roll neck alloy nodular cast iron composite roll manufacturing process and equipment
CN214867174U (en) Casting forming die for magnesium rod production and processing
CN106111913A (en) A kind of flange casting technique
CN110353500A (en) A kind of integral type Moca coffee pot pedestal and its integral formation method
CN201862734U (en) Fast sand mould forming mold for centrifugal casting special-shaped cylinder jacket
CN105798261B (en) A kind of building mortion and method for preparing high structural strength aluminium alloy wheel hub
CN209849877U (en) Spiral steel pipe production is with pouring device
CN205650777U (en) Flywheel casting mould
CN114210943B (en) Pouring production process for arc lining plate of discharge door
CN105328168B (en) Nickel-chrome-molybdenum alloy cast iron composite roll manufacturing process and equipment in a kind of forged steel roll neck
CN211052462U (en) Casting mould of steering knuckle casting
CN214079220U (en) Automatic pouring device of phosphorus-copper alloy
CN2151828Y (en) Horizontal continuous casting small square block crystal device
CN204770598U (en) Copper aluminium founding mould
CN106825516A (en) A kind of composite roll roller covers manufacturing process and equipment
CN211445486U (en) Pigment glass day tank furnace with rotary stirring function
CN213826972U (en) Continuous casting crystallizer for alloy steel processing
CN215614859U (en) Integrated into one piece device is used in crankshaft pulley production and processing
CN215373584U (en) Stirring device for stirring alloy liquid
CN216299616U (en) Forming die for sand mould riser of electric smelting alumina brick

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: The invention relates to an integrated Mocha pot base and an integrated forming method thereof

Effective date of registration: 20210927

Granted publication date: 20210108

Pledgee: Zhejiang Tailong commercial bank Limited by Share Ltd. Quzhou Changshan branch

Pledgor: ZHEJIANG CHUANGJIAN KITCHENWARE Co.,Ltd.

Registration number: Y2021330001797