CN110349468A - A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy - Google Patents
A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy Download PDFInfo
- Publication number
- CN110349468A CN110349468A CN201910636331.7A CN201910636331A CN110349468A CN 110349468 A CN110349468 A CN 110349468A CN 201910636331 A CN201910636331 A CN 201910636331A CN 110349468 A CN110349468 A CN 110349468A
- Authority
- CN
- China
- Prior art keywords
- test
- data
- insulation
- electrical installation
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/12—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
Abstract
The invention discloses a kind of, and the insulation of electrical installation based on multi-person synergy tests dummy emulation system, it includes: server function module: using local area network Model Establishment TCP/UDP Data Transport Protocol and socket communication protocol, guarantees the real-time connection and response of data;AI management module: Selection experiment project and test number by the management to pilot project and test number, and are analyzed test result;Emulation training module: environment and test process by simulating electric equipment test establish the training of insulation of electrical installation test simulation and emulation examination;Data security module: by the way of asymmetric encryption encrypting the transmitting between data, reduces because the data that data interference generates postpone and error in data;It solves in electrical equipment l-G simulation test, often lays particular emphasis on the teaching and simulation of experiment process, with actual more having a certain difference property of people's test operation situation, belong to the technical problems such as traditional teaching pattern.
Description
Technical field
The invention belongs to electric equipment test simulated teaching technical fields more particularly to a kind of based on the electrical of multi-person synergy
Apparatus insulated test dummy emulation system.
Background technique
Virtual reality technology is using increasingly wider in emulation training, and the data resource in simulation training system is also increasingly
It is more, on the one hand because of the higher recycling rate of waterused of simulation training system, it can satisfy large quantities of students while carrying out training, on the other hand
It is huge due to a lack of guidance and training information amount, cause student to have bigger cognitive load to academic environment, reduces training
Effect.In electrical equipment l-G simulation test, the teaching and simulation of experiment process are often laid particular emphasis on, with actual more people's test operations
Having a certain difference property of situation substantially still belongs to traditional teaching pattern, can not true reaction test complexity.
How by effective AI intelligent management, allows test process that can carry out simulation training according to true changeable situation, reach true
Positive result of training is still unsolved a great problem.
Summary of the invention
The technical problem to be solved by the present invention is it is virtual imitative to provide a kind of insulation of electrical installation test based on multi-person synergy
True system often lays particular emphasis on the teaching and simulation of experiment process to solve the prior art in electrical equipment l-G simulation test, with
Actual more having a certain difference property of people's test operation situation, substantially still belong to the technical problems such as traditional teaching pattern.
The technical scheme is that
A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy, it includes:
Server function module: using local area network Model Establishment TCP/UDP Data Transport Protocol and socket communication protocol, guarantees
The real-time connection and response of data;
AI management module: Selection experiment project and test number, by the management to pilot project and test number, and to test
As a result it is analyzed;
Emulation training module: it is imitative to establish insulation of electrical installation test for environment and test process by simulating electric equipment test
It is true to train and emulate examination, by the simulation of the operation, test result that prepare test, test process, make student's grasp electrical
The Standard Operating Procedure of apparatus insulated test, and the Grasping level of certification test principle and test operation;
Data security module: by the way of asymmetric encryption encrypting the transmitting between data, reduces because data are dry
Disturb data delay and the error in data of generation.
The server disposition of the server module is remotely accessed in local, administrator with account and password;To clothes
The data lab setting remote access user of business device and password, database access use SLL authentication mechanism and UTF-8 coded format;
The data command of data communication between client and server must all use check bit to be verified, while data are transmitted across
It is encrypted in journey using MD5.
AI management module includes analysis of experiments and multi-person synergy;The analysis of experiments is the big data data according to foundation
Whether library, typing test data allow testing crew check test to succeed by big data analysis of experiments;Multi-person synergy is using more
People's coordinated management carries out the division of role and task to testing crew, arranges, simulate actual experimental situation towards testing crew,
The testing crew of different numbers is distributed to complete corresponding test operation.
The implementation method of AI management module includes:
(1), it determines that testing crew number is a people, corresponds to the figure of a start node;
(2), experiment process is decomposed into b step, each step is arranged corresponding weight, is denoted as b (1), b (2), b
(3),...,b(n);
(3), it by the depth-first traversal algorithm of figure, is begun stepping through respectively from a node, calculates corresponding weight, as a result divide
It is not denoted as w (1), w (2), w (3) .., w (a);
(4), corresponding test optimal dividing and allocation result are chosen.
The emulation training module develops engine implementation using Unity3D, and modelling is built using 3DMax, makes
Make the mark that standard uses 11181 power grid threedimensional model of Q GDW 1795-2013 power grid three-dimensional modeling general rule and Q GDW
Standard specifically includes:
(1) model bakes: the baking mode of model is used uniformly Vary_lightingmap and bakes patch mode; Vary_
When lightingmap bakes setting, Map Channel and object uv coordinate channels are necessary for 3 channels, the shade side of light when baking
Formula is the advanced ray trace shade of adv.raytraced, and background colour is white, and the textures of object are unfolded manually;
(2) model binding and animation: two class of bone CAT, BIP, single body bone quantity are no more than 60;Animation frame per second,
The control of frame number, 30 frame per second, an action control are completed in 3 seconds;Animation is exported, 2 files are divided into, guide goes out without dynamic
The model and bone of work;The fbx file for there was only bone is exported after regulating animation;
(3) model exports:
Material will be baked and be changed to Standard ball, channel 1, self-luminous 100%;
All objects name, material ball name and textures name are consistent;
Merge vertex, remove scene, deletes all otiose objects;
Clear material ball, deletes useless material ball;
Export fbx, export fbx after, then again import max in look into read through fbx animation it is whether correct.
The method of asymmetric encryption are as follows: (1) information encryption is public key encryption, private key decryption, it is ensured that the safety of information;
(2) digital signature is private key encryption public key decryptions, it is ensured that the belongingness of digital signature;(3) login authentication private key encryption, public key solution
It is close.
The emulation training module is to establish electrical equipment with human-computer interaction technology based on virtual reality technology, dynamic catch of optics
Insulation Test ring curtain interacts the operation training that simulation training system completes pilot project;Virtual reality technology is simulation electrical equipment
The environment and test process of test, comprising: whole including model of place construction, threedimensional model processing and test operation flowsheeting
It closes;
(1) model of place is built: substation modelling, testing equipment, neighboring buildings and landform including substation are green
Change modelling;
(2) testing equipment make: modeling contents include apparatus for testing transformer, test of lightning arrester equipment, mutual inductor testing equipment,
Circuit freakers test device and the production of chemical test device model;
(3) type instrument tool making: modeling contents include experiment process: transformer voltage ratio test, transformer induction pressure resistance examination
It tests with partial discharge test, Insulation Resistance of Transformer test, transformer together with the test of casing dielectric loss, deformation of transformer winding
Test, on-load tap changers of transformers test, DCR of Transformer test;Breaker mechanic property examination, breaker are conductive
Loop resistance test;Mutual inductor medium loss test, mutual inductor insulation resistance test;Zinc-Oxide Arrester DC reference voltage and
Leakage current testing;Scene is drawn oil sample, gas on-site samples, gas on-site is chemically examined, gas on-site is chemically examined, gas on-site chemical examination needs
The all appts tool making to be used;
(4) toolroom makes: choosing corresponding instrument tool according to process, these instrument tools are incorporated into a toolroom;
(5) process cartoon making: the animations system such as personage, instrument and tool including all interactive steps of each experiment process
Make.
The invention has the advantages that:
The present invention is managed by AI, and Virtual Simulation is combined with artificial intelligence technology, the more people associations of the electrical equipment of proposition
Have the characteristics that vividness, interactivity with l-G simulation test, and the addition of AI intelligent management, it can not only learn in student training
Effective Teaching Service is provided in journey, helps student to rapidly adapt to virtual simulation environment and grasp professional skill, can also simulate
A variety of actual tests situations, complete one or multi-user collaborative operation, and smart allocation task simulates actual experimental role work completely
Make, and test situation is analyzed and summarized;The prior art is solved in electrical equipment l-G simulation test, often lays particular emphasis on examination
The teaching and simulation for testing process substantially still belong to tradition with actual more having a certain difference property of people's test operation situation
The technical problems such as teaching pattern.
Detailed description of the invention
Fig. 1 is present system structural schematic diagram;
Fig. 2 is AI management function schematic diagram;
Fig. 3 is that AI manages multi-person synergy experiment process schematic diagram;
Fig. 4 is asymmetric encryption schematic diagram;
Fig. 5 is asymmetric encryption Processing Algorithm schematic diagram.
Specific embodiment
A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy:
Server function module: using local area network Model Establishment TCP/UDP Data Transport Protocol and socket communication protocol, guarantees
The real-time connection and response of data;
AI management module: Selection experiment project and test number, by the management to pilot project and test number, and to test
As a result it is analyzed;
Emulation training module: it is imitative to establish insulation of electrical installation test for environment and test process by simulating electric equipment test
It is true to train and emulate examination, by the simulation of the operation, test result that prepare test, test process, make student's grasp electrical
The Standard Operating Procedure of apparatus insulated test, and student is investigated to the grasp journey of test principle and test operation using emulation examination
Degree;
Data security module: by the way of asymmetric encryption encrypting the transmitting between data, reduces because data are dry
Disturb data delay and the error in data of generation.
Server function module:
LAN environment is established, server disposition is in local.
Server operating system
Windows Server is the core of Microsoft Windows Server System (WSS), the service of Windows
Device operating system.
Server log
Setting administrator remotely accesses with account and password;
Database access
For the special remote access user of data lab setting and password, database access is compiled using SLL authentication mechanism and UTF-8
Code format, it is ensured that the safety of database;
The data command of data communication between client and server must all use check bit to be verified, while data pass
It is encrypted during defeated using MD5;
Emulation training module
Realize engine
The emulation part of emulation training uses Unity3D to develop engine.Unity3D is developed by Unity Technologies
One allows player easily to create the more of the types interaction contents such as 3 D video game, building visualization, realtime three dimensional animation
The comprehensive development of games tool of platform is the professional game engine integrated comprehensively.
Developing instrument
The logic development of emulation training uses Microsoft Visual Studio(abbreviation VS).VS is MS
Development kit series of products.VS is a basic complete developing instrument collection, it includes institute in entire software life-cycle
The most of tool needed, such as UML tool, code administration tool, Integrated Development Environment (IDE).VS can be realized from same
The application program towards multiple .NET Framework versions is created in one exploitation environment.Developer can construct towards
.NET it is various to mean that they can support in same environment for the application program of Framework 2.0,3.0 or 3.5
Project.
Model construction
The modelling of emulation training is built using 3DMax.It is three-dimensional to make canonical reference Q GDW 1795-2013 power grid
Model the series standard of general rule and 11181 power grid threedimensional model of Q GDW;
(1) model bakes
1. the baking mode of model is used uniformly Vary_lightingmap and bakes patch mode;
2. baked mapping is arranged, when Vary_lightingmap bakes setting, Map Channel and object uv coordinate channels are necessary for 3
Channel, the shade mode of light is adv.raytraced advanced ray trace shade when baking, and background colour will be changed to white, keep away
The case where exempting from black surround.The textures uv of main object must be unfolded manually.
(2) model binding and animation
1. bone is necessary for two class of CAT, BIP, single body bone quantity is no more than 60.
2. the control of animation frame per second, frame number is under normal circumstances 30 frame per second, a movement controls complete in 3 seconds as far as possible
At.
3. exporting animation, 2 files are separated, export model, the bone not acted, model is needed with covering information.
The fbx file of derived only bone after doing animation is regulated later.
(3) model exports
1. being changed to Standard ball, channel 1, self-luminous 100% for material is baked;
2. all objects name, material ball name, textures name are consistent;
3. merging vertex, scene is removed, deletes all otiose objects;
4. clear material ball deletes extra material ball (unessential textures will reduce);
5. export fbx(inspection checks whether to play a group export as required), after exporting fbx, then imports in max to look into again and read through
Whether the animation of fbx is correct;
AI management module includes:
Analysis of experiments
The first part that AI management is realized is analysis of experiments.
Big data database is established, using MYSQL database, related data is tested in typing.Data source mainly has following
Three parts:
(1) historical data is tested;
(2) core operation step data are tested;
(3) test result;
By analysis of experiments, the case where can testing with fast reaction, the quick check test of testing crew is allowed whether to succeed.
Multi-person synergy
Multi-person synergy management, generally at least 4 people;Towards testing crew, division, the peace of role and task are carried out to testing crew
Row simulates actual experimental situation, can distribute the testing crew of different numbers to complete corresponding test operation.
The implementation method of AI management module
It based on C/C++ development language, by graph traversal algorithm, realizes that result calculates, by optimal result, obtains role, stream
Journey, the optimum allocation result of task.
Graph traversal is the important operation of one kind of figure.So-called traversal refers to the access of the information to nodes all in figure,
Successively node each in figure access once and is only accessed primary.Due to from some given node, have it is multiple can be with
The next node (figure is not linear data structure) gone to, so in the case where sequence calculates (i.e. non-parallel computation), only
The access to certain nodes can be postponed --- it saves in some way to visit again later.Common way is to use
Stack (LIFO) or queue (FIFO).Due to scheming it is a kind of data structure for self quoting (i.e. recursive definition) in itself, very certainly
Or more precisely recursive fashion can also be so used, with corecursion, to realize the preservation of delay node.At this moment it (adopts
The case where with recurrence) these nodes are saved in call stack.
Realization process:
(1) testing crew number is a people, corresponds to the figure (a > 0) of a start node;
(2) experiment process is decomposed into b step, corresponding weight is arranged in each step, be denoted as b (1), b (2), b (3) ...,
b(n);
(3) the depth-first traversal algorithm for passing through figure, begins stepping through respectively from a node, calculates corresponding weight, as a result distinguish
It is denoted as w (1), w (2), w (3) .., w (a);
(4) graph traversal result is analyzed, weighting weight sum is compared, and chooses corresponding test optimal dividing and distribution knot
Fruit.
Data security module
Data security module uses asymmetric encryption mode, guarantees the safety of system data.
The introduction of asymmetrical encryption technology
Encryption Algorithm is divided into symmetric encipherment algorithm and rivest, shamir, adelman, it is asymmetric in mainly apply rivest, shamir, adelman.
Asymmetric encryption, which refers to, is integrated into the encryption skill in asymmetric to meet security requirement and ownership verifying demand
Art.Asymmetric encryption uses two asymmetrical passwords usually in encryption and decryption processes, is referred to as public key and private key.It is non-
There are two features to tool for symmetric key: first is that with after one of key (public key or private key) encryption information, only another is right
The key answered can just be unlocked.Second is that public key can be open to other people, private key then maintains secrecy, other people can not be extrapolated by the public key
Corresponding private key.
Asymmetric encryption introduction
In systems, the application scenarios of encryption mainly include information encryption, digital signature and login authentication etc..
It is implemented as follows:
(1) information encryption is public key encryption, private key decryption, it is ensured that the safety of information;
(2) digital signature is private key encryption public key decryptions, it is ensured that the belongingness of digital signature;
(3) login authentication private key encryption, public key decryptions.
Realization principle introduction:
(1) information encryption scene is mainly to be encrypted using the public key of recipient (being denoted as B) to information by information transmitter (being denoted as A)
After be then forwarded to B, B decrypts information using the private key of oneself.
(2) digital signature scene is then to use A using B, B is sent to after oneself private key encryption information by sender A
Public key to information decryption, to can ensure that information is sent by A.
(3) login authentication scene is then by client using being sent to server, Hou Zhejie after private key encryption log-on message
The public key decryptions of the client are used after receipts and authenticate log-on message
The present invention optimizes traditional simulation training structure and frame, introduces artificial intelligence management mode, and be directed to multi-person synergy task
Intelligent management and analysis of experiments, step by step give student training, and can count the Grasping level of student.It can allow electrical equipment
L-G simulation test is more bonded reality, really achievees the purpose that analogue simulation, improves training efficiency.
Claims (7)
1. a kind of insulation of electrical installation based on multi-person synergy tests dummy emulation system, it includes:
Server function module: using local area network Model Establishment TCP/UDP Data Transport Protocol and socket communication protocol, guarantees
The real-time connection and response of data;
AI management module: Selection experiment project and test number, by the management to pilot project and test number, and to test
As a result it is analyzed;
Emulation training module: it is imitative to establish insulation of electrical installation test for environment and test process by simulating electric equipment test
It is true to train and emulate examination, by the simulation of the operation, test result that prepare test, test process, make student's grasp electrical
The Standard Operating Procedure of apparatus insulated test, and the Grasping level of certification test principle and test operation;
Data security module: by the way of asymmetric encryption encrypting the transmitting between data, reduces because data are dry
Disturb data delay and the error in data of generation.
2. a kind of insulation of electrical installation based on multi-person synergy according to claim 1 tests dummy emulation system, special
Sign is: the server disposition of the server module is remotely accessed in local, administrator with account and password;To service
The data lab setting remote access user of device and password, database access use SLL authentication mechanism and UTF-8 coded format;Visitor
The data command of data communication between family end and server must all use check bit to be verified, while data transmission procedure
It is middle to be encrypted using MD5.
3. a kind of insulation of electrical installation based on multi-person synergy according to claim 1 tests dummy emulation system, special
Sign is: AI management module includes analysis of experiments and multi-person synergy;The analysis of experiments is the big data database according to foundation,
Whether typing test data allows testing crew check test to succeed by big data analysis of experiments;Multi-person synergy is assisted using more people
With management, towards testing crew, the division of role and task is carried out to testing crew, arranged, actual experimental situation, distribution are simulated
The testing crew of different numbers completes corresponding test operation.
4. a kind of insulation of electrical installation based on multi-person synergy according to claim 3 tests dummy emulation system, special
Sign is: the implementation method of AI management module includes:
(1), it determines that testing crew number is a people, corresponds to the figure of a start node;
(2), experiment process is decomposed into b step, each step is arranged corresponding weight, is denoted as b (1), b (2), b
(3),...,b(n);
(3), it by the depth-first traversal algorithm of figure, is begun stepping through respectively from a node, calculates corresponding weight, as a result divide
It is not denoted as w (1), w (2), w (3) .., w (a);
(4), corresponding test optimal dividing and allocation result are chosen.
5. a kind of insulation of electrical installation based on multi-person synergy according to claim 1 tests dummy emulation system, special
Sign is: the emulation training module develops engine implementation using Unity3D, and modelling is built using 3DMax, makes
Standard uses the standard of 11181 power grid threedimensional model of Q GDW 1795-2013 power grid three-dimensional modeling general rule and Q GDW,
It specifically includes:
(1) model bakes: the baking mode of model is used uniformly Vary_lightingmap and bakes patch mode; Vary_
When lightingmap bakes setting, Map Channel and object uv coordinate channels are necessary for 3 channels, the shade side of light when baking
Formula is the advanced ray trace shade of adv.raytraced, and background colour is white, and the textures of object are unfolded manually;
(2) model binding and animation: two class of bone CAT, BIP, single body bone quantity are no more than 60;Animation frame per second,
The control of frame number, 30 frame per second, an action control are completed in 3 seconds;Animation is exported, 2 files are divided into, guide goes out without dynamic
The model and bone of work;The fbx file for there was only bone is exported after regulating animation;
(3) model exports:
Material will be baked and be changed to Standard ball, channel 1, self-luminous 100%;
All objects name, material ball name and textures name are consistent;
Merge vertex, remove scene, deletes all otiose objects;
Clear material ball, deletes useless material ball;
Export fbx, export fbx after, then again import max in look into read through fbx animation it is whether correct.
6. a kind of insulation of electrical installation based on multi-person synergy according to claim 1 tests dummy emulation system, special
Sign is: the method for asymmetric encryption are as follows: (1) information encryption is public key encryption, private key decryption, it is ensured that the safety of information;(2)
Digital signature is private key encryption public key decryptions, it is ensured that the belongingness of digital signature;(3) login authentication private key encryption, public key decryptions.
7. a kind of insulation of electrical installation based on multi-person synergy according to claim 1 tests dummy emulation system, special
Sign is: the emulation training module is to establish electrical equipment with human-computer interaction technology based on virtual reality technology, dynamic catch of optics
Insulation Test ring curtain interacts the operation training that simulation training system completes pilot project;Virtual reality technology is simulation electrical equipment
The environment and test process of test, comprising: whole including model of place construction, threedimensional model processing and test operation flowsheeting
It closes;
(1) model of place is built: substation modelling, testing equipment, neighboring buildings and landform including substation are green
Change modelling;
(2) testing equipment make: modeling contents include apparatus for testing transformer, test of lightning arrester equipment, mutual inductor testing equipment,
Circuit freakers test device and the production of chemical test device model;
(3) type instrument tool making: modeling contents include experiment process: transformer voltage ratio test, transformer induction pressure resistance examination
It tests with partial discharge test, Insulation Resistance of Transformer test, transformer together with the test of casing dielectric loss, deformation of transformer winding
Test, on-load tap changers of transformers test, DCR of Transformer test;Breaker mechanic property examination, breaker are conductive
Loop resistance test;Mutual inductor medium loss test, mutual inductor insulation resistance test;Zinc-Oxide Arrester DC reference voltage and
Leakage current testing;Scene is drawn oil sample, gas on-site samples, gas on-site is chemically examined, gas on-site is chemically examined, gas on-site chemical examination needs
The all appts tool making to be used;
(4) toolroom makes: choosing corresponding instrument tool according to process, these instrument tools are incorporated into a toolroom;
(5) process cartoon making: the animations system such as personage, instrument and tool including all interactive steps of each experiment process
Make.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910636331.7A CN110349468A (en) | 2019-07-15 | 2019-07-15 | A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910636331.7A CN110349468A (en) | 2019-07-15 | 2019-07-15 | A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110349468A true CN110349468A (en) | 2019-10-18 |
Family
ID=68176264
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910636331.7A Pending CN110349468A (en) | 2019-07-15 | 2019-07-15 | A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110349468A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111028603A (en) * | 2019-12-27 | 2020-04-17 | 广东电网有限责任公司培训与评价中心 | Live-line work training method and system for transformer substation based on dynamic capture and virtual reality |
CN111240490A (en) * | 2020-03-24 | 2020-06-05 | 贵州电网有限责任公司 | Equipment insulation test training system based on VR virtual immersion and circular screen interaction |
CN111314484A (en) * | 2020-03-06 | 2020-06-19 | 王春花 | Virtual reality data synchronization method and device and virtual reality server |
CN112198403A (en) * | 2020-10-10 | 2021-01-08 | 重庆交通大学 | Ship cable insulation corrosion degree estimation technology based on multi-scale dielectric coefficient |
CN112883528A (en) * | 2021-03-22 | 2021-06-01 | 甘肃钢铁职业技术学院 | Computer network simulation modeling training system |
TWI823153B (en) * | 2021-10-04 | 2023-11-21 | 柯伯呈 | Interactive testing device for judging the quality of power cable insulation resistance |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000054098A (en) * | 2000-05-22 | 2000-09-05 | 서상태 | ARCHITEC TURE Internet ASP(Application Service Provider)Solution |
US20070153817A1 (en) * | 2006-01-05 | 2007-07-05 | Robert Osann | Interleaved and directional wireless mesh network |
CN102036242A (en) * | 2009-09-29 | 2011-04-27 | 中兴通讯股份有限公司 | Access authentication method and system in mobile communication network |
US20140274403A1 (en) * | 2013-03-14 | 2014-09-18 | Agincourt Gaming Llc | Systems and Methods for Identifying Virtual Entities in a Virtual Environment |
CN104575150A (en) * | 2015-01-15 | 2015-04-29 | 广东电网有限责任公司教育培训评价中心 | Multi-user online cooperating method, device and system for power simulation training |
CN105282240A (en) * | 2015-11-26 | 2016-01-27 | 电子科技大学中山学院 | High-power equipment remote monitoring analysis system |
CN105869470A (en) * | 2015-05-28 | 2016-08-17 | 国家电网公司 | Extra-high voltage transformer station operation simulation method and system |
CN105894235A (en) * | 2016-04-27 | 2016-08-24 | 合肥学院 | Storehouse material distribution guide system and method |
CN108074031A (en) * | 2017-06-29 | 2018-05-25 | 北京小度信息科技有限公司 | Order component formula method and device |
CN108154772A (en) * | 2018-01-09 | 2018-06-12 | 国网江苏省电力有限公司电力科学研究院 | Substation's collaborative simulation training system construction method based on virtual reality |
CN108806385A (en) * | 2018-05-08 | 2018-11-13 | 上海工程技术大学 | A kind of VR immersions multi-person synergy vehicle practice teaching system and teaching method |
-
2019
- 2019-07-15 CN CN201910636331.7A patent/CN110349468A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000054098A (en) * | 2000-05-22 | 2000-09-05 | 서상태 | ARCHITEC TURE Internet ASP(Application Service Provider)Solution |
US20070153817A1 (en) * | 2006-01-05 | 2007-07-05 | Robert Osann | Interleaved and directional wireless mesh network |
CN102036242A (en) * | 2009-09-29 | 2011-04-27 | 中兴通讯股份有限公司 | Access authentication method and system in mobile communication network |
US20140274403A1 (en) * | 2013-03-14 | 2014-09-18 | Agincourt Gaming Llc | Systems and Methods for Identifying Virtual Entities in a Virtual Environment |
CN104575150A (en) * | 2015-01-15 | 2015-04-29 | 广东电网有限责任公司教育培训评价中心 | Multi-user online cooperating method, device and system for power simulation training |
CN105869470A (en) * | 2015-05-28 | 2016-08-17 | 国家电网公司 | Extra-high voltage transformer station operation simulation method and system |
CN105282240A (en) * | 2015-11-26 | 2016-01-27 | 电子科技大学中山学院 | High-power equipment remote monitoring analysis system |
CN105894235A (en) * | 2016-04-27 | 2016-08-24 | 合肥学院 | Storehouse material distribution guide system and method |
CN108074031A (en) * | 2017-06-29 | 2018-05-25 | 北京小度信息科技有限公司 | Order component formula method and device |
CN108154772A (en) * | 2018-01-09 | 2018-06-12 | 国网江苏省电力有限公司电力科学研究院 | Substation's collaborative simulation training system construction method based on virtual reality |
CN108806385A (en) * | 2018-05-08 | 2018-11-13 | 上海工程技术大学 | A kind of VR immersions multi-person synergy vehicle practice teaching system and teaching method |
Non-Patent Citations (5)
Title |
---|
ALPS_01: "unity3d模型制作规范", 《博客园》 * |
李君: "虚拟环境下油田安全操作考评系统关键技术研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 * |
王军等: "面向智能变电站仿真技术的移动可视化监控系统设计与研究 ", 《通信电源技术》 * |
陆兴华: "《艺术展示导论》", 31 January 2019, 北京:商务印书馆 * |
黄小强等: "基于多人在线协作的输电线路带电作业仿真培训系统的设计与实现 ", 《自动化技术与应用》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111028603A (en) * | 2019-12-27 | 2020-04-17 | 广东电网有限责任公司培训与评价中心 | Live-line work training method and system for transformer substation based on dynamic capture and virtual reality |
CN111314484A (en) * | 2020-03-06 | 2020-06-19 | 王春花 | Virtual reality data synchronization method and device and virtual reality server |
CN111314484B (en) * | 2020-03-06 | 2020-11-10 | 北京掌中飞天科技股份有限公司 | Virtual reality data synchronization method and device and virtual reality server |
CN111240490A (en) * | 2020-03-24 | 2020-06-05 | 贵州电网有限责任公司 | Equipment insulation test training system based on VR virtual immersion and circular screen interaction |
CN112198403A (en) * | 2020-10-10 | 2021-01-08 | 重庆交通大学 | Ship cable insulation corrosion degree estimation technology based on multi-scale dielectric coefficient |
CN112198403B (en) * | 2020-10-10 | 2023-11-17 | 重庆交通大学 | Ship cable insulation corrosion degree estimation method based on multi-scale dielectric coefficients |
CN112883528A (en) * | 2021-03-22 | 2021-06-01 | 甘肃钢铁职业技术学院 | Computer network simulation modeling training system |
TWI823153B (en) * | 2021-10-04 | 2023-11-21 | 柯伯呈 | Interactive testing device for judging the quality of power cable insulation resistance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110349468A (en) | A kind of insulation of electrical installation test dummy emulation system based on multi-person synergy | |
CN106301911B (en) | The centralized simulation platform in kind of Information Network based on SDN half and its implementation | |
CN105471982B (en) | The exchange method and system of things-internet gateway and cloud platform | |
CN102842249B (en) | Based on the electric power interactive training system of assembly type | |
Lemay et al. | An isolated virtual cluster for SCADA network security research | |
CN102842248B (en) | Electric power interactive Training Methodology based on assembly type | |
CN105207366B (en) | Distribution terminal plug and play model configuration tool and its implementation based on IEC61850 | |
CN105093017B (en) | Intelligent substation GOOSE integrated testabilities device and its method of testing | |
CN106448300A (en) | Learning platform of mobile Internet based on virtual reality | |
CN109191591A (en) | Substation Training Simulator construction method based on augmented reality | |
CN113473472B (en) | Power network target range terminal access simulation and attack replay method and system | |
CN109272801A (en) | A kind of power distribution network operation simulation wire examination method and system based on VR technology | |
Andria et al. | Remote didactic laboratory “g. savastano,” the italian experience for e-learning at the technical universities in the field of electrical and electronic measurement: Architecture and optimization of the communication performance based on thin client technology | |
CN107481598A (en) | A kind of emulation training platform of intelligent substation | |
CN110047344A (en) | Livewire work virtual reality | |
Rodriguez et al. | P4 programmable patch panel (p7) an instant 100g emulated network on your tofino-based pizza box | |
CN104318833B (en) | The method of work of power network schedule automation experience system | |
Fu et al. | Design of experiment platform for digital substation based on IEC 61850 | |
CN106484953B (en) | Mobile terminal Intelligent Simulation System and its emulation mode | |
CN202650332U (en) | Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks | |
Hacker et al. | A co-simulation environment to evaluate cyber resilience in active distribution grids utilising behind-the-meter assets | |
CN109256003A (en) | A kind of power transformation O&M stimulating and training system | |
CN109831353A (en) | A kind of automatic test device of network multiple business | |
CN109981387A (en) | A kind of network flux statistical method | |
CN104318834B (en) | A kind of method of work of power network schedule automation experience system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |