CN110347988A - A kind of the template method for building up and system of project supervision - Google Patents
A kind of the template method for building up and system of project supervision Download PDFInfo
- Publication number
- CN110347988A CN110347988A CN201910595921.XA CN201910595921A CN110347988A CN 110347988 A CN110347988 A CN 110347988A CN 201910595921 A CN201910595921 A CN 201910595921A CN 110347988 A CN110347988 A CN 110347988A
- Authority
- CN
- China
- Prior art keywords
- construction
- data
- template
- project supervision
- construction process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 173
- 238000010276 construction Methods 0.000 claims abstract description 218
- 230000002159 abnormal effect Effects 0.000 claims description 11
- 239000000284 extract Substances 0.000 claims description 7
- 238000004364 calculation method Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 4
- 230000001737 promoting effect Effects 0.000 abstract description 2
- 238000011161 development Methods 0.000 description 2
- 238000013507 mapping Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/186—Templates
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/20—Natural language analysis
- G06F40/205—Parsing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- Artificial Intelligence (AREA)
- General Engineering & Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Economics (AREA)
- Computational Linguistics (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Operations Research (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to the technical fields of project supervision, more particularly, to the template method for building up and system of a kind of project supervision, the template method for building up of project supervision includes: S10: obtaining history arrangement and method for construction data, construction process mark is extracted from the history arrangement and method for construction data;S20: establishing data form, and the data form is written in construction process mark, obtains management frame table;S30: the placeholder of each construction process mark in the management frame table is calculated;S40: after time interface to be obtained is written in each construction process mark in the management frame table, using the management frame table as project supervision template.The present invention has the effect of promoting management efficiency.
Description
Technical field
The present invention relates to the technical fields of project supervision, a kind of template method for building up more particularly, to project supervision and are
System.
Background technique
Project supervision refers to engineering project of the supervisor with related qualification by the commission of Party A, according to state approval
File, the law in relation to engineering construction, regulation and engineering supervision contract and other construction contracts are built, Party A is represented
A kind of proficient service activity to the engineering construction implementing monitoring of Party B.Project supervision is a kind of paid engineering consulting clothes
Business;It is to be entrusted to carry out by Party A;The main foundation of management is law, regulation, technical standard, related contract and file;Management
Criterion be to abide by the law, is sincere, is just and scientific;Management purpose is to ensure that engineering construction quality and safety, improves engineering construction water
It is flat, give full play to returns of investment.
Existing project supervision be usually by supervisor send supervisor go to construction site carry out management, but due to
The engineering construction period is long, and the usual occupied area in construction site constructed is bigger, can reduce the effect that supervisor is supervised
Rate, therefore there are rooms for improvement.
Summary of the invention
The object of the present invention is to provide the template method for building up and system of a kind of a kind of project supervision for promoting management efficiency.
Foregoing invention purpose one of the invention has the technical scheme that
A kind of template method for building up of project supervision, the template method for building up of the project supervision include:
S10: obtaining history arrangement and method for construction data, and construction process mark is extracted from the history arrangement and method for construction data;
S20: establishing data form, and the data form is written in construction process mark, obtains management frame table;
S30: the placeholder of each construction process mark in the management frame table is calculated;
S40: after time interface to be obtained is written in each construction process mark in the management frame table, by the prison
Frame table is managed as project supervision template.
By using above-mentioned technical proposal, is obtained from history arrangement and method for construction and extract construction process mark, and the construction stream
Journey mark is written in preset data form, forms management frame table, and the construction process mark write-in that can be will acquire should
In management frame table, and the placeholder of each construction process mark is calculated in the management frame table, is able to use the placeholder
The data of construction site are obtained, and then are conducive to for the data of construction site being compared with the data of arrangement and method for construction, without group
Sending a large amount of supervisor goes to scene to carry out management, and then improves the efficiency of project supervision, meanwhile, it is added to be obtained
Time interface can allow supervisor to get the progress of practice of construction, be conducive to the progress according to the practice of construction, development pair
The measure answered.
The present invention is further arranged to: step S10 includes:
S11: construction type data are obtained, and the history arrangement and method for construction data are divided according to the construction type data
Class;
S12: extracting the construction process from the history arrangement and method for construction data by class and identify, and by the construction of every one kind
Process identification is associated.
By using above-mentioned technical proposal, history arrangement and method for construction data are classified according to construction type data, in turn
Construction process mark in the history arrangement and method for construction data of every one kind is associated, can be improved the project supervision acquired
The arrangement and method for construction relevance of template and corresponding classification, and then guarantee the quality of management.
The present invention is further arranged to: step S20 includes:
S21: similarity is calculated between each construction process mark;
S22: after the construction process mark that similarity is greater than preset threshold value is associated merging, the described of foundation is written
Data form.
By using above-mentioned technical proposal, by calculating the similarity between each construction process mark, and by similarity
Construction process expression greater than preset threshold value is associated merging, can merge duplicate data, avoid and pass through
Project supervision template gets the data of duplicate construction site.
The present invention is further arranged to: after step S30, the template method for building up of the project supervision further include:
S31: construction site data corresponding with construction process mark are obtained by the placeholder;
S32: if by getting the construction site data in the placeholder, the construction site data are compared
It is right, comparison result is obtained, if comparing out abnormal, will to compare out abnormal generation exception reporting.
By using above-mentioned technical proposal, by the placeholder of setting, make it possible to that construction site data are written automatically
The project supervision template, and then can be that data are compared with scheduled arrangement and method for construction to the construction site data, work as comparison
When abnormal out, exception reporting is issued, supervisor can be notified to handle in time.
The present invention is further arranged to: step S40 includes:
S41: the time interface to be obtained includes scheme time interface and real time interface, passes through the scheme time interface
It is compared after obtaining corresponding time data with the real time interface;
S42: if comparing out time delay information, the time delay information is written in the exception reporting.
By using above-mentioned technical proposal, when being given by scheme time interface with the real time interface scheduled scheme of acquisition
Between and practice of construction time, and the time is compared, is conducive to supervisor and the progress of construction is supervised in time
Control.
Foregoing invention purpose two of the invention has the technical scheme that
A kind of template of project supervision establishes system, and the template of the project supervision establishes system and includes:
Identifier acquisition module extracts construction stream for obtaining history arrangement and method for construction data from the history arrangement and method for construction data
Journey mark;
Frame table establishes module, for establishing data form, the data form is written in construction process mark, is supervised
Manage frame table;
Placeholder computing module, for calculating the placeholder of the mark of each construction process in the management frame table;
Time interface to be obtained is written for each construction process mark in the management frame table in module for reading and writing
Afterwards, using the management frame table as project supervision template.
By using above-mentioned technical proposal, is obtained from history arrangement and method for construction and extract construction process mark, and the construction stream
Journey mark is written in preset data form, forms management frame table, and the construction process mark write-in that can be will acquire should
In management frame table, and the placeholder of each construction process mark is calculated in the management frame table, is able to use the placeholder
The data of construction site are obtained, and then are conducive to for the data of construction site being compared with the data of arrangement and method for construction, without group
Sending a large amount of supervisor goes to scene to carry out management, and then improves the efficiency of project supervision, meanwhile, it is added to be obtained
Time interface can allow supervisor to get the progress of practice of construction, be conducive to the progress according to the practice of construction, development pair
The measure answered.
In conclusion advantageous effects of the invention are as follows:
Construction process mark is extracted 1. obtaining from history arrangement and method for construction, and preset data form is written in construction process mark
In, management frame table is formed, the construction process mark that can be will acquire is written in the management frame table, and in the management frame
The placeholder that each construction process mark is calculated in frame table, is able to use the data that the placeholder obtains construction site, Jin Eryou
Be compared conducive to by the data of construction site with the data of arrangement and method for construction, without send a large amount of supervisor go to scene into
Row management, and then improve the efficiency of project supervision;
2. time interface to be obtained is added, supervisor can be allowed to get the progress of practice of construction, be conducive to according to the reality
The progress of construction carries out corresponding measure.
Detailed description of the invention
Fig. 1 is a flow chart of the template method for building up of project supervision in one embodiment of the invention;
Fig. 2 is the implementation flow chart of step S10 in the template method for building up of project supervision in one embodiment of the invention;
Fig. 3 is the implementation flow chart of step S20 in the template method for building up of project supervision in one embodiment of the invention;
Fig. 4 is another flow chart in the template method for building up of project supervision in one embodiment of the invention;
Fig. 5 is the implementation flow chart of step S40 in the template method for building up of project supervision in one embodiment of the invention;
Fig. 6 is that the template of project supervision in one embodiment of the invention establishes a functional block diagram of system.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
In one embodiment, as shown in Figure 1, the invention discloses a kind of template method for building up of project supervision, specifically include as
Lower step:
S10: obtaining history arrangement and method for construction data, and construction process mark is extracted from history arrangement and method for construction data.
In the present embodiment, history arrangement and method for construction data referred in the past period, such as half a year, 1 year or 3 years,
All arrangement and method for construction data applied to project supervision.Intelligible, the arrangement and method for construction in the history arrangement and method for construction data is
Referring to foundation, supervisor is based on the arrangement and method for construction and construction site is gone to carry out management supervisor, in management,
Supervisor is compared according to the case where practice of construction with arrangement and method for construction, if there is exception, then takes phase according to the exception
The measure answered.Construction process mark refers to the character string for distinguishing each process step in the work progress of engineering, can manage
Solution, which identifies the specific name that can be construction process.
Specifically, from the database being stored in the history arrangement and method for construction data, the history arrangement and method for construction data are obtained,
And corresponding construction process mark is extracted from every part of history arrangement and method for construction data.
S20: establishing data form, and construction process is identified write-in data form, obtains management frame table.
In the present embodiment, data form refers to table for storing data.Management frame table refers to for that will construct
The frame that process identification imports.
Specifically, the data form is pre-established, by each construction process mark according to the sequence of process step, is successively write
Enter the data form, and then using the data form as management frame table.
S30: the placeholder of each construction process mark in management frame table is calculated.
In the present embodiment, placeholder refers in management frame table, occupies a fixed position in advance, past can be somebody's turn to do
Input data in placeholder.
Specifically, { key } can be used as placeholder in each construction process mark in management frame table, and will
The placeholder is put into each construction process mark for storing the position of particular content.
S40: after time interface to be obtained is written in each construction process mark in management frame table, by management frame table
As project supervision template.
In the present embodiment, time interface to be obtained refers to the interface for acquisition time data.When wherein this is to be obtained
Interface can obtain in time and the Practical Project of scheduled arrangement and method for construction, upload the data of corresponding site operation when
Between.After project supervision template refers to the data for obtaining construction site, the template that is compared with scheduled arrangement and method for construction.
Specifically, after editting the time interface to be obtained, which is put into management frame table
Each construction process mark in, and then obtain the project supervision template.
In the present embodiment, it is obtained from history arrangement and method for construction and extracts construction process mark, and construction process mark is write
Enter in preset data form, form management frame table, the management frame is written in the construction process mark that can be will acquire
In table, and the placeholder of each construction process mark is calculated in the management frame table, is able to use the placeholder and obtains construction
The data at scene, and then be conducive to for the data of construction site being compared with the data of arrangement and method for construction, it is a large amount of without sending
Supervisor goes to scene to carry out management, and then improves the efficiency of project supervision, meanwhile, it is indirect when being added to be obtained
Mouthful, supervisor can be allowed to get the progress of practice of construction, be conducive to the progress according to the practice of construction, carry out corresponding arrange
It applies.
In one embodiment, it as shown in Fig. 2, in step slo, that is, obtaining history arrangement and method for construction data, constructs from history
Construction process mark is extracted in protocol, is specifically comprised the following steps:
S11: construction type data are obtained, and are classified according to construction type data to history arrangement and method for construction data.
In the present embodiment, construction type data refer to the classification of the engineering of construction.Specifically, which can
To be construction, railway, water conservancy or highway etc..
Specifically, according to construction type data, history arrangement and method for construction data are obtained by class.
S12: construction process mark is extracted from history arrangement and method for construction data by class, and the construction process of every one kind is identified
It is associated.
Specifically, associated method can be using identical character string, to using identical construction type data to extract
History arrangement and method for construction data be marked, which can be any character, such as can be number, English alphabet or
Other symbols that can be identified by computer.
In one embodiment, as shown in figure 3, establishing data form in step S20, construction process is identified and is written
Data form obtains management frame table, specifically comprises the following steps:
S21: similarity is calculated between each construction process mark.
Specifically, using existing cosine similarity algorithm, the similarity of each construction process mark between any two is calculated.
S22: after the construction process mark that similarity is greater than preset threshold value is associated merging, the data of foundation are written
Table.
Specifically, there are two the similarities of construction process mark to be greater than preset threshold value, such as 0.9 if it exists, then illustrates
The two construction process mark meaning is identical, then merging can be associated in such a way that the two selects one, and then association is closed
After and, construction process is identified into write-in data form.
In one embodiment, as shown in figure 4, after step S30, the template method for building up of project supervision further include:
S31: construction site data corresponding with construction process mark are obtained by placeholder.
In the present embodiment, construction site data refer to obtains in Specific construction scene, and record has the scene to engineering
The data constructed.
Specifically, can be by way of Hash mapping after getting construction site data, by the construction site, data are led to
The placeholder is crossed to be corresponded to.
S32: if by getting construction site data in placeholder, construction site data is compared, are compared
Pair as a result, what will be compared out abnormal generates exception reporting if comparing out abnormal.
Specifically, if by way of the placeholder and Hash mapping, the construction site data have been got, then to applying
Work field data is compared, and there are many modes of the comparison, if the construction site data are image datas, is known using image
Otherwise, the image data of construction site is compared with the data in arrangement and method for construction, if compare out it is variant, to this
Difference is marked, and then obtains the comparison result;Be also possible to directly by the construction site data be sent to supervisor visitor
Family end is compared by supervisor in supervisor's client.
Further, if comparing out exception, the data of the exception are generated into the exception reporting.
In one embodiment, as shown in figure 5, in step s 40, i.e., each construction process in management frame table identifies
After time interface to be obtained is written, using management frame table as project supervision template, specifically comprise the following steps:
S41: time interface to be obtained includes scheme time interface and real time interface, by scheme time interface and it is practical when
Interface is compared after obtaining corresponding time data.
In the present embodiment, scheme time interface refers in scheduled arrangement and method for construction, it is contemplated that complete the construction process when
Between.Real time interface refers in practice of construction, completes the time of the construction process.It is intelligible, the real time interface
The time that corresponding construction site data are identified with construction process is got for the project supervision template.
Specifically, using program time interface extract that each construction process step plan completes from arrangement and method for construction when
Between.After the project supervision template gets construction site data corresponding with construction process mark, connect by the real time
Mouth obtains current time.And by time data and real time that in same construction process, operational version time data acquisition is arrived
The time data that interface is got are compared.
S42: if comparing out time delay information, time delay information is written in exception reporting.
Specifically, if comparing out the time delay information, i.e., the time data that real time interface is got are later than scheme
Then time delay information is written in exception reporting for the time data that time data acquisition arrives.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Embodiment two:
In one embodiment, the template for providing a kind of project supervision establishes system, the template of the project supervision establish system with it is upper
The template method for building up for stating project supervision in embodiment corresponds.As shown in fig. 6, the template of the project supervision establishes system packet
Include identifier acquisition module 10, frame table establishes module 20, placeholder computing module 30 and module for reading and writing 40.Each functional module is detailed
It is described as follows:
Identifier acquisition module 10 extracts construction process from history arrangement and method for construction data for obtaining history arrangement and method for construction data
Mark;
Frame table establishes module 20, for establishing data form, construction process is identified write-in data form, obtains management frame
Table;
Placeholder computing module 30, for calculating the placeholder of the mark of each construction process in management frame table;
Module for reading and writing 40 will supervise after time interface to be obtained is written for each construction process mark in management frame table
Frame table is managed as project supervision template.
Preferably, identifier acquisition module 10 includes:
Classify submodule 11, for obtaining construction type data, and according to construction type data to history arrangement and method for construction data into
Row classification;
It is associated with submodule 12, for extracting construction process mark from history arrangement and method for construction data by class, and every a kind of is applied
Work process identification is associated.
Preferably, frame table establishes module 20 and includes:
Similarity calculation submodule 21, for calculating similarity between each construction process mark;
Association merges submodule 22, after the construction process mark for similarity to be greater than to preset threshold value is associated merging,
The data form established is written.
Preferably, the template of project supervision establishes system further include:
Module 31 is obtained, for obtaining construction site data corresponding with construction process mark by placeholder;
Comparison module 32 is compared construction site data if getting construction site data for passing through in placeholder,
Comparison result is obtained, if comparing out abnormal, will to compare out abnormal generation exception reporting.
Preferably, module for reading and writing 40 includes:
Time compares submodule 41, includes scheme time interface and real time interface, the side of passing through for time interface to be obtained
Case time interface and real time interface are compared after obtaining corresponding time data;
Report generation submodule 42, if time delay information is written in exception reporting for comparing out time delay information.
Template about project supervision establishes the specific of system and limits the template that may refer to above for project supervision
The restriction of method for building up, details are not described herein.The template of above-mentioned project supervision establishes the modules in system can whole or portion
Divide and is realized by software, hardware and combinations thereof.Above-mentioned each module can be embedded in the form of hardware or independently of computer equipment
In processor in, can also be stored in a software form in the memory in computer equipment, in order to processor calling hold
The corresponding operation of the above modules of row.
Claims (10)
1. a kind of template method for building up of project supervision, which is characterized in that the template method for building up of the project supervision includes:
S10: obtaining history arrangement and method for construction data, and construction process mark is extracted from the history arrangement and method for construction data;
S20: establishing data form, and the data form is written in construction process mark, obtains management frame table;
S30: the placeholder of each construction process mark in the management frame table is calculated;
S40: after time interface to be obtained is written in each construction process mark in the management frame table, by the prison
Frame table is managed as project supervision template.
2. the template method for building up of project supervision as described in claim 1, which is characterized in that step S10 includes:
S11: construction type data are obtained, and the history arrangement and method for construction data are divided according to the construction type data
Class;
S12: extracting the construction process from the history arrangement and method for construction data by class and identify, and by the construction of every one kind
Process identification is associated.
3. the template method for building up of project supervision as described in claim 1, which is characterized in that step S20 includes:
S21: similarity is calculated between each construction process mark;
S22: after the construction process mark that similarity is greater than preset threshold value is associated merging, the described of foundation is written
Data form.
4. the template method for building up of project supervision as described in claim 1, which is characterized in that after step S30, the work
The template method for building up of journey management further include:
S31: construction site data corresponding with construction process mark are obtained by the placeholder;
S32: if by getting the construction site data in the placeholder, the construction site data are compared
It is right, comparison result is obtained, if comparing out abnormal, will to compare out abnormal generation exception reporting.
5. the template method for building up of project supervision as described in claim 1, which is characterized in that step S40 includes:
S41: the time interface to be obtained includes scheme time interface and real time interface, passes through the scheme time interface
It is compared after obtaining corresponding time data with the real time interface;
S42: if comparing out time delay information, the time delay information is written in the exception reporting.
6. a kind of template of project supervision establishes system, which is characterized in that the template of the project supervision establishes system and includes:
Identifier acquisition module extracts construction stream for obtaining history arrangement and method for construction data from the history arrangement and method for construction data
Journey mark;
Frame table establishes module, for establishing data form, the data form is written in construction process mark, is supervised
Manage frame table;
Placeholder computing module, for calculating the placeholder of the mark of each construction process in the management frame table;
Time interface to be obtained is written for each construction process mark in the management frame table in module for reading and writing
Afterwards, using the management frame table as project supervision template.
7. the template of project supervision as claimed in claim 6 establishes system, which is characterized in that the identifier acquisition module packet
It includes:
Classification submodule, for obtaining construction type data, and according to the construction type data to the history arrangement and method for construction
Data are classified;
It is associated with submodule, is identified for extracting the construction process from the history arrangement and method for construction data by class, and will be each
The construction process mark of class is associated.
8. the template of project supervision as claimed in claim 6 establishes system, which is characterized in that the frame table establishes module packet
It includes:
Similarity calculation submodule, for calculating similarity between each construction process mark;
Association merges submodule, and the construction process mark for similarity to be greater than to preset threshold value is associated merging
Afterwards, the data form of foundation is written.
9. the template of project supervision as claimed in claim 6 establishes system, which is characterized in that the template of the project supervision is built
Erection system further include:
Module is obtained, for obtaining construction site data corresponding with construction process mark by the placeholder;
Comparison module, if for by getting the construction site data in the placeholder, to the construction site number
According to being compared, comparison result is obtained, if comparing out abnormal, will to compare out abnormal generation exception reporting.
10. the template of project supervision as claimed in claim 6 establishes system, which is characterized in that the module for reading and writing includes:
Time compares submodule, includes scheme time interface and real time interface for the time interface to be obtained, passes through
The scheme time interface and the real time interface are compared after obtaining corresponding time data;
Report generation submodule, if the exception is written in the time delay information for comparing out time delay information
In report.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910595921.XA CN110347988B (en) | 2019-07-03 | 2019-07-03 | Template building method and system for engineering supervision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910595921.XA CN110347988B (en) | 2019-07-03 | 2019-07-03 | Template building method and system for engineering supervision |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110347988A true CN110347988A (en) | 2019-10-18 |
CN110347988B CN110347988B (en) | 2023-06-30 |
Family
ID=68177714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910595921.XA Active CN110347988B (en) | 2019-07-03 | 2019-07-03 | Template building method and system for engineering supervision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110347988B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111046075A (en) * | 2019-12-20 | 2020-04-21 | 广东海外建设咨询有限公司 | Project supervision informatization construction and management method and device |
CN111062827A (en) * | 2019-12-30 | 2020-04-24 | 四川省城市建设工程监理有限公司 | Engineering supervision method based on artificial intelligence mode |
CN111815284A (en) * | 2020-07-14 | 2020-10-23 | 于思平 | Engineering flow building system based on data analysis |
CN115358721A (en) * | 2022-08-30 | 2022-11-18 | 中新华都国际工程咨询有限公司 | Engineering supervision information supervision system and method based on big data |
CN116993296A (en) * | 2023-08-15 | 2023-11-03 | 深圳市中联信信息技术有限公司 | Intelligent supervision management system and method applied to engineering design interaction platform |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060097410A (en) * | 2005-03-09 | 2006-09-14 | (주)아이티엠 코퍼레이션 건축사사무소 | Supervisor information system and it's control method for supervision of construction work |
CN101882225A (en) * | 2009-12-29 | 2010-11-10 | 北京中科辅龙计算机技术股份有限公司 | Engineering drawing material information extraction method based on template |
CN104809591A (en) * | 2015-05-11 | 2015-07-29 | 东北电力大学 | Electric power construction engineering supervision mechanism based on big data |
CN106886849A (en) * | 2017-01-20 | 2017-06-23 | 深圳广田集团股份有限公司 | Construction management-control method and system that a kind of BIM simulations are combined with taking photo by plane |
CN109146411A (en) * | 2018-08-02 | 2019-01-04 | 广东展诚工程咨询有限公司 | A kind of project supervision, cost, the total management system of bid, consulting |
CN109542880A (en) * | 2018-11-28 | 2019-03-29 | 上海众深科技股份有限公司 | A kind of method for early warning of device fabrication quality problems |
CN109872118A (en) * | 2018-12-30 | 2019-06-11 | 广州骏升建设管理有限公司 | The data managing method and system of project supervision |
-
2019
- 2019-07-03 CN CN201910595921.XA patent/CN110347988B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060097410A (en) * | 2005-03-09 | 2006-09-14 | (주)아이티엠 코퍼레이션 건축사사무소 | Supervisor information system and it's control method for supervision of construction work |
CN101882225A (en) * | 2009-12-29 | 2010-11-10 | 北京中科辅龙计算机技术股份有限公司 | Engineering drawing material information extraction method based on template |
CN104809591A (en) * | 2015-05-11 | 2015-07-29 | 东北电力大学 | Electric power construction engineering supervision mechanism based on big data |
CN106886849A (en) * | 2017-01-20 | 2017-06-23 | 深圳广田集团股份有限公司 | Construction management-control method and system that a kind of BIM simulations are combined with taking photo by plane |
CN109146411A (en) * | 2018-08-02 | 2019-01-04 | 广东展诚工程咨询有限公司 | A kind of project supervision, cost, the total management system of bid, consulting |
CN109542880A (en) * | 2018-11-28 | 2019-03-29 | 上海众深科技股份有限公司 | A kind of method for early warning of device fabrication quality problems |
CN109872118A (en) * | 2018-12-30 | 2019-06-11 | 广州骏升建设管理有限公司 | The data managing method and system of project supervision |
Non-Patent Citations (1)
Title |
---|
孟晓静 等: "虚拟动态管理方法在公路工程施工中的应用研究", 石家庄铁道大学学报(社会科学版), vol. 10, no. 01, pages 50 - 56 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111046075A (en) * | 2019-12-20 | 2020-04-21 | 广东海外建设咨询有限公司 | Project supervision informatization construction and management method and device |
CN111062827A (en) * | 2019-12-30 | 2020-04-24 | 四川省城市建设工程监理有限公司 | Engineering supervision method based on artificial intelligence mode |
CN111062827B (en) * | 2019-12-30 | 2023-07-18 | 四川省城市建设工程咨询集团有限公司 | Engineering supervision method based on artificial intelligence mode |
CN111815284A (en) * | 2020-07-14 | 2020-10-23 | 于思平 | Engineering flow building system based on data analysis |
CN111815284B (en) * | 2020-07-14 | 2022-10-21 | 广东冶建施工图审查中心有限公司 | Engineering flow building system based on data analysis |
CN115358721A (en) * | 2022-08-30 | 2022-11-18 | 中新华都国际工程咨询有限公司 | Engineering supervision information supervision system and method based on big data |
CN116993296A (en) * | 2023-08-15 | 2023-11-03 | 深圳市中联信信息技术有限公司 | Intelligent supervision management system and method applied to engineering design interaction platform |
CN116993296B (en) * | 2023-08-15 | 2024-04-16 | 深圳市中联信信息技术有限公司 | Intelligent supervision management system and method applied to engineering design interaction platform |
Also Published As
Publication number | Publication date |
---|---|
CN110347988B (en) | 2023-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110347988A (en) | A kind of the template method for building up and system of project supervision | |
CN109525595A (en) | A kind of black production account recognition methods and equipment based on time flow feature | |
WO2021208601A1 (en) | Artificial-intelligence-based image processing method and apparatus, and device and storage medium | |
CN111125774A (en) | Engineering safety supervision traceability system and method based on block chain intelligent contract | |
CN115828112B (en) | Fault event response method and device, electronic equipment and storage medium | |
CN110322226A (en) | A kind of project supervision method and system | |
CN110083639A (en) | A kind of method and device that the data blood relationship based on clustering is intelligently traced to the source | |
WO2021155684A1 (en) | Gene-disease relationship knowledge base construction method and apparatus, and computer device | |
CN112990378B (en) | Scene recognition method and device based on artificial intelligence and electronic equipment | |
CN111814443A (en) | Table generation method and device combining RPA and AI, computing equipment and storage medium | |
CN110505444A (en) | Safety defense monitoring system based on big data | |
CN108363771B (en) | Image retrieval method for public security investigation application | |
CN117035099A (en) | Enterprise knowledge base question-answer pair generation method based on large model and knowledge graph | |
CN106547890B (en) | Quick clustering preprocess method in large nuber of images characteristic vector | |
CN106874306A (en) | People information portrait Compare System Key Performance Indicator evaluating method | |
CN109118176A (en) | Document handling method, device, computer equipment and storage medium | |
CN105530125A (en) | Internetwork data exchange system | |
Acosta et al. | City safety perception model based on visual content of street images | |
Guo et al. | Deep network with spatial and channel attention for person re-identification | |
CN108595617A (en) | A kind of education big data overall analysis system | |
CN114723652A (en) | Cell density determination method, cell density determination device, electronic apparatus, and storage medium | |
CN108108444B (en) | Enterprise business unit self-adaptive system and implementation method thereof | |
Chen et al. | Improvement research and application of text recognition algorithm based on CRNN | |
Li et al. | An Object Detection Model for Electric Power Operation Sites Based on Federated Self-supervised Learning | |
CN113987514A (en) | System safety state rating method based on deep learning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |