CN110344427A - Supporter - Google Patents
Supporter Download PDFInfo
- Publication number
- CN110344427A CN110344427A CN201910447656.0A CN201910447656A CN110344427A CN 110344427 A CN110344427 A CN 110344427A CN 201910447656 A CN201910447656 A CN 201910447656A CN 110344427 A CN110344427 A CN 110344427A
- Authority
- CN
- China
- Prior art keywords
- hole
- pile body
- connector
- filled cavity
- supporting section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003780 insertion Methods 0.000 claims abstract description 18
- 230000037431 insertion Effects 0.000 claims abstract description 18
- 238000007711 solidification Methods 0.000 claims abstract description 15
- 230000008023 solidification Effects 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 238000010586 diagram Methods 0.000 description 8
- 230000009969 flowable effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The embodiment of the present application discloses a kind of supporter, and supporter includes: inserting paragraph portion, for being inserted into the hole of pile body;Supporting section portion, connect with insertion section;First filled cavity is set in inserting paragraph portion;First opening, is set to the one end in remote supporting section portion, inserting paragraph portion, is connected to the first filled cavity;Interface channel is set to the side in inserting paragraph portion, is connected to the first filled cavity;In the state that inserting paragraph portion is inserted into the hole of pile body, the obturator in the hole of pile body can be filled in the first filled cavity by interface channel and the first opening;In the state of obturator solidification in first filled cavity, interface channel and the first opening, supporter can be fixedly connected based on the obturator solidified in interface channel with pile body.The supporter of the embodiment of the present application, inserting paragraph portion can be swimmingly inserted into the hole of pile body, reduced the difficulty in the hole of supporter insertion pile body, shiftingly shortened the time required in the hole of supporter insertion pile body.
Description
Technical field
The present invention relates to a kind of supporters.
Background technique
Supporter is to build common support construction, and supporter is generally connect with pile body, supports supporter by pile body.It is existing
There is the supporter in technology to be generally reliably connected with pile body by peg to realize;However, in the hole of supporter insertion pile body
When, peg can touch the hole wall of pile body, cause supporter insertion difficult, difficulty of construction is big.
Summary of the invention
In view of this, an embodiment of the present invention is intended to provide a kind of supporters.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
The embodiment of the present application provides a kind of supporter, and the supporter includes: inserting paragraph portion, for being inserted into the hole of pile body
It is interior;
Supporting section portion is connect with the insertion section;
First filled cavity is set in the inserting paragraph portion;
First opening, is set to the one end in the far described supporting section portion, the inserting paragraph portion, is connected to first filled cavity;
Interface channel is set to the side in the inserting paragraph portion, is connected to first filled cavity;
In the state of in the hole of the inserting paragraph portion insertion pile body, the obturator in the hole of the pile body can be by described
Interface channel and first opening are filled in first filled cavity;First filled cavity, the interface channel and institute
In the state of stating the obturator solidification in the first opening, the supporter can be based on the institute solidified in the interface channel
Obturator is stated to be fixedly connected with the pile body.
In some optional implementations, the inserting paragraph portion includes:
At least two first connectors are connect with the supporting section portion, to remote on the length direction in the supporting section portion
Side from the supporting section portion extends, the circumferential distribution along the supporting section portion;At least two first connector, which encloses, to be set
And form first filled cavity;
The interface channel is formed between the side of two first adjacent connectors at least two first connector,
The one end in the remote supporting section portion of at least two first connector, which is enclosed, to be set and forms first opening.
In some optional implementations, the inserting paragraph portion further include:
Second connector is connect with the two first adjacent connectors respectively, at least two first connector
It encloses and sets and form first filled cavity;
The interface channel is formed between second connector and the side of the two first adjacent connectors.
In some optional implementations, second connector be located at least two first connector enclose set and
It is formed except first filled cavity;
It is described in the state that second connector and at least two first connector are inserted into the hole of the pile body
Obturator in the hole of pile body can be wrapped in except second connector and at least two first connector;Described
In the state of obturator solidification except two connectors and at least two first connector, the supporter being capable of base
It is fixedly connected in the obturator of second connector side solidification with the pile body.
In some optional implementations, further includes:
First separator is set between the supporting section portion and at least two first connector;Described at least two
A first connector is connect by first separator with the supporting section portion;First separator and described at least two
First connector, which encloses, to be set and forms first filled cavity;
At least two first connector is inserted into the hole of the pile body and the first part in the supporting section portion inserts
In the state of entering in the hole of the pile body, there is first distance between first separator and the top side of the pile body.
In some optional implementations, the inserting paragraph portion is angle steel lattice shape structure, and the supporting section portion is steel
Tubular structure.
In some optional implementations, further includes:
Second filled cavity, the length direction along the supporting section portion are set in the supporting section portion;
Second opening, is set to the one end in the far described inserting paragraph portion, the supporting section portion, is used for second filled cavity
Fill the obturator.
In some optional implementations, further includes:
Through-hole is set to the side in the inserting paragraph portion, is connected to first filled cavity, forms the interface channel.
In some optional implementations, the through-hole is helical structure, and the through-hole is along the inserting paragraph portion
Circumferential Spiral distribution;Or,
The through-hole is n shape, and the through-hole is set to the end in the inserting paragraph portion;Or,
The through-hole is bar shaped, and length direction of the through-hole along the inserting paragraph portion is interspersed.
In some optional implementations, first filled cavity is also provided in the supporting section portion;
The supporter further include:
Second separator is set in first filled cavity, the company positioned at the inserting paragraph portion and the supporting section portion
Meet place;Second spacing body and the supporting section portion form the first part of first filled cavity, second separator with
The inserting paragraph portion forms the second part of first filled cavity;
Third opening, is set to the one end in the far described inserting paragraph portion, the supporting section portion, the with first filled cavity
A part connection, for filling the obturator to the first part of first filled cavity;
The inserting paragraph portion is inserted into the hole of the pile body and the second part in the supporting section portion is inserted into the pile body
Hole in the state of, there is second distance, in the hole of the pile body between second separator and the top side of the pile body
Obturator can by the through-hole and it is described first opening be filled in the second part of first filled cavity;Described
In the state of obturator solidification in the second part of one filled cavity, the through-hole and first opening, the support
Body can be fixedly connected based on the obturator solidified in the through-hole with the pile body.
In the embodiment of the present invention, in the state that the inserting paragraph portion is inserted into the hole of pile body, that is, filling out in the hole of pile body
It fills body and is in flowable state, the obturator in the hole of the pile body can be opened by the interface channel and described first
Mouth is filled in first filled cavity;It is filled out described in first filled cavity, the interface channel and first opening
It fills in the state of body solidification, the supporter can be solid based on the obturator and the pile body solidified in the interface channel
Fixed connection;Since interface channel is set to the side in the inserting paragraph portion namely interface channel does not protrude the inserting paragraph portion
Surface, the inserting paragraph portion can be swimmingly inserted into the hole of pile body, reduce the difficulty in the hole of supporter insertion pile body, deflecting
Ground shortens the time required in the hole of supporter insertion pile body;Meanwhile the obturator by solidifying in interface channel makes
The supporter is fixedly connected with the pile body, can either be improved the bonding strength of the supporter Yu the pile body, also can
The structure for simplifying the supporter reduces the supporter cost.
Detailed description of the invention
Fig. 1 is an optional structural schematic diagram of supporter in the embodiment of the present application;
Fig. 2 is an optional structural schematic diagram of supporter in the embodiment of the present application;
Fig. 3 is an optional structural schematic diagram of supporter in the embodiment of the present application;
Fig. 4 is an optional structural schematic diagram of supporter in the embodiment of the present application;
Fig. 5 is an optional structural schematic diagram of supporter in the embodiment of the present application;
Fig. 6 is the cross-sectional view A-A of supporter in Fig. 5;
Fig. 7 is an optional structural schematic diagram of supporter in the embodiment of the present application;
Fig. 8 is an optional structural schematic diagram of supporter in the embodiment of the present application;
Fig. 9 is an optional structural schematic diagram of supporter in the embodiment of the present application.
Appended drawing reference: 110, inserting paragraph portion;111, the first connector;112, the second connector;120, supporting section portion;130,
First filled cavity;1301, the first part of the first filled cavity;1302, the second part of the first filled cavity;131, the first opening;
132, third is open;140, interface channel;150, the first separator;160, the second separator;170, pile body;180, supporting body;
190, the second filled cavity;191, the second opening.
Specific embodiment
Technical solution of the present invention is further described in detail with reference to the accompanying drawings and specific embodiments of the specification.It answers
Work as understanding, specific embodiment described herein is only used to explain the application, is not used to limit the application.
In the embodiment of the present application record, it should be noted that unless otherwise indicated and limit, term " connection " should be done extensively
Reason and good sense solution, for example, it may be electrical connection, the connection being also possible to inside two elements can be directly connected, can also pass through
Intermediary is indirectly connected, and for the ordinary skill in the art, can understand above-mentioned term as the case may be
Concrete meaning.
It should be noted that term involved in the embodiment of the present application " first second third " be only be that difference is similar
Object, do not represent the particular sorted for object, it is possible to understand that ground, " Yi Er third " can be in the case where permission
Exchange specific sequence or precedence.It should be understood that the object that " first second third " is distinguished in the appropriate case can be mutual
Change so that embodiments herein described herein can the sequence other than those of illustrating or describing herein implement.
It is described in detail below in conjunction with Fig. 1 to Fig. 9 supporter recorded to the embodiment of the present application.
The embodiment of the present application describes a kind of supporter, the supporter include: inserting paragraph portion 110, supporting section portion 120,
First filled cavity 130, first opening 131 and interface channel 140.Inserting paragraph portion 110 is for being inserted into the hole of pile body 170.Bearing
Section portion 120 is connect with the insertion section.First filled cavity 130 is set in the inserting paragraph portion 110.First opening, 131 setting
In the one end in the remote supporting section portion 120, the inserting paragraph portion 110, the first opening 131 is connected to first filled cavity 130.
Interface channel 140 is set to the side in the inserting paragraph portion 110, and interface channel 140 is connected to first filled cavity 130.Institute
In the state of stating in the hole of the insertion of inserting paragraph portion 110 pile body 170, the obturator in the hole of the pile body 170 can be by described
Interface channel 140 and first opening 131 are filled in first filled cavity 130;It is first filled cavity 130, described
In the state of obturator solidification in interface channel 140 and first opening 131, the supporter can be based on described
The obturator solidified in interface channel 140 is fixedly connected with the pile body 170.
In the embodiment of the present application, inserting paragraph portion 110 is for being inserted into the hole of pile body 170, so as to inserting paragraph portion 110 and stake
Body 170 connects.The structure in inserting paragraph portion 110 is not construed as limiting.For example, inserting paragraph portion 110 can be tube-shaped structure, or
Square-tube-shaped structure.As an example, inserting paragraph portion 110 is square steel tube.
It will be apparent to a skilled person that before inserting paragraph portion 110 is in the hole of insertion pile body 170, pile body 170
Hole in have obturator, at this point, obturator not yet solidify, be in flowable state.Here, the material of obturator is not
It limits.As an example, obturator is concrete.
In the embodiment of the present application, supporting section portion 120 is for supporting supporting body 180.The structure in supporting section portion 120 does not limit
It is fixed.For example, supporting section portion 120 can be tube-shaped structure, or square-tube-shaped structure.120 shape of supporting section portion can be with
The shape in inserting paragraph portion 110 is identical, can also be different.As
Here, the structure of supporting body 180 is not construed as limiting.For example, as shown in Figure 8 and Figure 9, supporting body 180 can be floor,
It may be supporting station.
Here, supporting section portion 120 and inserting paragraph portion 110 can be two parts of an individual formula structural member, for example, such as Fig. 3
With shown in Fig. 4.The structure that supporting section portion 120 is formed and being fixedly connected with inserting paragraph portion 110 or two structural members
Part, for example, as depicted in figs. 1 and 2.
It will be apparent to a skilled person that supporting section portion 120 can be located at outside the hole of the pile body 170, that is,
The bottom side in supporting section portion 120 is concordant with the top side face of the pile body 170, at this point, inserting paragraph portion 110 is just fully located at pile body
In 170 hole.Certainly, the part in supporting section portion 120 also can be inserted in the hole of the pile body 170, as shown in Figure 2.
In the embodiment of the present application, the structure of the first filled cavity 130 is not construed as limiting.First filled cavity 130 can be rule
Shape, or irregular shape.For example, the first filled cavity 130 can be cylindrical structure, or square column type
Structure.Here, the first filled cavity 130 can be arranged along the length direction in the inserting paragraph portion 110.
In the embodiment of the present application, the structure of the first opening 131 is not construed as limiting, as long as obturator is open by described first
131 are able to enter in first filled cavity 130.For example, the first opening 131 can be cylindrical structure, or
Square column type structure.
In the embodiment of the present application, the structure of interface channel 140 is not construed as limiting, as long as obturator passes through the interface channel
140 are able to enter in first filled cavity 130.For example, interface channel 140 can be logical to be formed by enclosed shape structure
Road, or by the channel that there is the structure of opening to be formed.The state that interface channel 140 is formed by the structure with opening
Under, interface channel 140 is non-close shape structure.For example, the cross sectional shape of interface channel 140 is n shape.
In the embodiment of the present application, in the state that the inserting paragraph portion 110 is inserted into the hole of pile body 170, at this point, pile body
Obturator in 170 hole is in flowable state, and the obturator in the hole of the pile body 170 can pass through the connection
Channel 140 and first opening 131 are filled in first filled cavity 130;First filled cavity 130, the connection
In the state of obturator solidification in channel 140 and first opening 131, the supporter can be based on the connection
The obturator solidified in channel 140 is fixedly connected with the pile body 170;Since interface channel 140 is set to the insertion
The side in section portion 110 namely interface channel 140 do not protrude the surface in the inserting paragraph portion 110, and the inserting paragraph portion 110 can
It is swimmingly inserted into the hole of pile body 170, reduces the difficulty in the hole of supporter insertion pile body 170, shiftingly shorten supporter
It is inserted into the time required in the hole of pile body 170;Meanwhile the obturator by solidifying in interface channel 140 makes the support
Body is fixedly connected with the pile body 170, can either be improved the bonding strength of the supporter Yu the pile body 170, can also be subtracted
Change the structure of the supporter, to reduce the supporter cost.
In some optional implementations of the embodiment of the present application, as shown in figure 5, the inserting paragraph portion 110 include: to
Few two the first connectors 111.At least two first connectors 111 are connect with the supporting section portion 120, and at least two first connect
Fitting 111 extends on the length direction in the supporting section portion 120 to the side far from the supporting section portion 120, and at least two
First connector 111 along the supporting section portion 120 circumferential distribution, that is, each of at least two first connectors 111
First connector 111 is all set to the periphery in the supporting section portion 120;At least two first connector 111, which encloses, to be set and shape
At first filled cavity 130, that is, all first connectors 111 for being located at the periphery in the supporting section portion 120 are enclosed and are set and shape
At first filled cavity 130;In at least two first connector 111 side of two first adjacent connectors 111 it
Between form the interface channel 140, the one end in the remote supporting section portion 120 of at least two first connector 111, which is enclosed, to be set
And form first opening 131;Will pass through the interface channel 140 that at least two first connectors 111 form big sectional area,
To further increase the bonding strength of supporter and pile body 170, meanwhile, it is formed by least two first connectors 111
Inserting paragraph portion 110 alleviates the weight of supporter, to reduce the cost of supporter.
In this implementation, the structure in supporting section portion 120 does not have to limit.As an example, as illustrated in figures 1 and 8, branch
Holding section portion 120 can also include: the second filled cavity 190 and the second opening 191.Second filled cavity 190 is along the supporting section portion 120
Length direction be set in the supporting section portion 120;Second opening 191 is set to the remote insertion in the supporting section portion 120
The one end in section portion 110, for filling the obturator to second filled cavity 190;To improve the strong of supporting section portion 120
Degree.
In this implementation, the structure of the first connector 111 is not construed as limiting, as long as the first connector 111 is in the branch
It holds and extends on the length direction in section portion 120 to the side far from the supporting section portion 120, and the first connector 111 is positioned at described
The periphery in supporting section portion 120.For example, the cross sectional shape of the first connector 111 can be rectangle, or square.
As an example, as shown in Figure 5 and Figure 6, the first connector 111 is angle steel shape structure.
Here, the quantity of at least two first connectors 111 is not construed as limiting.For example, at least two first connectors 111
Quantity can be two, or three.As an example, as shown in Figure 5 and Figure 6, at least two first connectors 111
Quantity is four.
Here, at least two first connectors 111 can be uniformly distributed along the periphery in the supporting section portion 120, such as Fig. 6 institute
Show.Certainly, at least two first connectors 111 can also be along the periphery uneven distribution in the supporting section portion 120.
In this implementation, at least two first connectors 111 can directly be connect with supporting section portion 120, can also be with
It is connect by other structures part with supporting section portion 120.
For example, as shown in Figure 1 and Figure 5, supporter can also include: the first separator 150.The setting of first separator 150
Between the supporting section portion 120 and at least two first connector 111;At least two first connector 111 is logical
First separator 150 is crossed to connect with the supporting section portion 120;First separator 150 and described at least two first
Connector 111, which encloses, to be set and forms first filled cavity 130, that is, the first separator 150 is the wall body of the first filled cavity 130
A part.
In this example, the structure of the first separator 150 is not construed as limiting.As an example, as depicted in figs. 1 and 2, first
Separator 150 is plate structure.
In this example, in the state that at least two first connector 111 is inserted into the hole of the pile body 170, institute
The first part for stating supporting section portion 120 can be inserted in the hole of the pile body 170.As an example, as shown in Figure 2 and Figure 8, institute
State at least two first connectors 111 be inserted into the hole of the pile body 170 and the first part in the supporting section portion 120 insert
In the state of entering in the hole of the pile body 170, have first between first separator 150 and the top side of the pile body 170
Distance, that is, first separator 150 is located in the hole of the pile body 170;At this point, due to the of the supporting section portion 120
A part also is located in the hole of the pile body 170, can be improved the bonding strength of supporter Yu pile body 170;Simultaneously as first
Separator 150 also is located in the hole of the pile body 170, in the state of the obturator solidification in the hole of the pile body 170, first point
Spacing body 150 can be improved the bonding strength between supporter and pile body 170.
Here, the value of first distance is not construed as limiting.For example, first distance can be 2 meters.
In this implementation, in order to improve the rigidity of at least two first connectors 111, other structures part can be passed through
To fix at least two first connectors 111.
Example one, as shown in Figure 5 and Figure 6, the inserting paragraph portion 110 can also include: the second connector 112.Second connects
Fitting 112 is connect with the two first adjacent connectors 111 respectively, and the second connector 112 connects with described at least two first
Fitting 111, which encloses, to be set and forms first filled cavity 130;Second connector 112 and the two first adjacent connectors
The interface channel 140 is formed between 111 side, that is, second connector 112 forms the interface channel 140
Wall body.
In example one, the structure of the second connector 112 is not construed as limiting.For example, the second connector 112 can be blocky knot
Structure, can also be with strip structure.As an example, as shown in Figure 5 and Figure 6, the second connector 112 is plate structure.
In example one, the quantity of the second connector 112 is corresponding with the quantity of the first connector 111.When the first connector
When 111 quantity is two, the quantity of the second connector 112 can be one, at this point, the second connector 112 connection two
The side of a first connector 111;The quantity of second connector 112 may be two, at this point, two the second connectors
112 can be connected respectively the two sides of two the first connectors 111.When the quantity of the first connector 111 is two or more, the
The quantity of two connectors 112 can be identical as the quantity of the first connector 111, for example, the quantity of the first connector 111 is four
A, the quantity of the second connector 112 is four, and four the second connectors 112 are connected respectively two first adjacent connectors
111.Certainly, the quantity of the second connector 112 can be greater than the quantity of the first connector 111, at this point, adjacent two first connect
Part 111 can be connected by multiple second connectors 112.For example, as shown in figure 5, the two first adjacent connectors 111 are logical
The connection of at least two second connectors 112 is crossed, at least two second connector 112 is along the two first adjacent connectors
111 length direction is uniformly distributed.
In example one, the position of the second connector 112 is not construed as limiting.For example, the second connector 112 can be located at least
Two the first connectors 111 enclose and set and formed within first filled cavity 130.In another example as shown in Figure 5 and Figure 6, described
Two connectors 112, which are located at least two first connector 111 and enclose, to be set and is formed except first filled cavity 130;It is described
In the state that second connector 112 and at least two first connector 111 are inserted into the hole of the pile body 170, the stake
Obturator in the hole of body 170 can be wrapped in second connector 112 and at least two first connector 111 it
Outside;In the state of obturator solidification except second connector 112 and at least two first connector 111,
The obturator that the supporter can be solidified based on 112 side of the second connector is fixedly connected with the pile body 170,
To further increase the bonding strength of supporter Yu pile body 170.
In example one, at least two first connectors 111 and the second connector 112 can pass through weldering according to actual needs
The mode connect is fixedly connected.Certainly, at least two first connectors 111 and the second connector 112 can also pass through conventional knot
Component replaces.For example, the inserting paragraph portion 110 is angle steel lattice shape structure, the supporting section portion 120 is steel tubular structure,
Angle steel lattice shape structure and steel tubular structure can directly be welded into the body that is supported, it can also be by angle steel lattice shape structure and steel
Tubular structure welds the body that is supported by plate body;To reduce processing cost.
In some optional implementations of the embodiment of the present application, as shown in Figure 3 and Figure 7, supporter can also include:
Through-hole.Through-hole is set to the side in the inserting paragraph portion 110, and through-hole is connected to first filled cavity 130, and through-hole forms described
Interface channel 140.
In this implementation, the structure of through-hole is not construed as limiting.For example, the through-hole can be helical structure, it is described
Circumferential Spiral distribution of the through-hole along the inserting paragraph portion 110.In another example the through-hole is n shape, the through-hole is set to described insert
Enter the end in section portion 110, at this point, the first opening 131 is non-close shape structure.For another example the through-hole is bar shaped, the through-hole
Length direction along the inserting paragraph portion 110 is interspersed, to improve the bonding strength of supporter Yu pile body 170.
In this implementation, first filled cavity 130 can all be located in inserting paragraph portion 110.Certainly, described
First filled cavity 130 can also be located in inserting paragraph portion 110 with only a part, and the remainder of the first filled cavity 130 is located at bearing
Section portion 120.
For example, as shown in figure 9, first filled cavity 130 can also be set in the supporting section portion 120;The branch
Support body can also include: the second separator 160 and third opening 132.Second separator 160 is set to first filled cavity
In 130, positioned at the junction in the inserting paragraph portion 110 and the supporting section portion 120;Second spacing body and the supporting section portion
120 form the first part 1301 of first filled cavity, and second separator 160 forms institute with the inserting paragraph portion 110
State the second part 1302 of the first filled cavity.Third opening 132 is set to the remote inserting paragraph portion 110, the supporting section portion 120
One end, third opening 132 is connected to the first part 1301 of first filled cavity, for the of first filled cavity
The 1301 filling obturator of a part;The inserting paragraph portion 110 is inserted into the hole of the pile body 170 and the supporting section
In the state that the second part in portion 120 is inserted into the hole of the pile body 170, second separator 160 and the pile body 170
There is second distance, that is, second separator 160 is located in the hole of the pile body 170 between top side;The pile body 170
Hole in the obturator second part that can be filled in first filled cavity by the through-hole and first opening 131
In 1302;The obturator in the second part 1302 of first filled cavity, the through-hole and first opening 131 is solidifying
Gu in the state of, the supporter can be fixedly connected based on the obturator solidified in the through-hole with the pile body 170;
At this point, the supporter can also be consolidated based on the obturator for the solidification wrapped up outside the second separator 160 with the pile body 170
Fixed connection, to further increase the bonding strength of supporter and pile body 170.
Here, the structure of the second separator 160 is not construed as limiting.As an example, as figure 9, the second separator 160 can be with
For plate structure.
Here, the value of second distance is not construed as limiting.For example, second distance can be 2 meters.
In this implementation, inserting paragraph portion 110 and supporting section portion 120 can be directly made up of steel tubular structure part,
Inserting paragraph portion 110 is formed and processing through-hole in the inserting paragraph portion 110 of steel tubular part;It can also be by steel tubular part
It welds plate structure and forms the second separator 160, to reduce processing cost.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.
Claims (10)
1. a kind of supporter, which is characterized in that the supporter includes:
Inserting paragraph portion, for being inserted into the hole of pile body;
Supporting section portion is connect with the insertion section;
First filled cavity is set in the inserting paragraph portion;
First opening, is set to the one end in the far described supporting section portion, the inserting paragraph portion, is connected to first filled cavity;
Interface channel is set to the side in the inserting paragraph portion, is connected to first filled cavity;
In the state of in the hole of the inserting paragraph portion insertion pile body, the obturator in the hole of the pile body can pass through the connection
Channel and first opening are filled in first filled cavity;First filled cavity, the interface channel and described
In the state of obturator solidification in one opening, the supporter can be based on filling out described in solidifying in the interface channel
Body is filled to be fixedly connected with the pile body.
2. supporter according to claim 1, which is characterized in that the inserting paragraph portion includes:
At least two first connectors are connect with the supporting section portion, to far from institute on the length direction in the supporting section portion
The side for stating supporting section portion extends, the circumferential distribution along the supporting section portion;At least two first connector, which encloses, to be set and shape
At first filled cavity;
The interface channel is formed between the side of two first adjacent connectors at least two first connector, it is described
The one end in the remote supporting section portion of at least two first connectors, which is enclosed, to be set and forms first opening.
3. supporter according to claim 2, which is characterized in that the inserting paragraph portion further include:
Second connector connect with the two first adjacent connectors respectively, encloses and set at least two first connector
And form first filled cavity;
The interface channel is formed between second connector and the side of the two first adjacent connectors.
4. supporter according to claim 3, which is characterized in that second connector is located at described at least two first
Connector, which encloses, to be set and is formed except first filled cavity;
In the state that second connector and at least two first connector are inserted into the hole of the pile body, the pile body
Hole in obturator can be wrapped in except second connector and at least two first connector;Described second connects
In the state of obturator solidification except fitting and at least two first connector, the supporter can be based on institute
The obturator for stating the solidification of the second connector side is fixedly connected with the pile body.
5. supporter according to claim 2, which is characterized in that further include:
First separator is set between the supporting section portion and at least two first connector;Described at least two
A connection piece is connect by first separator with the supporting section portion;First separator and described at least two first
Connector, which encloses, to be set and forms first filled cavity;
At least two first connector is inserted into the hole of the pile body and insertion institute, the first part in the supporting section portion
In the state of stating in the hole of pile body, there is first distance between first separator and the top side of the pile body.
6. supporter according to claim 1, which is characterized in that the inserting paragraph portion is angle steel lattice shape structure, described
Supporting section portion is steel tubular structure.
7. supporter according to any one of claims 2 to 6, which is characterized in that further include:
Second filled cavity, the length direction along the supporting section portion are set in the supporting section portion;
Second opening, is set to the one end in the far described inserting paragraph portion, the supporting section portion, for filling to second filled cavity
The obturator.
8. supporter according to claim 1, which is characterized in that further include:
Through-hole is set to the side in the inserting paragraph portion, is connected to first filled cavity, forms the interface channel.
9. supporter according to claim 8, which is characterized in that the through-hole is helical structure, and the through-hole is along institute
State the circumferential Spiral distribution in inserting paragraph portion;Or,
The through-hole is n shape, and the through-hole is set to the end in the inserting paragraph portion;Or,
The through-hole is bar shaped, and length direction of the through-hole along the inserting paragraph portion is interspersed.
10. supporter according to claim 8 or claim 9, which is characterized in that first filled cavity is also provided at the bearing
In section portion;
The supporter further include:
Second separator is set in first filled cavity, positioned at the junction in the inserting paragraph portion and the supporting section portion;
Second spacing body and the supporting section portion form the first part of first filled cavity, and second separator is inserted with described
Enter the second part that section portion forms first filled cavity;
Third opening, is set to the one end in the far described inserting paragraph portion, the supporting section portion, and first with first filled cavity
Divide connection, for filling the obturator to the first part of first filled cavity;
The inserting paragraph portion is inserted into the hole of the pile body and the second part in the supporting section portion is inserted into the hole of the pile body
In the state of interior, there is second distance, filling out in the hole of the pile body between second separator and the top side of the pile body
Filling body can be filled in the second part of first filled cavity by the through-hole and first opening;Described first fills out
It fills in the state of the obturator solidification in the second part, the through-hole and first opening of chamber, the support physical efficiency
It is enough to be fixedly connected based on the obturator solidified in the through-hole with the pile body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910447656.0A CN110344427A (en) | 2019-05-27 | 2019-05-27 | Supporter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910447656.0A CN110344427A (en) | 2019-05-27 | 2019-05-27 | Supporter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110344427A true CN110344427A (en) | 2019-10-18 |
Family
ID=68173976
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910447656.0A Pending CN110344427A (en) | 2019-05-27 | 2019-05-27 | Supporter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110344427A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07216878A (en) * | 1994-02-08 | 1995-08-15 | Elf:Kk | Method of burying ready-made pile |
CN1362557A (en) * | 2000-12-28 | 2002-08-07 | 西胁醇 | Pile construction method |
JP3111247U (en) * | 2005-03-15 | 2005-07-14 | 不動電設有限会社 | Equipment strut device |
KR20130070295A (en) * | 2011-12-19 | 2013-06-27 | (주)아리터 | Supporting pile with double steel pipe and construction method thereof |
JP2014109175A (en) * | 2012-12-04 | 2014-06-12 | Takenaka Komuten Co Ltd | Construction method for steel pipe concrete pile and steel pipe pile |
CN109797753A (en) * | 2019-03-11 | 2019-05-24 | 深圳宏业基岩土科技股份有限公司 | Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column |
CN211228569U (en) * | 2019-05-27 | 2020-08-11 | 中铁第四勘察设计院集团有限公司 | Support body |
-
2019
- 2019-05-27 CN CN201910447656.0A patent/CN110344427A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07216878A (en) * | 1994-02-08 | 1995-08-15 | Elf:Kk | Method of burying ready-made pile |
CN1362557A (en) * | 2000-12-28 | 2002-08-07 | 西胁醇 | Pile construction method |
JP3111247U (en) * | 2005-03-15 | 2005-07-14 | 不動電設有限会社 | Equipment strut device |
KR20130070295A (en) * | 2011-12-19 | 2013-06-27 | (주)아리터 | Supporting pile with double steel pipe and construction method thereof |
JP2014109175A (en) * | 2012-12-04 | 2014-06-12 | Takenaka Komuten Co Ltd | Construction method for steel pipe concrete pile and steel pipe pile |
CN109797753A (en) * | 2019-03-11 | 2019-05-24 | 深圳宏业基岩土科技股份有限公司 | Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column |
CN211228569U (en) * | 2019-05-27 | 2020-08-11 | 中铁第四勘察设计院集团有限公司 | Support body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7942371B1 (en) | Conduit spacer for duct banks | |
US10260480B2 (en) | Wind power plant foundation and wind power plant | |
KR101565463B1 (en) | Steel assembly of column for filling concrete | |
CN103548181B (en) | Battery interconnect module | |
EP0171432A4 (en) | Modules used for retaining walls and the like. | |
CN110344427A (en) | Supporter | |
CN207988558U (en) | A kind of precast floor slab support device | |
CN110337519A (en) | Permanent concrete blinding and the method for manufacturing betonanc composite construction using this formwork | |
CN106347253B (en) | Electric connection box bracket and the electric connection box for being equipped with the bracket | |
JP2007046996A (en) | Block wall and radiation ray shield wall | |
CN211228569U (en) | Support body | |
HU185500B (en) | Method for making railway sleeper from ferroconcrete and device for implementing this method | |
CN106013035A (en) | Detachable geocell | |
CN206707763U (en) | A kind of pre-buried channel flow component for subway tunnel | |
CN204081646U (en) | Combined enclosing wall | |
CN208919553U (en) | A kind of column fixed mechanism | |
CN213596720U (en) | Highway subgrade settlement-preventing device | |
JPH079536Y2 (en) | General purpose arm | |
CN205348579U (en) | Square steel tube concrete column with antidetonation function | |
CN214993900U (en) | Building foundation pit supporting structure | |
CN217352581U (en) | Semi-embedded type steel column base node | |
CN211127065U (en) | Octagonal assembled cable piece | |
CN216275611U (en) | Supporting pile for reinforcing arch springing of tunnel body | |
CN211285657U (en) | Double-walled steel cofferdam picture peg underwater anchoring structure based on finish rolling deformed steel bar | |
EP0677617A2 (en) | Method for forming a vibration damping screen in the ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |