CN110340102A - Construction site waste steel bar recovery system - Google Patents

Construction site waste steel bar recovery system Download PDF

Info

Publication number
CN110340102A
CN110340102A CN201810292050.XA CN201810292050A CN110340102A CN 110340102 A CN110340102 A CN 110340102A CN 201810292050 A CN201810292050 A CN 201810292050A CN 110340102 A CN110340102 A CN 110340102A
Authority
CN
China
Prior art keywords
steel bar
cleaning
waste steel
construction site
cutter device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810292050.XA
Other languages
Chinese (zh)
Inventor
李富
曹涛
石涛
李禹峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Qian Ao Construction Engineering Co Ltd
Original Assignee
Hubei Qian Ao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Qian Ao Construction Engineering Co Ltd filed Critical Hubei Qian Ao Construction Engineering Co Ltd
Priority to CN201810292050.XA priority Critical patent/CN110340102A/en
Publication of CN110340102A publication Critical patent/CN110340102A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • B08B3/022Cleaning travelling work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F11/00Cutting wire
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B27/00Other grinding machines or devices
    • B24B27/033Other grinding machines or devices for grinding a surface for cleaning purposes, e.g. for descaling or for grinding off flaws in the surface
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Abstract

The present invention relates to a kind of construction site waste steel bar recovery systems, including cleaning plant, cutter device and material collecting device, the cleaning plant, cutter device are sequentially coaxially arranged along reinforcing bar feedstock direction, the turnover panel height of the material collecting device is located at below the cutting groove on cutter device, the cleaning plant is made of scale mill and driving gear, the gear ring matched with driving gear is equipped on the outside of the scale mill, the driving gear is driven by motor;The scale mill is circular ring structure and is disposed with along waste steel bar feedstock direction except scrap layer, cleaning layer;The cutter device includes the pedestal for opening up V-type reinforcing bar cutting groove;The material collecting device includes rewinding bracket, second baffle and turnover panel.The concrete and iron rust that the present invention wraps up waste steel bar by cleaning plant above are cleared up, and the end of waste steel bar is carried out cutting recycling to the reinforcing bar after cleaning using cutter device, reduces production cost.

Description

Construction site waste steel bar recovery system
Technical field
The invention belongs to technical field of buildings, are related to a kind of construction site waste steel bar recovery system.
Background technique
Reinforcing bar is a kind of bar of steel, is widely used in various building structure, particularly large size, heavy type, light thin wall And high building structure.It include a large amount of waste steel bars in the solid waste in removal house during carrying out work of renovating shantytowns, Concrete is wrapped up on these waste steel bar surfaces, and some surfaces generate a large amount of iron rust, manually uses hammer, it is difficult to remove, take When it is laborious.If these waste and old reinforcing bars, which carry out utilization, can save buildings and resources, reduce production cost.Therefore research and development one are needed Kind construction site waste steel bar recovery system.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of construction site waste steel bar recovery system, reduction is produced into This.
The scheme of the invention is:
A kind of construction site waste steel bar recovery system, including cleaning plant, cutter device and material collecting device, the cleaning dress Set, cutter device is sequentially coaxially arranged along reinforcing bar feedstock direction, the turnover panel height of the material collecting device is located on cutter device Below cutting groove, the cleaning plant is made of scale mill and driving gear, and the scale mill outside is equipped with and driving tooth The gear ring matched is taken turns, the driving gear is driven by motor;The scale mill is circular ring structure and feeds along waste steel bar Direction is disposed with except scrap layer, cleaning layer;The cutter device includes the pedestal for opening up V-type reinforcing bar cutting groove;The receipts Expect that device includes rewinding bracket, second baffle and turnover panel.
Preferably, described except scrap layer is except the internal symmetry of scrap layer is equipped with channel, the connecting rod one of the inside in the channel End is fixedly connected by spring with the inner wall except scrap layer, and the other end is rotatably equipped with steel brush;Described remove also sets inside scrap layer There are a cricoid iron rust and concrete slag collecting chamber, iron rust and concrete slag collecting chamber are uniformly provided with several iron close to steel brush side Rust and concrete slag feed opening;
Preferably, the cleaning layer middle position is equipped with cleaning disk;The cleaning disk is uniformly provided with several spray heads, described It is successively arranged waste collection chamber and cleaning solution storage chamber on the outside of cleaning disk, the waste collection chamber is uniform close to the side of spray head It is provided with several inlet openings;The inside of the cleaning solution storage chamber is fixedly installed with water pump, the water outlet and cleaning disk of water pump Connection.
Preferably, several grooves, filled rubber in groove are opened up on the cell wall of the cutting groove.
Preferably, the pedestal is connect with casing by support rod, and installation cutting handle, casing internal install sand on casing Wheel, pedestal disengaging reinforcing bar two sides are equipped with first baffle.
Preferably, the rewinding bracket includes chassis and the support frame above the chassis, and support frame as described above includes Junction is provided with two struts of axle sleeve, and the angle between described two struts is 100-130 °;
Preferably, the turnover panel is located at the top of two struts, is fixedly connected on the turnover panel corresponding with the axle sleeve The two sides of axis, the rewinding bracket are equipped with charging conduit, and the second baffle is located at the side of the turnover panel, and turns over perpendicular to described Plate.
The invention has the advantages that:
1, the concrete and iron rust that the present invention wraps up waste steel bar by cleaning plant above are cleared up, and in addition reinforcing bar makes Soldering processing is usually carried out with the end of reinforcing bar in the process, C, Mn, Si, Re, B, Nb, Ni, Cr element need inside welding wire Further melting recovery processing is carried out, the reinforcing bar after cleaning is cut go back to the end of waste steel bar using cutter device Receive, at the same cutter device waste steel bar can also be carried out being cut to after the reinforcing bar of production standard size length material collecting device into Row wrapping is recycled again.
2, cleaning plant of the invention, which is equipped with, removes scrap layer, cleaning layer, can effectively be polished waste steel bar, clearly It washes, removes the concrete and iron rust on surface.It is smaller to reinforcing bar injury, it does not need to beat, remove thoroughly.
3, filled rubber in the groove of the cutter device in the present invention increases reinforcing bar cutting groove groove wall frictional force, reinforcing bar After being placed in reinforcing bar cutting groove, reinforcing bar can generate friction with rubber, not easily shifted.
4, cutting groove is V-structure, and the reinforcing bar that can place different-diameter is cut.
5, first baffle make the spark generated when reinforcing bar cutting will not spluttering, guarantee operator safety.
6, the angle between described two struts is 100-130 °, and reversal rate can be improved so that reinforcing bar hurtle down to Charging conduit avoids reinforcing bar and accumulates on returning face plate, improves the falling speed of reinforcing bar.
7, the second baffle is located at the side of the turnover panel, and perpendicular to the turnover panel, reinforcing bar is prevented to be detached from returning face plate.
Detailed description of the invention
Fig. 1 present system schematic top plan view;
Fig. 2 cleaning plant structural schematic diagram;
Fig. 3 cleans schematic diagram of a layer structure;
Fig. 4 removes scrap schematic diagram of a layer structure;
Fig. 5 cutter device schematic diagram of a layer structure;
Fig. 6 material collecting device schematic diagram of a layer structure;
Fig. 7 material collecting device schematic diagram of a layer structure;
Fig. 8 material collecting device schematic diagram of a layer structure;
Wherein: cleaning plant 1, material collecting device 3, rewinding bracket 31, axle sleeve 311, strut 312, axis 321, turnover panel 32, cutter device 2, cutting groove 211, pedestal 21, casing 22, support rod 23, cutting handle 24, first baffle 25, grinding wheel 26, scale mill 11, tooth Circle 111, driving gear 12, motor 13 remove scrap layer 112, channel 1121, connecting rod 1122, spring 1123, steel brush 1124, iron rust With concrete slag collecting chamber 1125, iron rust and concrete slag feed opening 1126, cleaning layer 113 clean disk 1131, spray head 11311, waste collection chamber 1132, cleaning solution storage chamber 1133, water pump 1134.
Specific embodiment
The present invention is further illustrated below with reference to embodiment, but the scope of protection of present invention is not limited to implement The range of example statement.
Embodiment 1
A kind of construction site waste steel bar recovery system, including cleaning plant 1, cutter device 2 and material collecting device 3, the cleaning Device 1, cutter device 2 are sequentially coaxially arranged along reinforcing bar feedstock direction, and 32 height of turnover panel of the material collecting device 3 is located at cutting dress 211 lower section of cutting groove on 2 is set, the cleaning plant 1 is made of scale mill 11 and driving gear 12, the scale mill 11 Outside is equipped with the gear ring 111 matched with driving gear 12, and the driving gear 12 is driven by motor 13;The scale mill 11 It is disposed with for circular ring structure and along waste steel bar feedstock direction except scrap layer 112, cleaning layer 113;The cutter device 2 wraps Include the pedestal 21 for opening up V-type reinforcing bar cutting groove 211;The material collecting device 3 includes rewinding bracket 31, second baffle 33 and turnover panel 32。
Preferably, described except scrap layer 112 is except the internal symmetry of scrap layer 112 is equipped with channel 1121, the channel 1121 Inside 1122 one end of connecting rod by spring 1123 with except the inner wall of scrap layer 112 is fixedly connected, the other end is rotatably equipped with Steel brush 1124;Described remove is additionally provided with cricoid iron rust and concrete slag collecting chamber 1125, iron rust and concrete inside scrap layer 112 Slag collecting chamber 1125 is uniformly provided with several iron rust and concrete slag feed opening 1126 close to 1124 side of steel brush;
Preferably, 113 middle position of cleaning layer is equipped with cleaning disk 1131;The cleaning disk 1131 is uniformly provided with several A spray head 11311 is successively arranged waste collection chamber 1132 and cleaning solution storage chamber 1133 on the outside of the cleaning disk 1131, described Waste collection chamber 1132 is evenly arranged with several inlet openings 1132 close to the side of spray head 11311;The cleaning solution storage chamber 1133 inside is fixedly installed with water pump 1134, and the water outlet of water pump 1134 is connected to cleaning disk 1131.The cleaning solution is deposited The cleaning solution stored in storage chamber 1133 is water or acid solution or aqueous slkali.
Preferably, several grooves 2111, filled rubber in groove are opened up on the cell wall of the cutting groove 211.
Preferably, the pedestal 21 is connect with casing 22 by support rod 23, installation cutting handle 24, casing on casing 23 Grinding wheel 26 is installed in 23 inside, and the pedestal 21 passes in and out reinforcing bar two sides and is equipped with first baffle 25.
Preferably, the rewinding bracket 31 includes chassis and the support frame above the chassis, support frame as described above packet Two struts 312 that junction is provided with axle sleeve 311 are included, the angle between described two struts 312 is 100-130 °;
Preferably, the turnover panel 32 is located at the top of two struts 312, is fixedly connected with and the axle sleeve on the turnover panel 32 The two sides of 311 corresponding axis 321, the rewinding bracket 31 are equipped with charging conduit 34, and the second baffle 33 is located at the turnover panel 32 side, and perpendicular to the turnover panel 32.
This utility system working principle: it by an insertion cleaning plant 1 of waste steel bar, initially enters except scrap layer 112, connecting rod 1122 makes steel brush 1124 be close to rebar surface under the action of spring 1123, carries out polishing derusting to rebar surface, The iron rust and concrete slag generated when polishing falls into iron rust and concrete slag collecting chamber 1125 and is collected, at the same time, electricity Machine 13 drives driving gear 12 to rotate, so that scale mill 11 be driven to rotate, waste steel bar is made to obtain comprehensive polishing;Reinforcing bar Polishing after the completion of enter cleaning layer 113 in, water pump 1134 by cleaning solution be pumped into cleaning disk 1131 in the reinforcing bar after polishing into Row is sprayed, and the waste liquid after cleaning flows into waste collection chamber 1132, and at the same time, the rotation of scale mill 11 obtains reinforcing bar To comprehensive cleaning, the reinforcing bar for cleaning completion enters cutter device 2, and material collecting device 3 is entered after cutting to cutter device Class carries out class wrapping.

Claims (7)

1. a kind of construction site waste steel bar recovery system, including cleaning plant (1), cutter device (2) and material collecting device (3), It is characterized by: the cleaning plant (1), cutter device (2) are sequentially coaxially arranged along reinforcing bar feedstock direction, the material collecting device (3) turnover panel (32) is highly located at below the cutting groove (211) on cutter device (2), and the cleaning plant (1) is by scale mill (11) it is formed with driving gear (12), the gear ring matched with driving gear (12) is equipped on the outside of the scale mill (11) (111), the driving gear (12) is driven by motor (13);The scale mill (11) be circular ring structure and along waste steel bar into Material direction is disposed with except scrap layer (112), cleaning layer (113);The cutter device (2) includes opening up the cutting of V-type reinforcing bar The pedestal (21) of slot (211);The material collecting device (3) includes rewinding bracket (31), second baffle (33) and turnover panel (32).
2. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: described to remove scrap layer (112) except the internal symmetry of scrap layer (112) is equipped with channel (1121), the connecting rod (1122) of the inside of the channel (1121) One end is fixedly connected by spring (1123) with the inner wall except scrap layer (112), and the other end is rotatably equipped with steel brush (1124);Institute It states except cricoid iron rust and concrete slag collecting chamber (1125) is additionally provided with inside scrap layer (112), iron rust and concrete slag are collected Chamber (1125) is uniformly provided with several iron rust and concrete slag feed opening (1126) close to steel brush (1124) side.
3. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the cleaning layer (113) Middle position is equipped with cleaning disk (1131);The cleaning disk (1131) is uniformly provided with several spray heads (11311), described clear It washes on the outside of disk (1131) and is successively arranged waste collection chamber (1132) and cleaning solution storage chamber (1133), the waste collection chamber (1132) side close to spray head (11311) is evenly arranged with several inlet openings (1132);The cleaning solution storage chamber (1133) Inside be fixedly installed with water pump (1134), the water outlet of water pump (1134) is connected to cleaning disk (1131).
4. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the cutting groove (211) Cell wall on open up several grooves (2111), filled rubber in groove.
5. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the pedestal (21) and machine Shell (22) is connected by support rod (23), installation cutting handle (24) on casing (23), installs grinding wheel (26) inside casing (23), Pedestal (21) disengaging reinforcing bar two sides are equipped with first baffle (25).
6. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the rewinding bracket (31) Support frame including chassis and above the chassis, support frame as described above include two that junction is provided with axle sleeve (311) Strut (312), the angle between described two struts (312) is 100-130 °.
7. waste steel bar recovery system in construction site according to claim 1, it is characterised in that: the turnover panel (32) is located at The top of two struts (312) is fixedly connected with axis (321) corresponding with the axle sleeve (311), institute on the turnover panel (32) The two sides for stating rewinding bracket (31) are equipped with charging conduit (34), and the second baffle (33) is located at the side of the turnover panel (32), and Perpendicular to the turnover panel (32).
CN201810292050.XA 2018-04-03 2018-04-03 Construction site waste steel bar recovery system Pending CN110340102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810292050.XA CN110340102A (en) 2018-04-03 2018-04-03 Construction site waste steel bar recovery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810292050.XA CN110340102A (en) 2018-04-03 2018-04-03 Construction site waste steel bar recovery system

Publications (1)

Publication Number Publication Date
CN110340102A true CN110340102A (en) 2019-10-18

Family

ID=68172516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810292050.XA Pending CN110340102A (en) 2018-04-03 2018-04-03 Construction site waste steel bar recovery system

Country Status (1)

Country Link
CN (1) CN110340102A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111687227A (en) * 2020-08-03 2020-09-22 赵思辉 Composite die for improving surface smoothness of cold-drawn steel
CN112775353A (en) * 2020-12-18 2021-05-11 黎讴 Reinforcing bar waste recycling processingequipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111687227A (en) * 2020-08-03 2020-09-22 赵思辉 Composite die for improving surface smoothness of cold-drawn steel
CN112775353A (en) * 2020-12-18 2021-05-11 黎讴 Reinforcing bar waste recycling processingequipment

Similar Documents

Publication Publication Date Title
CN205588118U (en) Steel rust removal device
CN104786125B (en) Polishing and dust collecting integrated device for concrete reinforcements on construction site
CN208115407U (en) A kind of workshop dust collector
CN110340102A (en) Construction site waste steel bar recovery system
CN107282496A (en) A kind of Parts Washing Equipment
CN208712492U (en) Construction site waste steel bar recovery system
CN110026839A (en) A kind of old reinforcing bar derusting curing means
CN210937588U (en) Flame cutting machine
CN214772820U (en) Automatic cleaning and spraying device for prefabricated box girder model
CN210413818U (en) Grinding device for outer circle of carbon felt heat-insulating cylinder
CN219502327U (en) Dust remover for sand processing
CN216539969U (en) Pipeline surface treatment equipment for pipeline engineering
CN204565850U (en) Concrete reinforcement rust cleaning dust arrester installation
CN214389318U (en) Automatic rotating device for waste gas treatment filter screen
CN214194317U (en) Damaged road surface reforms transform prosthetic preprocessing device
CN109202661A (en) A kind of full-automatic bearing feeding derusting cleaning, drying production line
CN210360772U (en) Pipe rust cleaning device
CN209379565U (en) A kind of metal handle ultrasonic cleaning equipment
CN215696506U (en) Petroleum pipeline cleaning device with pipe diameter adjustable structure
CN111702639A (en) Concrete mud cleaning device in different states for concrete pouring industry
CN215879082U (en) Environment-friendly auto-parts waste recovery device
CN212444617U (en) Angle grinder with cleaning function
CN211885603U (en) Water saving fixtures is used at fitment job site
CN205733248U (en) Automatic dust collection electrotrephine
CN212944261U (en) Maintenance whitewashing machine outward appearance cleaning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191018