CN110336247A - A kind of method for protecting transformer holds control device and protection system - Google Patents

A kind of method for protecting transformer holds control device and protection system Download PDF

Info

Publication number
CN110336247A
CN110336247A CN201910748762.2A CN201910748762A CN110336247A CN 110336247 A CN110336247 A CN 110336247A CN 201910748762 A CN201910748762 A CN 201910748762A CN 110336247 A CN110336247 A CN 110336247A
Authority
CN
China
Prior art keywords
batcher
allotment
current
control device
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910748762.2A
Other languages
Chinese (zh)
Other versions
CN110336247B (en
Inventor
张增禄
刘超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhang Xiaoju
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910748762.2A priority Critical patent/CN110336247B/en
Publication of CN110336247A publication Critical patent/CN110336247A/en
Application granted granted Critical
Publication of CN110336247B publication Critical patent/CN110336247B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values
    • G01R19/16533Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application
    • G01R19/16538Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application in AC or DC supplies
    • G01R19/16547Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values characterised by the application in AC or DC supplies voltage or current in AC supplies
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/04Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for transformers

Abstract

The application discloses a kind of method for protecting transformer, holds control device and protection system.The method is applied to the appearance control device of installation on the transformer, specifically includes: being in advance every phase alternating current setting load current value and the default recovery value that transfinites in holding control device;Timing detects the real-time total current of every phase alternating current;When the real-time total current for detecting certain phase alternating current is more than the load current value of the phase alternating current, then to batcher transmission allotment electricity consumption instruction;In preset time after transmitting from the allotment electricity consumption instruction to batcher, the real-time total current for detecting every phase alternating current is below the default recovery value that transfinites, then the instruction for restoring batcher rated current is transmitted to batcher.Improving does not have current protection and transformer is caused extremely to be easy impaired problem between existing transformer and batcher, so that the stability of distribution system is stronger.

Description

A kind of method for protecting transformer holds control device and protection system
Technical field
This application involves electricity load control technology field more particularly to a kind of method for protecting transformer, hold control Device and protection system.
Background technique
In a power distribution system, transformer is used to change the size of alternating voltage as core devices, and defeated to power distribution circuit Send suitable voltage.To guarantee that transformer is in the working condition of safety, normal load is well below the volume of transformer Constant load, the load utilization rate that this has resulted in transformer is relatively low, and when the load that transformer operates normally is more than that its is specified When load, the relatively lossy of transformer will cause, while also making the bad stability of distribution system.
In existing distribution system, when the total current for the electricity consumption product that user terminal uses is too big, transformer is fed back to Transient current also can rapidly increase, and can generate quick-blow to transformer.Based on this, in order to protect transformation in a power distribution system Device, the application come into being.
Summary of the invention
This application provides a kind of methods for protecting transformer, applied to the appearance control device of installation on the transformer, institute The method of stating includes:
It is in advance every phase alternating current setting load current value and the default recovery value that transfinites in holding control device;
Timing detects the real-time total current of every phase alternating current;
When the real-time total current for detecting certain phase alternating current is more than the load current value of the phase alternating current, then to batcher biography Defeated allotment electricity consumption instruction;
In preset time after transmitting from the allotment electricity consumption instruction to batcher, the real-time total of every phase alternating current is detected Electric current is below the default recovery value that transfinites, then the instruction for restoring batcher rated current is transmitted to batcher.
Method as described above for protecting transformer, wherein described to transmit allotment electricity consumption instruction, tool to batcher Body includes:
Appearance control device determines allotment strategy according to the real-time total current detected, directly will be under allotment strategy by communication line It is sent to batcher;
The allotment electricity consumption for carrying real-time total current instruction is sent to background server or, holding control device, by background service Device determines allotment strategy according to real-time total current, by allotment policy distribution to batcher.
The method for protecting transformer as described above, wherein will allotment policy distribution to batcher, specifically include as Lower sub-step:
Inquiry meets the batcher of interrupt condition;
Situation is actually used according to batcher and generates allotment strategy, and sending to the batcher for meeting interrupt condition includes adjusting Adjustment with strategy indicates;
The allotment for receiving batcher is completed after responding, and the batcher priority deployed is updated.
The method for protecting transformer as described above, wherein the allotment strategy include interrupt whole end-equipments, Interrupt unit end-equipment reduces the power of portion distal end equipment;
When using the allotment strategy for interrupting whole end-equipments, sends to the highest batcher of priority level and all interrupt End-equipment instruction;
When using the allotment strategy of interrupt unit end-equipment, according to the current detection value controlling device and reporting is held, calculating is needed The magnitude of current to be adjusted carries the magnitude of current for needing to adjust in adjustment instruction, highest to priority level according to preset rules The adjustment instruction of batcher transmitting portion;
When using the under powered allotment strategy by portion distal end equipment, according to preset rules to priority level highest Batcher transmitting portion plant capacity turn down instruction.
The application also provides a kind of for protecting the appearance control device of transformer, comprising: current detection module, intelligent control module And communication module;
Current detection module will test result and be sent to intelligence for periodically detecting the real-time total current of every phase alternating current Control module;
Intelligent control module, for surpassing when the real-time total current for receiving certain phase alternating current that current detection module detects When crossing the load current value of the phase alternating current, notice communication module issues allotment electricity consumption instruction to batcher;
And for detecting in preset time after notifying communication module to issue allotment electricity consumption instruction to batcher The real-time total current of every phase alternating current be below it is described it is default transfinite recovery value when, notify communication module to issue recovery to batcher The instruction of batcher rated current;
Communication module is issued to batcher for that will deploy electricity consumption instruction, and will restore batcher rated current Instruction is issued to batcher.
The appearance control device as described above for being used to protect transformer, wherein the intelligent control module is used for according to total in real time Electric current determines adjustable strategies, and the communication module is notified to issue the allotment electricity consumption including the adjustable strategies to batcher and refer to Show.
The appearance control device as described above for being used to protect transformer, wherein policy distribution will be deployed extremely in the communication module Batcher is specifically used for the batcher that inquiry meets interrupt condition, actually uses situation according to batcher and generates allotment strategy, and Sending to the batcher for meeting interrupt condition includes the tactful adjustment instruction of allotment, and response is completed in the allotment for receiving batcher Afterwards, the batcher priority deployed is updated.
The application also provides a kind of for protecting the protection system of transformer appearance control device including installation on the transformer, It further include batcher, the appearance control device is connect with the batcher by communication line;
The batcher, for according to the on-off for holding the allotment policy control electrical equipment that control device issues;And root According to the instruction for holding the recovery batcher rated current that control device issues, batcher coil is restored to normal rated current.
The application also provides a kind of for protecting the protection system of transformer appearance control device including installation on the transformer, It further include background server and batcher, the appearance control device and the batcher are connect with the background server telecommunication;
The background server, for receiving the allotment electricity consumption instruction held control device and send the real-time total current of carrying, Allotment strategy is determined according to real-time total current, by allotment policy distribution to batcher;
And the instruction for holding the recovery batcher rated current that control device is sent is received, which is issued to quantitative Device;
The batcher, the on-off of the allotment policy control electrical equipment for being issued according to the background server;With And the instruction of the recovery batcher rated current issued according to the background server, batcher coil is restored to normal volume Constant current.
The protection system as described above for being used to protect transformer, wherein in the background server, according to total electricity in real time Stream, which determines, deploys strategy, and the batcher of interrupt condition is met specifically for inquiring, and actually uses situation according to batcher and generates tune With strategy, and sending to the batcher for meeting interrupt condition includes the tactful adjustment instruction of allotment, and receives batcher After response is completed in allotment, the batcher priority deployed is updated.
The application realize have the beneficial effect that: using it is provided by the present application protection transformer method, hold control device and Protection system, improving does not have current protection and transformer is caused extremely to be easy to be damaged between existing transformer and batcher The problem of, so that the stability of distribution system is stronger.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The some embodiments recorded in invention can also be obtained according to these attached drawings other for those of ordinary skill in the art Attached drawing.
Fig. 1 is the transformer protection method flow chart that the embodiment of the present application one provides;
Fig. 2 is the method flow diagram for generating allotment strategy;
Fig. 3 is the method flow diagram for the tranformer protection system that the embodiment of the present application two provides;
Fig. 4 is the method flow diagram for the tranformer protection system that the embodiment of the present application three provides;
Fig. 5 is the schematic diagram for holding control device in the tranformer protection system of the offer of the embodiment of the present application four;
Fig. 6 is the tranformer protection system schematic that the embodiment of the present application five provides;
Fig. 7 is the tranformer protection system schematic that the embodiment of the present application six provides.
Specific embodiment
With reference to the attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on the present invention In embodiment, those skilled in the art's every other embodiment obtained without making creative work, all Belong to the scope of protection of the invention.
In order to reduce impact of the instantaneous heavy current to transformer, guarantee that the safety of transformer, the application provide a kind of transformation Device protects system, the system comprises transformer, holds control device and batcher.
Under normal conditions, the quantity of transformer, appearance control device and batcher in a certain distribution region (such as a certain cell) is set It is set to 1:1:n, is i.e. a transformer is installed in a distribution region, appearance control device is installed on a transformer, one Hold control device and safeguards several batchers in the distribution region;Alternatively it is also possible to according to the coverage area in distribution region and The quantity that the operating load of each equipment can deploy transformer in the region at any time, hold control device and batcher.
Specifically, hold control device and be mounted on the transformer terminal in distribution region, for detecting the electric current of transformer, hold control device point (three-phase alternating current is a kind of transporting pattern of electric energy, referred to as three-phase electricity to three-phase electricity, and by three, frequency is identical, amplitude is identical, phase Position successively 120 ° of mutual deviation exchange potential composition power supply), every its rated current of phase electrographic recording and real-time current.Batcher installation In user terminal, it is adjusted for the total load of all electrical equipments in counting user end, and to user terminal electricity consumption.
It is easily damaged to improve laying communication line brought by the communication line connection held between control device and batcher And the problem that maintenance cost is high further includes background server in tranformer protection system provided by the present application, holds control device and determines It only needs to be electrically connected between measuring device not needing to communicate to connect, holds control device by background server and issue adjustment order to batcher.
In addition, can also deploy backstage at any time according to the operating load of the coverage area in distribution region and each equipment and take The quantity of business device, such as multiple proxy servers can be set in the biggish distribution region of range, each fragment region is matched Electric control, then each proxy server is managed and is safeguarded by total background server.
Embodiment one
The embodiment of the present application one provides a kind of transformer protection method, is applied to hold control device, as shown in Figure 1, specifically including Following steps:
Step 110 is every phase alternating current setting load current value and the default recovery value that transfinites in holding control device in advance;
Preferably, in the three-phase electricity for holding control device, corresponding load current value is set for every phase alternating current;In addition, in order to The safety for guaranteeing transformer further includes setting maximum current value, the maximum current value ratio in advance to hold every phase alternating current of control device The maximum value of transformer is small by 10%;Maximum current value is set as a, load current value m, default detection interval is set as 1 hour, The default recovery value that transfinites is L;Wherein, preset detection interval can sets itself according to actual needs, it is not limited here.
Step 120, the real-time total current for holding the control every phase alternating current of device according to default detection interval timing detection, when certain intersection When the real-time total current of galvanic electricity is more than the load current value of the phase alternating current, allotment electricity consumption instruction is transmitted to batcher;
Specifically, it when the timer in appearance control device reaches default detection interval, detects and holds every phase alternating current wires in control device The real-time total current of circle illustrates currently when detecting present current value a > c > m of real-time total current in user terminal electrical equipment Total electricity consumption already exceed the load current value of setting, then transmit allotment electricity consumption instruction to batcher, notify batcher pair User terminal electrical equipment carries out interruption adjustment;
Wherein, when holding setting communication line between control device and batcher, then holding control device can directly transmit to batcher Electricity consumption instruction is deployed, specific allotment strategy is carried in allotment electricity consumption instruction;It may be the place for reducing batcher Allotment electricity consumption instruction is first sent to background server by reason burden, then determines allotment strategy by background server, will deploy plan It is slightly issued to batcher, corresponding interrupt is carried out to user equipment and is adjusted;
The embodiment of the present application preferably, holding is not laid with communication line between control device and batcher, hold control device immediately rearward Platform server sends allotment electricity consumption instruction, and background server generates allotment strategy after receiving the request, will be under allotment strategy It is sent to batcher, batcher carries out user equipment to interrupt adjustment accordingly according to allotment strategy;It can be reduced using this scheme Hold between control device and batcher due to manual maintenance caused by being laid with communication line and easy the problem of being destroyed.
In step 130, preset time after transmitting the allotment electricity consumption instruction to batcher, every intersection is periodically detected The real-time total current of galvanic electricity is below the default recovery value that transfinites, then the finger for restoring batcher rated current is transmitted to batcher Show;
Specifically, hold control device and continue the real-time total current that timing detects every phase alternating current;If detecting certain phase alternating current Real-time total current then continues to transmit allotment electricity consumption instruction to batcher still between load current value and maximum current value;If When detecting that the current value of transformer is below load current value in certain time length, is then transmitted to batcher and restore batcher volume The instruction of constant current.
In the embodiment of the present application, preferably when detecting that present current value alreadys exceed load current value, then set again Regular inspection surveys interval, shortens the time of detection current value, and such as 5 minutes, if the current value detected again is also above specified electricity Flow valuve, then background server sends the request of adjustment quantitative device electricity consumption, continues to interrupt user terminal electrical equipment, if detect Current value load current value, then user equipment electricity consumption adjusted meets with electric standard, will not cause to pacify to transformer Umbra is rung;
It optionally, can also include readjusting detection interval after sending electricity consumption acceptable response to background server To default detection interval, the frequent communication for holding control device and background server is reduced.
In the embodiment of the present application, the recovery of transfiniting of batcher electric current is initiated by holding control device, holds control device real-time detection electric current simultaneously Adjustment order is sent, such as holding control device phase alternating current rated current is 50A, detects that real-time current reaches 51A, then Xiang Dingliang Device transmits down command, and batcher electric current is lowered 20% by rule, and the real-time current for holding control device at this time programs 48A, meets and becomes The stable operation of depressor;
Further, it is more than when appearance control device current value of (such as 20 minutes) real-time detection within continuous time does not rebound always The default recovery value 45A that transfinites, then illustrate that high current electricity consumption is stopped using, and holds control device and transmits recovery order of transfiniting to batcher, will Batcher coil is restored to normal rated current.
Fig. 2 is the stream that the step 120 provided by the embodiments of the present application based on Fig. 1 transmits that allotment electricity consumption is indicated to batcher Journey schematic diagram, as shown in Fig. 2, transmitting allotment electricity consumption instruction to batcher includes following sub-step:
It is not laid with communication line between control device and batcher it should be noted that if holding, then following methods are by background service Device executes, and is laid with communication line between control device and batcher if holding, and above scheme can be executed by holding control device end, can also be by Background server end executes, and preferably reduces and holds control device processing pressure, is executed by background server;
Step 210, inquiry meet the batcher of interrupt condition;
Specifically, the batcher priority level list that maintenance timing updates in holding control device or background server, it is excellent from this The batcher of highest priority is searched in first rank list;
For example, batcher priority level list as shown in table 1 below, certain residential building has 6 layers of 3 unit, and every unit has 2 Family, number is bigger, and priority level is higher, and the batcher for participating in allotment is 21-36:
16 15 14 13 12 11
17 30 29 28 27 10
18 31 36 35 26 9
19 32 33 34 25 8
20 21 22 23 24 7
1 2 3 4 5 6
Table 1
According to upper table it is found that highest priority is intermediate resident 36, optionally, according to the electric current of the transformer detected Value can choose multiple batchers, such as select priority for 36 and 35 batcher, by the two batchers after the completion of allotment Priority level initializing is 1 and 2, then by the priority of other batchers from adding 2, batcher priority level as shown in table 2 below is arranged Table:
18 17 16 15 14 13
19 32 31 30 29 12
20 33 1 2 28 11
21 34 35 36 27 10
22 23 24 25 26 9
3 4 5 6 7 8
Table 2
If after allotment allotment after total current it is still not up to standard, continue interrupt 34 and 33 batcher, and so on carry out Circulation.
Step 220 actually uses situation generation allotment strategy according to batcher, and sends out to the batcher for meeting interrupt condition Send the adjustment instruction including allotment strategy;
Wherein, allotment strategy specifically includes the whole end-equipments of interruption, interrupt unit end-equipment and by portion distal end Power reduction of equipment etc.;When using the allotment strategy for interrupting whole end-equipments, to the highest batcher hair of priority level It send and all interrupts end-equipment instruction;When using the allotment strategy of interrupt unit end-equipment, the electricity that device reports is controlled according to appearance Detected value is flowed, the magnitude of current for needing to adjust is calculated, the magnitude of current for needing to adjust is carried in adjustment instruction, according to preset rules pair The highest batcher transmitting portion adjustment instruction of priority level;When using by the under powered allotment strategy of portion distal end equipment When, instruction (the preset rules example is turned down to the highest batcher transmitting portion plant capacity of priority level according to preset rules The for example highest multiple batcher mean allocations of priority level need the reduced magnitude of current, or according to user feedback are priority scheduling The highest multiple batcher distribution of grade need the reduced magnitude of current etc. accordingly);
For example, transfiniting when holding to control device and report, certain building priority=1 managed under the appearance control device is inquired according to priority The family N issues the coil that batcher is arrived in electric current adjustment order, by the coil rating electric current of all priority=1 in this building one by one Lower 20%.
It should be noted that being specifically chosen which kind of allotment strategy is set by the actual conditions in distribution region, and can root The batcher actual use situation changed when factually is made adjustment, such as selection is complete in the case where significantly exceeding rated power The allotment strategy of end-equipment is interrupted in portion, or selection does not close but turns down portion distal end when current power distribution regional temperature is too low Allotment strategy of plant capacity etc., concrete condition is not construed as limiting.
After response is completed in step 230, the allotment for receiving batcher, the batcher priority deployed is updated;If still connecing It receives and holds the allotment electricity consumption instruction that control device reports, then continue to return to step 210;
In the embodiment of the present application, when allotment complete epicycle batcher electricity consumption after, by batcher priority level list The priority update of the batcher of allotment is minimum, if holding the transformer current value that control device reports is still higher than load current value, Need allocated gauging device electricity consumption again.
Further, it is cooperation allotment strategy at batcher end, it is preferential increases setting in batcher subscriber administration interface Priority, the rated current of coil and the current flow etc. that each household coil current is adjusted is arranged by manager in grade function;And Log history deploys log in batcher, and the percentage lowered including present coil electric current finally lowers time etc., in case after Phase consults.
In addition, end-equipment can be arranged by resident in the indoor of batcher end connection and deploy priority, such as indoors Five end-equipments corresponding priority is respectively set, batcher is deployed accordingly according to end-equipment priority, such as Priority is set from 1 to 5,1 indicates highest priority, and 5 indicate that priority is minimum, adjusts electric current and adjusts since priority is 1;
For example, as shown in the table, the priority level initializing of indoor end-equipment is as follows:
Table 3
Embodiment two
Fig. 3 is the specific method flow chart (transformer shown in Fig. 3 of tranformer protection system provided by the embodiments of the present application Protection system is formed by holding the batcher controlling device and capable of communicating to connect therewith).As shown in figure 3, shown method includes:
Step 301 holds the real-time total current that control device timing detects every phase alternating current;
Step 302, when hold control device detect certain phase alternating current real-time total current be more than load current value when, to batcher Transmission allotment electricity consumption instruction;It is carried in the allotment electricity consumption instruction and holds the allotment strategy that control device generates;
After step 303, batcher receive allotment electricity consumption instruction, according to the allotment strategy tune in allotment electricity consumption instruction Adjust measuring device rated current;
Step 304 holds control device after sending allotment electricity consumption instruction, continues real-time total electricity that timing detects every phase alternating current Stream then continues to execute step 302 when the real-time total current for detecting certain phase alternating current is still above load current value;When default The real-time total current of the every phase alternating current detected in time is below the default recovery value that transfinites, and thens follow the steps 305;
Specifically, the default recovery value that transfinites can also be set in holding control device, which is lower than load current value, can be according to reality Border is set, such as rated current is 50A, then can set this and preset transfinites recovery value as 45A, is being preset when holding control device The real-time current of the every phase alternating current of detection below presets always the recovery value that transfinites in time, then illustrates that high current electricity consumption has stopped Only, then the rated current that can restore batcher is normal load current value.
Step 305 holds the recovery order of transfiniting that control device transmits recovery batcher rated current to batcher;
Batcher coil is restored to normal specified electricity after receiving recovery of transfiniting and ordering by step 306, batcher Stream.
Embodiment three
Fig. 4 is the specific method flow chart (transformer shown in Fig. 4 of tranformer protection system provided by the embodiments of the present application Protection system is formed by holding control device, background server and batcher).As shown in figure 4, shown method includes:
Step 401 holds the real-time total current that control device timing detects every phase alternating current;
Step 402, when hold control device detect certain phase alternating current real-time total current be more than load current value when, to backstage take Business device transmission allotment electricity consumption instruction;The real-time total current detected is carried in the allotment electricity consumption instruction;
Step 403, background server generate allotment plan according to the real-time total current in the allotment electricity consumption instruction received Slightly, adjustable strategies are sent to the batcher for meeting interrupt condition;
It is specified according to the allotment Developing Tactics batcher in adjustment instruction after step 404, batcher receive adjustable strategies Electric current, and return to allotment to background server and complete response;
Step 405, background server, which receive after response is completed in allotment, updates the batcher priority deployed;
Step 406 holds control device after sending allotment electricity consumption instruction, continues real-time total electricity that timing detects every phase alternating current Stream then continues to execute step 402 when the real-time total current for detecting certain phase alternating current is still above load current value;When default The real-time total current of the every phase alternating current detected in time is below the default recovery value that transfinites, and thens follow the steps 405;
Step 405 holds the recovery order of transfiniting that control device restores batcher rated current to backstage server transport;
Step 406, background server send to batcher after receiving recovery of transfiniting and ordering and restore the specified electricity of batcher The recovery instruction of transfiniting of stream;
Batcher coil is restored to normal specified electricity after receiving recovery of transfiniting and indicating by step 407, batcher Stream, and response is successfully recovered to background server return.
Example IV
Fig. 5 is the specific schematic diagram for holding control device in tranformer protection system provided by the embodiments of the present application.As shown in figure 5, The appearance control device includes: the first intelligent control module 510, the first current detection module 520 and first communication module 530;The One intelligent control module 510 communicates mould with the first current detection module 520 and first respectively to hold the main control chip in control device Block 530 connects, the collaboration communication for controlling and coordinating to hold each module in control device;
First current detection module 520 will test result transmission for periodically detecting the real-time total current of every phase alternating current To intelligent control module;
First intelligent control module 510 is used for when the reality for receiving certain phase alternating current that current detection module 520 detects When total current when being more than the load current value of the phase alternating current, notify first communication module 530 to batcher to issue allotment electricity consumption Amount instruction;
And for preset time after notifying first communication module 530 to issue allotment electricity consumption instruction to batcher It is interior, detect every phase alternating current real-time total current be below it is described it is default transfinite recovery value when, notice first communication module 530 to Batcher issues the instruction for restoring batcher rated current;
First communication module 530 is issued to batcher for that will deploy electricity consumption instruction, and will to restore batcher specified The instruction of electric current is issued to batcher.
In the embodiment of the present application, further, the intelligent control module is used to determine adjustment plan according to real-time total current Slightly, the communication module is notified to issue the allotment electricity consumption instruction including the adjustable strategies to batcher.
In the embodiment of the present application, further, allotment policy distribution to batcher is specifically used in the communication module Inquiry meets the batcher of interrupt condition, actually uses situation according to batcher and generates allotment strategy, and to meeting interrupt condition Batcher send include allotment strategy adjustment instruction, receive batcher allotment complete response after, update and deployed Batcher priority.
In the embodiment of the present application, further, the appearance control device further includes first time module 540, for being the first intelligence Energy control module 510 provides the time for the real-time total current for detecting every phase alternating current and for being the first intelligent control module 510 record notice first communication modules 530 issue the preset time after allotment electricity consumption instruction to batcher.
In the embodiment of the present application, further, it is additionally provided with and is connect with intelligent control module and for defeated in holding control device Enter to hold the first input module 550 of control device parameter and for showing current the first display module 560 for holding control device state.
Embodiment five
Fig. 6 is the specific schematic diagram of tranformer protection system provided by the embodiments of the present application.As shown in fig. 6, the protection System includes appearance control device as shown in Figure 5, further includes batcher, and the appearance control device and the batcher are connected by communication line It connects;
The batcher, for according to the on-off for holding the allotment policy control electrical equipment that control device issues;And root According to the instruction for holding the recovery batcher rated current that control device issues, batcher coil is restored to normal rated current.
Specifically, batcher includes the second intelligent control module 610, the second current detection module 620, the second time module 630 and second communication module 640;
Wherein, the second intelligent control module 610 be batcher in main control chip, respectively with the second current detection module 620, the second time module 630 and second communication module 640 connect, and the cooperation for controlling and coordinating each module in batcher is logical Letter;Second current detection module 620 is used to detect the total current of all electrical equipments of user terminal, and the electrical equipment that will test is total Electric current offers the second intelligent control module 610, and electrical equipment total current is transmitted to by the second intelligent control module 610 by electric wire Transformer;Second intelligent control module 610 makes execution signal to electrical equipment controlling terminal according to the instruction received, control The on-off of electrical equipment;Second time module 630 has time clock feature, provides time guarantee for the display for timer;
Further, the second input module 650 connecting with the second intelligent control module 610 is additionally provided in batcher With the second display module 660;Wherein, the second input module 650 can receive the set information of input according to user demand, including But be not limited to adjustment date, time and the setting of current maxima of each electrical equipment etc.;Second display module 660 can be right The set information of user and the current state of timer are shown.
Embodiment six
Fig. 7 is the specific schematic diagram of tranformer protection system provided by the embodiments of the present application.As shown in fig. 7, the protection System includes appearance control device as shown in Figure 5, further includes batcher and background server, and the appearance controls device and the batcher and institute State the connection of background server telecommunication;
The background server, for receiving the allotment electricity consumption instruction held control device and send the real-time total current of carrying, Allotment strategy is determined according to real-time total current, by allotment policy distribution to batcher;
And the instruction for holding the recovery batcher rated current that control device is sent is received, which is issued to quantitative Device;
The batcher, the on-off of the allotment policy control electrical equipment for being issued according to the background server;With And the instruction of the recovery batcher rated current issued according to the background server, batcher coil is restored to normal volume Constant current.
In the embodiment of the present application, further, in the background server, allotment strategy is determined according to real-time total current, Meet the batcher of interrupt condition specifically for inquiring, situation is actually used according to batcher and generates allotment strategy, and to meeting The batcher of interrupt condition send include allotment strategy adjustment instruction, and receive batcher allotment complete response after, Update the batcher priority deployed.
Although the preferred embodiment of the application has been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the application range.Obviously, those skilled in the art can be to the application Various modification and variations are carried out without departing from spirit and scope.If in this way, these modifications and variations of the application Belong within the scope of the claim of this application and its equivalent technologies, then the application is also intended to encompass these modification and variations and exists It is interior.

Claims (10)

1. a kind of method for protecting transformer, which is characterized in that applied to the appearance control device of installation on the transformer, the side Method includes:
It is in advance every phase alternating current setting load current value and the default recovery value that transfinites in holding control device;
Timing detects the real-time total current of every phase alternating current;
When the real-time total current for detecting certain phase alternating current is more than the load current value of the phase alternating current, then to batcher transmission tune Adapted battery capacity indication;
In preset time after transmitting from the allotment electricity consumption instruction to batcher, the real-time total of every phase alternating current is periodically detected Electric current is below the default recovery value that transfinites, then the instruction for restoring batcher rated current is transmitted to batcher.
2. the method as described in claim 1 for protecting transformer, which is characterized in that described to transmit allotment use to batcher Battery capacity indication specifically includes:
Hold and control device according to the determining allotment strategy of the real-time total current detected, policy distribution will directly be deployed extremely by communication line Batcher;
The allotment electricity consumption for carrying real-time total current instruction is sent to background server or, holding control device, by background server root Total current determines allotment strategy when factually, by allotment policy distribution to batcher.
3. the method as claimed in claim 2 for protecting transformer, which is characterized in that by allotment policy distribution to quantitatively Device specifically includes following sub-step:
Inquiry meets the batcher of interrupt condition;
Situation is actually used according to batcher and generates allotment strategy, and sending to the batcher for meeting interrupt condition includes allotment plan Adjustment instruction slightly;
The allotment for receiving batcher is completed after responding, and the batcher priority deployed is updated.
4. as claimed in claim 2 or claim 3 for the method for protecting transformer, which is characterized in that during the allotment strategy includes Disconnected whole end-equipment, interrupt unit end-equipment reduce the power of portion distal end equipment;
When using the allotment strategy for interrupting whole end-equipments, is sent to the highest batcher of priority level and all interrupt end Equipment instruction;
When using the allotment strategy of interrupt unit end-equipment, according to the current detection value controlling device and reporting is held, calculating needs to adjust The magnitude of current of section carries the magnitude of current for needing to adjust in adjustment instruction, highest to priority level quantitative according to preset rules The adjustment instruction of device transmitting portion;
It is highest to priority level fixed according to preset rules when using the under powered allotment strategy by portion distal end equipment Measuring device transmitting portion plant capacity turns down instruction.
5. a kind of for protecting the appearance control device of transformer characterized by comprising current detection module, intelligent control module with And communication module;
Current detection module will test result and be sent to intelligent control for periodically detecting the real-time total current of every phase alternating current Module;
Intelligent control module, for being more than to be somebody's turn to do when the real-time total current for receiving certain phase alternating current that current detection module detects When the load current value of phase alternating current, notice communication module issues allotment electricity consumption instruction to batcher;
And for detecting every phase in preset time after notifying communication module to issue allotment electricity consumption instruction to batcher The real-time total current of alternating current be below it is described it is default transfinite recovery value when, it is quantitative that notice communication module to batcher issues recovery The instruction of device rated current;
Communication module is issued to batcher, and the instruction that will restore batcher rated current for that will deploy electricity consumption instruction It is issued to batcher.
6. as claimed in claim 5 for protecting the appearance control device of transformer, which is characterized in that the intelligent control module is used for Adjustable strategies are determined according to real-time total current, and the communication module is notified to issue the allotment including the adjustable strategies to batcher Electricity consumption instruction.
7. as claimed in claim 5 for protecting the appearance control device of transformer, which is characterized in that will allotment in the communication module Policy distribution is specifically used for the batcher that inquiry meets interrupt condition to batcher, actually uses situation according to batcher and generates tune With strategy, and sending to the batcher for meeting interrupt condition includes the tactful adjustment instruction of allotment, receives the allotment of batcher After completing response, the batcher priority deployed is updated.
8. it is a kind of for protecting the protection system of transformer, including installing appearance as claimed in claim 7 control on the transformer Device, which is characterized in that further include batcher, the appearance control device is connect with the batcher by communication line;
The batcher, for according to the on-off for holding the allotment policy control electrical equipment that control device issues;And according to institute The instruction for holding the recovery batcher rated current that control device issues is stated, batcher coil is restored to normal rated current.
9. it is a kind of for protecting the protection system of transformer, including installing appearance as claimed in claim 7 control on the transformer Device, which is characterized in that further include background server and batcher, the appearance controls device and the batcher and the background server Telecommunication connection;
The background server, for receiving the allotment electricity consumption instruction held control device and send the real-time total current of carrying, according to Real-time total current determines allotment strategy, by allotment policy distribution to batcher;
And the instruction for holding the recovery batcher rated current that control device is sent is received, which is issued to batcher;
The batcher, the on-off of the allotment policy control electrical equipment for being issued according to the background server;And root According to the instruction for the recovery batcher rated current that the background server issues, batcher coil is restored to normal specified electricity Stream.
10. as claimed in claim 9 for protecting the protection system of transformer, which is characterized in that in the background server, Allotment strategy is determined according to real-time total current, and the batcher of interrupt condition is met specifically for inquiring, is made according to batcher is practical Allotment strategy is generated with situation, and sends the adjustment instruction including allotment strategy, Yi Jijie to the batcher for meeting interrupt condition The allotment for receiving batcher is completed after responding, and the batcher priority deployed is updated.
CN201910748762.2A 2019-08-14 2019-08-14 Method for protecting transformer, capacity controller and protection system Active CN110336247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910748762.2A CN110336247B (en) 2019-08-14 2019-08-14 Method for protecting transformer, capacity controller and protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910748762.2A CN110336247B (en) 2019-08-14 2019-08-14 Method for protecting transformer, capacity controller and protection system

Publications (2)

Publication Number Publication Date
CN110336247A true CN110336247A (en) 2019-10-15
CN110336247B CN110336247B (en) 2022-01-28

Family

ID=68149576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910748762.2A Active CN110336247B (en) 2019-08-14 2019-08-14 Method for protecting transformer, capacity controller and protection system

Country Status (1)

Country Link
CN (1) CN110336247B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5621598A (en) * 1989-11-27 1997-04-15 Tekneon Corporation Luminous tube protection circuit
US20080106425A1 (en) * 2006-11-02 2008-05-08 Deaver Brian J System and Method for Detecting Distribution Transformer Overload
CN101242460A (en) * 2008-03-19 2008-08-13 珠海市伊特高科技有限公司 Distribution network monitoring management system
CN102004192A (en) * 2010-10-21 2011-04-06 江苏省电力公司连云港供电公司 Load early-warning device for a power distribution grid
CN102684303A (en) * 2012-03-27 2012-09-19 宋旭 Intelligent power load batcher and electric equipment control system
CN202513673U (en) * 2012-03-27 2012-10-31 宋旭 Intelligent electrical load quantifying device and electric equipment control system
CN104362589A (en) * 2014-11-27 2015-02-18 国家电网公司 Sectionalized protection device for high overload distribution transformer
CN104466951A (en) * 2014-11-24 2015-03-25 珠海格力电器股份有限公司 Control method and device for automatically detecting and adjusting loads
US20150233975A1 (en) * 2012-11-26 2015-08-20 Mitsubishi Electric Corporation Voltage monitoring control device, voltage control device, and voltage monitoring control method
CN105119239A (en) * 2015-09-17 2015-12-02 国网山东省电力公司东营供电公司 Intelligent power grid transformer micro-control protector
EP3091628A1 (en) * 2015-05-04 2016-11-09 General Electric Company Integrated transformer health monitoring architecture
CN106961155A (en) * 2017-03-30 2017-07-18 华映科技(集团)股份有限公司 A kind of intelligent power distribution access system for possessing electricity consumption data monitoring and security function

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5621598A (en) * 1989-11-27 1997-04-15 Tekneon Corporation Luminous tube protection circuit
US20080106425A1 (en) * 2006-11-02 2008-05-08 Deaver Brian J System and Method for Detecting Distribution Transformer Overload
CN101242460A (en) * 2008-03-19 2008-08-13 珠海市伊特高科技有限公司 Distribution network monitoring management system
CN102004192A (en) * 2010-10-21 2011-04-06 江苏省电力公司连云港供电公司 Load early-warning device for a power distribution grid
CN102684303A (en) * 2012-03-27 2012-09-19 宋旭 Intelligent power load batcher and electric equipment control system
CN202513673U (en) * 2012-03-27 2012-10-31 宋旭 Intelligent electrical load quantifying device and electric equipment control system
US20150233975A1 (en) * 2012-11-26 2015-08-20 Mitsubishi Electric Corporation Voltage monitoring control device, voltage control device, and voltage monitoring control method
CN104466951A (en) * 2014-11-24 2015-03-25 珠海格力电器股份有限公司 Control method and device for automatically detecting and adjusting loads
CN104362589A (en) * 2014-11-27 2015-02-18 国家电网公司 Sectionalized protection device for high overload distribution transformer
EP3091628A1 (en) * 2015-05-04 2016-11-09 General Electric Company Integrated transformer health monitoring architecture
CN105119239A (en) * 2015-09-17 2015-12-02 国网山东省电力公司东营供电公司 Intelligent power grid transformer micro-control protector
CN106961155A (en) * 2017-03-30 2017-07-18 华映科技(集团)股份有限公司 A kind of intelligent power distribution access system for possessing electricity consumption data monitoring and security function

Also Published As

Publication number Publication date
CN110336247B (en) 2022-01-28

Similar Documents

Publication Publication Date Title
RU2582584C2 (en) Device and method of controlling electric power consumption in multiple lighting devices in lighting system
EP3312971B1 (en) Methods for discovering, partitioning, organizing, and administering communication devices in a transformer area network
US20190068004A1 (en) Wireless power transfer control
CN110419151B (en) Power control device and power system
CN114444739B (en) Digital smart power grid region management system and method
CN110994602B (en) Power grid dispatching demand response system and method
CN102044880A (en) Power production control system and method
EP2721706A2 (en) Method and apparatus for controlling energy services based on market data
US10998728B2 (en) Power supply control method, power management server, control apparatus, and power supply control system
CN108462175A (en) A kind of electric heating equipment demand response interactive approach, system and device
CN114902524A (en) Power distribution system and method
CN106961110B (en) Automatic voltage control method and system for power system
CN105900308B (en) The method for keeping electrical network stable by load break
CN111463783A (en) Low-voltage distribution network topology identification and fault positioning device and application method
CN110336247A (en) A kind of method for protecting transformer holds control device and protection system
CN106936144A (en) A kind of power distribution station three-phase power balance device and method of self-adaptive regulating
CN109473964A (en) Communication control method, load and network system
CN110890762B (en) Voltage balance control method and system under receiving-end multi-drop-point serial access mode
CN109980674B (en) Same-transmitting-end and same-receiving-end multi-loop direct-current transmission power control method
TWI697174B (en) Regulating method of integrated system of renewable energy and distribution automation
JP6936097B2 (en) Power management device and power management method
EP4145660A1 (en) Dynamic computation and control of distributed assets at the edge of a power grid
CN106451382A (en) Relaying protection system
CN114389234A (en) Ground fault protection system of flexible direct current power grid and protection control method thereof
CN114977184A (en) Movable flexible direct electric energy conversion and supply vehicle and use method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200323

Address after: 100176 Sixth Floor, No. 16 Building, 18 Kechuang Thirteenth Street, Beijing Daxing District, Beijing Economic and Technological Development Zone

Applicant after: Zhang Xiaoju

Address before: 100176 Sixth Floor, No. 16 Building, 18 Kechuang Thirteenth Street, Beijing Daxing District, Beijing Economic and Technological Development Zone

Applicant before: Zhang Zenglu

Applicant before: Liu Chao

GR01 Patent grant
GR01 Patent grant