CN110333915A - Timing executes method, apparatus, computer equipment and the storage medium of task - Google Patents

Timing executes method, apparatus, computer equipment and the storage medium of task Download PDF

Info

Publication number
CN110333915A
CN110333915A CN201910470635.0A CN201910470635A CN110333915A CN 110333915 A CN110333915 A CN 110333915A CN 201910470635 A CN201910470635 A CN 201910470635A CN 110333915 A CN110333915 A CN 110333915A
Authority
CN
China
Prior art keywords
task
subtask
execution
task execution
pending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910470635.0A
Other languages
Chinese (zh)
Inventor
刘建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OneConnect Smart Technology Co Ltd
Original Assignee
OneConnect Smart Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OneConnect Smart Technology Co Ltd filed Critical OneConnect Smart Technology Co Ltd
Priority to CN201910470635.0A priority Critical patent/CN110333915A/en
Publication of CN110333915A publication Critical patent/CN110333915A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/445Program loading or initiating
    • G06F9/44505Configuring for program initiating, e.g. using registry, configuration files
    • G06F9/4451User profiles; Roaming
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/448Execution paradigms, e.g. implementations of programming paradigms
    • G06F9/4482Procedural

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer And Data Communications (AREA)

Abstract

This application discloses method, apparatus, computer equipment and storage mediums that timing executes task, wherein, the method that timing executes task, it include: the pending task and the corresponding configuration file of pending task that management end receives that task distribution end is sent, pending task is including at least a subtask;Each subtask is assigned to task execution end according to preset rules;According to the configuration file of pending task, the corresponding mission bit stream in the first subtask is obtained, mission bit stream includes at least the first subtask corresponding default execution time;Receive the corresponding actual execution time in first subtask of task execution end feedback;Judge whether the actual execution time is identical as the default execution time;If so, controlling the task execution end terminates to execute first subtask.Timed task system has abandoned the Crontab of Unix system completely, using the written in code of PHP, can reduce many time-consuming process, improve task execution efficiency.

Description

Timing executes method, apparatus, computer equipment and the storage medium of task
Technical field
This application involves computer field is arrived, method, apparatus, computer equipment that timing executes task are especially related to And storage medium.
Background technique
Crontab order is common among the operating system of Unix and class Unix, for the finger being periodically performed to be arranged It enables.The order is read from standard input device and is instructed, and is deposited in " Crontab " file, for reading and holding later Row.When program operates on Unix system, task is usually timed by Crontab, in Crontab timed task system The command bar of system be directly timed task setting or special configuration task configuration end to Crontab timed task system into The setting of row task, Crontab timed task system is executed according to set timed task, when the task of required execution is more When, need to spend more time, influence execution efficiency, and if when current memory deficiency, Crontab timed task system can not Judge and carry out respective handling, memory is be easy to cause to overflow situation, the timed task system automation degree based on Crontab It is low, and timing executes the low efficiency of task.
Summary of the invention
The main purpose of the application is the method for providing timing and executing task, it is intended to solve the timing based on Crontab and appoint The technical issues of system automation degree of being engaged in is low, and timing executes the low efficiency of task.
The application proposes a kind of method that timing executes task, comprising: management end receive that task distribution end sends wait hold Row task and the corresponding configuration file of pending task, wherein management end and task distribution end pre-establish communication connection, to Execution task includes at least a subtask;Each subtask is assigned to task execution end according to preset rules, wherein task is held Row end and management end pre-establish communication connection;According to the configuration file of pending task, corresponding of the first subtask is obtained Business information, wherein the first subtask is contained in all subtasks in pending task, mission bit stream includes at least the first son The task corresponding default execution time;Receive the corresponding actual execution time in the first subtask of task execution end feedback;Judgement Whether actual execution time is identical as the default execution time;If so, control task actuating station terminates to execute the first subtask.
Present invention also provides the devices that a kind of timing executes task, are integrated in management end, device includes: the first reception mould Block distributes the pending task and the corresponding configuration file of pending task that end is sent for receiving task, wherein management end Communication connection is pre-established with task distribution end, pending task includes at least a subtask;Distribution module is used for each son Task is assigned to task execution end according to preset rules, and wherein task execution end and management end pre-establish communication connection;First Module is obtained, for the configuration file according to pending task, obtains the corresponding mission bit stream in the first subtask, wherein the first son Task is contained in all subtasks in pending task, and mission bit stream includes at least the corresponding default execution in the first subtask Time;Second receiving module, for receiving the corresponding actual execution time in the first subtask of task execution end feedback;Judge mould Block, for judging whether actual execution time is identical as the default execution time;Control module, if for actual execution time and in advance If executing, the time is identical, then control task actuating station terminates to execute the first subtask.
Present invention also provides a kind of computer equipment, including memory and processor, memory is stored with computer journey The step of sequence, processor realizes the above method when executing computer program.
Present invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, computer program The step of above-mentioned method is realized when being executed by processor.
The timed task system of the application has abandoned the Crontab of Unix system completely, using the written in code of PHP, packet Task configuration end, management end and task execution end are included, and realizes that task configures end, management end and task execution by TCP or UDP Communication connection between end, and by being run under cli mode, realize that the multi-process stage runs simultaneously in multiple tasks actuating station Processing, and directly cached using the OpCode in memory, it greatly reduces request initialization, creation in disk I/O and PHP and holds Many time-consuming process such as row environment, morphology parsing, syntax parsing, compiling OpCode, request closing, improve task execution efficiency. And the timed task system of the application is no longer limited by the self-contained Fixed Time Interval of Crontab, two neighboring process rank Between section, execution task time interval between two neighboring subtask can arbitrarily regulate and control, be more able to satisfy and need to monitor in real time The demand of running environment further increases task execution efficiency by the way that smaller time interval is arranged.
Detailed description of the invention
The timing of one embodiment of Fig. 1 the application executes the method flow schematic diagram of task;
The timing of one embodiment of Fig. 2 the application executes the apparatus structure schematic diagram of task;
The computer equipment schematic diagram of internal structure of one embodiment of Fig. 3 the application.
Specific embodiment
Referring to Fig.1, the method that the timing of one embodiment of the application executes task, comprising:
S1: management end receives the pending task and the corresponding configuration file of pending task that task distribution end is sent, Wherein management end and task distribution end pre-establish communication connection, and pending task includes at least a subtask.
The timed task system of the present embodiment, eliminates the reliance on Crontab, but one timed task system of independent design, The timed task system includes timer and timer, and timer is used to customize the operation duration in multiple script process stages, meter When device be used to carry out timing to the runing time in each script process stage;Management is arranged in the timed task system of the present embodiment End, management role actuating station and task configure end, task execution end and management end and are communicated to connect by Socket, task execution The mission bit stream that managed end is obtained from task configuration end is terminated, the progress of each timed task of management end management and monitoring is remembered in real time Related data is recorded, the implementation progress, success rate, failure rate of each general assignment are counted.The timed task system of the present embodiment uses The written in code of PHP, including task configuration end, management end and task execution end, and pass through TCP (Transmission Control Protocol) or UDP (User Datagram Protocol) network service, TCP and UDP belong to transport layer Agreement realizes the communication connection between task configuration end, management end and task execution end, since TCP is relatively reliable, it is preferred to use TCP network service, and by being run under cli (Command Line Interface, command line interface) mode, realize mostly into The journey stage runs processing in multiple tasks actuating station simultaneously, and realizes that PHP file will be resided after disk reading parsing once Memory, for use next time when directly use the OpCode in memory to cache, OpCode caching be PHP performance enhancement extension, They by by oneself injection PHP execution life cycle, and cache the compilation phase as a result, to reuse later, greatly Reduce request initialization in disk I/O and PHP, creation performing environment, morphology parsing, syntax parsing, compiling OpCode, request Many time-consuming process such as closing improve task execution efficiency.And the timed task system of the present embodiment has abandoned Unix completely The Crontab of system does not depend on the containers such as nginx, apache, and reduce that the containers such as nginx, apache communicate with PHP is logical Cost is interrogated, and resource can be with permanent retention, it is not necessary to each initialization data library connection etc..The timed task system of the present embodiment Developed using the version of PHP5 or more, its performance of the version after PHP5 is continuously improved, be conducive to system operation it is more smooth, Preferably, larger change has been done using PHP7, PHP7, compared to before with bigger performance advantage.
S2: each subtask is assigned to task execution end according to preset rules, wherein task execution end and management end are preparatory Establish communication connection.
Management end is monitored task execution end operating condition, and is carried out according to the rule of setting to task execution end Corresponding management, management end obtain the current memory situation at task execution end, according to the pending of the task configuration end received The execution to subtask is responsible at the configuration file of task, each subtask of reasonable distribution to task actuating station, task execution end, is responsible for It executes the calculating monitoring of time and controls the execution of next subtask.
S3: according to the configuration file of pending task, obtaining the corresponding mission bit stream in the first subtask, wherein the first son is appointed Business is contained in pending task in all subtasks for including, and mission bit stream includes at least corresponding preset in the first subtask and holds The row time.
The configuration file of pending task is issued by task configuration end, which is general assignment, including extremely A few subtask, the mission bit stream of each subtask includes respective subtask title, subtask content, subtask duration The information such as the execution interval between adjacent subtask.
S4: the corresponding actual execution time in the first subtask of task execution end feedback is received.
The corresponding actual execution time in subtask is subtask Starting Executing Time to tiring out between the end time of subtask Plot operation duration.By counting the operation duration of each process phases, the corresponding actual execution time in subtask is obtained.The present embodiment Timed task system, the Crontab of Unix system has been abandoned completely, when being no longer limited by the self-contained fixation of Crontab Between be spaced, the execution task time interval between the two neighboring process phases of the present embodiment, between two neighboring subtask can Arbitrarily regulation is more able to satisfy the demand for needing the running environment monitored in real time, such as financial stock market, smaller by being arranged Time interval further increases task execution efficiency.Task execution end, which calculates and controls subtask, executes the time, guarantees subtask Go on smoothly, when its subtask duration reach setting value when, task execution end, which controls the subtask, to terminate to execute.
S5: judge whether actual execution time is identical as the default execution time.
It is corresponding to set the corresponding preset duration of each process phases, each process rank when subtask includes multiple process phases The adduction of the corresponding preset duration of section is the default execution time.Such as subtask a, the execution time for setting subtask a is from n-th second Start to terminate to m seconds, perhaps setting terminates or be arranged since n-th millisecond to m milliseconds to m since n-th millisecond Second terminates, or setting terminated since n-th minute to m minutes.
S6: if so, control task actuating station terminates to execute the first subtask.
Further, task execution end includes at least two, and each subtask is assigned to task execution according to preset rules The step S2 at end, comprising:
Judge whether the current residual amount of ram of first task actuating station meets the needs of the first subtask, wherein first Task execution end is contained in all task execution ends.
If satisfied, then the first subtask is distributed to first task actuating station.
The present embodiment manages the distribution of subtask by management end, to guarantee that the subtask at task execution end smoothly executes, And reach making full use of for resource, it avoids task execution end from memory occur and overflows situation.Same general assignment is not in the present embodiment Can be respectively by different task execution ends with subtask, while each subtask is run, shorten the execution time of general assignment, improves Task execution efficiency, the thread configuration parameter in each task execution end of the present embodiment is identical, and each task execution end is to execution The effect of subtask is identical.Above-mentioned " first " is not used in restriction, elsewhere acts on identical similar to term for distinguishing.
Further, task execution end includes at least two, and configuration file includes the thread configuration parameter of pending task, Each subtask is assigned to the step S2 at task execution end according to preset rules, comprising:
Firstly, determining pending task corresponding second task execution end according to thread configuration parameter.
Then, by the corresponding each subtask of pending task, while the second task execution end is sent to.
In the present embodiment, the corresponding all subtasks of same general assignment carry out at same task execution end, facilitate to be formed simultaneously Management role log.The thread configuration parameter of the multiple tasks actuating station of the present embodiment is distinguished according to task type, different The corresponding thread configuration parameter of task type is different, and the general assignment of the correspondence different task type of different service types can basis The corresponding task execution end of different thread configuration parameter selections.In the application other embodiments, when multiple subtasks need to hold Row and current task actuating station is unable to satisfy when needing, for example current task actuating station has reached or close to memory limiting value, can Other task execution ends with identical thread configuration parameter are distributed into remaining subtask, management end plans as a whole each task execution end Executive condition, realize the execution of general assignment.
Further, the first subtask includes at least two process phases, includes two adjacent processes ranks in configuration file Prefixed time interval between section, the step of receiving the corresponding actual execution time in the first subtask of task execution end feedback S4, comprising:
Step 1: the information in the first subtask corresponding current process stage of first task actuating station feedback is received, The information in middle current process stage includes at least, current process stage corresponding first accumulation operation duration, with current process rank Next process phases of Duan Xianglin, current process stage and current process stage adjacent next process phases are the first son The process phases for the arbitrary neighborhood in all process phases that task includes.
Step 2: judging whether the first accumulation operation duration in current process stage reaches preset duration.
Step 3: controlling first task if the first accumulation operation duration in current process stage reaches preset duration and holding Row end terminates to execute the current process stage, and enters process interval stage.
Step 4: judging whether the corresponding time interval of process interval stage reaches prefixed time interval.
Step 5: controlling first task if the corresponding time interval of process interval stage reaches prefixed time interval and holding Row end executes the next process phases adjacent with the current process stage.
Step 6: obtaining the second accumulation operation duration of current process stage adjacent next process phases.
Step 7: summarizing the first son according to the acquisition modes of the first accumulation operation duration and the second accumulation operation duration and appointing The accumulation operation duration for all process phases that business includes, obtains actual execution time.
In the present embodiment, the corresponding preset duration of each process phases be may be the same or different, and is not construed as limiting.Two neighboring process There are time intervals between stage, to complete the linking between each process phases, including data-linkage etc., such as current process When stage needs to call the data of a upper process phases, need to carry out data-linkage.The task execution end of the present embodiment includes fixed Minimum task time interval is arranged in Shi Gongneng, clocking capability and Trigger Function, timing function, and each subtask includes at least one Process phases, clocking capability carry out timing calculating according to the operation duration of each process phases;Trigger Function is directed to any one It is corresponding to exit the clocking capability when the timing duration of clocking capability reaches the operation duration of the process phases for process phases Process phases trigger the operation of process phases new in task execution end.The timing function of the present embodiment is task execution time Basis instrument, be arranged task time interval minimum value, then corresponding task execution time can be in the base of above-mentioned basis instrument Multiple setting is carried out on plinth, the settable minimum task time interval of timing function can be Millisecond or second grade or minute Grade, is arranged according to actual needs, and the minimum execution time compared to Crontab is 1 minute, timing of the present embodiment based on PHP Task system setting is more flexible, and the scope of application is more extensive.If the setting of task execution time interval is small as far as possible, obtain task execution end It quickly to handle subtask, is pooled in management end after the completion of each subtask, quickly to send implementing result, improves transmitting efficiency And corresponding working efficiency, minimum task time interval are Millisecond, 3 milliseconds are preferably provided to, at this point, if being allocated in same When a task execution end is handled, be equivalent to it is per second there are about 333 subtasks to complete, there are 2000 subtasks to complete within one minute, Relative to existing dependence Crontab completion timing task, since the minimum execution time of Crontab is 1 minute, the present embodiment Timed task system executes the more efficient of task.
Further, task configuration end configures web interface, and control task actuating station terminates the step of executing the first subtask After S6, comprising:
Obtain the corresponding execution data in all subtasks for including in pending task, wherein execute data at least Implementation progress and implementing result including all subtasks for including in pending task.
According to implementing result, real-time update calculates the success rate and failure for all subtasks for including in pending task Rate.
All sons that will include in the implementation progress and pending task of all subtasks for including in pending task The success rate and failure rate of task, Real-time Feedback to web interface are simultaneously shown.
In the present embodiment, timed task system carries out web interface configuration, and the network I/O that timed task system itself carries connects Mouthful be it is asynchronous, developer can realize the Asynchronous Programming of task based access control event, realize Distributed Application, multiple and different sons is arranged Task facilitates user configuration task.When compared to creation Crontab task, it is necessary to must have the system that can configure Crontab Account, needs the system account of the additional each machine of maintenance, and configures Crontab one by one inside the system of each machine, Process is cumbersome, configuration trouble.Compared to Crontab timed task system, the timed task system of the present embodiment can be looked into intuitively The implementation progress, success rate, failure rate for seeing each general assignment, the task execution number obtained by management end from task execution end According to, and feed back into the Mission Monitor of web interface, facilitate user monitoring and checks.
Further, the corresponding step S7 for executing data in all subtasks for including in pending task is obtained, Include:
Whether real-time detection receives the abnormal of third task execution end feedback and executes data.
If so, the abnormal implementing result for executing the corresponding subtask of data of label is to execute failure.
Then, control third task execution end, which is interrupted, executes current subtask, and controls third task execution end and destroy and work as The corresponding process in preceding subtask.
Then, the communication connection for obtaining from third task execution end and executing data is disconnected.
The present embodiment task execution end regularly sends heartbeat detection data to management end, and management end judges according to imposing a condition Task execution end whether normal operation, for example whether abnormal, if operation data is abnormal, show to transport if analyzing the operation data that receives Row is abnormal.When the task execution at task execution end occurs abnormal, management end quickly carries out corresponding abnormal feedback notification simultaneously The current subtask of control task actuating station pull-up, and the connection with task execution end is disconnected, prevent management end from continuing to run and appointing The relevant operation of actuating station of being engaged in, consumption management end memory, influences the speed of service.When the connection of task execution end and management end is normal When, task execution end re-initiates connection, and management end receives the information at task execution end again.When process rank in the present embodiment After Duan Jinhang or after being abnormal execution, if process phases continue to remain in task execution end, task execution can be occupied The memory at end, influences the speed of performing task and efficiency at task execution end, and memory is be easy to cause to overflow situation, can pass through destruction The abnormal process phases of the process phases or appearance finished, timely releasing memory space.Above-mentioned heartbeat detection is task It is communicated between actuating station and management end, timing carries out a heartbeat detection, the communication of Detection task actuating station and management end It whether normal connects.The abnormal judgement of the present embodiment, including user are led to by checking that task daily record and heartbeat detection log obtain It crosses log to be analyzed and processed, while having to the overall operation of system and getting information about, when being conducive to system appearance exception.
The management end of the present embodiment, task execution end can also be run in same terminal operating in different terminals, and worked as and appointed When business frequent operation, same terminal then will affect progress, low memory be caused, it is preferred, therefore, that management end, task execution end It works in the different terminal of each leisure, each inter-terminal communication connection, then management end, task execution end have enough memories to guarantee Timed task is gone on smoothly.In the present embodiment when being divided into Millisecond between task time, task execution end handles frequent activity, Be easy to cause memory overflow situation, then task execution end can be separately operable by more terminals, operation distribution by management end according to Corresponding situation is specified, is to be run by present terminal, otherwise by other if whether memory is enough for the task execution end of present terminal Terminal operating.Same task execution end can multi-process synchronization process task treatment effeciency improved with speed up processing.
Further, there are dual-thread connection, dual-thread includes holding to third task for management end and third task execution end Row end sends exectorial first thread, and the second thread for executing data is obtained from third task execution end, disconnect from Third task execution end obtained after the step of communication connection for executing data, comprising:
Judge whether current time reaches default timing section.
Instruction is reconnected if so, sending by first thread to third task execution end.
Then, receive third task execution end according to the connection signal for reconnecting instruction feedback, and connect the second thread.
Finally, receiving the execution data of third task execution end feedback by the second thread.
The management end of the present embodiment is overall control center, but does not need frequent processing activity, with prevent management end due to Processing frequent activity causes operation to make mistakes.The timing of task execution end reports task execution data to management end, and management end is according to setting Fixed condition judge task execution end whether normal operation;Task execution data include the implementation progress, success rate, failure of task Rate, task execution end report the timing of task execution data that can arbitrarily set, such as 1 minute, to note abnormalities in time. The present embodiment communicates the information mutual communication for realizing timed task system by Socket, is bi-directionally connected by dual-thread realization, favorably In task execution end while receiving assignment instructions, can also to management end timing feedback execute data, improve communication efficiency and The treatment effeciency of timed task system.The each city in 100 cities is such as detected when handling some burdensome tasks in citing ground Weather information or mail is sent to 1w human hair, entire implementation procedure can be very slow, may block the several seconds, because of general assignment process quilt Obstruction, will affect subsequent request;Because general assignment process and subtask process are interconnected by Socket communication, can To pre-establish multiple subtask processes, general assignment process is communicated by Socket assignment instructions being handed down to subtask process, The subtask process asynchronous execution at one or more task execution ends is simultaneously timely feedbacked data are executed to management end.
Timed task system has abandoned the Crontab of Unix system completely, is matched using the written in code of PHP, including task End, management end and task execution end are set, and realizes that task configures between end, management end and task execution end by TCP or UDP Communication connection, and by being run under cli mode, the realization multi-process stage runs processing simultaneously in multiple tasks actuating station, and Directly cached using the OpCode in memory, greatly reduce request initialization in disk I/O and PHP, creation performing environment, Many time-consuming process such as morphology parsing, syntax parsing, compiling OpCode, request closing, improve task execution efficiency.And the application Timed task system be no longer limited by the self-contained Fixed Time Interval of Crontab, the two neighboring process of the present embodiment Execution task time interval between stage, between two neighboring subtask can arbitrarily regulate and control, and be more able to satisfy and need to monitor in real time The demand of running environment further increase task execution efficiency by the way that smaller time interval is arranged.
Referring to Fig. 2, the timing of one embodiment of the application executes the device of task, is integrated in management end, device includes:
First receiving module 1 receives the pending task and pending task that task distribution end is sent for management end Corresponding configuration file, wherein management end and task distribution end pre-establish communication connection, and pending task includes at least one Subtask.
The timed task system of the present embodiment, eliminates the reliance on Crontab, but one timed task system of independent design, The timed task system includes timer and timer, and timer is used to customize the operation duration in multiple script process stages, meter When device be used to carry out timing to the runing time in each script process stage;Management is arranged in the timed task system of the present embodiment End, management role actuating station and task configure end, task execution end and management end and are communicated to connect by Socket, task execution The mission bit stream that managed end is obtained from task configuration end is terminated, the progress of each timed task of management end management and monitoring is remembered in real time Related data is recorded, the implementation progress, success rate, failure rate of each general assignment are counted.The timed task system of the present embodiment uses The written in code of PHP, including task configuration end, management end and task execution end, and pass through TCP (Transmission Control Protocol) or UDP (User Datagram Protocol) network service, TCP and UDP belong to transport layer Agreement realizes the communication connection between task configuration end, management end and task execution end, since TCP is relatively reliable, it is preferred to use TCP network service, and by being run under cli (Command Line Interface, command line interface) mode, realize mostly into The journey stage runs processing in multiple tasks actuating station simultaneously, and realizes that PHP file will be resided after disk reading parsing once Memory, for use next time when directly use the OpCode in memory to cache, OpCode caching be PHP performance enhancement extension, They by by oneself injection PHP execution life cycle, and cache the compilation phase as a result, to reuse later, greatly Reduce request initialization in disk I/O and PHP, creation performing environment, morphology parsing, syntax parsing, compiling OpCode, request Many time-consuming process such as closing improve task execution efficiency.And the timed task system of the present embodiment has abandoned Unix completely The Crontab of system does not depend on the containers such as nginx, apache, and reduce that the containers such as nginx, apache communicate with PHP is logical Cost is interrogated, and resource can be with permanent retention, it is not necessary to each initialization data library connection etc..The timed task system of the present embodiment Developed using the version of PHP5 or more, its performance of the version after PHP5 is continuously improved, be conducive to system operation it is more smooth, Preferably, larger change has been done using PHP7, PHP7, compared to before with bigger performance advantage.
Distribution module 2, for each subtask to be assigned to task execution end according to preset rules, wherein task execution end Communication connection is pre-established with management end.
Management end is monitored task execution end operating condition, and is carried out according to the rule of setting to task execution end Corresponding management, management end obtain the current memory situation at task execution end, according to the pending of the task configuration end received The execution to subtask is responsible at the configuration file of task, each subtask of reasonable distribution to task actuating station, task execution end, is responsible for It executes the calculating monitoring of time and controls the execution of next subtask.
First obtains module 3, for the configuration file according to pending task, obtains the corresponding task letter in the first subtask Breath, wherein the first subtask is contained in pending task in all subtasks for including, mission bit stream includes at least the first son The task corresponding default execution time.
The configuration file of pending task is issued by task configuration end, which is general assignment, including extremely A few subtask, the mission bit stream of each subtask includes respective subtask title, subtask content, subtask duration The information such as the execution interval between adjacent subtask.
Second receiving module 4, for receiving the corresponding actual execution time in the first subtask of task execution end feedback.
The corresponding actual execution time in subtask is subtask Starting Executing Time to tiring out between the end time of subtask Plot operation duration.By counting the operation duration of each process phases, the corresponding actual execution time in subtask is obtained.The present embodiment Timed task system, the Crontab of Unix system has been abandoned completely, when being no longer limited by the self-contained fixation of Crontab Between be spaced, the execution task time interval between the two neighboring process phases of the present embodiment, between two neighboring subtask can Arbitrarily regulation is more able to satisfy the demand for needing the running environment monitored in real time, such as financial stock market, smaller by being arranged Time interval further increases task execution efficiency.Task execution end, which calculates and controls subtask, executes the time, guarantees subtask Go on smoothly, when its subtask duration reach setting value when, task execution end, which controls the subtask, to terminate to execute.
Judgment module 5, for judging whether actual execution time is identical as the default execution time.
It is corresponding to set the corresponding preset duration of each process phases, each process rank when subtask includes multiple process phases The adduction of the corresponding preset duration of section is the default execution time.Such as subtask a, the execution time for setting subtask a is from n-th second Start to terminate to m seconds, perhaps setting terminates or be arranged since n-th millisecond to m milliseconds to m since n-th millisecond Second terminates, or setting terminated since n-th minute to m minutes.
Control module 6, if identical as the default execution time for actual execution time, control task actuating station terminates to hold The first subtask of row.
Further, task execution end includes at least two, distribution module 2, comprising:
First judging unit, for judging whether the current residual amount of ram of first task actuating station meets the first subtask Demand, wherein first task actuating station is contained in all task execution ends.Allocation unit, for if satisfied, then by first Subtask is distributed to first task actuating station.
The present embodiment manages the distribution of subtask by management end, to guarantee that the subtask at task execution end smoothly executes, And reach making full use of for resource, it avoids task execution end from memory occur and overflows situation.Same general assignment is not in the present embodiment Can be respectively by different task execution ends with subtask, while each subtask is run, shorten the execution time of general assignment, improves Task execution efficiency, the thread configuration parameter in each task execution end of the present embodiment is identical, and each task execution end is to execution The effect of subtask is identical.Above-mentioned " first " is not used in restriction, elsewhere acts on identical similar to term for distinguishing.
Further, task execution end includes at least two, and configuration file includes the thread configuration parameter of pending task, Distribution module 2, comprising:
Determination unit, for determining pending task corresponding second task execution end according to thread configuration parameter.First Transmission unit is used for the corresponding each subtask of pending task, while being sent to the second task execution end.
In the present embodiment, the corresponding all subtasks of same general assignment carry out at same task execution end, facilitate to be formed simultaneously Management role log.The thread configuration parameter of the multiple tasks actuating station of the present embodiment is distinguished according to task type, different The corresponding thread configuration parameter of task type is different, and the general assignment of the correspondence different task type of different service types can basis The corresponding task execution end of different thread configuration parameter selections.In the application other embodiments, when multiple subtasks need to hold Row and current task actuating station is unable to satisfy when needing, for example current task actuating station has reached or close to memory limiting value, can Other task execution ends with identical thread configuration parameter are distributed into remaining subtask, management end plans as a whole each task execution end Executive condition, realize the execution of general assignment.
Further, the first subtask includes at least two process phases, includes two adjacent processes ranks in configuration file Prefixed time interval between section, the second receiving module 4, comprising:
Receiving unit, the letter in the first subtask corresponding current process stage for receiving first task actuating station feedback Breath, wherein the information in current process stage includes at least, and current process stage corresponding first accumulation operation duration is advanced with working as Journey stage adjacent next process phases, current process stage and current process stage adjacent next process phases are the The process phases for the arbitrary neighborhood in all process phases that one subtask includes.
Second judgment unit, for judging whether the first accumulation operation duration in current process stage reaches preset duration.
First control unit controls if the first accumulation operation duration for the current process stage reaches preset duration First task actuating station terminates to execute the current process stage, and enters process interval stage.
Third judging unit, for judging whether the corresponding time interval of process interval stage reaches prefixed time interval.
Second control unit controls if reaching prefixed time interval for the corresponding time interval of process interval stage First task actuating station executes the next process phases adjacent with the current process stage.
Acquiring unit, for obtaining the second accumulation operation duration of current process stage adjacent next process phases.
Collection unit summarizes for the acquisition modes according to the first accumulation operation duration and the second accumulation operation duration The accumulation operation duration for all process phases that one subtask includes, obtains actual execution time.
In the present embodiment, the corresponding preset duration of each process phases be may be the same or different, and is not construed as limiting.Two neighboring process There are time intervals between stage, to complete the linking between each process phases, including data-linkage etc., such as current process When stage needs to call the data of a upper process phases, need to carry out data-linkage.The task execution end of the present embodiment includes fixed Minimum task time interval is arranged in Shi Gongneng, clocking capability and Trigger Function, timing function, and each subtask includes at least one Process phases, clocking capability carry out timing calculating according to the operation duration of each process phases;Trigger Function is directed to any one It is corresponding to exit the clocking capability when the timing duration of clocking capability reaches the operation duration of the process phases for process phases Process phases trigger the operation of process phases new in task execution end.The timing function of the present embodiment is task execution time Basis instrument, be arranged task time interval minimum value, then corresponding task execution time can be in the base of above-mentioned basis instrument Multiple setting is carried out on plinth, the settable minimum task time interval of timing function can be Millisecond or second grade or minute Grade, is arranged according to actual needs, and the minimum execution time compared to Crontab is 1 minute, timing of the present embodiment based on PHP Task system setting is more flexible, and the scope of application is more extensive.
In the present embodiment, task configures end and sends pending task, i.e. general assignment, which includes that multiple sons are appointed Business, which is assigned to task execution end and is responsible for executing corresponding subtask by management end, if between task execution time It is small as far as possible every being arranged, enable task execution end quickly processing subtask, to be pooled in management end after the completion of each subtask, with fast Speed sends implementing result, improves transmitting efficiency and corresponding working efficiency, and minimum task time interval is Millisecond, preferably sets Be set to 3 milliseconds, at this point, if when being allocated in the processing of the same task execution end, be equivalent to it is per second there are about 333 subtasks to complete, There are 2000 subtasks to complete within one minute, relative to existing dependence Crontab completion timing task, most due to Crontab The small execution time is 1 minute, and the timed task system of the present embodiment executes the more efficient of task.
Further, task configuration end configures web interface, and timing executes the device of task, comprising:
Second obtains module, for obtaining the corresponding execution data in all subtasks for including in pending task, Wherein, implementation progress and implementing result that data include at least all subtasks for including in pending task are executed.
Update module, for according to implementing result, real-time update to calculate all subtasks for including in pending task Success rate and failure rate.
Feedback module, the implementation progress and pending task of all subtasks for that will include in pending task In include all subtasks success rate and failure rate, Real-time Feedback to web interface simultaneously shows.
In the present embodiment, timed task system carries out web interface configuration, and the network I/O that timed task system itself carries connects Mouthful be it is asynchronous, developer can realize the Asynchronous Programming of task based access control event, realize Distributed Application, multiple and different sons is arranged Task facilitates user configuration task.When compared to creation Crontab task, it is necessary to must have the system that can configure Crontab Account, needs the system account of the additional each machine of maintenance, and configures Crontab one by one inside the system of each machine, Process is cumbersome, configuration trouble.Compared to Crontab timed task system, the timed task system of the present embodiment can be looked into intuitively The implementation progress, success rate, failure rate for seeing each general assignment, the task execution number obtained by management end from task execution end According to, and feed back into the Mission Monitor of web interface, facilitate user monitoring and checks.
Further, second module is obtained, comprising:
Detection unit executes data for whether real-time detection to receive the abnormal of third task execution end feedback.
Marking unit marks abnormal execution if executing data for receiving the abnormal of third task execution end feedback The implementing result of the corresponding subtask of data is to execute failure.
Third control unit interrupts the current subtask of execution for controlling third task execution end, and controls third task Actuating station destroys the corresponding process in current subtask.
Switching units obtain the communication connection for executing data from third task execution end for disconnecting.
The present embodiment task execution end regularly sends heartbeat detection data to management end, and management end judges according to imposing a condition Task execution end whether normal operation, for example whether abnormal, if operation data is abnormal, show to transport if analyzing the operation data that receives Row is abnormal.When the task execution at task execution end occurs abnormal, management end quickly carries out corresponding abnormal feedback notification simultaneously The current subtask of control task actuating station pull-up, and the connection with task execution end is disconnected, prevent management end from continuing to run and appointing The relevant operation of actuating station of being engaged in, consumption management end memory, influences the speed of service.When the connection of task execution end and management end is normal When, task execution end re-initiates connection, and management end receives the information at task execution end again.When process rank in the present embodiment After Duan Jinhang or after being abnormal execution, if process phases continue to remain in task execution end, task execution can be occupied The memory at end, influences the speed of performing task and efficiency at task execution end, and memory is be easy to cause to overflow situation, can pass through destruction The abnormal process phases of the process phases or appearance finished, timely releasing memory space.Above-mentioned heartbeat detection is task It is communicated between actuating station and management end, timing carries out a heartbeat detection, the communication of Detection task actuating station and management end It whether normal connects.The abnormal judgement of the present embodiment, including user are led to by checking that task daily record and heartbeat detection log obtain It crosses log to be analyzed and processed, while having to the overall operation of system and getting information about, when being conducive to system appearance exception.
The management end of the present embodiment, task execution end can also be run in same terminal operating in different terminals, and worked as and appointed When business frequent operation, same terminal then will affect progress, low memory be caused, it is preferred, therefore, that management end, task execution end It works in the different terminal of each leisure, each inter-terminal communication connection, then management end, task execution end have enough memories to guarantee Timed task is gone on smoothly.In the present embodiment when being divided into Millisecond between task time, task execution end handles frequent activity, Be easy to cause memory overflow situation, then task execution end can be separately operable by more terminals, operation distribution by management end according to Corresponding situation is specified, is to be run by present terminal, otherwise by other if whether memory is enough for the task execution end of present terminal Terminal operating.Same task execution end can multi-process synchronization process task treatment effeciency improved with speed up processing.
Further, there are dual-thread connection, dual-thread includes holding to third task for management end and third task execution end Row end sends exectorial first thread, and the second thread for executing data is obtained from third task execution end, and second obtains Modulus block, comprising:
Third judging unit, for judging whether current time reaches default timing section.Second transmission unit, is used for If current time reaches default timing section, is sent by first thread to third task execution end and reconnect instruction.It connects By unit, for receiving third task execution end according to the connection signal for reconnecting instruction feedback, and the second thread is connected.It connects Unit is received, for receiving the execution data of third task execution end feedback by the second thread.
The management end of the present embodiment is overall control center, but does not need frequent processing activity, with prevent management end due to Processing frequent activity causes operation to make mistakes.The timing of task execution end reports task execution data to management end, and management end is according to setting Fixed condition judge task execution end whether normal operation;Task execution data include the implementation progress, success rate, failure of task Rate, task execution end report the timing of task execution data that can arbitrarily set, such as 1 minute, to note abnormalities in time. The present embodiment communicates the information mutual communication for realizing timed task system by Socket, is bi-directionally connected by dual-thread realization, favorably In task execution end while receiving assignment instructions, can also to management end timing feedback execute data, improve communication efficiency and The treatment effeciency of timed task system.The each city in 100 cities is such as detected when handling some burdensome tasks in citing ground Weather information or mail is sent to 1w human hair, entire implementation procedure can be very slow, may block the several seconds, because of general assignment process quilt Obstruction, will affect subsequent request;Because general assignment process and subtask process are interconnected by Socket communication, can To pre-establish multiple subtask processes, general assignment process is communicated by Socket assignment instructions being handed down to subtask process, The subtask process asynchronous execution at one or more task execution ends is simultaneously timely feedbacked data are executed to management end.
Referring to Fig. 3, a kind of computer equipment is also provided in the embodiment of the present application, which can be server, Its internal structure can be as shown in Figure 3.The computer equipment includes processor, the memory, network connected by system bus Interface and database.Wherein, the processor of the Computer Design is for providing calculating and control ability.The computer equipment is deposited Reservoir includes non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program And database.The internal memory provides environment for the operation of operating system and computer program in non-volatile memory medium.It should The database of computer equipment is used to store timing and executes all data that the process of task needs.The network of the computer equipment Interface is used to communicate with external end by network connection.Appointed when the computer program is executed by processor with realizing that timing executes The method of business.
Above-mentioned processor executes the method that above-mentioned timing executes task, comprising: management end receives what task distribution end was sent Pending task and the corresponding configuration file of pending task, wherein management end and task distribution end pre-establish communication and connect It connects, pending task includes at least a subtask;Each subtask is assigned to task execution end according to preset rules, wherein appointing Business actuating station and management end pre-establish communication connection;According to the configuration file of pending task, it is corresponding to obtain the first subtask Mission bit stream, wherein the first subtask is contained in all subtasks in pending task, mission bit stream includes at least the The one subtask corresponding default execution time;Receive the corresponding actual execution time in the first subtask of task execution end feedback; Judge whether actual execution time is identical as the default execution time;If so, control task actuating station terminates to execute the first son times Business.
Above-mentioned computer equipment, timed task system have abandoned the Crontab of Unix system completely, using the code of PHP Write, including task configuration end, management end and task execution end, and by TCP or UDP realize task configure end, management end and Communication connection between task execution end, and by being run under cli mode, realize the multi-process stage in multiple tasks actuating station Processing is run simultaneously, and is directly cached using the OpCode in memory, is greatly reduced in disk I/O and PHP and is requested initially Change, creation performing environment, morphology parsing, syntax parsing, compiling OpCode, request many time-consuming process such as closing, improves task Execution efficiency.And the timed task system of the application is no longer limited by the self-contained Fixed Time Interval of Crontab, this implementation Example two neighboring process phases between, the execution task time interval between two neighboring subtask can arbitrarily regulate and control, more can Meet the demand for needing the running environment monitored in real time, by the way that smaller time interval is arranged, further increases task execution effect Rate.
In one embodiment, task execution end includes at least two, and above-mentioned processor is by each subtask according to default rule The step of being then assigned to task execution end, comprising: judge whether the current residual amount of ram of first task actuating station meets first The demand of subtask, wherein first task actuating station is contained in all task execution ends;If satisfied, then by the first subtask It distributes to first task actuating station.
In one embodiment, task execution end includes at least two, and configuration file includes that the thread of pending task is matched Parameter is set, the step of each subtask is assigned to task execution end according to preset rules by above-mentioned processor, comprising: match according to thread It sets parameter and determines pending task corresponding second task execution end;By the corresponding each subtask of pending task, send simultaneously To the second task execution end.
In one embodiment, the first subtask includes at least two process phases, includes two adjacent in configuration file Prefixed time interval between process phases, above-mentioned processor receive the corresponding reality in the first subtask of task execution end feedback The step of executing the time, comprising: receive the letter in the first subtask corresponding current process stage of first task actuating station feedback Breath, wherein the information in current process stage includes at least, and current process stage corresponding first accumulation operation duration is advanced with working as Journey stage adjacent next process phases, current process stage and current process stage adjacent next process phases are the Two process phases of the arbitrary neighborhood in all process phases that one subtask includes;Judge that the first of the current process stage tires out Whether plot operation duration reaches preset duration;If the first accumulation operation duration in current process stage reaches preset duration, control First task actuating station processed terminates to execute the current process stage, and enters process interval stage;Judgement process interval stage is corresponding Time interval whether reach prefixed time interval;If the corresponding time interval of process interval stage reaches prefixed time interval, It then controls first task actuating station and executes the next process phases adjacent with the current process stage;It is adjacent to obtain the current process stage Next process phases second accumulation operation duration;According to the acquisition of the first accumulation operation duration and the second accumulation operation duration Mode summarizes the accumulation operation duration for all process phases that the first subtask includes, obtains actual execution time.
In one embodiment, task configuration end configures web interface, and above-mentioned processor control task actuating station terminates to execute After the step of first subtask, comprising: the corresponding execution data in all subtasks for including in pending task are obtained, Wherein, implementation progress and implementing result that data include at least all subtasks for including in pending task are executed;According to holding Row is as a result, real-time update calculates the success rate and failure rate for all subtasks for including in pending task;By pending task In include all subtasks implementation progress and pending task in include all subtasks success rate and failure Rate, Real-time Feedback to web interface are simultaneously shown.
In one embodiment, above-mentioned processor obtains that all subtasks for including in pending task are corresponding to hold The step of row data, comprising: whether real-time detection receives the abnormal of third task execution end feedback and execute data;If so, The abnormal implementing result for executing the corresponding subtask of data of label is to execute failure;Control third task execution end, which interrupts to execute, works as Preceding subtask, and control third task execution end and destroy the corresponding process phases in current subtask;It disconnects from third task execution End obtains the communication connection for executing data.
In one embodiment, there are dual-thread connection, dual-thread includes to third for management end and third task execution end Task execution end sends exectorial first thread, and the second thread for executing data is obtained from third task execution end, Above-mentioned processor disconnected after the step of obtaining the communication connection for executing data from third task execution end, comprising: judgement is current Whether the time reaches preset timing section;Refer to if so, sending to reconnect to third task execution end by first thread It enables;Receive third task execution end according to the connection signal for reconnecting instruction feedback, and connects the second thread;Pass through the second line Journey receives the execution data of third task execution end feedback.
It will be understood by those skilled in the art that structure shown in Fig. 3, only part relevant to application scheme is tied The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme.
One embodiment of the application also provides a kind of computer readable storage medium, is stored thereon with computer program, calculates When machine program is executed by processor realize timing execute task method, comprising: management end receive task distribution end send to Execution task and the corresponding configuration file of pending task, wherein management end and task distribution end pre-establish communication connection, Pending task includes at least a subtask;Each subtask is assigned to task execution end according to preset rules, wherein task Actuating station and management end pre-establish communication connection;According to the configuration file of pending task, it is corresponding to obtain the first subtask Mission bit stream, wherein the first subtask is contained in all subtasks in pending task, mission bit stream includes at least first The subtask corresponding default execution time;Receive the corresponding actual execution time in the first subtask of task execution end feedback;Sentence Whether disconnected actual execution time is identical as the default execution time;If so, control task actuating station terminates to execute the first subtask.
Above-mentioned computer readable storage medium, timed task system have abandoned the Crontab of Unix system completely, use The written in code of PHP, including task configuration end, management end and task execution end, and by TCP or UDP realize task configure end, Communication connection between management end and task execution end, and by being run under cli mode, realize the multi-process stage at multiple Business actuating station runs processing simultaneously, and is directly cached using the OpCode in memory, greatly reduces and asks in disk I/O and PHP Many time-consuming process such as initialization, creation performing environment, morphology parsing, syntax parsing, compiling OpCode, request closing are sought, are mentioned High task execution efficiency.And the timed task system of the application is no longer limited by the self-contained Fixed Time Interval of Crontab, Execution task time interval between the two neighboring process phases of the present embodiment, between two neighboring subtask can arbitrarily adjust Control is more able to satisfy the demand for needing the running environment monitored in real time, by the way that smaller time interval is arranged, further increases task Execution efficiency.
In one embodiment, task execution end includes at least two, and above-mentioned processor is by each subtask according to default rule The step of being then assigned to task execution end, comprising: judge whether the current residual amount of ram of first task actuating station meets first The demand of subtask, wherein first task actuating station is contained in all task execution ends;If satisfied, then by the first subtask It distributes to first task actuating station.
In one embodiment, task execution end includes at least two, and configuration file includes that the thread of pending task is matched Parameter is set, the step of each subtask is assigned to task execution end according to preset rules by above-mentioned processor, comprising: match according to thread It sets parameter and determines pending task corresponding second task execution end;By the corresponding each subtask of pending task, send simultaneously To the second task execution end.
In one embodiment, the first subtask includes at least two process phases, includes two adjacent in configuration file Prefixed time interval between process phases, above-mentioned processor receive the corresponding reality in the first subtask of task execution end feedback The step of executing the time, comprising: receive the letter in the first subtask corresponding current process stage of first task actuating station feedback Breath, wherein the information in current process stage includes at least, and current process stage corresponding first accumulation operation duration is advanced with working as Journey stage adjacent next process phases, current process stage and current process stage adjacent next process phases are the Two process phases of the arbitrary neighborhood in all process phases that one subtask includes;Judge that the first of the current process stage tires out Whether plot operation duration reaches preset duration;If the first accumulation operation duration in current process stage reaches preset duration, control First task actuating station processed terminates to execute the current process stage, and enters process interval stage;Judgement process interval stage is corresponding Time interval whether reach prefixed time interval;If the corresponding time interval of process interval stage reaches prefixed time interval, It then controls first task actuating station and executes the next process phases adjacent with the current process stage;It is adjacent to obtain the current process stage Next process phases second accumulation operation duration;According to the acquisition of the first accumulation operation duration and the second accumulation operation duration Mode summarizes the accumulation operation duration for all process phases that the first subtask includes, obtains actual execution time.
In one embodiment, task configuration end configures web interface, and above-mentioned processor control task actuating station terminates to execute After the step of first subtask, comprising: the corresponding execution data in all subtasks for including in pending task are obtained, Wherein, implementation progress and implementing result that data include at least all subtasks for including in pending task are executed;According to holding Row is as a result, real-time update calculates the success rate and failure rate for all subtasks for including in pending task;By pending task In include all subtasks implementation progress and pending task in include all subtasks success rate and failure Rate, Real-time Feedback to web interface are simultaneously shown.
In one embodiment, above-mentioned processor obtains that all subtasks for including in pending task are corresponding to hold The step of row data, comprising: whether real-time detection receives the abnormal of third task execution end feedback and execute data;If so, The abnormal implementing result for executing the corresponding subtask of data of label is to execute failure;Control third task execution end, which interrupts to execute, works as Preceding subtask, and control third task execution end and destroy the corresponding process phases in current subtask;It disconnects from third task execution End obtains the communication connection for executing data.
In one embodiment, there are dual-thread connection, dual-thread includes to third for management end and third task execution end Task execution end sends exectorial first thread, and the second thread for executing data is obtained from third task execution end, Above-mentioned processor disconnected after the step of obtaining the communication connection for executing data from third task execution end, comprising: judgement is current Whether the time reaches preset timing section;Refer to if so, sending to reconnect to third task execution end by first thread It enables;Receive third task execution end according to the connection signal for reconnecting instruction feedback, and connects the second thread;Pass through the second line Journey receives the execution data of third task execution end feedback.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, above-mentioned computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, Any reference used in provided herein and embodiment to memory, storage, database or other media, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double speed are according to rate SDRAM (SSRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
The foregoing is merely preferred embodiment of the present application, are not intended to limit the scope of the patents of the application, all utilizations Equivalent structure or equivalent flow shift made by present specification and accompanying drawing content is applied directly or indirectly in other correlations Technical field, similarly include in the scope of patent protection of the application.

Claims (10)

1. a kind of method that timing executes task characterized by comprising
Management end receives the pending task and the corresponding configuration file of the pending task that task distribution end is sent, wherein The management end and task distribution end pre-establish communication connection, and the pending task includes at least a subtask;
Each subtask is assigned to task execution end according to preset rules, wherein the task execution end and the management end Pre-establish communication connection;
According to the configuration file of the pending task, the corresponding mission bit stream in the first subtask is obtained, wherein first son Task is contained in all subtasks in the pending task, and the mission bit stream includes at least first subtask pair The default execution time answered;
Receive the corresponding actual execution time in first subtask of the task execution end feedback;
Judge whether the actual execution time is identical as the default execution time;
If so, controlling the task execution end terminates to execute first subtask.
2. the method that timing according to claim 1 executes task, which is characterized in that the task execution end includes at least Two, described the step of each subtask is assigned to task execution end according to preset rules, comprising:
Judge whether the current residual amount of ram of first task actuating station meets the needs of first subtask, wherein described First task actuating station is contained in all task execution ends;
If satisfied, then first subtask is distributed to the first task actuating station.
3. the method that timing according to claim 1 executes task, which is characterized in that the task execution end includes at least Two, the configuration file includes the thread configuration parameter of the pending task, it is described by each subtask according to default Rule is assigned to the step of task execution end, comprising:
Pending task corresponding second task execution end is determined according to the thread configuration parameter;
By the corresponding each subtask of the pending task, while being sent to second task execution end.
4. the method that timing according to claim 2 or 3 executes task, which is characterized in that first subtask is at least It include the prefixed time interval between two adjacent process phases, institute including two process phases, in the configuration file The step of stating the corresponding actual execution time in first subtask for receiving task execution end feedback, comprising:
The information in the first subtask corresponding current process stage of the first task actuating station feedback is received, wherein institute The information for stating the current process stage includes at least, and the current process stage corresponding first accumulates operation duration, works as with described The adjacent next process phases of preceding process phases, the current process stage and the current process stage it is adjacent it is next into Journey stage, two process phases of the arbitrary neighborhood in all process phases for including for first subtask;
Judge whether the first accumulation operation duration in the current process stage reaches preset duration;
If the first accumulation operation duration in the current process stage reaches preset duration, the first task actuating station is controlled Terminate to execute the current process stage, and enters process interval stage;
Judge whether the corresponding time interval of the process interval stage reaches prefixed time interval;
If the corresponding time interval of the process interval stage reaches prefixed time interval, the first task actuating station is controlled Execute the next process phases adjacent with the current process stage;
Obtain the second accumulation operation duration of the current process stage adjacent next process phases;
According to the acquisition modes of the first accumulation operation duration and the second accumulation operation duration, summarizes first son and appoint The accumulation operation duration for all process phases that business includes, obtains the actual execution time.
5. the method that timing according to claim 1 executes task, which is characterized in that task configuration end configures web Interface, after the control task execution end terminates the step of executing first subtask, comprising:
Obtain the corresponding execution data in all subtasks for including in the pending task, wherein the execution data Including at least the implementation progress and implementing result of all subtasks for including in the pending task;
According to the implementing result, real-time update calculates the success rate and mistake for all subtasks for including in the pending task Lose rate;
The institute that will include in the implementation progress for all subtasks for including in the pending task and the pending task There are the success rate and failure rate of subtask, Real-time Feedback is to the web interface and shows.
6. the method that timing according to claim 5 executes task, which is characterized in that described to obtain the pending task In include the corresponding execution data in all subtasks the step of, comprising:
Whether real-time detection receives the abnormal of third task execution end feedback and executes data;
If so, the label abnormal implementing result for executing the corresponding subtask of data is to execute failure;
It controls third task execution end and interrupts the current subtask of execution, and control described in the destruction of third task execution end The corresponding process phases in current subtask;
Disconnect the communication connection for obtaining from third task execution end and executing data.
7. the method that timing according to claim 6 executes task, which is characterized in that the management end and the third are appointed For actuating station of being engaged in there are dual-thread connection, the dual-thread includes sending exectorial First Line to third task execution end Journey, and the second thread for executing data is obtained from third task execution end, it is described to disconnect from the third task execution End obtained after the step of communication connection for executing data, comprising:
Judge whether current time reaches preset timing section;
Instruction is reconnected if so, sending by the first thread to third task execution end;
Receive third task execution end according to the connection signal for reconnecting instruction feedback, and connects second line Journey;
The execution data of third task execution end feedback are received by second thread.
8. the device that a kind of timing executes task, which is characterized in that be integrated in management end, described device includes:
First receiving module, for receiving the pending task and the pending task is corresponding matches that task distribution end is sent File is set, wherein the management end and task distribution end pre-establish communication connection, the pending task is included at least One subtask;
Distribution module, for each subtask to be assigned to task execution end according to preset rules, wherein the task execution End pre-establishes communication connection with the management end;
First obtains module, for the configuration file according to the pending task, obtains the corresponding task letter in the first subtask Breath, wherein first subtask is contained in all subtasks in the pending task, the mission bit stream is at least wrapped Include the first subtask corresponding default execution time;
Second receiving module, when the corresponding reality in first subtask for receiving the task execution end feedback executes Between;
Judgment module, for judging whether the actual execution time is identical as the default execution time;
Control module controls the task execution if identical as the default execution time for the actual execution time End terminates to execute first subtask.
9. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 7 the method when executing the computer program.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of method described in any one of claims 1 to 7 is realized when being executed by processor.
CN201910470635.0A 2019-05-31 2019-05-31 Timing executes method, apparatus, computer equipment and the storage medium of task Pending CN110333915A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910470635.0A CN110333915A (en) 2019-05-31 2019-05-31 Timing executes method, apparatus, computer equipment and the storage medium of task

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910470635.0A CN110333915A (en) 2019-05-31 2019-05-31 Timing executes method, apparatus, computer equipment and the storage medium of task

Publications (1)

Publication Number Publication Date
CN110333915A true CN110333915A (en) 2019-10-15

Family

ID=68140682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910470635.0A Pending CN110333915A (en) 2019-05-31 2019-05-31 Timing executes method, apparatus, computer equipment and the storage medium of task

Country Status (1)

Country Link
CN (1) CN110333915A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110888865A (en) * 2019-12-04 2020-03-17 北京明略软件系统有限公司 Data processing method and device based on one-way linked list
CN111309463A (en) * 2020-02-05 2020-06-19 北京明略软件系统有限公司 Method and device for determining task execution time and readable storage medium
CN112667383A (en) * 2020-12-31 2021-04-16 北京高途云集教育科技有限公司 Task execution and scheduling method, system, device, computing equipment and medium
CN113535353A (en) * 2021-06-29 2021-10-22 未鲲(上海)科技服务有限公司 Timing task scheduling method and device and computer equipment
CN114326670A (en) * 2021-12-24 2022-04-12 北京龙鼎源科技股份有限公司 Method and device for detecting task executed by controller, storage medium and electronic device
CN115098253A (en) * 2022-06-17 2022-09-23 特赞(上海)信息科技有限公司 Subtask execution method and system and electronic equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013091219A1 (en) * 2011-12-22 2013-06-27 华为技术有限公司 Method and apparatus for processing concurrent tasks
WO2013106923A1 (en) * 2012-01-20 2013-07-25 Energy Aware Technology Inc. System and method of compiling and organizing power consumption data and converting such data into one or more user actionable formats
CN106775965A (en) * 2016-11-17 2017-05-31 腾讯科技(深圳)有限公司 A kind of processing method and processing device of timed task
CN107748695A (en) * 2017-10-24 2018-03-02 平安科技(深圳)有限公司 Timed task processing method, device, storage medium and computer equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013091219A1 (en) * 2011-12-22 2013-06-27 华为技术有限公司 Method and apparatus for processing concurrent tasks
WO2013106923A1 (en) * 2012-01-20 2013-07-25 Energy Aware Technology Inc. System and method of compiling and organizing power consumption data and converting such data into one or more user actionable formats
CN106775965A (en) * 2016-11-17 2017-05-31 腾讯科技(深圳)有限公司 A kind of processing method and processing device of timed task
CN107748695A (en) * 2017-10-24 2018-03-02 平安科技(深圳)有限公司 Timed task processing method, device, storage medium and computer equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘一田;刘士进;: "多租户高可用并行任务调度框架", 计算机系统应用, no. 12 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110888865A (en) * 2019-12-04 2020-03-17 北京明略软件系统有限公司 Data processing method and device based on one-way linked list
CN111309463A (en) * 2020-02-05 2020-06-19 北京明略软件系统有限公司 Method and device for determining task execution time and readable storage medium
CN111309463B (en) * 2020-02-05 2023-04-07 北京明略软件系统有限公司 Method and device for determining task execution time and readable storage medium
CN112667383A (en) * 2020-12-31 2021-04-16 北京高途云集教育科技有限公司 Task execution and scheduling method, system, device, computing equipment and medium
CN112667383B (en) * 2020-12-31 2024-02-09 北京高途云集教育科技有限公司 Task execution and scheduling method, system, device, computing equipment and medium
CN113535353A (en) * 2021-06-29 2021-10-22 未鲲(上海)科技服务有限公司 Timing task scheduling method and device and computer equipment
CN113535353B (en) * 2021-06-29 2022-05-20 未鲲(上海)科技服务有限公司 Timing task scheduling method and device and computer equipment
CN114326670A (en) * 2021-12-24 2022-04-12 北京龙鼎源科技股份有限公司 Method and device for detecting task executed by controller, storage medium and electronic device
CN114326670B (en) * 2021-12-24 2024-03-05 北京龙鼎源科技股份有限公司 Detection method and device for executing tasks by controller, storage medium and electronic device
CN115098253A (en) * 2022-06-17 2022-09-23 特赞(上海)信息科技有限公司 Subtask execution method and system and electronic equipment

Similar Documents

Publication Publication Date Title
CN110333915A (en) Timing executes method, apparatus, computer equipment and the storage medium of task
US10877813B2 (en) Resource control stack based system for multiple domain presentation of cloud computing resource control
US11321132B2 (en) Edge computing method and apparatus for flexibly allocating computing resource
ES2326538T3 (en) SYSTEM AND METHOD FOR MANAGING OPERATING CHARACTERISTICS IN A COMPUTER ENVIRONMENT OF VARIOUS LEVELS.
CN107688496A (en) Task distribution formula processing method, device, storage medium and server
CN108834086B (en) Method and device for sending short message, computer equipment and storage medium
DE102004052270B4 (en) Processing device management system
CN108845884A (en) Physical source distributing method, apparatus, computer equipment and storage medium
CN108965381A (en) Implementation of load balancing, device, computer equipment and medium based on Nginx
CN108132833A (en) Distributed timing task scheduling method and device based on zookeeper technology
US8295963B2 (en) Methods for performing data management for a recipe-and-component control module
CN110297814A (en) Method for monitoring performance, device, equipment and the storage medium of database manipulation
CN106330769A (en) Business processing method and server
CN106575247A (en) Fault tolerant federation of computing clusters
CN106209482A (en) A kind of data center monitoring method and system
CN107451147A (en) A kind of method and apparatus of kafka clusters switching at runtime
CN107783829A (en) Task processing method, device, storage medium and computer equipment
CN110334126A (en) Timed task processing method, device and computer equipment based on Spring MVC
CN109634730A (en) Method for scheduling task, device, computer equipment and storage medium
CN104168326A (en) Server load balancing method and system
US10892947B2 (en) Managing cross-cloud distributed application
CN109062982A (en) Financial data exchange method, device, computer equipment and storage medium
CN107634871B (en) Connectivity test method, device and system
CN106559485B (en) A kind of method and device of control server shutdown
US20090234786A1 (en) Method for Governing the Operation of a Generalist Agent within a Complex Multi-Agent Adaptive System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination