CN110333909A - A kind of modeling method that automation secondary device model automatically configures - Google Patents
A kind of modeling method that automation secondary device model automatically configures Download PDFInfo
- Publication number
- CN110333909A CN110333909A CN201910577104.1A CN201910577104A CN110333909A CN 110333909 A CN110333909 A CN 110333909A CN 201910577104 A CN201910577104 A CN 201910577104A CN 110333909 A CN110333909 A CN 110333909A
- Authority
- CN
- China
- Prior art keywords
- information
- secondary device
- component
- control system
- acquisition system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/12—Use of codes for handling textual entities
- G06F40/14—Tree-structured documents
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/445—Program loading or initiating
- G06F9/44505—Configuring for program initiating, e.g. using registry, configuration files
Abstract
A kind of modeling method that automation secondary device model automatically configures of the present invention, comprising: save and Dispatching Control System is adjusted to determine the secondary device account information for needing to configure model, account information is adjusted into acquisition system with being sent to;Device id in account information is associated by ground tune acquisition system with physical device to be matched, and will be monitored the module information of the equipment after successful match automatically and is organized into complete facility information, facility information is sent to province's tune Dispatching Control System;Saving and adjusting Dispatching Control System is that component assigns sole component ID, and module information is adjusted acquisition system with being sent to again;Device model is imported into database automatically by ground tune acquisition system, completes the building of equipment complete model between adjusting with saving;Simultaneously in the life cycle of equipment, the transition information of component can also be automatically sent to province's tune Dispatching Control System, rebuild model.The present invention has ensured the consistency of model between province ground, greatly improves the timeliness and accuracy of secondary device variation.
Description
Technical field
The present invention relates to power system automatic field, in particular to what a kind of automation secondary device model automatically configured
Modeling method.
Background technique
As electric system is constantly built and the propulsion of every practical function, the secondary device team of support is provided
5 is also more and more huger.The secondary device function for monitoring of automated system is weaker at present, lacks unified efficient device model certainly
The dynamic method updated can not comprehensively monitor automated system secondary device resource without real-time device model.Dimension
Shield personnel can not accomplish in time to grasp the device model information of whole system comprehensively, can not be to the equipment of automated system
State makes correct anticipation.
In order to improve the correctness and real-time of automated system secondary device model, realize from the secondary device saved to ground
In-service monitoring, complete a kind of modeling method that automatically configures of automation secondary device model very it is necessary to.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, propose that a kind of automation secondary device model automatically configures
Modeling method, realize that automation secondary device model automatically configures.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of modeling method that automation secondary device model automatically configures, comprising:
It saves and Dispatching Control System is adjusted to determine the automation secondary device for needing to monitor, assign the secondary device and uniquely set
Standby ID, and be the first XML file of standard by the account information tissue of the secondary device, it will be described by wide-area transmission service
First XML file is sent to ground adjusting data acquisition system;First XML file include the secondary device device name,
The operation system of device id and place;
After local adjusting data acquisition system receives the equipment account information that province's tune Dispatching Control System issues, automatically with set
The standby hardware information acquisition collected facility information of service module is matched, and carrying out matched facility information includes implementor name
Claim, if device name matches, the unique device id of the secondary device adjusted and be arranged in Dispatching Control System will be saved and assigned
Adjust the equipment to match in acquisition system with giving;The collected facility information of device hardware information collection service module also wraps
Include module information;The module information includes disc information and network interface card information;
Ground adjusting data acquisition system leads to the module information of the secondary device monitored with the second XML file of standard
It crosses wide-area transmission service and is sent to province's tune Dispatching Control System;
It saves and each component that Dispatching Control System is the secondary device is adjusted to assign unique component ID, complete complete two
The building of secondary device model, and organize to be sent to ground adjusting data acquisition system by wide-area transmission service for third XML file;Institute
Stating third XML file includes device id, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the third XML file, and complete secondary device model information is imported into
Database.
Preferably, the method also includes:
In the life cycle of secondary device, if ground adjusting data acquisition system judges that device hardware information collection services mould
The collected module information of block and stored secondary device model are inconsistent, then by the corresponding module information of newly added equipment component
It is automatically sent to province's tune Dispatching Control System;
Save adjust Dispatching Control System be increase newly component assign unique component ID to complete the reconstruction of complete device model, and
Tissue is sent to ground adjusting data acquisition system by wide-area transmission service for the 4th XML file;4th XML file includes setting
Standby ID, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the 4th XML file, and complete secondary device model information is imported into
Database.
Preferably, the method also includes:
In the life cycle of secondary device, if component or/and module information change, by automatic regular polling sending assembly
Or/and module information transition information saves to tune Dispatching Control System is saved and adjusts the component in Dispatching Control System more new model related
Information is organized to adjust number with being sent to by wide-area transmission service for the 5th XML file to complete the reconstruction of complete device model
According to acquisition system;5th XML file includes device id, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the 5th XML file, and complete secondary device model information is imported into
Database.
Preferably, adjusting data acquisition system in described ground is by the module information of the secondary device monitored with standard
XML format is sent to province's tune Dispatching Control System by wide-area transmission service, specifically includes:
The module information tissue of the secondary device monitored is the XML format of standard by ground adjusting data acquisition system,
Province's tune Dispatching Control System is sent in a manner of default automatic regular polling of minute.
Preferably, the method also includes:
Local adjusting data acquisition system monitors that province's tune Dispatching Control System issues complete secondary device model and reality
When equipment is consistent, stop the module information that poll sends the secondary device.
Preferably, carrying out matched facility information further includes operation system, only operation system and when all consistent implementor name,
Indicate matching.
The invention has the following beneficial effects:
(1) a kind of modeling method for automatically configuring of automation secondary device model of the present invention realizes province's over the ground secondary
The full control of device model, ensure that the consistency of secondary device model between province ground;
(2) a kind of modeling method for automatically configuring of automation secondary device model of the present invention, the building of device model and
The remodeling construction Chengdu that apparatus assembly later changes does not need artificial treatment, greatly reduces cost of labor;
(3) a kind of modeling method that automation secondary device model automatically configures of the present invention, this method have ensured secondary set
The real-time of standby model, the module information of variation can timely on give, complete the automatic building of new model, module information changes energy
It is enough to be timely transmitted to province's tune Dispatching Control System;
(4) a kind of modeling method that automation secondary device model automatically configures of the present invention, can be applied not only to automate
Secondary device is equally applicable the model constructions such as database, the automatic machine room environment of automation.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those skilled in the art without any creative labor, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the flow chart for the modeling method that the automation secondary device model of the embodiment of the present invention automatically configures;
Fig. 2 is the first XML file structural schematic diagram of the embodiment of the present invention;
Fig. 3 is the acquisition collected facility information structural representation of service module of the equipment of the embodiment of the present invention hardware information
Figure;
Fig. 4 is the second XML file structural schematic diagram of the embodiment of the present invention;
Fig. 5 is the third XML file structural schematic diagram of the embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
It is shown in Figure 1, a kind of modeling method that automation secondary device model automatically configures of the present invention, comprising:
S101 is saved and Dispatching Control System is adjusted to determine the secondary device account information for needing to configure model, account information is sent out
It send to ground adjusting data acquisition system.
It adjusts Dispatching Control System to determine the automation secondary device for needing to monitor specifically, saving, assigns the secondary device
Unique device id, and be the first XML file of standard by the account information tissue of the secondary device, it is taken by wide-area transmission
First XML file is sent to ground adjusting data acquisition system by business;First XML file includes setting for the secondary device
Standby title, device id and the operation system at place.
The first XML file structural schematic diagram is shown in Figure 2." name " field therein indicates device name,
" system " field indicates that the operation system at place, " id " field indicate device id.
S102, the device id in account information is associated by ground adjusting data acquisition system with physical device to be matched, matching
The module information of the equipment will be monitored automatically after success and is organized into complete facility information, and facility information is sent to province's tune
Spend control system.
Specifically, ground adjusting data acquisition system carries out dissection process to the equipment account information received, which is believed
Breath is matched with existing running equipment is automated, and successful match, which then records, saves the Equipment Foundations model information (comprising equipment
ID, device name, place operation system etc.), while the module information of the equipment is monitored automatically, it fails to match does not do above-mentioned place then
Reason.
It should be understood that
A, successful match is just calculated in operation system where there was only secondary device and implementor name exact matching, and what it fails to match does not do
Processing;
B, apparatus assembly information includes the information such as disk, network interface card, the business process under equipment, after being matched to the equipment,
These module informations that will be detected under the equipment, and these components are belonged under the equipment.
The collected facility information structural schematic diagram of device hardware information collection service module is shown in Figure 3, therein
" namevalue " field indicates device name.
Further, adjusting data acquisition system in ground is by the module information of the secondary device monitored with the second of standard
XML file is sent to province's tune Dispatching Control System by wide-area transmission service.The second XML file structural schematic diagram is referring to figure
Shown in 4.
S103, saving and adjusting Dispatching Control System is that component assigns sole component ID, and module information is adjusted number with being sent to again
According to acquisition system.
Shown in Figure 4, the apparatus assembly information that ground adjusting data acquisition system monitors will organize XML format for standard
File (the second XML file), and automatic regular polling is sent to province's tune Dispatching Control System, adjusts Dispatching Control System to summarize this by province and sets
Standby model information, and full model is issued again to ground adjusting data acquisition system;Local adjusting data acquisition system monitors to issue
The equipment full model it is consistent with physical device when, stop poll sending device module information.
It should be understood that
A, the apparatus assembly information monitored will be sent to province's tune Dispatching Control System every 1 minute poll, prevent
Leakage passes, and leakage is received;
If b, the model that province adjusts Dispatching Control System to issue is still with ground tune physical presence difference, the component having differences
Information is sent poll is repeated, until model and reality are consistent.
It adjusts each component that Dispatching Control System is the secondary device to assign unique component ID specifically, saving, completes
The building of complete secondary device model, and tissue is sent to ground adjusting data by wide-area transmission service for third XML file and adopts
Collecting system;The third XML file includes device id, the component ID of each component and relevant information.
Third XML file structure is shown in Figure 5, wherein " id " field of the part " node " indicates device id, " disk "
Partial " id " indicates that DPU disk pack unit ID, " id " of the part " net " indicate network interface card component ID.
Device model is imported into database automatically by S104, ground adjusting data acquisition system, and it is complete to complete equipment between saving ground tune
The building of model.
Specifically, ground adjusting data acquisition system parses the third XML file, and by complete secondary device model information
It imported into database.
Further, the method also includes:
In the life cycle of secondary device, if ground adjusting data acquisition system judges that device hardware information collection services mould
The collected module information of block and stored secondary device model are inconsistent, then by the corresponding module information of newly added equipment component
It is automatically sent to province's tune Dispatching Control System;
Save adjust Dispatching Control System be increase newly component assign unique component ID to complete the reconstruction of complete device model, and
Tissue is sent to ground adjusting data acquisition system by wide-area transmission service for the 4th XML file;4th XML file includes setting
Standby ID, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the 4th XML file, and complete secondary device model information is imported into
Database.
Further, the method also includes:
In the life cycle of secondary device, if component or/and module information change, by automatic regular polling sending assembly
Or/and module information transition information saves to tune Dispatching Control System is saved and adjusts the component in Dispatching Control System more new model related
Information is organized to adjust number with being sent to by wide-area transmission service for the 5th XML file to complete the reconstruction of complete device model
According to acquisition system;5th XML file includes device id, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the 5th XML file, and complete secondary device model information is imported into
Database.
It should be noted that the present invention can also be used in database, UPS in operation system process and Room Power environment,
The building of the device models such as precision air conditioner.
A kind of modeling method that automation secondary device model automatically configures of the present invention, it is ensured that secondary device monitors platform
Model information accuracy and timeliness, and greatly reduce the maintenance workload of device model.
Specific embodiment is applied in the present invention, and principle and implementation of the present invention are described, above embodiments
Explanation be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art,
According to the thought of the present invention, there will be changes in the specific implementation manner and application range, in conclusion in this specification
Appearance should not be construed as limiting the invention.
Claims (6)
1. a kind of modeling method that automation secondary device model automatically configures characterized by comprising
It saves and Dispatching Control System is adjusted to determine the automation secondary device for needing to monitor, assign the secondary device unique equipment
ID, and be the first XML file of standard by the account information tissue of the secondary device, by wide-area transmission service by described the
One XML file is sent to ground adjusting data acquisition system;First XML file includes the device name of the secondary device, sets
The operation system of standby ID and place;
It is automatically hard with equipment after local adjusting data acquisition system receives the equipment account information that province's tune Dispatching Control System issues
The collected facility information of part information collection service module is matched, and carrying out matched facility information includes device name, such as
Fruit device name matches, then will save and the unique device id of the secondary device being arranged in Dispatching Control System is adjusted to adjust with assigning
The equipment to match in acquisition system;The collected facility information of device hardware information collection service module further includes component
Information;The module information includes disc information and network interface card information;
Ground adjusting data acquisition system passes through the module information of the secondary device monitored with the second XML file of standard wide
Domain transmission service is sent to province's tune Dispatching Control System;
Province adjusts each component that Dispatching Control System is the secondary device to assign unique component ID, completes completely secondary set
The building of standby model, and organize to be sent to ground adjusting data acquisition system by wide-area transmission service for third XML file;Described
Three XML files include device id, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the third XML file, and complete secondary device model information is imported into data
Library.
2. the modeling method that automation secondary device model according to claim 1 automatically configures, which is characterized in that described
Method further include:
In the life cycle of secondary device, if ground adjusting data acquisition system judges that device hardware information collection service module is adopted
The module information collected and stored secondary device model are inconsistent, then the corresponding module information of newly added equipment component is automatic
It is sent to province's tune Dispatching Control System;
Saving and adjusting Dispatching Control System is that newly-increased component assigns unique component ID to complete the reconstruction of complete device model, and organizes
Ground adjusting data acquisition system is sent to by wide-area transmission service for the 4th XML file;4th XML file includes equipment
ID, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the 4th XML file, and complete secondary device model information is imported into data
Library.
3. the modeling method that automation secondary device model according to claim 1 automatically configures, which is characterized in that described
Method further include:
In the life cycle of secondary device, if component or/and module information change, by automatic regular polling sending assembly or/
With module information transition information to tune Dispatching Control System is saved, the device related information adjusted in Dispatching Control System more new model is saved
To complete the reconstruction of complete device model, and tissue is sent to ground adjusting data by wide-area transmission service for the 5th XML file and adopts
Collecting system;5th XML file includes device id, the component ID of each component and relevant information;
Ground adjusting data acquisition system parses the 5th XML file, and complete secondary device model information is imported into data
Library.
4. the modeling method that automation secondary device model according to claim 1 automatically configures, which is characterized in that described
Ground adjusting data acquisition system takes the module information of the secondary device monitored with the XML format of standard by wide-area transmission
Business is sent to province's tune Dispatching Control System, specifically includes:
The module information tissue of the secondary device monitored is the XML format of standard by ground adjusting data acquisition system, with pre-
If the mode of automatic regular polling of minute is sent to province's tune Dispatching Control System.
5. the modeling method that automation secondary device model according to claim 4 automatically configures, which is characterized in that described
Method further include:
Local adjusting data acquisition system monitors that province's tune Dispatching Control System issues complete secondary device model and physical device
When consistent, stop the module information that poll sends the secondary device.
6. the modeling method that automation secondary device model according to claim 1 automatically configures, which is characterized in that carry out
Matched facility information further includes operation system, only operation system and when all consistent implementor name, indicates matching.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910577104.1A CN110333909B (en) | 2019-06-28 | 2019-06-28 | Modeling method for automatic configuration of automatic secondary equipment model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910577104.1A CN110333909B (en) | 2019-06-28 | 2019-06-28 | Modeling method for automatic configuration of automatic secondary equipment model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110333909A true CN110333909A (en) | 2019-10-15 |
CN110333909B CN110333909B (en) | 2022-03-29 |
Family
ID=68144564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910577104.1A Active CN110333909B (en) | 2019-06-28 | 2019-06-28 | Modeling method for automatic configuration of automatic secondary equipment model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110333909B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113406443A (en) * | 2021-08-02 | 2021-09-17 | 广东电网有限责任公司东莞供电局 | Low-voltage transformer area fault accurate positioning system and method |
CN113505972A (en) * | 2021-06-17 | 2021-10-15 | 国网电力科学研究院有限公司 | Secondary equipment model issuing configuration method |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6349345B1 (en) * | 1999-01-29 | 2002-02-19 | Hewlett-Packard Company | Autoconfigurable device that provisionally configures itself as the primary or secondary peripheral device depending on if another peripheral device is present |
CN102361348A (en) * | 2011-09-28 | 2012-02-22 | 江苏方天电力技术有限公司 | Method for monitoring time setting state of secondary equipment of intelligent converting station |
CN104318027A (en) * | 2014-10-29 | 2015-01-28 | 国家电网公司 | Information table template based closed-loop automatic interaction model information table design method |
CN104537572A (en) * | 2014-12-08 | 2015-04-22 | 广东电网有限责任公司电力科学研究院 | Transformer substation secondary device parameter configuration method and system |
CN104578404A (en) * | 2014-11-18 | 2015-04-29 | 合肥中能电力科技有限公司 | Online monitoring system for secondary equipment of power system |
CN104699801A (en) * | 2015-03-19 | 2015-06-10 | 国家电网公司 | Method and device of secondary equipment associating configuration |
CN105305617A (en) * | 2015-10-15 | 2016-02-03 | 广东电网有限责任公司中山供电局 | Transformer substation online secondary equipment standing book information acquisition method |
US20160261620A1 (en) * | 2008-03-18 | 2016-09-08 | Mcafee, Inc. | System, method, and computer program product for dynamically configuring a virtual environment for identifying unwanted data |
CN109687582A (en) * | 2018-12-18 | 2019-04-26 | 安徽立卓智能电网科技有限公司 | Precisely obtain the method for scheduling system transformer state handover event |
CN109815522A (en) * | 2018-12-03 | 2019-05-28 | 中国南方电网有限责任公司 | A method of it realizes and saves ground model splicing edge device partition definition and verify in advance |
CN109918725A (en) * | 2019-01-30 | 2019-06-21 | 国网江苏省电力有限公司技能培训中心 | Integrated test method based on the modeling of emulation platform secondary device |
-
2019
- 2019-06-28 CN CN201910577104.1A patent/CN110333909B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6349345B1 (en) * | 1999-01-29 | 2002-02-19 | Hewlett-Packard Company | Autoconfigurable device that provisionally configures itself as the primary or secondary peripheral device depending on if another peripheral device is present |
US20160261620A1 (en) * | 2008-03-18 | 2016-09-08 | Mcafee, Inc. | System, method, and computer program product for dynamically configuring a virtual environment for identifying unwanted data |
CN102361348A (en) * | 2011-09-28 | 2012-02-22 | 江苏方天电力技术有限公司 | Method for monitoring time setting state of secondary equipment of intelligent converting station |
CN104318027A (en) * | 2014-10-29 | 2015-01-28 | 国家电网公司 | Information table template based closed-loop automatic interaction model information table design method |
CN104578404A (en) * | 2014-11-18 | 2015-04-29 | 合肥中能电力科技有限公司 | Online monitoring system for secondary equipment of power system |
CN104537572A (en) * | 2014-12-08 | 2015-04-22 | 广东电网有限责任公司电力科学研究院 | Transformer substation secondary device parameter configuration method and system |
CN104699801A (en) * | 2015-03-19 | 2015-06-10 | 国家电网公司 | Method and device of secondary equipment associating configuration |
CN105305617A (en) * | 2015-10-15 | 2016-02-03 | 广东电网有限责任公司中山供电局 | Transformer substation online secondary equipment standing book information acquisition method |
CN109815522A (en) * | 2018-12-03 | 2019-05-28 | 中国南方电网有限责任公司 | A method of it realizes and saves ground model splicing edge device partition definition and verify in advance |
CN109687582A (en) * | 2018-12-18 | 2019-04-26 | 安徽立卓智能电网科技有限公司 | Precisely obtain the method for scheduling system transformer state handover event |
CN109918725A (en) * | 2019-01-30 | 2019-06-21 | 国网江苏省电力有限公司技能培训中心 | Integrated test method based on the modeling of emulation platform secondary device |
Non-Patent Citations (1)
Title |
---|
陈剑 等: ""基于全景模型文件的智能标签的优化研究"", 《电力系统保护与控制》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113505972A (en) * | 2021-06-17 | 2021-10-15 | 国网电力科学研究院有限公司 | Secondary equipment model issuing configuration method |
CN113406443A (en) * | 2021-08-02 | 2021-09-17 | 广东电网有限责任公司东莞供电局 | Low-voltage transformer area fault accurate positioning system and method |
Also Published As
Publication number | Publication date |
---|---|
CN110333909B (en) | 2022-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100964300B1 (en) | A dispatcher training simulation system | |
CN106603958B (en) | Distributed storage remote centralized monitoring system and method for transformer substation inspection robot | |
CN104052631A (en) | Equipment information collecting method, device and system | |
CN106712001A (en) | Data modeling method for network message recording analysis device | |
CN109495290B (en) | Operation and maintenance system main station and sub station interaction method and system | |
CN110784398A (en) | Data acquisition gateway and data analysis method for industrial Internet of things processing equipment | |
CN110333909A (en) | A kind of modeling method that automation secondary device model automatically configures | |
CN105914890A (en) | Transformer substation automation control system | |
CN110989547A (en) | Detection method and system for intelligent substation one-key sequence control system | |
CN111654488A (en) | Three-station-in-one transformer substation and sensing terminal information access method | |
CN102497403A (en) | Electric power marketing and power distribution service data synchronization method | |
CN109962529B (en) | On-line monitoring and operation and maintenance device of electrical secondary equipment | |
CN106909615B (en) | Method and device for verifying data information consistency between master station and substation | |
CN210804735U (en) | Intelligent electric meter | |
CN104112183A (en) | Plug-and-play intelligent scheduling model management system and management method of intelligent substation | |
CN102663037A (en) | Comprehensive statistics inquiring system for SCADA (supervisory control and data acquisition) historical data | |
CN104182818A (en) | Method and system for collecting substation information automatically and intelligently | |
CN104834985A (en) | Synthetic data active information service method for electric power dispatching | |
CN111146868A (en) | Power communication machine room dynamic loop monitoring standardized access method and system | |
CN111665771A (en) | Infrastructure monitoring system and monitoring method | |
CN107342904B (en) | Data simulation method and device for testing substation control layer equipment of transformer substation | |
CN113348778B (en) | Generalized satellite comprehensive test system based on DDS system | |
CN206149291U (en) | Transformer station monitoring system | |
CN115037037A (en) | Wisdom garden electric energy monitoring management system | |
CN212009353U (en) | Infrastructure monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |