CN110328513A - Automatic intubation machine - Google Patents

Automatic intubation machine Download PDF

Info

Publication number
CN110328513A
CN110328513A CN201910730130.3A CN201910730130A CN110328513A CN 110328513 A CN110328513 A CN 110328513A CN 201910730130 A CN201910730130 A CN 201910730130A CN 110328513 A CN110328513 A CN 110328513A
Authority
CN
China
Prior art keywords
block
arc
clip
machine according
intubation machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910730130.3A
Other languages
Chinese (zh)
Inventor
肖凤娟
王红凯
段军宇
屈红旭
刘聪
余峰
许准
朱建敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Autobio Experimental Instrument Zhengzhou Co Ltd
Autobio Labtec Instruments Zhengzhou Co Ltd
Original Assignee
Autobio Labtec Instruments Zhengzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Autobio Labtec Instruments Zhengzhou Co Ltd filed Critical Autobio Labtec Instruments Zhengzhou Co Ltd
Priority to CN201910730130.3A priority Critical patent/CN110328513A/en
Publication of CN110328513A publication Critical patent/CN110328513A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/027Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same using hydraulic or pneumatic means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

本发明公开了一种自动插管机,包括底座,底座上自左向右间隔设置有动力源、用于固定连接管的夹持组件和接头固定组件,夹持组件包括由所述动力源驱动的基板,基板上表面设置有通过弹性件连为一体的固定夹块和活动夹块,固定夹块贴合面和活动夹块贴合面对称开设有弧形槽,两所述弧形槽围成用于固定连接管的夹持孔,固定夹块和活动夹块分别设置有弧形夹片;活动夹块的前侧面贴设有开合扳手。本发明优点在于实现了连接管和接头的自动化快速插接,提高了插管效率,能够满足不同接头与不同连接管的快速插接,适用范围广。

The invention discloses an automatic intubation machine, which comprises a base, on which a power source, a clamping assembly for fixing a connecting pipe and a joint fixing assembly are arranged at intervals from left to right, and the clamping assembly includes components driven by the power source. The upper surface of the substrate is provided with a fixed clamp block and a movable clamp block which are connected as a whole through elastic parts, and the bonding surface of the fixed clamp block and the movable clamp block are symmetrically provided with arc-shaped grooves, and the two arc-shaped grooves A clamping hole for fixing the connecting pipe is enclosed, and the fixed clamping block and the movable clamping block are respectively provided with arc-shaped clamping pieces; The invention has the advantages of realizing the automatic fast insertion of connecting pipes and joints, improving the intubation efficiency, being able to meet the rapid insertion of different joints and different connecting pipes, and having a wide application range.

Description

自动插管机Automatic intubation machine

技术领域technical field

本发明涉及插管机,尤其是涉及一种自动插管机。The invention relates to an intubation machine, in particular to an automatic intubation machine.

背景技术Background technique

液路系统是全自动化体外诊断设备的重要组成部分,是决定体外诊断设备工作性能的关键因素。液路系统通常利用接头将多根连接管串联或并联后形成多个管路,接头与连接管之间的密封性能是保证设备正常运行的前提。The hydraulic system is an important part of the fully automated in vitro diagnostic equipment and a key factor determining the performance of the in vitro diagnostic equipment. The hydraulic system usually uses joints to connect multiple connecting pipes in series or in parallel to form multiple pipelines. The sealing performance between the joints and the connecting pipes is the prerequisite for ensuring the normal operation of the equipment.

传统的插管方式是人工手动将连接管与接头插接为一体,在插接时双手用力超过0.7kg时,操作人员就会出现手部疲劳现象,然而接头与连接管插接时则需要0.9~1.9kg的外力,因而人工手动插管容易造成手部疲劳,插管效率低,同时由于接头表面光滑且体积小,插管难度大,插接时容易打滑,导致接头断裂或误伤操作人员。因而,目前人工插管时通常利用加热软化连接管或喷洒酒精降低插管力度,但是软化连接管或喷涂酒精依然存在拿捏难度大的问题,并且软化后的连接管还容易出现连接管不可回弹现象,影响接头与连接管的密封性能。为此,如何设计一种能够既能实现自动插接、又能保证插接处密封性能的自动插管机是本领域技术人员亟待解决的重要问题。The traditional intubation method is to manually insert the connecting tube and the connector into one body. When the force of both hands exceeds 0.7kg during insertion, the operator will experience hand fatigue. However, when the connector and the connecting tube are inserted, 0.9 kg is required. ~1.9kg of external force, so manual intubation is likely to cause hand fatigue and low intubation efficiency. At the same time, due to the smooth surface and small size of the joint, it is difficult to intubate, and it is easy to slip during insertion, resulting in joint breakage or accidental injury to the operator. Therefore, at present, in manual intubation, heating and softening the connecting tube or spraying alcohol is usually used to reduce the intubation force, but softening the connecting tube or spraying alcohol is still difficult to handle, and the softened connecting tube is prone to non-rebounding of the connecting tube Phenomenon, affecting the sealing performance of joints and connecting pipes. For this reason, how to design an automatic intubation machine that can realize automatic insertion and ensure the sealing performance of the insertion is an important problem to be solved urgently by those skilled in the art.

发明内容Contents of the invention

本发明目的在于提供一种自动插管机,实现了连接管与接头的自动快速插接,提高了插管效率。The object of the present invention is to provide an automatic intubation machine, which realizes the automatic fast insertion of the connecting pipe and the joint, and improves the intubation efficiency.

为实现上述目的,本发明采取下述技术方案:To achieve the above object, the present invention takes the following technical solutions:

本发明所述的自动插管机,包括底座,所述底座上自左向右间隔设置有动力源、用于固定连接管的夹持组件和接头固定组件,所述夹持组件包括由所述动力源驱动的基板,所述基板上表面设置有通过弹性件连为一体的固定夹块和活动夹块,所述固定夹块贴合面和活动夹块贴合面对称开设有弧形槽,两所述弧形槽围成用于固定连接管的夹持孔,固定夹块和活动夹块中部均设置有自弧形槽向右延伸的弧形夹片;所述活动夹块的前侧面贴设有开合扳手。The automatic intubation machine according to the present invention includes a base on which a power source, a clamping assembly for fixing a connecting pipe and a joint fixing assembly are arranged at intervals from left to right, and the clamping assembly includes the The base plate driven by the power source, the upper surface of the base plate is provided with a fixed clamp block and a movable clamp block connected as a whole by elastic parts, and the fitting surface of the fixed clamp block and the movable clamp block are symmetrically provided with arc-shaped grooves , the two arc-shaped grooves surround the clamping hole for fixing the connecting pipe, and the middle of the fixed clamp block and the movable clamp block are provided with arc-shaped clips extending from the arc-shaped groove to the right; the front of the movable clamp block There is an open and close wrench attached to the side.

所述开合扳手包括转动设置在所述基板上的偏心轮和设置在所述偏心轮顶部的把手,所述偏心轮的外周与所述活动夹块的前侧面相切。The split wrench includes an eccentric wheel arranged on the base plate and a handle arranged on the top of the eccentric wheel, and the outer circumference of the eccentric wheel is tangent to the front side of the movable clamping block.

所述固定夹块和所述活动夹块之间设置有导向销。A guide pin is arranged between the fixed clamp block and the movable clamp block.

所述底座上设置有导向组件,所述动力源驱动所述基板沿所述导向组件往返移动;所述动力源为气缸,所述气缸通过垫高块固定在所述底座上。The base is provided with a guide assembly, and the power source drives the base plate to move back and forth along the guide assembly; the power source is an air cylinder, and the air cylinder is fixed on the base through a riser.

所述导向组件包括一对间隔设置在所述底座上的导向块,每个所述导向块的上表面均固定设置有导轨,所述基板下表面间隔设置有一对沿所述导轨滑动的滑槽。The guide assembly includes a pair of guide blocks arranged at intervals on the base, guide rails are fixedly arranged on the upper surface of each of the guide blocks, and a pair of slide grooves sliding along the guide rails are arranged at intervals on the lower surface of the substrate .

两所述弧形夹片围成左大右小的圆台形导向孔,每个弧形夹片上均开设有沿其长度方向延伸的缓冲槽。The two arc-shaped clips enclose a frustum-shaped guide hole with a larger left and a smaller right, and each arc-shaped clip is provided with a buffer groove extending along its length.

所述接头固定组件包括固定在所述底座上的安装块,所述安装块上表面通过固定销连接有用于固定接头的接头定位块。The joint fixing assembly includes a mounting block fixed on the base, and a joint positioning block for fixing the joint is connected to the upper surface of the mounting block through a fixing pin.

所述接头定位块为直通接头定位块,靠近所述弧形夹片的接头定位块上表面的边缘处前后间隔设置有一对第一夹持块,两所述第一夹持块之间的间隙形成与所述夹持孔对应的卡槽。The joint positioning block is a straight-through joint positioning block, and a pair of first clamping blocks are arranged at intervals before and after near the edge of the joint positioning block upper surface of the arc clip, and the gap between the two first clamping blocks A card slot corresponding to the clamping hole is formed.

所述接头定位块上表面的另一边缘处间隔设置有一对第二夹持块。A pair of second clamping blocks are arranged at intervals on the other edge of the upper surface of the joint positioning block.

所述接头定位块为三通接头定位块,靠近所述弧形夹片处的接头定位块一边缘中部开设有用于固定三通接头的定位槽,接头定位块上表面水平开设有用于固定三通接头的V形槽。The joint positioning block is a three-way joint positioning block, and the middle part of the edge of the joint positioning block near the arc clip is provided with a positioning groove for fixing the three-way joint, and the upper surface of the joint positioning block is horizontally opened for fixing the three-way V-groove for joints.

本发明优点在于实现了连接管和接头的自动化快速插接,提高了插管效率,能够满足不同接头与不同连接管的快速插接,适用范围广。具体地,气缸推动基板快速移动至接头后再推动基板快速返回,实现连接管与接头的快速插接;偏心轮外周与活动夹块相切,通过转动偏心轮即可实现连接管的快速取、放,操作简单;导向组件为双导轨,导向性能好,保证基板的运动轨迹。The invention has the advantages of realizing the automatic fast insertion of connecting pipes and joints, improving the intubation efficiency, being able to meet the rapid insertion of different joints and different connecting pipes, and having a wide application range. Specifically, the cylinder pushes the base plate to quickly move to the joint and then pushes the base plate back quickly to realize the quick insertion of the connecting pipe and the joint; the outer circumference of the eccentric wheel is tangent to the movable clamping block, and the fast removal and removal of the connecting pipe can be realized by rotating the eccentric wheel Easy to operate; the guiding component is double guide rails, which has good guiding performance and ensures the movement track of the substrate.

附图说明Description of drawings

图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2是图1的主视图。Fig. 2 is a front view of Fig. 1 .

图3是图1的俯视图。FIG. 3 is a top view of FIG. 1 .

图4是图3中接头固定组件的剖视结构示意图。Fig. 4 is a schematic cross-sectional structure diagram of the joint fixing assembly in Fig. 3 .

图5是本发明所述接头定位块的另一种结构示意图。Fig. 5 is another structural schematic diagram of the joint positioning block of the present invention.

图6是图5中接头定位块的俯视图。Fig. 6 is a top view of the joint positioning block in Fig. 5 .

具体实施方式Detailed ways

如图1-3所示,本发明所述的自动插管机,包括底座1,底座1上自左向右间隔设置有动力源、用于固定连接管的夹持组件和接头固定组件,动力源为双杠气缸10(当然也可以采用其他直线驱动动力源,如液压缸、电动推杆等),双杆气缸10通过垫高块11固定安装在底座1上;双杆气缸10的两个接口分别通过与手扳阀21(4H210-08)的A接口、B接口连通,手扳阀的P接口与气源连通,通过手扳阀21控制双杆气缸10活塞杆的伸出或缩回,实现夹持组件的左右快速往返平移;As shown in Figures 1-3, the automatic intubation machine according to the present invention includes a base 1 on which a power source, a clamping assembly and a joint fixing assembly for fixing the connecting pipe are arranged at intervals from left to right, and the power source The power source is a parallel bar cylinder 10 (of course, other linear drive power sources can also be used, such as hydraulic cylinders, electric push rods, etc.), and the double-rod cylinder 10 is fixedly installed on the base 1 through the pad 11; the two interfaces of the double-rod cylinder 10 By connecting with the A interface and B interface of the lever valve 21 (4H210-08), respectively, and the P interface of the lever valve being connected with the air source, the extension or retraction of the piston rod of the double-rod cylinder 10 is controlled by the lever valve 21. Realize the left and right fast back and forth translation of the clamping component;

如图1-3所示,底座1上设置有导向组件,导向组件包括一对间隔设置在底座1上的导向块12,每个导向块12的上表面均固定设置有导轨13,双杆气缸10驱动夹持组件沿导轨13左右往返移动,双导轨13能够保证夹持组件的运动轨迹,保证运动精度;As shown in Figures 1-3, a guide assembly is provided on the base 1, and the guide assembly includes a pair of guide blocks 12 arranged at intervals on the base 1. The upper surface of each guide block 12 is fixed with a guide rail 13, and the double-rod cylinder 10 Drive the clamping assembly to move back and forth along the guide rail 13, and the double guide rail 13 can ensure the movement track of the clamping assembly and ensure the motion accuracy;

如图1-3所示,夹持组件包括由双杆气缸10驱动的基板2,基板2的左侧通过连接板22与双杆气缸10的活塞杆相固连,基板2上表面设置有通过弹性件3(弹性件3为压缩弹簧连为一体)的固定夹块4和活动夹块5,固定夹块4与基板2通过螺钉固定连接,拆装简单方便;固定夹块4贴合面和活动夹块5贴合面对称开设有弧形槽,两弧形槽围成用于固定连接管的夹持孔6,固定夹块4和活动夹块5中部分别自弧形槽向右延伸设置有弧形夹片7,两弧形夹片7围成左大右小的圆台形导向孔,每个弧形夹片7上均开设有沿其长度方向延伸的缓冲槽14,使得连接管和接头插接时弧形夹片7存在变形量,能够实现连接管和接头的快速插接;活动夹块5的前侧面贴设有开合扳手,开合扳手包括转动设置在基板2上的偏心轮8和设置在偏心轮8顶部的把手,偏心轮8的外周与活动夹块5的前侧面相贴合,偏心轮8的弧形凸出部与活动夹块5接触时,活动夹块5和固定夹块4闭合,通过把手转动偏心轮8,偏心轮8的平面与活动夹块5贴合时,压缩弹簧受到的挤压力消失,活动夹块5在压缩弹簧的作用下快速弹开,便于取、放连接管;As shown in Figures 1-3, the clamping assembly includes a base plate 2 driven by a double-rod cylinder 10, the left side of the base plate 2 is fixedly connected with the piston rod of the double-rod cylinder 10 through a connecting plate 22, and the upper surface of the base plate 2 is provided with a The fixed clip 4 and the movable clip 5 of the elastic part 3 (the elastic part 3 is a compression spring connected as a whole), the fixed clip 4 and the base plate 2 are fixedly connected by screws, and the disassembly and assembly are simple and convenient; the bonding surface of the fixed clip 4 and The fitting surface of the movable clamping block 5 is symmetrically provided with arc-shaped grooves, and the two arc-shaped grooves surround the clamping hole 6 for fixing the connecting pipe. The middle parts of the fixed clamping block 4 and the movable clamping block 5 respectively extend from the arc-shaped grooves to the right An arc-shaped clip 7 is provided, and the two arc-shaped clips 7 encircle a truncated circular guide hole with a large left and a small right. Each arc-shaped clip 7 is provided with a buffer groove 14 extending along its length, so that the connecting pipe When plugged with the joint, the arc clip 7 has a deformation amount, which can realize the quick insertion of the connecting pipe and the joint; The eccentric wheel 8 and the handle arranged on the top of the eccentric wheel 8, the outer periphery of the eccentric wheel 8 fits the front side of the movable clamp block 5, and when the arc-shaped protrusion of the eccentric wheel 8 contacts the movable clamp block 5, the movable clamp block 5 and the fixed clip 4 are closed, and the eccentric wheel 8 is turned by the handle. When the plane of the eccentric wheel 8 fits with the movable clip 5, the extrusion force received by the compression spring disappears, and the movable clip 5 bounces quickly under the action of the compression spring. Open, easy to take and put the connecting pipe;

如图1所示,接头固定组件包括固定在底座1上的安装块15,安装块15上表面通过固定销连接有用于固定接头的接头定位块16,接头定位块16为三通接头定位块,靠近弧形夹片7处的接头定位块16中部开设有用于固定三通接头(型号为HY4)的定位槽19,定位槽19包括与三通接头的支头相配合的直线段和与三通接头的主头相配合的倾斜段,三通接头卡装入定位槽19的状态如图2所示,三通接头的一支头处于水平状态,另一支头倾斜向上,其主头位于定位槽19内,满足支头与连接管的插接需求;接头定位块16上表面水平开设有用于固定三通接头的V形槽20,将三通接头的两支头卡装在V形槽20内,具体如图2所示,使其主头转动180°与弧形夹片7内的连接管位于同一轴线上。实际加工时,为满足接头定位块16的快速更换或调整,将接头定位块16横断面加工成尺寸相同的方形结构。As shown in Figure 1, the joint fixing assembly includes a mounting block 15 fixed on the base 1, the upper surface of the mounting block 15 is connected with a joint positioning block 16 for fixing the joint through a fixing pin, and the joint positioning block 16 is a three-way joint positioning block, The middle part of the joint positioning block 16 close to the arc clip 7 is provided with a positioning groove 19 for fixing the tee joint (model HY4). The inclined section where the main head of the joint is matched, the state of the three-way joint snapped into the positioning groove 19 is shown in Figure 2, one head of the three-way joint is in a horizontal state, the other head is inclined upward, and its main head is positioned at the positioning groove 19. In the groove 19, the insertion requirements of the support head and the connecting pipe are met; the upper surface of the joint positioning block 16 is horizontally provided with a V-shaped groove 20 for fixing the three-way joint, and the two supports of the three-way joint are clamped in the V-shaped groove 20 Inside, specifically as shown in Figure 2, the main head is rotated 180° and the connecting pipe in the arc clip 7 is located on the same axis. In actual processing, in order to meet the quick replacement or adjustment of the joint positioning block 16, the cross section of the joint positioning block 16 is processed into a square structure with the same size.

实际加工时,接头定位块16还可以为如图5、6所示的直通接头定位块,其横断面为方形结构,靠近弧形夹片的接头定位块16上表面边缘处的中心位置处前后间隔设置有一对第一夹持块17,两第一夹持块17之间的间隙形成与夹持孔6对应的卡槽(用于卡装型号为C2.5-3直通接头,材质为PP),使接头与卡装在弧形夹片7内的连接管位于同一轴线上,避免因错位而导致插管失败,提高插管准确率;为满足另一种直通接头(C2-1,材质为PP)与连接管的插接需求,在与第一夹持块17相对的接头定位块16另一侧边的中心位置处间隔设置一对第二夹持块18,当需要使用第二夹持块18时,将固定销取出,将接头定位块16水平旋转180°后,再通过固定销将其固定在安装块15上即可实现快速调整。During actual processing, the joint positioning block 16 can also be a straight joint positioning block as shown in Figures 5 and 6. A pair of first clamping blocks 17 are arranged at intervals, and the gap between the two first clamping blocks 17 forms a card slot corresponding to the clamping hole 6 (for clamping the model is C2.5-3 straight-through connector, the material is PP ), so that the connector and the connecting tube clamped in the arc-shaped clip 7 are located on the same axis, so as to avoid intubation failure caused by misalignment and improve the accuracy of intubation; in order to meet another straight-through connector (C2-1, material For the insertion requirements of PP) and the connecting pipe, a pair of second clamping blocks 18 are arranged at intervals at the center of the other side of the joint positioning block 16 opposite to the first clamping block 17. When holding the block 18, take out the fixing pin, rotate the joint positioning block 16 horizontally by 180°, and fix it on the mounting block 15 by the fixing pin to realize quick adjustment.

本发明的具体工作过程简述如下:Concrete work process of the present invention is briefly described as follows:

当将三通接头与连接管插接为一体时,先将三通接头的支头分别与连接管插接,然后再将其主头与第三个连接管插接为一体,具体过程为:When connecting the three-way joint and the connecting pipe as one, first insert the branch heads of the three-way joint with the connecting pipe respectively, and then insert the main head of the three-way joint with the third connecting pipe as a whole. The specific process is as follows:

1)、转动偏心轮8使活动夹块5自动弹开,将连接管卡入夹持孔6内,并使连接管右端与弧形夹片7的右端平齐,转动偏心轮8使活动夹块5和固定夹块4闭合,实现连接管的卡装;调整接头定位块16,使接头定位块16的定位槽19正对弧形夹片7,将三通接头的主头插入定位槽19的倾斜段,其一支头水平卡装定位槽19的水平段并与连接管位于同一轴线;通过手扳阀21控制双杆气缸10的活塞杆快速伸出,基板2带动连接管快速与接头插接为一体,打开活动夹块5将连接管和接头取出,完成一连接管与三通接头的一支头的插接作业;1) Turn the eccentric wheel 8 to make the movable clamp block 5 bounce off automatically, snap the connecting pipe into the clamping hole 6, and make the right end of the connecting pipe flush with the right end of the arc clip 7, and turn the eccentric wheel 8 to make the movable clamp The block 5 and the fixed clamp block 4 are closed to realize the clamping of the connecting pipe; adjust the joint positioning block 16 so that the positioning groove 19 of the joint positioning block 16 is facing the arc clip 7, and insert the main head of the tee joint into the positioning groove 19 The inclined section, one head of which is horizontally clamped to the horizontal section of the positioning groove 19 and is located on the same axis as the connecting pipe; the piston rod of the double-rod cylinder 10 is controlled to extend rapidly through the hand pull valve 21, and the base plate 2 drives the connecting pipe to quickly connect with the joint Insert and connect as a whole, open the movable clamp block 5 to take out the connecting pipe and the joint, and complete the plugging operation of a connecting pipe and a head of the three-way joint;

2)、在夹持组件上卡装第二个连接管,将三通接头的主头插装在定位槽19内并使另一支头处于如图所示的水平状态,通过手扳阀21控制夹持组件左、右快速往返,将第二个连接管与三通接头的另一支头插接为一体;2) Install the second connecting pipe on the clamping assembly, insert the main head of the three-way joint into the positioning groove 19 and make the other branch head in the horizontal state as shown in the figure, and pull the valve 21 by hand Control the left and right fast reciprocation of the clamping component, and plug the second connecting pipe with the other branch of the tee joint as a whole;

3)、三通接头的两支头插接完成后,在夹持组件上卡装第三个连接管,将三通接头的两支头卡装在接头定位块16的V形槽20内,具体如图2所示,然后将接头定位块16水平旋转180°,使三通接头的主头与连接管位于同一轴线上,通过手扳阀21控制夹持组件左右快速往返,实现第三个连接管与三通接头主头的插接作业,提高了插管效率。3) After the two branches of the three-way joint are plugged in, the third connecting pipe is clamped on the clamping assembly, and the two branches of the three-way joint are clamped in the V-shaped groove 20 of the joint positioning block 16, Specifically as shown in Figure 2, then the joint positioning block 16 is rotated horizontally by 180°, so that the main head of the three-way joint and the connecting pipe are on the same axis, and the clamping assembly is controlled by the hand pull valve 21 to go back and forth quickly to realize the third The insertion operation of the connecting pipe and the main head of the three-way joint improves the intubation efficiency.

将直通接头与连接管插接为一体的具体过程为:The specific process of inserting the straight-through joint and the connecting pipe as a whole is as follows:

1)、将连接管卡装在夹持组件上,将直通接头卡装在第一夹持块17(或第二夹持块18)之间的卡槽内,使得直接接头与连接管位于同一轴线上,通过手扳阀21控制夹持组件左右快速往返移动,即可将连接管与直接接头的一接头插接为一体;1) Install the connecting pipe on the clamping assembly, and clamp the straight joint into the slot between the first clamping block 17 (or the second clamping block 18), so that the direct joint and the connecting pipe are located at the same On the axis, the fast reciprocating movement of the clamping assembly is controlled by the hand pull valve 21, so that the connecting pipe and a joint of the direct joint can be inserted into one body;

2)、然后将直通接头水平旋转180°后再次卡装在卡槽内,将另一连接管卡装在夹持组件上,通过手扳阀21控制夹持组件左右快速往返移动,即可将第二个连接管与直接接头的另一接头插接为一体,提高了插管效率。2) Then rotate the straight-through connector horizontally by 180° and snap it into the card slot again, snap another connecting pipe on the clamping assembly, and control the fast back and forth movement of the clamping assembly left and right through the hand pull valve 21, and then the The second connecting tube is integrated with the other joint of the direct joint, which improves the intubation efficiency.

Claims (10)

1. a kind of automatic intubation machine, it is characterised in that: including pedestal (1), be arranged at intervals with from left to right on the pedestal (1) dynamic Power source, clamp assemblies and connector fixation kit for being fixedly connected with pipe, the clamp assemblies include by the power source drive Substrate (2), substrate (2) upper surface is provided with the fixing clip (4) and movable clip block that elastic component (3) is linked together (5), fixing clip (4) binding face and movable clip block (5) binding face symmetrically offer arc groove, and two arc grooves surround For being fixedly connected with the holding holes (6) of pipe, it is provided in the middle part of fixing clip (4) and movable clip block (5) from arc groove and prolongs to the right The arc clip (7) stretched;The leading flank of the movable clip block (5) is sticked and has folding spanner.
2. automatic intubation machine according to claim 1, it is characterised in that: the folding spanner is described including being rotatably arranged on Eccentric wheel (8) on substrate (2) and the handle being arranged at the top of the eccentric wheel (8), the periphery of the eccentric wheel (8) with it is described The leading flank of movable clip block (5) is tangent.
3. automatic intubation machine according to claim 1 or 2, it is characterised in that: the fixing clip (4) and the activity folder Guide pin (9) are provided between block (5).
4. automatic intubation machine according to claim 1, it is characterised in that: be provided with guidance set on the pedestal (1), institute Substrate described in power source drive (2) is stated to move back and forth along the guidance set;The power source is cylinder (10), the cylinder (10) it is fixed on the pedestal (1) by keel (11).
5. automatic intubation machine according to claim 4, it is characterised in that: the guidance set is arranged at intervals on including a pair The upper surface of guide pad (12) on the pedestal (1), each guide pad (12) is fixedly installed guide rail (13), described Substrate (2) lower surface is arranged at intervals with a pair of sliding slot along the guide rail (13) sliding.
6. automatic intubation machine according to claim 1, it is characterised in that: two arc clips (7) surround left large and right small Truncated cone-shaped pilot hole, offer the dashpot (14) extended along its length on each arc clip (7).
7. automatic intubation machine according to claim 1, it is characterised in that: the connector fixation kit is described including being fixed on Mounting blocks (15) on pedestal (1), mounting blocks (15) upper surface are connected with the connector for anchor tip by fixed pin Locating piece (16).
8. automatic intubation machine according to claim 7, it is characterised in that: the connector locating piece (16) is fixed for straight coupling Position block, the edge time interval close to connector locating piece (16) upper surface of the arc clip (7) are provided with a pair first Grip block (17), the gap between two first grip blocks (17) form card slot corresponding with the holding holes (6).
9. automatic intubation machine according to claim 8, it is characterised in that: connector locating piece (16) upper surface it is another Edge is arranged at intervals with a pair of second grip block (18).
10. automatic intubation machine according to claim 7, it is characterised in that: the connector locating piece (16) is three-way connection Locating piece, (16) one marginal center of connector locating piece at the arc clip (7) are offered for fixing three-way connection Locating slot (19), connector locating piece (16) upper surface level offers the V-shaped groove (20) for fixing three-way connection.
CN201910730130.3A 2019-08-08 2019-08-08 Automatic intubation machine Pending CN110328513A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910730130.3A CN110328513A (en) 2019-08-08 2019-08-08 Automatic intubation machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910730130.3A CN110328513A (en) 2019-08-08 2019-08-08 Automatic intubation machine

Publications (1)

Publication Number Publication Date
CN110328513A true CN110328513A (en) 2019-10-15

Family

ID=68149072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910730130.3A Pending CN110328513A (en) 2019-08-08 2019-08-08 Automatic intubation machine

Country Status (1)

Country Link
CN (1) CN110328513A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111571514A (en) * 2020-06-02 2020-08-25 江阴标榜汽车部件股份有限公司 Assembling device and assembling method suitable for double-tube structure
CN112756947A (en) * 2020-12-28 2021-05-07 张家港市霞飞塑业有限公司 Intubation device for inserting pump body and suction tube of perfume sprayer
CN114873537A (en) * 2022-05-06 2022-08-09 深圳市鑫洲芯微电子有限公司 Automatic plug equipment of quick fixed material pipe
CN116214119A (en) * 2023-05-11 2023-06-06 汕头市铭信实业有限公司 Adjustable press nozzle plug pipe assembling machine based on extrusion offset discharging and assembling method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110106695A (en) * 2010-03-23 2011-09-29 부국산업주식회사 Heat Shrink Tube Insertion Device
CN203650401U (en) * 2013-12-31 2014-06-18 天津鹏翎胶管股份有限公司 Inserting tool for nylon pipe and quick coupling
CN104440035A (en) * 2014-11-03 2015-03-25 广西大学 Automatic assembling device for connection of rubber tube and connector
US20160114447A1 (en) * 2014-10-23 2016-04-28 Fu Ding Electronical Technology (Jiashan) Co.,Ltd. Clamping device
CN105537936A (en) * 2016-02-22 2016-05-04 宣城上润电气有限公司 Automatic assembling device for shower head hose
CN106425945A (en) * 2016-10-28 2017-02-22 广西大学 A three-way joint clamp
CN106584071A (en) * 2017-02-07 2017-04-26 厦门攸信信息技术有限公司 Device for mounting flexible pipe onto heat dissipator in interference manner
CN206883134U (en) * 2016-11-29 2018-01-16 常州市常蒸蒸发器有限公司 Finned heat exchanger is intubated assembling device
CN210360186U (en) * 2019-08-08 2020-04-21 安图实验仪器(郑州)有限公司 Automatic pipe inserting machine

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110106695A (en) * 2010-03-23 2011-09-29 부국산업주식회사 Heat Shrink Tube Insertion Device
CN203650401U (en) * 2013-12-31 2014-06-18 天津鹏翎胶管股份有限公司 Inserting tool for nylon pipe and quick coupling
US20160114447A1 (en) * 2014-10-23 2016-04-28 Fu Ding Electronical Technology (Jiashan) Co.,Ltd. Clamping device
CN104440035A (en) * 2014-11-03 2015-03-25 广西大学 Automatic assembling device for connection of rubber tube and connector
CN105537936A (en) * 2016-02-22 2016-05-04 宣城上润电气有限公司 Automatic assembling device for shower head hose
CN106425945A (en) * 2016-10-28 2017-02-22 广西大学 A three-way joint clamp
CN206883134U (en) * 2016-11-29 2018-01-16 常州市常蒸蒸发器有限公司 Finned heat exchanger is intubated assembling device
CN106584071A (en) * 2017-02-07 2017-04-26 厦门攸信信息技术有限公司 Device for mounting flexible pipe onto heat dissipator in interference manner
CN210360186U (en) * 2019-08-08 2020-04-21 安图实验仪器(郑州)有限公司 Automatic pipe inserting machine

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111571514A (en) * 2020-06-02 2020-08-25 江阴标榜汽车部件股份有限公司 Assembling device and assembling method suitable for double-tube structure
CN111571514B (en) * 2020-06-02 2023-11-14 江阴标榜汽车部件股份有限公司 Assembling device and assembling method suitable for double-tube structure
CN112756947A (en) * 2020-12-28 2021-05-07 张家港市霞飞塑业有限公司 Intubation device for inserting pump body and suction tube of perfume sprayer
CN114873537A (en) * 2022-05-06 2022-08-09 深圳市鑫洲芯微电子有限公司 Automatic plug equipment of quick fixed material pipe
CN114873537B (en) * 2022-05-06 2023-08-18 深圳市鑫洲芯微电子有限公司 Automatic stopper equipment of stopper of quick fixed material pipe
CN116214119A (en) * 2023-05-11 2023-06-06 汕头市铭信实业有限公司 Adjustable press nozzle plug pipe assembling machine based on extrusion offset discharging and assembling method

Similar Documents

Publication Publication Date Title
CN110328513A (en) Automatic intubation machine
CN210908869U (en) Water pipe assembling mechanism
CN210360186U (en) Automatic pipe inserting machine
CN101372091A (en) Clamping device for thread tightening
CN210129589U (en) Power line overhauls ground connection overlap joint pole
CN110307419A (en) Pipeline docking intelligent robot
CN209062579U (en) A special-shaped workpiece drilling fixture
CN203765490U (en) Fastener clamping device for automatic electromagnetic riveting equipment
CN211490543U (en) Clamp for pipe cutting machine
CN209110507U (en) A kind of transmission shaft hold-down devices
CN217108517U (en) Fixing device for water supply pipeline in construction engineering
CN218254718U (en) A clamping device for pipe fitting processing
CN216682251U (en) Manipulator clamping jaw mechanism with multiple jaws
CN216520111U (en) Kitchen water pipe overhauls uses pipe connector
CN221849888U (en) A double-opening vise
CN209578744U (en) A kind of automatic positioning caching piping and druming screw device
CN209380354U (en) Special fixture for round bars
CN207577809U (en) Air conditioner pipeline pipe clip assembly tooling
CN222271154U (en) Auxiliary jig for demolding of rubber bent pipe
CN207858687U (en) A kind of positioning clamping device for the detection of automobile product flange
CN222080051U (en) Fiber tube expanding and pulling device
CN221224649U (en) Clamping device of eddy current detection sensor
CN205989288U (en) A kind of iron chains erecting device of handrail circular guideway
CN222696593U (en) A fixture capable of fixing various types of workpieces
CN216327933U (en) Assembly fixture of locating ball

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Country or region after: China

Address after: 450016 No.199, Jingkai 15th Street, Zhengzhou Economic and Technological Development Zone, Henan Province

Applicant after: AUTOBIO LABTEC INSTRUMENTS Co.,Ltd.

Address before: No. 199, 15th Street, economic and Technological Development Zone, Zhengzhou City, Henan Province

Applicant before: AUTOBIO LABTEC INSTRUMENTS Co.,Ltd.

Country or region before: China

RJ01 Rejection of invention patent application after publication