CN110320576A - 超前地质预报方法、装置及存储介质 - Google Patents
超前地质预报方法、装置及存储介质 Download PDFInfo
- Publication number
- CN110320576A CN110320576A CN201910663319.5A CN201910663319A CN110320576A CN 110320576 A CN110320576 A CN 110320576A CN 201910663319 A CN201910663319 A CN 201910663319A CN 110320576 A CN110320576 A CN 110320576A
- Authority
- CN
- China
- Prior art keywords
- detection result
- detected
- area
- geology
- distance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910663319.5A CN110320576A (zh) | 2019-07-22 | 2019-07-22 | 超前地质预报方法、装置及存储介质 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910663319.5A CN110320576A (zh) | 2019-07-22 | 2019-07-22 | 超前地质预报方法、装置及存储介质 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110320576A true CN110320576A (zh) | 2019-10-11 |
Family
ID=68124335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910663319.5A Pending CN110320576A (zh) | 2019-07-22 | 2019-07-22 | 超前地质预报方法、装置及存储介质 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110320576A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113010942A (zh) * | 2021-02-25 | 2021-06-22 | 中国铁路设计集团有限公司 | 隧道开挖风险预警及围岩分级评价方法 |
WO2021147555A1 (zh) * | 2020-01-21 | 2021-07-29 | 山东大学 | Tbm搭载的利用汞进行超前地质预报的系统及方法 |
CN113738448A (zh) * | 2021-09-13 | 2021-12-03 | 中国矿业大学 | 采动岩体渗突水远近临多源分级信息智能监测预警方法 |
CN115929326A (zh) * | 2023-01-29 | 2023-04-07 | 北京城建轨道交通建设工程有限公司 | 用于穿越富水断层破碎带隧道的加固施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102495434A (zh) * | 2011-11-25 | 2012-06-13 | 成都畅达通地下工程科技发展有限公司 | 地下工程超前地质预报的方法 |
CN103389524A (zh) * | 2013-08-01 | 2013-11-13 | 中国建筑第四工程局有限公司 | 隧道地质的预报方法和系统 |
CN103472499A (zh) * | 2013-09-18 | 2013-12-25 | 中国华冶科工集团有限公司 | 矿山井下导水构造带的探测定位方法 |
CN106772644A (zh) * | 2016-12-14 | 2017-05-31 | 中国矿业大学 | 矿井瞬变电磁三分量探测方法 |
-
2019
- 2019-07-22 CN CN201910663319.5A patent/CN110320576A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102495434A (zh) * | 2011-11-25 | 2012-06-13 | 成都畅达通地下工程科技发展有限公司 | 地下工程超前地质预报的方法 |
CN103389524A (zh) * | 2013-08-01 | 2013-11-13 | 中国建筑第四工程局有限公司 | 隧道地质的预报方法和系统 |
CN103472499A (zh) * | 2013-09-18 | 2013-12-25 | 中国华冶科工集团有限公司 | 矿山井下导水构造带的探测定位方法 |
CN106772644A (zh) * | 2016-12-14 | 2017-05-31 | 中国矿业大学 | 矿井瞬变电磁三分量探测方法 |
Non-Patent Citations (1)
Title |
---|
郑玉欣: "野三关隧道进口主要地质问题及施工对策", 《隧道建设》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021147555A1 (zh) * | 2020-01-21 | 2021-07-29 | 山东大学 | Tbm搭载的利用汞进行超前地质预报的系统及方法 |
CN113010942A (zh) * | 2021-02-25 | 2021-06-22 | 中国铁路设计集团有限公司 | 隧道开挖风险预警及围岩分级评价方法 |
CN113010942B (zh) * | 2021-02-25 | 2022-10-25 | 中国铁路设计集团有限公司 | 隧道开挖风险预警及围岩分级评价方法 |
CN113738448A (zh) * | 2021-09-13 | 2021-12-03 | 中国矿业大学 | 采动岩体渗突水远近临多源分级信息智能监测预警方法 |
CN115929326A (zh) * | 2023-01-29 | 2023-04-07 | 北京城建轨道交通建设工程有限公司 | 用于穿越富水断层破碎带隧道的加固施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110320576A (zh) | 超前地质预报方法、装置及存储介质 | |
US8064287B2 (en) | Method for interpreting seismic data and controlled source electromagnetic data to estimate subsurface reservoir properties | |
NO347906B1 (en) | Stratigraphic function | |
CN104636980B (zh) | 针对河道砂油藏类型油气汇集条件的地球物理表征方法 | |
CN102866417A (zh) | 一种地下溶洞地震跨孔ct探测及层析成像装置及方法 | |
CN105116453A (zh) | 一种冻土带天然气水合物的瞬变电磁勘探方法及装置 | |
CN202837558U (zh) | 一种地下溶洞地震跨孔ct探测及层析成像装置 | |
CN104991268A (zh) | 一种真振幅偏移成像方法 | |
CN108051852A (zh) | 3d快速高分辨率隧道施工超前智能预报方法 | |
Amanatidou et al. | Combined application of seismic and electrical geophysical methods for karst cavities detection: A case study at the campus of the new University of Western Macedonia, Kozani, Greece | |
Ding et al. | Reliability analysis of seismic attribute in the detection of fault-karst | |
US20210396897A1 (en) | Computer implemented method for correcting a reservoir model of a reservoir geological formation based on seismic images | |
CN105093300B (zh) | 一种地质体边界识别方法及装置 | |
Tran et al. | Inversion of first-arrival time using simulated annealing | |
CN107526108B (zh) | 碳酸盐岩缝洞体积校正方法 | |
Colombero et al. | Imaging near-surface sharp lateral variations with surface-wave methods—Part 1: Detection and location | |
US10379257B2 (en) | Distributing petrofacies using analytical modeling | |
CN113970785A (zh) | 暗河裂缝发育预测方法、系统、存储介质以及电子设备 | |
CN115469376A (zh) | 基于非同源数据隧道超前地质预报综合探测方法及系统 | |
von Ketelhodt et al. | Elastic parameters from compressional and shear wave tomographic survey: A case study from Kuala Lumpur, Malaysia | |
CN114839671A (zh) | 地面和地巷瞬变电磁法精细识别煤系地层电性界面方法 | |
Lu et al. | Tunnel concealed karst cave joint detection by tunnel seismic and transient electromagnetic | |
Luo et al. | Abnormal transmission attenuation and its impact on seismic-fracture prediction—A physical modeling study | |
Guoqiang et al. | Detecting shallow caverns in China using TEM | |
CN114839672A (zh) | 一种超前水平钻探随钻随测的隧道快速超前地质预报方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Sun Honglin Inventor after: Xu Gaoming Inventor after: Mao Zeyu Inventor after: Liu Jindong Inventor after: Liu Tiehua Inventor after: Liu Fusheng Inventor after: Liu Tie Inventor after: Fang Jianfeng Inventor after: Zhou Ge Inventor after: Hua Xirui Inventor after: Wang Min Inventor before: Liu Tiehua Inventor before: Mao Zeyu Inventor before: Liu Jindong Inventor before: Liu Fusheng Inventor before: Liu Tie Inventor before: Yan Shenhua Inventor before: Zhou Ge Inventor before: Hua Xirui Inventor before: Wang Min Inventor before: Chen Zhixing |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210831 Address after: 430060 No. 745, Ping Yuan Road, Yangyuan, Wuchang, Wuhan, Hubei Applicant after: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd. Applicant after: JIUJINGQU RAILWAY ZHEJIANG Co.,Ltd. Address before: 430060 No. 745, Ping Yuan Road, Yangyuan, Wuchang, Wuhan, Hubei Applicant before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191011 |
|
RJ01 | Rejection of invention patent application after publication |