CN110318010A - Worm-gear speed reducer founding materials and preparation method with output axle construction - Google Patents

Worm-gear speed reducer founding materials and preparation method with output axle construction Download PDF

Info

Publication number
CN110318010A
CN110318010A CN201910756373.4A CN201910756373A CN110318010A CN 110318010 A CN110318010 A CN 110318010A CN 201910756373 A CN201910756373 A CN 201910756373A CN 110318010 A CN110318010 A CN 110318010A
Authority
CN
China
Prior art keywords
parts
worm
gear
founding materials
speed reducer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910756373.4A
Other languages
Chinese (zh)
Inventor
管晟琦
管凯华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Xinrong Fang Technology Co Ltd
Original Assignee
Hangzhou Xinrong Fang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Xinrong Fang Technology Co Ltd filed Critical Hangzhou Xinrong Fang Technology Co Ltd
Priority to CN201910756373.4A priority Critical patent/CN110318010A/en
Publication of CN110318010A publication Critical patent/CN110318010A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • B22C9/04Use of lost patterns
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/08Making cast-iron alloys
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C37/00Cast-iron alloys
    • C22C37/04Cast-iron alloys containing spheroidal graphite
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C37/00Cast-iron alloys
    • C22C37/06Cast-iron alloys containing chromium
    • C22C37/08Cast-iron alloys containing chromium with nickel
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C37/00Cast-iron alloys
    • C22C37/10Cast-iron alloys containing aluminium or silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C47/00Making alloys containing metallic or non-metallic fibres or filaments
    • C22C47/02Pretreatment of the fibres or filaments
    • C22C47/06Pretreatment of the fibres or filaments by forming the fibres or filaments into a preformed structure, e.g. using a temporary binder to form a mat-like element
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C49/00Alloys containing metallic or non-metallic fibres or filaments
    • C22C49/02Alloys containing metallic or non-metallic fibres or filaments characterised by the matrix material
    • C22C49/08Iron group metals

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Gears, Cams (AREA)
  • Gear Transmission (AREA)

Abstract

The invention discloses worm-gear speed reducer founding materials and preparation method with output axle construction, including worm gear founding materials, worm screw founding materials and output shaft founding materials, and the present invention relates to speed reducer founding materials production technical fields.The worm-gear speed reducer founding materials and preparation method of band output axle construction, it can avoid worm gear and the direct contact wear of worm screw face, the mesh degree between worm gear and worm screw can be substantially increased, the case where worm and gear skids is avoided the occurrence of well, simultaneously because there is certain fibre gap on SMA carbon fiber film surface, lubricating oil can be detained well, to substantially reduce the degree of wear between worm and gear, to ensure that the normal engaged transmission between worm gear and worm screw well, the worm gear and worm material for making preparation have stronger toughness, avoid worm gear and worm screw engages extruding for a long time well, the gear teeth and bar tooth are made to deform, the generation of the case where to also result in skidding.

Description

Worm-gear speed reducer founding materials and preparation method with output axle construction
Technical field
The present invention relates to speed reducer founding materials production technical fields, and the worm and gear specially with output axle construction slows down Machine founding materials and preparation method.
Background technique
Worm-gear speed reducer is a kind of power transmission mechanism, using the velocity transducer of gear, by the winding number of motor Desired winding number is decelerated to, and obtains the mechanism of larger torque, in the mechanism for transmitting power and movement, speed reducer Application range is quite extensive, its trace, ship, vapour from the vehicles can be seen in the transmission system of various machinery Vehicle, locomotive, heavy machinery for building, machining machine and tool and automated production equipment used in mechanical industry, into daily life Common household electrical appliances, clock and watch etc., application arrive Smaller load from the transmission work of big power, and accurate angle transmission can be shown in To the application of speed reducer, and in industrial application, speed reducer, which has, to slow down and increases torque functions, therefore is widely used in speed With the conversion equipment of torque, three mostly important components are worm gear, worm screw and output shaft in worm-gear speed reducer, in worm gear In the worm decelerating machine course of work, long term wear is mutually driven between worm gear and worm screw, it is therefore desirable to the material of worm and gear It optimizes, while output shaft will receive extraneous impact force or torque in the long-term use, therefore be also required to output The material of axis optimizes, to ensure that worm-gear speed reducer is able to carry out long-term use.
The worm gear of worm-gear speed reducer, worm screw and output shaft directly adopt single alloy steel material mostly and are cast at present Processing is made, however, such material has the following deficiencies:
1), the worm gear of single alloy steel and worm screw in the long-term use, are easy to happen abrasion between the gear teeth and bar tooth, When wearing to a certain extent, that is, it will appear skidding, to seriously affect the normal engaged transmission between worm gear and worm screw.
2), the impulse fatigue resistance of the worm gear of single alloy steel and worm screw can be poor, and toughness is lower, long-term to engage It squeezes, the gear teeth and bar tooth can be made to deform, thus the case where also resulting in skidding generation.
3), the impact resistance of the output shaft of single alloy steel is poor, in long-term use process or multiple unexpected punching It hits, output shaft is easily broken off, to prevent worm-gear speed reducer from normal use.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides the worm-gear speed reducer founding materials with output axle construction and preparations Method, the worm gear for solving the single alloy steel of existing worm-gear speed reducer and worm screw in the long-term use, the gear teeth It is easy to happen abrasion between bar tooth, when wearing to a certain extent, that is, will appear skidding, to seriously affect worm gear and worm screw Between positive production engaged transmission, the impulse fatigue resistance of the worm gear of single alloy steel and worm screw can be poor, and toughness is lower, Long-term engagement squeezes, and the gear teeth and bar tooth can be made to deform, thus the case where also resulting in skidding generation, and single alloy steel products The impact resistance of the output shaft of matter is poor, and in long-term use process or multiple accidental shock, output shaft is easily broken off, thus Prevent the problem of worm-gear speed reducer is from normal use.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: the worm and gear with output axle construction slows down Machine founding materials, including worm gear founding materials, worm screw founding materials and output shaft founding materials, the original of the worm screw founding materials Material includes: 20-30 parts of cast steel, 5-10 parts of manganese-titanium, 5-10 parts of chrome-silicon powder, 1-5 parts of rhenium powder, SMA carbon fiber by weight 1-5 parts of dimension, 1-5 parts of nano silica, 1-5 parts of carburant, 5-10 parts of Nitinol and 1-5 parts of nodulizer, and worm gear is cast The raw material of material includes: 10-20 parts of ampco alloy, 10-20 parts of rear earth zinc-aluminium alloy, copper oxide 5-10 by weight Part, 5-10 parts of glass putty, 1-5 parts of SMA carbon fiber, 1-5 parts of Nitinol, 10-12 parts of titanium dioxide powder and 1-5 parts of graphite, it is described Output shaft founding materials include: 20-30 parts of spheroidal graphite cast-iron, 5-10 parts of tungsten carbide, 5-10 parts of manganeisen, 1-5 parts of chromium powder, chrome molybdenum 1-5 parts of alloy, 1-5 parts of carburant, 1-5 parts of quartz sand, 1-5 parts of bauxite, 1-5 parts of nickel powder and 1-5 parts of cadmium powder.
Preferably, the raw material of the worm screw founding materials includes following component: 25 parts of cast steel, 7 parts of manganese-titanium, chrome-silicon powder 7 parts of end, 3 parts of rhenium powder, 3 parts of SMA carbon fiber, 3 parts of nano silica, 3 parts of carburant, 7 parts of Nitinol and 3 parts of nodulizer.
Preferably, the raw material of the worm gear founding materials includes following component: 15 parts of ampco alloy, rare earth zinc-aluminium close 15 parts of gold, 7 parts of copper oxide, 7 parts of glass putty, 3 parts of SMA carbon fiber, 3 parts of Nitinol, 11 parts of titanium dioxide powder and 3 parts of graphite.
Preferably, the raw material of the output shaft founding materials includes following component: 25 parts of spheroidal graphite cast-iron, 7 parts of tungsten carbide, manganese 7 parts of ferroalloy, 3 parts of chromium powder, 3 parts of chrome molybdenum, 3 parts of carburant, 3 parts of quartz sand, 3 parts of bauxite, 3 parts of nickel powder and 3 parts of cadmium powder.
Preferably, the SMA carbon fiber is ultra-fine wire drawing fibrous material.
Preferably, the carburant is under the high temperature conditions, by graphitization, to make the arrangement of carbon atom in the microcosmic of graphite The high-quality carburant of form, graphitization can reduce the content of magazine in carburant, improve the carbon content of carburant, reduce sulphur and contain Amount.
Preferably, the nodulizer is ReFeSi magnesium alloy.
The invention also discloses the preparation methods of the worm-gear speed reducer founding materials with output axle construction, specifically include Following steps:
The production of S1, worm screw founding materials: its manufacturing process specifically includes the following steps:
A1, cast steel, manganese-titanium and the Nitinol for choosing corresponding weight ratio part first carry out flame baking respectively, then will casting Steel, manganese-titanium and Nitinol, which sequentially add, is melted into molten liquid in fusion apparatus;
A2, the carburant of corresponding weight ratio part is added in fusion apparatus later, rises to 1220- to the temperature in fusion apparatus At 1350 DEG C, then it is separately added into the chrome-silicon powder, rhenium powder, nano silica and nodulizer of corresponding weight ratio part, sets melting It is standby to be warming up to 1400-1560 DEG C, after reacting 40-50s, worm screw casting liquid can be obtained;
A3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for a4, the worm screw casting liquid melt for first obtaining step a2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1400-1580 DEG C;
A5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained The compacting of SMA carbon fiber is finally bonded in the surface of speed reducer worm part by bar part in film-form by adhesive;
The production of S2, worm gear founding materials: its manufacturing process specifically includes the following steps:
B1, ampco alloy, rear earth zinc-aluminium alloy, copper oxide and the Nitinol for choosing corresponding weight ratio part first successively add Enter and is melted into molten liquid in fusion apparatus;
B2, the graphite of corresponding weight ratio part is added in fusion apparatus later, rises to 1100-1230 to the temperature in fusion apparatus DEG C when, then be separately added into the glass putty and titanium dioxide powder of corresponding weight ratio part, so that fusion apparatus is warming up to 1300-1420 DEG C, instead After answering 5-15min, worm gear casting liquid can be obtained;
B3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for b4, the worm gear casting liquid melt for first obtaining step b2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1200-1360 DEG C;
B5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained Part is taken turns, the compacting of SMA carbon fiber is finally bonded in film-form by adhesive to the surface of speed reducer worm part;
The production of S3, output shaft founding materials: its manufacturing process specifically includes the following steps:
C1, spheroidal graphite cast-iron, tungsten carbide, manganeisen and the chrome molybdenum for choosing corresponding weight ratio part first sequentially add melting and set Molten liquid is melted into standby;
C2, the carburant of corresponding weight ratio part is added in fusion apparatus later, rises to 1460- to the temperature in fusion apparatus At 1600 DEG C, then it is separately added into the chromium powder, quartz sand, bauxite, nickel powder and cadmium powder of corresponding weight ratio part, fusion apparatus is made to heat up To 1590-1870 DEG C, after reacting 10-15min, output shaft casting liquid can be obtained;
C3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for c4, the worm gear casting liquid melt for first obtaining step c2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1450-1680 DEG C;
C5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, it is defeated that speed reducer can be obtained Shaft part;
The molding assembly of S4, worm decelerating machine: worm gear, worm screw and the output that step S1, step S2 and step S3 are prepared respectively Axis is assembled with reducer shell and other accessories respectively, and the molding assembly of worm-gear speed reducer can be completed.
(3) beneficial effect
The present invention provides worm-gear speed reducer founding materials and preparation method with output axle construction.Compared with prior art Have it is following the utility model has the advantages that
(1), the worm-gear speed reducer founding materials and preparation method of band output axle construction, by worm gear cast member and snail One layer of SMA carbon fiber film of surface adhesion of bar cast member can avoid worm gear and the direct contact wear of worm screw face, simultaneously because SMA carbon fiber film has excellent wear-resisting property, can substantially increase the mesh degree between worm gear and worm screw, avoid out well The case where existing worm and gear skids, simultaneously because there is certain fibre gap on SMA carbon fiber film surface, can be detained profit well Sliding machine oil, so that the degree of wear between worm and gear is substantially reduced, to ensure that between worm gear and worm screw well just Often engaged transmission.
(2), the worm-gear speed reducer founding materials and preparation method of band output axle construction, by casting material in worm gear Ultimum Ti is added in material and worm screw founding materials, makes the worm gear of preparation and worm material that there is stronger toughness, very well Avoid worm gear and worm screw engage extruding for a long time, so that the gear teeth and bar tooth is deformed, thus the case where also resulting in skidding hair It is raw, while by the way that manganese-titanium, chrome-silicon powder, rhenium powder and nano silica, Lai Tigao snail are added in worm material component The shock resistance of pole stock matter, by the way that rear earth zinc-aluminium alloy, copper oxide, glass putty, titanium dioxide are added in worm gear material component Powder and graphite are, it can be achieved that improve the shock resistance of worm screw material, to greatly strengthen the shock resistance fatigue of worm gear and worm screw Performance and toughness substantially prolong the service life of worm and gear.
(3), the worm-gear speed reducer founding materials and preparation method of band output axle construction, by being cast in output shaft Tungsten carbide, manganeisen, chromium powder, chrome molybdenum, quartz sand, bauxite, nickel powder and cadmium powder are added in material, can greatly promote defeated The impact resistance of shaft avoids output shaft during being used for a long time or repeatedly accidental shock well, and output shaft is easily broken The case where splitting, to ensure that the normal use of worm-gear speed reducer.
Detailed description of the invention
Fig. 1 is the flow chart of preparation method of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the embodiment of the present invention provides three kinds of technical solutions: the worm-gear speed reducer casting with output axle construction The preparation method of producing material material, specifically includes following embodiment:
Embodiment 1
The production of S1, worm screw founding materials: its manufacturing process specifically includes the following steps:
A1,25 parts of cast steels for choosing corresponding weight ratio part first, 7 parts of manganese-titaniums and 7 parts of Nitinols carry out flame baking respectively It is roasting, then cast steel, manganese-titanium and Nitinol are sequentially added and are melted into molten liquid in fusion apparatus;
A2,3 parts of carburants of corresponding weight ratio part are added in fusion apparatus later, rise to 1290 to the temperature in fusion apparatus DEG C when, then be separately added into 7 parts of chrome-silicon powder, 3 parts of rhenium powder, 3 parts of nano silicas and 3 parts of nodulizers of corresponding weight ratio part, So that fusion apparatus is warming up to 1450 DEG C, after reacting 45s, worm screw casting liquid can be obtained;
A3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for a4, the worm screw casting liquid melt for first obtaining step a2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1490 DEG C;
A5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained 3 parts of SMA carbon fiber compactings are finally bonded in the surface of speed reducer worm part by bar part in film-form by adhesive;
The production of S2, worm gear founding materials: its manufacturing process specifically includes the following steps:
B1,15 parts of ampco alloys for choosing corresponding weight ratio part first, 15 parts of rear earth zinc-aluminium alloys, 7 parts of copper oxide and 3 parts Nitinol, which sequentially adds, is melted into molten liquid in fusion apparatus;
B2,3 parts of graphite of corresponding weight ratio part are added in fusion apparatus later, rise to 1190 DEG C to the temperature in fusion apparatus When, then 7 parts of glass puttys and 11 parts of titanium dioxide powders of corresponding weight ratio part are separately added into, so that fusion apparatus is warming up to 1390 DEG C, instead After answering 10min, worm gear casting liquid can be obtained;
B3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for b4, the worm gear casting liquid melt for first obtaining step b2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1290 DEG C;
B5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained Part is taken turns, 3 parts of SMA carbon fiber compactings are finally bonded in film-form by adhesive to the surface of speed reducer worm part;
The production of S3, output shaft founding materials: its manufacturing process specifically includes the following steps:
C1,25 parts of spheroidal graphite cast-iron for choosing corresponding weight ratio part first, 7 parts of tungsten carbides, 7 parts of manganeisens and 3 parts of chrome molybdenums It sequentially adds and is melted into molten liquid in fusion apparatus;
C2,3 parts of carburants of corresponding weight ratio part are added in fusion apparatus later, rise to 1510 to the temperature in fusion apparatus DEG C when, then be separately added into 3 parts of chromium powders, 3 parts of quartz sands, 3 parts of bauxites, 3 parts of nickel powders and 3 parts of cadmium powder of corresponding weight ratio part, make Fusion apparatus is warming up to 1700 DEG C, and after reacting 13min, output shaft casting liquid can be obtained;
C3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for c4, the worm gear casting liquid melt for first obtaining step c2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1550 DEG C;
C5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, it is defeated that speed reducer can be obtained Shaft part;
The molding assembly of S4, worm decelerating machine: worm gear, worm screw and the output that step S1, step S2 and step S3 are prepared respectively Axis is assembled with reducer shell and other accessories respectively, and the molding assembly of worm-gear speed reducer can be completed.
Embodiment 2
The production of S1, worm screw founding materials: its manufacturing process specifically includes the following steps:
A1,20 parts of cast steels for choosing corresponding weight ratio part first, 5 parts of manganese-titaniums and 5 parts of Nitinols carry out flame baking respectively It is roasting, then cast steel, manganese-titanium and Nitinol are sequentially added and are melted into molten liquid in fusion apparatus;
A2,1 part of carburant of corresponding weight ratio part is added in fusion apparatus later, rises to 1220 to the temperature in fusion apparatus DEG C when, then be separately added into 5 parts of chrome-silicon powder, 1 part of rhenium powder, 1 part of nano silica and 1 part of nodulizer of corresponding weight ratio part, So that fusion apparatus is warming up to 1400 DEG C, after reacting 40s, worm screw casting liquid can be obtained;
A3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for a4, the worm screw casting liquid melt for first obtaining step a2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1400 DEG C;
A5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained 1 part of SMA carbon fiber compacting is finally bonded in the surface of speed reducer worm part by bar part in film-form by adhesive;
The production of S2, worm gear founding materials: its manufacturing process specifically includes the following steps:
B1,10 parts of ampco alloys for choosing corresponding weight ratio part first, 10 parts of rear earth zinc-aluminium alloys, 5 parts of copper oxide and 1 part Nitinol, which sequentially adds, is melted into molten liquid in fusion apparatus;
B2,1 part of graphite of corresponding weight ratio part is added in fusion apparatus later, rises to 1100 DEG C to the temperature in fusion apparatus When, then 5 parts of glass puttys and 10 parts of titanium dioxide powders of corresponding weight ratio part are separately added into, so that fusion apparatus is warming up to 1300 DEG C, instead After answering 5min, worm gear casting liquid can be obtained;
B3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for b4, the worm gear casting liquid melt for first obtaining step b2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1200 DEG C;
B5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained Part is taken turns, 1 part of SMA carbon fiber compacting is finally bonded in film-form by adhesive to the surface of speed reducer worm part;
The production of S3, output shaft founding materials: its manufacturing process specifically includes the following steps:
C1,20 parts of spheroidal graphite cast-iron for choosing corresponding weight ratio part first, 5 parts of tungsten carbides, 5 parts of manganeisens and 1 part of chrome molybdenum It sequentially adds and is melted into molten liquid in fusion apparatus;
C2,1 part of carburant of corresponding weight ratio part is added in fusion apparatus later, rises to 1460 to the temperature in fusion apparatus DEG C when, then be separately added into 1 part of chromium powder, 1 part of quartz sand, 1 part of bauxite, 1 part of nickel powder and 1 part of cadmium powder of corresponding weight ratio part, make Fusion apparatus is warming up to 1590 DEG C, and after reacting 10min, output shaft casting liquid can be obtained;
C3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for c4, the worm gear casting liquid melt for first obtaining step c2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1450 DEG C;
C5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, it is defeated that speed reducer can be obtained Shaft part;
The molding assembly of S4, worm decelerating machine: worm gear, worm screw and the output that step S1, step S2 and step S3 are prepared respectively Axis is assembled with reducer shell and other accessories respectively, and the molding assembly of worm-gear speed reducer can be completed.
Embodiment 3
The production of S1, worm screw founding materials: its manufacturing process specifically includes the following steps:
A1,30 parts of cast steels for choosing corresponding weight ratio part first, 10 parts of manganese-titaniums and 10 parts of Nitinols carry out flame respectively Baking, then cast steel, manganese-titanium and Nitinol being sequentially added, molten liquid is melted into fusion apparatus;
A2,5 parts of carburants of corresponding weight ratio part are added in fusion apparatus later, rise to 1350 to the temperature in fusion apparatus DEG C when, then be separately added into 10 parts of chrome-silicon powder, 5 parts of rhenium powder, 5 parts of nano silicas and 5 parts of nodulizers of corresponding weight ratio part, So that fusion apparatus is warming up to 1560 DEG C, after reacting 50s, worm screw casting liquid can be obtained;
A3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for a4, the worm screw casting liquid melt for first obtaining step a2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1580 DEG C;
A5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained 5 parts of SMA carbon fiber compactings are finally bonded in the surface of speed reducer worm part by bar part in film-form by adhesive;
The production of S2, worm gear founding materials: its manufacturing process specifically includes the following steps:
B1,20 parts of ampco alloys for choosing corresponding weight ratio part first, 20 parts of rear earth zinc-aluminium alloys, 10 parts of copper oxide and 5 Part Nitinol, which sequentially adds, is melted into molten liquid in fusion apparatus;
B2,5 parts of graphite of corresponding weight ratio part are added in fusion apparatus later, rise to 1230 DEG C to the temperature in fusion apparatus When, then 10 parts of glass puttys and 12 parts of titanium dioxide powders of corresponding weight ratio part are separately added into, so that fusion apparatus is warming up to 1420 DEG C, instead After answering 15min, worm gear casting liquid can be obtained;
B3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for b4, the worm gear casting liquid melt for first obtaining step b2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1360 DEG C;
B5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained Part is taken turns, 5 parts of SMA carbon fiber compactings are finally bonded in film-form by adhesive to the surface of speed reducer worm part;
The production of S3, output shaft founding materials: its manufacturing process specifically includes the following steps:
C1,30 parts of spheroidal graphite cast-iron for choosing corresponding weight ratio part first, 10 parts of tungsten carbides, 10 parts of manganeisens and 5 parts of chrome molybdenums close Gold, which sequentially adds, is melted into molten liquid in fusion apparatus;
C2,5 parts of carburants of corresponding weight ratio part are added in fusion apparatus later, rise to 1600 to the temperature in fusion apparatus DEG C when, then be separately added into 5 parts of chromium powders, 5 parts of quartz sands, 5 parts of bauxites, 5 parts of nickel powders and 5 parts of cadmium powder of corresponding weight ratio part, make Fusion apparatus is warming up to 1870 DEG C, and after reacting 15min, output shaft casting liquid can be obtained;
C3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for c4, the worm gear casting liquid melt for first obtaining step c2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1680 DEG C;
C5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, it is defeated that speed reducer can be obtained Shaft part;
The molding assembly of S4, worm decelerating machine: worm gear, worm screw and the output that step S1, step S2 and step S3 are prepared respectively Axis is assembled with reducer shell and other accessories respectively, and the molding assembly of worm-gear speed reducer can be completed.
In the present invention, SMA carbon fiber be ultra-fine wire drawing fibrous material, SMA carbon fiber be shape memory carbon fiber, have compared with High toughness and wear-resisting property.
In the present invention, carburant is under the high temperature conditions, by graphitization, to make the arrangement of carbon atom in the microcosmic shape of graphite The high-quality carburant of state, graphitization can reduce the content of magazine in carburant, improve the carbon content of carburant, reduce sulphur and contain Amount.
In the present invention, nodulizer is ReFeSi magnesium alloy.
Test experiments
Certain machinery production enterprise uses the preparation method of 1-3 of the embodiment of the present invention, prepares three groups of worm-gear speed reducers respectively and produces Product, while the WPA worm-gear speed reducer for choosing same type in the market is as a control group, then subtracts respectively to every group of worm and gear Worm gear, worm screw and the output shaft of fast machine carry out four Secondary Shocks experiments, record worm gear, the worm screw of every group of worm-gear speed reducer respectively Each maximum anti-shock loading, every later group of worm-gear speed reducer are separately connected the electricity of identical output power with output shaft Then motivation and output loading carry out trial operation test experiments, every group of worm-gear speed reducer are observed during experiment Vibration and noise situation, record first appears the time of vibration, after four groups of worm-gear speed reducers do not shut down trial operation 72-96h, Every group of worm-gear speed reducer is disassembled, the abrasion condition of worm gear and worm screw inside every group of worm-gear speed reducer is observed, And it records.
The shock resistance experimental result statistical form of 1 embodiment 1 of table
The shock resistance experimental result statistical form of 2 embodiment 2 of table
The shock resistance experimental result statistical form of 3 embodiment 3 of table
The shock resistance experimental result statistical form of the existing worm-gear speed reducer of table 4
By above-mentioned table 1-4 it is found that the worm gear of worm-gear speed reducer prepared by embodiment 1, worm screw and output shaft are born Maximum impact is maximum, and the worm gear of worm-gear speed reducer prepared by embodiment 2 and embodiment 3, worm screw and output shaft are held The maximum impact received is bigger than choosing the WPA worm-gear speed reducer of same type in the market.
5 72-96h vibration noise of table and worm and gear abrasion condition statistical form
As shown in Table 5, embodiment 1-3 does not occur the case where vibration noise when carrying out 72-96h trial operation test experiments, and The WPA worm-gear speed reducer for choosing same type in the market occurs the case where vibration noise, while embodiment 1-3 in 73.8h After carrying out 72-96h trial operation test experiments, worm gear is glossy with worm screw face, without any abrasion, and chooses same type in the market The worm gear of WPA worm-gear speed reducer and the surface of worm screw have polishing scratch.
In summary
The present invention can avoid worm gear by one layer of SMA carbon fiber film of surface adhesion in worm gear cast member and worm screw cast member With the direct contact wear of worm screw face, simultaneously because SMA carbon fiber film have excellent wear-resisting property, can substantially increase worm gear and Mesh degree between worm screw avoids the occurrence of the case where worm and gear skids, simultaneously because SMA carbon fiber film surface well There is certain fibre gap, lubricating oil can be detained well, so that the degree of wear between worm and gear is substantially reduced, thus It ensure that the normal engaged transmission between worm gear and worm screw well, by adding in worm gear founding materials and worm screw founding materials Enter Ultimum Ti, makes the worm gear of preparation and worm material that there is stronger toughness, avoid worm gear well and worm screw is long Phase engagement squeezes, and the gear teeth and bar tooth is made to deform, thus the case where also resulting in skidding generation, while by worm material Manganese-titanium, chrome-silicon powder, rhenium powder and nano silica are added in component, the shock resistance of Lai Tigao worm screw material is led to It crosses and rear earth zinc-aluminium alloy, copper oxide, glass putty, titanium dioxide powder and graphite is added in worm gear material component, it can be achieved that improving snail The shock resistance of pole stock matter substantially prolongs to greatly strengthen the impulse fatigue resistance energy and toughness of worm gear and worm screw The service life of worm and gear, while being closed by the way that tungsten carbide, manganeisen, chromium powder, chrome molybdenum are added in output shaft founding materials Gold, quartz sand, bauxite, nickel powder and cadmium powder, can greatly promote the impact resistance of output shaft, avoid output shaft in length well The case where phase uses or repeatedly during accidental shock, and output shaft is easily broken off, to ensure that worm-gear speed reducer Normal use.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. the worm-gear speed reducer founding materials with output axle construction, including worm gear founding materials, worm screw founding materials and defeated Shaft founding materials, it is characterised in that: the raw material of the worm screw founding materials includes: 20-30 parts of cast steel, manganese titanium by weight 5-10 parts of alloy, 5-10 parts of chrome-silicon powder, 1-5 parts of rhenium powder, 1-5 parts of SMA carbon fiber, 1-5 parts of nano silica, carburant 1- 5 parts, 5-10 parts of Nitinol and 1-5 parts of nodulizer, and the raw material of worm gear founding materials includes: that ampco closes by weight 10-20 parts golden, 10-20 parts of rear earth zinc-aluminium alloy, 5-10 parts of copper oxide, 5-10 parts of glass putty, 1-5 parts of SMA carbon fiber, Nitinol 1-5 parts, 10-12 parts of titanium dioxide powder and 1-5 parts of graphite, the output shaft founding materials include: 20-30 parts of spheroidal graphite cast-iron, carbon Change tungsten 5-10 parts, 5-10 parts of manganeisen, 1-5 parts of chromium powder, 1-5 parts of chrome molybdenum, 1-5 parts of carburant, 1-5 parts of quartz sand, aluminium 1-5 parts of alumina, 1-5 parts of nickel powder and 1-5 parts of cadmium powder.
2. the worm-gear speed reducer founding materials of band output axle construction according to claim 1, it is characterised in that: described The raw material of worm screw founding materials includes following component: 25 parts of cast steel, 7 parts of manganese-titanium, 7 parts of chrome-silicon powder, 3 parts of rhenium powder, SMA carbon 3 parts of fiber, 3 parts of nano silica, 3 parts of carburant, 7 parts of Nitinol and 3 parts of nodulizer.
3. the worm-gear speed reducer founding materials of band output axle construction according to claim 1, it is characterised in that: described The raw material of worm gear founding materials includes following component: 15 parts of ampco alloy, 15 parts of rear earth zinc-aluminium alloy, 7 parts of copper oxide, tin 7 parts of powder, 3 parts of SMA carbon fiber, 3 parts of Nitinol, 11 parts of titanium dioxide powder and 3 parts of graphite.
4. the worm-gear speed reducer founding materials of band output axle construction according to claim 1, it is characterised in that: described The raw material of output shaft founding materials includes following component: 25 parts of spheroidal graphite cast-iron, 7 parts of tungsten carbide, 7 parts of manganeisen, 3 parts of chromium powder, 3 parts of chrome molybdenum, 3 parts of carburant, 3 parts of quartz sand, 3 parts of bauxite, 3 parts of nickel powder and 3 parts of cadmium powder.
5. the worm-gear speed reducer founding materials with output axle construction according to claim 1 to 3, special Sign is: the SMA carbon fiber is ultra-fine wire drawing fibrous material.
6. the worm-gear speed reducer founding materials with output axle construction described according to claim 1 or 2 or 4 any one, It is characterized by: the carburant is under the high temperature conditions, by graphitization, to make the arrangement of carbon atom in the micromorphology of graphite High-quality carburant.
7. the worm-gear speed reducer founding materials of band output axle construction according to any one of claims 1 or 2, special Sign is: the nodulizer is ReFeSi magnesium alloy.
8. the preparation method of the worm-gear speed reducer founding materials with output axle construction, it is characterised in that: specifically include following Step:
The production of S1, worm screw founding materials: its manufacturing process specifically includes the following steps:
A1, cast steel, manganese-titanium and the Nitinol for choosing corresponding weight ratio part first carry out flame baking respectively, then will casting Steel, manganese-titanium and Nitinol, which sequentially add, is melted into molten liquid in fusion apparatus;
A2, the carburant of corresponding weight ratio part is added in fusion apparatus later, rises to 1220- to the temperature in fusion apparatus At 1350 DEG C, then it is separately added into the chrome-silicon powder, rhenium powder, nano silica and nodulizer of corresponding weight ratio part, sets melting It is standby to be warming up to 1400-1560 DEG C, after reacting 40-50s, worm screw casting liquid can be obtained;
A3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for a4, the worm screw casting liquid melt for first obtaining step a2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1400-1580 DEG C;
A5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained The compacting of SMA carbon fiber is finally bonded in the surface of speed reducer worm part by bar part in film-form by adhesive;
The production of S2, worm gear founding materials: its manufacturing process specifically includes the following steps:
B1, ampco alloy, rear earth zinc-aluminium alloy, copper oxide and the Nitinol for choosing corresponding weight ratio part first successively add Enter and is melted into molten liquid in fusion apparatus;
B2, the graphite of corresponding weight ratio part is added in fusion apparatus later, rises to 1100-1230 to the temperature in fusion apparatus DEG C when, then be separately added into the glass putty and titanium dioxide powder of corresponding weight ratio part, so that fusion apparatus is warming up to 1300-1420 DEG C, instead After answering 5-15min, worm gear casting liquid can be obtained;
B3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for b4, the worm gear casting liquid melt for first obtaining step b2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1200-1360 DEG C;
B5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, speed reducer snail can be obtained Part is taken turns, the compacting of SMA carbon fiber is finally bonded in film-form by adhesive to the surface of speed reducer worm part;
The production of S3, output shaft founding materials: its manufacturing process specifically includes the following steps:
C1, spheroidal graphite cast-iron, tungsten carbide, manganeisen and the chrome molybdenum for choosing corresponding weight ratio part first sequentially add melting and set Molten liquid is melted into standby;
C2, the carburant of corresponding weight ratio part is added in fusion apparatus later, rises to 1460- to the temperature in fusion apparatus At 1600 DEG C, then it is separately added into the chromium powder, quartz sand, bauxite, nickel powder and cadmium powder of corresponding weight ratio part, fusion apparatus is made to heat up To 1590-1870 DEG C, after reacting 10-15min, output shaft casting liquid can be obtained;
C3, production shell, are dewaxed shell using steam generator, and carry out high-temperature roasting to shell;
Successively by refining, filtering and degasification, adjustment temperature preparation is poured for c4, the worm gear casting liquid melt for first obtaining step c2 Note, then pours casting liquid into the casting mold after molding, and pouring temperature is 1450-1680 DEG C;
C5, it successively carries out cooling down later, be opened, pickup, quenching, cutting, shot-peening and cleaning post-processing, it is defeated that speed reducer can be obtained Shaft part;
The molding assembly of S4, worm decelerating machine: worm gear, worm screw and the output that step S1, step S2 and step S3 are prepared respectively Axis is assembled with reducer shell and other accessories respectively, and the molding assembly of worm-gear speed reducer can be completed.
CN201910756373.4A 2019-08-16 2019-08-16 Worm-gear speed reducer founding materials and preparation method with output axle construction Withdrawn CN110318010A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910756373.4A CN110318010A (en) 2019-08-16 2019-08-16 Worm-gear speed reducer founding materials and preparation method with output axle construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910756373.4A CN110318010A (en) 2019-08-16 2019-08-16 Worm-gear speed reducer founding materials and preparation method with output axle construction

Publications (1)

Publication Number Publication Date
CN110318010A true CN110318010A (en) 2019-10-11

Family

ID=68126089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910756373.4A Withdrawn CN110318010A (en) 2019-08-16 2019-08-16 Worm-gear speed reducer founding materials and preparation method with output axle construction

Country Status (1)

Country Link
CN (1) CN110318010A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111531129A (en) * 2020-05-07 2020-08-14 陕西柴油机重工有限公司 Method for improving hardness of speed reducer box body of cast iron pumping unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111531129A (en) * 2020-05-07 2020-08-14 陕西柴油机重工有限公司 Method for improving hardness of speed reducer box body of cast iron pumping unit
CN111531129B (en) * 2020-05-07 2022-10-14 陕西柴油机重工有限公司 Method for improving hardness of speed reducer box body of cast iron pumping unit

Similar Documents

Publication Publication Date Title
CN102563006B (en) Gear
CN102049519B (en) Manufacturing method of powder metallurgy chain wheel
WO2005024274A1 (en) Precision gear, its gear mechanism and production method of precision gear
CN102115843A (en) Vermicular graphite cast iron for producing brake drum of high-speed and heavy-load automobile
CN101539064A (en) Aluminum alloy engine crankcase without cylinder sleeve
CN200961675Y (en) Large composite structure gear
CN110318010A (en) Worm-gear speed reducer founding materials and preparation method with output axle construction
CN106001450A (en) Cylinder sleeve casting technology
CN110923517A (en) Aluminum-manganese alloy capable of being brazed at high temperature and forming method thereof
CN101269412B (en) Production of abrasion-proof ceramic composite mold steel plate with self-propagating method
CN102807843A (en) Friction material with good wear-in property
CN1995425A (en) Magnesium alloy and its preparation method
CN102080173A (en) Technological process for preparing Al2O3-TiC aluminum-based composite material
CN103307109B (en) A kind of preparation method of abrasion-proof bearing bush
CN102198508B (en) Manufacture method for automobile 5DYA limited block
CN102796268A (en) Preparation method of friction material with good running-in performance
CN102634320A (en) Material of high-wear-resistance ceramic automobile brake block and preparation method thereof
CN104148609B (en) A kind of manufacture method of die casting machine injection drift
CN103084572A (en) Forming stamping mold with wear-resistant coating
CN101353739A (en) Multicomponent silicon brass novel material automobile synchro converter ring
CN1311938C (en) Continuous double-metal cast forming method
CN103789650A (en) Preparation method of wear-resistant high-speed steel
CN103421992A (en) Manufacturing technique of timing sprocket device for ultralight aluminium alloy valve camshaft
CN207961459U (en) A kind of crankshaft chain wheel of automobile engine
CN202251816U (en) Powder metallurgy gear

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20191011

WW01 Invention patent application withdrawn after publication