CN110317911A - Blast furnace medium-capital overhauling quickly draws coal gas method after going into operation - Google Patents

Blast furnace medium-capital overhauling quickly draws coal gas method after going into operation Download PDF

Info

Publication number
CN110317911A
CN110317911A CN201910543564.2A CN201910543564A CN110317911A CN 110317911 A CN110317911 A CN 110317911A CN 201910543564 A CN201910543564 A CN 201910543564A CN 110317911 A CN110317911 A CN 110317911A
Authority
CN
China
Prior art keywords
blast furnace
coal gas
gas
going
dust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910543564.2A
Other languages
Chinese (zh)
Other versions
CN110317911B (en
Inventor
杨广洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxing Ductile Iron Pipes Co Ltd
Original Assignee
Xinxing Ductile Iron Pipes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxing Ductile Iron Pipes Co Ltd filed Critical Xinxing Ductile Iron Pipes Co Ltd
Priority to CN201910543564.2A priority Critical patent/CN110317911B/en
Publication of CN110317911A publication Critical patent/CN110317911A/en
Application granted granted Critical
Publication of CN110317911B publication Critical patent/CN110317911B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/002Evacuating and treating of exhaust gases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/22Dust arresters
    • C21B2100/02

Abstract

Quickly draw coal gas method after going into operation the present invention relates to blast furnace medium-capital overhauling, belong to Blast Furnace Iron-making Production Technology field, comprising the following steps: installs coal gas diffusing device additional on the clean coal gas branch pipe before dry all cabinet clean coal gas butterfly valves of dedusting;Blast furnace guides to blast furnace gas from dry dust-removing box clean coal gas branch pipe from blast furnace gas pipeline network before going into operation;After blast furnace ignition blow-on, it is stepped up air quantity, when air quantity and top temperature reach target value, starts to draw coal gas;Blast furnace gas successively passes through gravitational precipitator, coal gas dust removal cabinet and by the gas bleeding valve emission coal gas at the top of dust-removing box.Blast furnace medium-capital overhauling provided by the invention quickly draws coal gas method after going into operation, and substantially shortens the time that blast furnace gas is introduced to gaspipe network, improves production security.

Description

Blast furnace medium-capital overhauling quickly draws coal gas method after going into operation
Technical field
Quickly draw coal gas method after going into operation the present invention relates to blast furnace medium-capital overhauling, belongs to Blast Furnace Iron-making Production Technology field.
Background technique
Blast furnace carry out it is big or middle repair operation after, need in time by the gas safety of generation, smoothly introducing company's gas pipe Net reduces the coal gas diffusion time, while being conducive to the fast quick-recovery of conditions of blast furnace, improves coal gas and utilizes.Because coal gas have it is toxic, Therefore inflammable and explosive special nature draws in course of gas that there are great security risks, while when introducing blast furnace gas Gaspipe network is the key factor that blast furnace restores speed." forward direction " is mostly used to draw coal gas method greatly at this stage, when needing longer Between, during which coal gas largely diffuses, and waste of energy while pollutes environment, while extending the recovery time of blast furnace.
Summary of the invention
Quickly draw coal gas method after going into operation the object of the present invention is to provide blast furnace medium-capital overhauling, substantially shortens and draw blast furnace gas Enter the time of gaspipe network, improves production security.
To achieve the goals above, the technical solution adopted by the present invention is that:
Blast furnace medium-capital overhauling quickly draws coal gas method after going into operation, and includes the following steps,
1), coal gas diffusing device is installed additional on the clean coal gas branch pipe before dry all cabinet clean coal gas butterfly valves of dedusting;
2), blast furnace guides to blast furnace gas from dry dust-removing box clean coal gas branch pipe from blast furnace gas pipeline network before going into operation;
3), after blast furnace ignition blow-on, it is stepped up air quantity, when air quantity and top temperature reach target value, starts to draw coal gas;
4), blast furnace gas successively passes through gravitational precipitator, coal gas dust removal cabinet, and passes through the gas bleeding valve at the top of dust-removing box Emission coal gas.
Technical solution of the present invention further improvement lies in that: in step 1), coal gas diffusing device include gas bleeding valve and Probe tube.
Technical solution of the present invention further improvement lies in that: in step 1), from all cabinet clean coal gas branch pipe bleeding devices Sampling hole does explosion test no less than three times, until qualification.
Technical solution of the present invention further improvement lies in that: in step 2, blast furnace go into operation before blast furnace gas is guided to for 24 hours it is dry At dust-removing box clean coal gas branch pipe.
Technical solution of the present invention further improvement lies in that: the target value of air quantity and top temperature is in step 3), air quantity Reach 50% or more of normal air quantity and top temperature reaches 150 DEG C or more.
Technical solution of the present invention further improvement lies in that: in step 4), blast furnace in drawing course of gas, open by high furnace side Gravitational precipitator intercepter valve (IV) simultaneously closes off bleeding valve;Open the purified gas butterfly of all dust-removing boxs in coal gas dust removal housing area Valve.
Technical solution of the present invention further improvement lies in that: in step 4), blast furnace gas is diffused through gas bleeding valve, every Explosion test is done no less than three times in the dust measuring hole of a coal gas dust removal cabinet, and after each dust measuring hole is qualified, blast furnace gas is simultaneously Enter blast furnace gas main pipe net.
By adopting the above-described technical solution, the technical effect that the present invention obtains has:
Blast furnace medium-capital overhauling provided by the invention quickly draws coal gas method after going into operation, and is that completely new big or middle repair of blast furnace of one kind draws coal gas Method, relatively traditional " forward direction " draw coal gas method, save the time, reduce the blast furnace gas diffusing time, are conducive to conditions of blast furnace Fast quick-recovery.
Blast furnace medium-capital overhauling provided by the invention quickly draws coal gas method after going into operation, and substantially shortens the blast furnace gas diffusing time, The high coal gas of recycling calorific capacity as much as possible, reduces atmosphere pollution, reduces thermal losses, shortens blast furnace and restores normally to smelt Time.
Blast furnace medium-capital overhauling provided by the invention quickly draws coal gas method after going into operation, and practical operation is simple and easy;The coal of installation The manufacture of gas bleeding device is simple, and " forward direction " before bleed workload is compared is drawn coal gas method and greatly reduced, and labor intensity is substantially Degree reduces.
Detailed description of the invention
Fig. 1 is the flow chart for quickly drawing coal gas method after blast furnace medium-capital overhauling of the invention is gone into operation.
Specific embodiment
With reference to the accompanying drawing 1 and specific embodiment the present invention is described in further details.
Blast furnace medium-capital overhauling of the invention as shown in Fig. 1 quickly draws the flow chart of coal gas method after going into operation, the present invention is public It has opened and has quickly drawn coal gas method after a kind of blast furnace medium-capital overhauling is gone into operation, this method is used for blast furnace ironmaking.Here is specific embodiment:
Blast furnace medium-capital overhauling disclosed by the invention quickly draws coal gas method after going into operation, specifically includes the following steps:
1), coal gas diffusing device is installed additional on the clean coal gas branch pipe before dry all cabinet clean coal gas butterfly valves of dedusting.
The coal gas diffusing device includes gas bleeding valve and probe tube.Specifically, the coal gas diffusing device includes setting Set the gas bleeding valve on clean coal gas branch pipe, and the probe tube connecting with gas bleeding valve exit seal;The probe tube Top is provided with sampling hole.
Further, explosion test is done no less than three times from all cabinet clean coal gas branch pipe bleeding device sampling holes, until Until qualification.
2), blast furnace guides to blast furnace gas from dry dust-removing box clean coal gas branch pipe from blast furnace gas pipeline network before going into operation.
Specifically, blast furnace for 24 hours guides to blast furnace gas at dry dust-removing box clean coal gas branch pipe before going into operation.It is provided in the present invention Embodiment in, the time interval of guiding to blast furnace gas at dry dust-removing box clean coal gas branch pipe can be for 24 hours before blast furnace is gone into operation Left and right, explosion test can be taken turns doing from all cabinet clean coal gas branch pipe bleeding device sampling holes by closing on timing node, until Until qualification.
3), after blast furnace ignition blow-on, it is stepped up air quantity, when air quantity and top temperature reach target value, starts to draw coal Gas.
In embodiment provided by the invention, the target value of air quantity and top temperature is that air quantity reaches the 50% of normal air quantity Above and top temperature reaches 150 DEG C or more.
4), blast furnace gas successively passes through gravitational precipitator, coal gas dust removal cabinet, and is put by the coal gas at the top of dust-removing box Dissipate valve emission coal gas.
Blast furnace in drawing course of gas, open gravitational precipitator intercepter valve (IV) and simultaneously close off bleeding valve by high furnace side;Coal gas Open the clean coal gas butterfly valve of all dust-removing boxs in dust-removing box region.
Further, blast furnace gas is diffused through gas bleeding valve, does outburst examination in the dust measuring hole of each coal gas dust removal cabinet It tests no less than three times, after each dust measuring hole is qualified, blast furnace gas is incorporated to blast furnace gas main pipe net.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or It changes still within the protection scope of the invention.

Claims (7)

1. blast furnace medium-capital overhauling quickly draws coal gas method after going into operation, it is characterised in that: include the following steps,
1), coal gas diffusing device is installed additional on the clean coal gas branch pipe before dry all cabinet clean coal gas butterfly valves of dedusting;
2), blast furnace guides to blast furnace gas from dry dust-removing box clean coal gas branch pipe from blast furnace gas pipeline network before going into operation;
3), after blast furnace ignition blow-on, it is stepped up air quantity, when air quantity and top temperature reach target value, starts to draw coal gas;
4), blast furnace gas successively passes through gravitational precipitator, coal gas dust removal cabinet, and passes through the gas bleeding valve at the top of dust-removing box Emission coal gas.
2. blast furnace medium-capital overhauling according to claim 1 quickly draws coal gas method after going into operation, it is characterised in that: in step 1), Coal gas diffusing device includes gas bleeding valve and probe tube.
3. blast furnace medium-capital overhauling according to claim 1 quickly draws coal gas method after going into operation, it is characterised in that: in step 1), Explosion test is done no less than three times from all cabinet clean coal gas branch pipe bleeding device sampling holes, until qualification.
4. blast furnace medium-capital overhauling according to claim 1 quickly draws coal gas method after going into operation, it is characterised in that: in step 2, Blast furnace for 24 hours guides to blast furnace gas at dry dust-removing box clean coal gas branch pipe before going into operation.
5. blast furnace medium-capital overhauling according to claim 1 quickly draws coal gas method after going into operation, it is characterised in that: step 3) apoplexy The target value of amount and top temperature is that air quantity reaches 50% or more of normal air quantity and top temperature reaches 150 DEG C or more.
6. blast furnace medium-capital overhauling according to claim 1 quickly draws coal gas method after going into operation, it is characterised in that: in step 4), Blast furnace in drawing course of gas, open gravitational precipitator intercepter valve (IV) and simultaneously close off bleeding valve by high furnace side;Coal gas dust removal cabinet Open the clean coal gas butterfly valve of all dust-removing boxs in region.
7. blast furnace medium-capital overhauling according to claim 1 quickly draws coal gas method after going into operation, it is characterised in that: in step 4), Blast furnace gas is diffused through gas bleeding valve, does explosion test no less than three times in the dust measuring hole of each coal gas dust removal cabinet, until After the qualification of each dust measuring hole, blast furnace gas is incorporated to blast furnace gas main pipe net.
CN201910543564.2A 2019-06-21 2019-06-21 Method for quickly introducing coal gas after blast furnace overhaul and mid-term delivery Active CN110317911B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910543564.2A CN110317911B (en) 2019-06-21 2019-06-21 Method for quickly introducing coal gas after blast furnace overhaul and mid-term delivery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910543564.2A CN110317911B (en) 2019-06-21 2019-06-21 Method for quickly introducing coal gas after blast furnace overhaul and mid-term delivery

Publications (2)

Publication Number Publication Date
CN110317911A true CN110317911A (en) 2019-10-11
CN110317911B CN110317911B (en) 2021-03-26

Family

ID=68119976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910543564.2A Active CN110317911B (en) 2019-06-21 2019-06-21 Method for quickly introducing coal gas after blast furnace overhaul and mid-term delivery

Country Status (1)

Country Link
CN (1) CN110317911B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111020086A (en) * 2019-12-30 2020-04-17 山东钢铁集团日照有限公司 Method for quickly introducing coal gas during blow-in of blast furnace
CN114921599A (en) * 2022-05-23 2022-08-19 广东韶钢松山股份有限公司 Method for introducing coal gas by blowing in blast furnace
CN115820955A (en) * 2022-11-11 2023-03-21 日照钢铁控股集团有限公司 Process method for quickly introducing coal gas during blow-in of blast furnace

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001276536A (en) * 2000-03-29 2001-10-09 Hitachi Zosen Corp Dry dust collecting apparatus for blast furnace
CN101260322A (en) * 2006-08-29 2008-09-10 包头钢铁(集团)有限责任公司 Blast furnace gas dust removing device and technique by dry method
CN102337364A (en) * 2011-07-20 2012-02-01 中冶南方工程技术有限公司 Device for recovering coal gas in equalizing and relieving process of furnace top of blast furnace
CN103276124A (en) * 2013-05-29 2013-09-04 新兴铸管股份有限公司 Environment-friendly blowing-down/restoring method of blast furnace
CN204369915U (en) * 2014-12-23 2015-06-03 鞍钢股份有限公司 A kind of dedusting of blast furnace gas purification system of sectional gas treatment
CN205062095U (en) * 2015-10-29 2016-03-02 中冶华天南京工程技术有限公司 Blast furnace furnace roof material jar diffuses gas purifying, recovery system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001276536A (en) * 2000-03-29 2001-10-09 Hitachi Zosen Corp Dry dust collecting apparatus for blast furnace
CN101260322A (en) * 2006-08-29 2008-09-10 包头钢铁(集团)有限责任公司 Blast furnace gas dust removing device and technique by dry method
CN102337364A (en) * 2011-07-20 2012-02-01 中冶南方工程技术有限公司 Device for recovering coal gas in equalizing and relieving process of furnace top of blast furnace
CN103276124A (en) * 2013-05-29 2013-09-04 新兴铸管股份有限公司 Environment-friendly blowing-down/restoring method of blast furnace
CN204369915U (en) * 2014-12-23 2015-06-03 鞍钢股份有限公司 A kind of dedusting of blast furnace gas purification system of sectional gas treatment
CN205062095U (en) * 2015-10-29 2016-03-02 中冶华天南京工程技术有限公司 Blast furnace furnace roof material jar diffuses gas purifying, recovery system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111020086A (en) * 2019-12-30 2020-04-17 山东钢铁集团日照有限公司 Method for quickly introducing coal gas during blow-in of blast furnace
CN114921599A (en) * 2022-05-23 2022-08-19 广东韶钢松山股份有限公司 Method for introducing coal gas by blowing in blast furnace
CN115820955A (en) * 2022-11-11 2023-03-21 日照钢铁控股集团有限公司 Process method for quickly introducing coal gas during blow-in of blast furnace

Also Published As

Publication number Publication date
CN110317911B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN110317911A (en) Blast furnace medium-capital overhauling quickly draws coal gas method after going into operation
CN108379996B (en) Device and method for reducing sulfur dioxide in chimney of ground dust removal system in dry quenching environment
CN205157513U (en) Flame retarded cable burning test device
CN104593536B (en) A kind of method of online replacing air stove blast furnace gas stop valve
CN204901823U (en) Gas replacement system of blue charcoal tail gas boiler
CN102732835A (en) Dual-gas-supply inflation system applied to vacuum coating equipment and inflation method of system
CN210923164U (en) Sampling pipeline of atmosphere analyzer in furnace
CN211394523U (en) Blast furnace damping-down diffusion coal gas recovery device
CN103276124B (en) Environment-friendly blowing-down/restoring method of blast furnace
CN210570054U (en) Aluminum pole workshop waste gas collection pipeline distribution system
CN204369915U (en) A kind of dedusting of blast furnace gas purification system of sectional gas treatment
CN203419936U (en) Blast-furnace gas and nitrogen purging device of combustion gas turbine
CN209098712U (en) A kind of blast furnace stops environmental protection displacement apparatus again
CN205137486U (en) No bypass sintering flue gas desulfurization flue system
CN201757185U (en) Smoke guide and conversion valve for coke oven
CN219283736U (en) Cold air recovery system of environment testing machine
CN112251552B (en) Coal gas treatment method for eliminating black smoke emitted from top of blast furnace
CN219935772U (en) Cable horizontal combustion test device
CN214529104U (en) High-temperature waste gas discharge device for reverse air supply of hot blast stove
CN204513414U (en) A kind of wreath remains incinerator
CN109880656B (en) Blowing-out and sweeping method for double-section gas furnace
CN110699504B (en) Device and method for separating blast furnace gas and sweeping steam
CN220828354U (en) Induced draft fan and thermal power generation system
CN209763049U (en) Circulating fluidized bed boiler lower floor secondary tuber pipe cooling structure
CN215947180U (en) Coke oven tedge flue gas dust arrester installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant