CN110316859A - Oil production waste water in oil field processing unit and operating method - Google Patents

Oil production waste water in oil field processing unit and operating method Download PDF

Info

Publication number
CN110316859A
CN110316859A CN201910508492.8A CN201910508492A CN110316859A CN 110316859 A CN110316859 A CN 110316859A CN 201910508492 A CN201910508492 A CN 201910508492A CN 110316859 A CN110316859 A CN 110316859A
Authority
CN
China
Prior art keywords
fixed
plate
front apron
baffle
rear baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910508492.8A
Other languages
Chinese (zh)
Inventor
陈安秋
马庆
孔德江
赵晓艳
侯剑华
王乐乐
张振民
叶欣
王玉珏
罗贤银
刘英春
付鹏
张玲丽
滕威
杨军营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910508492.8A priority Critical patent/CN110316859A/en
Publication of CN110316859A publication Critical patent/CN110316859A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/66Treatment of water, waste water, or sewage by neutralisation; pH adjustment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/72Treatment of water, waste water, or sewage by oxidation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/10Nature of the water, waste water, sewage or sludge to be treated from quarries or from mining activities

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Sewage (AREA)

Abstract

Oil production waste water in oil field processing unit and operating method.Its composition of this product includes: purification tank for liquid waste, the middle position of purification tank for liquid waste is provided with cleaning groove, cleaning groove is provided with bottom plate, bottom plate welds front apron and rear baffle, front apron is oppositely arranged with rear baffle, left side between front apron and rear baffle is buckled with the fixed buckle of half degree of lip-rounding, the fixed buckle of half degree of lip-rounding includes left blend stop plate, left blend stop plate fixed vertical connects front shoe, it is fixed between front apron and front shoe by front bolt, left blend stop plate fixed vertical connects rear fixed plate, it is fixed between rear baffle and rear fixed plate by rear bolt, the height of left blend stop plate is equal to the depth of cleaning groove, left blend stop plate is provided with left fixed slot, weld right shell body in the right side of front apron and rear baffle, right shell body connects screen pack, and it is fixed by screw.The present invention is for oil production waste water in oil field processing.

Description

Oil production waste water in oil field processing unit and operating method
Technical field:
The present invention relates to a kind of oil production waste water in oil field processing unit and operating methods.
Background technique:
Will appear waste water during oil extraction in oil field, these waste water handle can achieve the purpose that it is free from environmental pollution, Existing wastewater treatment equipment is unable to satisfy demand.
Summary of the invention:
The object of the present invention is to provide one kind can satisfy demand, using effect good oil production waste water in oil field processing unit and operation Method.
Above-mentioned purpose is realized by following technical scheme:
A kind of oil production waste water in oil field processing unit, composition includes: purification tank for liquid waste, the interposition of the purification tank for liquid waste It sets and is provided with cleaning groove, the cleaning groove is provided with bottom plate, the bottom plate welding front apron and rear baffle, before described Baffle is oppositely arranged with the rear baffle, and the left side between the front apron and the rear baffle is buckled with half degree of lip-rounding and fixes Buckle, the fixed buckle of half degree of lip-rounding includes left blend stop plate, and the left blend stop plate fixed vertical connects front shoe, described Front apron and the front shoe between fixed by front bolt, it is fixed after the described left blend stop plate fixed vertical connection Plate is fixed between the rear baffle and the rear fixed plate by rear bolt, and the height of the left blend stop plate is equal to institute The depth for the cleaning groove stated, the left blend stop plate are provided with left fixed slot, the front apron and the rear baffle Right shell body is welded on right side, and the right shell body connection screen pack is simultaneously fixed by screw.
The oil production waste water in oil field processing unit, the front apron welds hanging ring before left front hanging ring and the right side, described Rear baffle welds hanging ring behind left back hanging ring and the right side, and the front apron vertically connects preceding flat fixed plate, the preceding flat fixed plate Perpendicular fixation hole before being provided with, the rear baffle flat fixed plate after vertically connecting, the rear flat fixed plate erect fixation hole after being provided with, The preceding perpendicular fixation hole and the rear perpendicular fixation hole are inserted into conical rod, and the conical rod insertion underground is fixed, described Conical rod top welded cover plate.The fixed buckle of bottom plate, half degree of lip-rounding, front apron, rear baffle, right shell body, screen pack composition Sedimentation basin case.
The oil production waste water in oil field processing unit, connecting plate before the front apron welds, the preceding connecting plate are opened There are preceding trough with straight angle, connecting plate after the rear baffle welding, the rear connecting plate is provided with rear trough with straight angle, the preceding trough with straight angle It is inserted into preceding right angle frid, right angle frid, the preceding right angle frid and the rear trough with straight angle after the rear trough with straight angle insertion Plate is by proposing baffle connection.
A kind of operating method of oil production waste water in oil field processing unit, this operating method include seven steps, the first step by bottom plate with Half degree of lip-rounding fixing buckle board group is fitted together, and second step fits together front apron, rear baffle, right shell body, screen pack, third The bottom of sedimentation basin case is packed into cleaning groove by step, and conical rod is passed through preceding perpendicular fixation hole and afterwards perpendicular fixation hole interpolation by the 4th step Enter underground to fix, when mud of the 5th step in sedimentation basin case needs to clear up, assembles preceding right angle frid, propose baffle, is rear straight Chamfered groove plate, the 6th step take out conical rod, and the 7th step hangs out sedimentation basin case, outwells mud.
The utility model has the advantages that
1. sedimentation basin case of the invention facilitates taking-up, convenience, speed are fast when clearing up mud and solid sundries, sling and are packed into and is all square Just, using effect is good.
Preceding right angle frid of the invention proposes that baffle, rear right angle frid are not assembled when sedimentation basin case is not needed and proposed, no Mud and solid sundries are influenced to enter in sedimentation basin case, assembled when needing to propose sedimentation basin case preceding right angle frid, propose baffle, Right angle frid afterwards, when hanging out sedimentation basin case, the mud and solid sundries that can be blocked in sedimentation basin case do not drop out sedimentation basin case, Using safe, effect is good.
Sedimentation basin case of the invention is inserted into underground by conical rod and is fixed, and can further fix sedimentation basin case, really Guarantor's sedimentation basin case loading purification tank for liquid waste internal ratio is stronger, and use is safe.
Screen pack of the invention is fixed by screws in right shell body, is needing to clear up and replace screen pack when side Just, speed is fast, easy to use, effect is good.
Detailed description of the invention:
Attached drawing 1 is the structural schematic diagram of this product.
Attached drawing 2 is the top view of this product.
Specific embodiment:
Below in conjunction with attached drawing of the invention, technical scheme in the embodiment of the invention is clearly and completely described.
Embodiment 1:
A kind of oil production waste water in oil field processing unit, composition includes: purification tank for liquid waste 1, the interposition of the purification tank for liquid waste It sets and is provided with cleaning groove 2, the cleaning groove is provided with bottom plate 3, the bottom plate welding front apron 4 and rear baffle 5, described Front apron be oppositely arranged with the rear baffle, the left side between the front apron and the rear baffle is buckled with half degree of lip-rounding Fixed buckle, the fixed buckle of half degree of lip-rounding includes left blend stop plate 6, and the left blend stop plate fixed vertical connects front shoe 7, left blend stop plate fixed vertical connection fixed by front bolt 8 between the front apron and the front shoe, described Rear fixed plate 9, fixed by rear bolt 10 between the rear baffle and the rear fixed plate, the height of the left blend stop plate Degree is equal to the depth of the described cleaning groove, and the left blend stop plate is provided with left fixed slot 11, the front apron with it is described The right side of rear baffle weld right shell body 12, the described right shell body connection screen pack 13 is simultaneously fixed by screw 14.Left blend stop The height of plate is not higher than cleaning groove, it is ensured that sedimentation basin case does not influence mud and solid sundries enter, and using effect is good.Filter screen Plate does not influence waste water and flows through, and can make mud and solid sundries that can stay in sedimentation basin case, precipitating, filtering effect It is good.
Embodiment 2:
Oil production waste water in oil field processing unit described in embodiment 1, the front apron weld hanging ring 16 before left front hanging ring 15 and the right side, The rear baffle welds hanging ring 18 behind left back hanging ring 17 and the right side, and the front apron vertically connects preceding flat fixed plate 19, described Preceding flat fixed plate be provided with before perpendicular fixation hole 20, the rear baffle flat fixed plate 21 after vertically connecting, the rear flat fixation Plate erects fixation hole 22 after being provided with, the preceding perpendicular fixation hole and the rear perpendicular fixation hole are inserted into conical rod 23, the circle Cone bar insertion underground is fixed, the top welded cover plate 24 of the conical rod.The fixed buckle of bottom plate, half degree of lip-rounding, front apron, rear gear Plate, right shell body, screen pack form sedimentation basin case.Hanging ring gives lifting precipitating behind hanging ring, left back hanging ring, the right side before left front hanging ring, the right side Pond case provides necessary guarantee, safe when slinging.
Embodiment 3:
Oil production waste water in oil field processing unit as described in example 2, connecting plate 25 before the front apron welds, the preceding connection Plate is provided with preceding trough with straight angle 26, and connecting plate 27 after the rear baffle welding, the rear connecting plate is provided with rear trough with straight angle 28, described Preceding trough with straight angle be inserted into preceding right angle frid 29, right angle frid 30 after the rear trough with straight angle insertion, the preceding right angle frid with The rear right angle frid is by proposing that baffle 31 connects.
Preceding right angle frid is inserted into preceding trough with straight angle, had not only facilitated securely in trough with straight angle after the insertion of rear right angle frid, and assembling mentions Convenient, secured when baffle out, assembling, dismounting speed are all fast.
Embodiment 4:
Oil production waste water in oil field processing unit described in embodiment 1, the left side of purification tank for liquid waste be adsorption and oxidation pond 32 and have into Mouthful, the right side of purification tank for liquid waste is to neutralize aeration tank 33 and have discharge outlet.(this embodiment is the prior art)
Embodiment 5:
A kind of operating method of oil production waste water in oil field processing unit, this operating method include seven steps, and the first step is by bottom plate and Ban Kou Shape fixing buckle board group is fitted together, and second step fits together front apron, rear baffle, right shell body, screen pack, and third step will The bottom of sedimentation basin case is packed into cleaning groove, and conical rod is passed through in preceding perpendicular fixation hole and afterwards perpendicular fixation hole and is inserted into ground by the 4th step Under fix, when mud of the 5th step in sedimentation basin case needs to clear up, assemble preceding right angle frid, propose baffle, rear trough with straight angle Plate, the 6th step take out conical rod, and the 7th step hangs out sedimentation basin case, outwells mud.

Claims (3)

1. a kind of oil production waste water in oil field processing unit, composition includes: purification tank for liquid waste, it is characterized in that: at the waste water The middle position in reason pond is provided with cleaning groove, and the cleaning groove is provided with bottom plate, and the bottom plate welding front apron is with after Baffle, the front apron are oppositely arranged with the rear baffle, the left side between the front apron and the rear baffle It is buckled with the fixed buckle of half degree of lip-rounding, the fixed buckle of half degree of lip-rounding includes left blend stop plate, and the left blend stop plate fixed vertical connects Front shoe is connect, is fixed between the front apron and the front shoe by front bolt, the left blend stop plate is fixed Vertical connection rear fixed plate, is fixed between the rear baffle and the rear fixed plate by rear bolt, the left blend stop The height of plate is equal to the depth of the described cleaning groove, and the left blend stop plate is provided with left fixed slot, the front apron with Right shell body is welded on the right side of the rear baffle, and the right shell body connection screen pack is simultaneously fixed by screw;Before described Hanging ring before the left front hanging ring of baffle welding and the right side, the rear baffle weld hanging ring behind left back hanging ring and the right side, and the front apron hangs down Direct-connected to connect preceding flat fixed plate, the preceding flat fixed plate perpendicular fixation hole before being provided with, the rear baffle is flat after vertically connecting to be fixed Plate, the rear flat fixed plate erect fixation hole after being provided with, the preceding perpendicular fixation hole and the rear perpendicular fixation hole are inserted into circle Bar is bored, the conical rod insertion underground is fixed, the top welded cover plate of the conical rod.The fixed buckle of bottom plate, half degree of lip-rounding, Front apron, rear baffle, right shell body, screen pack form sedimentation basin case.
2. oil production waste water in oil field processing unit according to claim 1, it is characterized in that: connection before the front apron welding Plate, the preceding connecting plate are provided with preceding trough with straight angle, and connecting plate after the rear baffle welding, the rear connecting plate is provided with rear straight Chamfered groove, the preceding trough with straight angle are inserted into preceding right angle frid, right angle frid after the rear trough with straight angle insertion, the preceding trough with straight angle Plate is with the rear right angle frid by proposing that baffle is connect.
3. a kind of operating method of oil production waste water in oil field processing unit, it is characterized in that: this operating method includes seven steps, the first step will Bottom plate is fitted together with half degree of lip-rounding fixing buckle board group, and front apron, rear baffle, right shell body, screen pack are assembled in one by second step It rises, third step clears up the bottom loading of sedimentation basin case in groove, and conical rod is passed through preceding perpendicular fixation hole and erected admittedly with rear by the 4th step Determine insertion underground in hole to fix, when mud of the 5th step in sedimentation basin case needs to clear up, assembles preceding right angle frid, proposes gear Plate, rear right angle frid, the 6th step take out conical rod, and the 7th step hangs out sedimentation basin case, outwells mud.
CN201910508492.8A 2019-06-13 2019-06-13 Oil production waste water in oil field processing unit and operating method Pending CN110316859A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910508492.8A CN110316859A (en) 2019-06-13 2019-06-13 Oil production waste water in oil field processing unit and operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910508492.8A CN110316859A (en) 2019-06-13 2019-06-13 Oil production waste water in oil field processing unit and operating method

Publications (1)

Publication Number Publication Date
CN110316859A true CN110316859A (en) 2019-10-11

Family

ID=68119568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910508492.8A Pending CN110316859A (en) 2019-06-13 2019-06-13 Oil production waste water in oil field processing unit and operating method

Country Status (1)

Country Link
CN (1) CN110316859A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203253209U (en) * 2013-05-07 2013-10-30 江西省电力设计院 Integrated hoisting type coal slime sedimentation forebay in steel structure
CN204225174U (en) * 2014-11-10 2015-03-25 雷燕铭 A kind of husky block of Novel spider plant being applied to stone flour sedimentation basin
CN108128979A (en) * 2017-12-30 2018-06-08 天津航进科技发展有限公司 A kind of buried sewage treatment equipment
CN108905309A (en) * 2018-07-29 2018-11-30 佛山奎丰商务咨询服务有限公司 A kind of hospital wastewater discharge environment-friendly processing unit
CN208436448U (en) * 2018-06-04 2019-01-29 中交城乡建设规划设计研究院有限公司 Sedimentation basin of sewage disposal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203253209U (en) * 2013-05-07 2013-10-30 江西省电力设计院 Integrated hoisting type coal slime sedimentation forebay in steel structure
CN204225174U (en) * 2014-11-10 2015-03-25 雷燕铭 A kind of husky block of Novel spider plant being applied to stone flour sedimentation basin
CN108128979A (en) * 2017-12-30 2018-06-08 天津航进科技发展有限公司 A kind of buried sewage treatment equipment
CN208436448U (en) * 2018-06-04 2019-01-29 中交城乡建设规划设计研究院有限公司 Sedimentation basin of sewage disposal
CN108905309A (en) * 2018-07-29 2018-11-30 佛山奎丰商务咨询服务有限公司 A kind of hospital wastewater discharge environment-friendly processing unit

Similar Documents

Publication Publication Date Title
CN203741169U (en) Flocculation stirring tank with filtering function
CN208327752U (en) A kind of sewage purification processing system
CN205076925U (en) Urban sewage treatment equipment
CN110316859A (en) Oil production waste water in oil field processing unit and operating method
CN202609998U (en) Spiral-flow type energy-saving muddy water flocculation mixing device
CN210845553U (en) Self-service effluent treatment plant for carwash
CN208648919U (en) A kind of blowdown factory water filter purification device
CN203781933U (en) Aggregation plate inclining grease trap
CN208561938U (en) A kind of heavy metal wastewater thereby controlling device
CN206325299U (en) Starch from sweet potato produces filter
CN206138869U (en) Useless water circulation filtration device
CN213171954U (en) Combined sewage treatment device
CN210728839U (en) Multistage filtering device for rubber manufacturing equipment
CN209702424U (en) A kind of integrated sewage treating apparatus
CN202089813U (en) Integral water purifier
CN209161620U (en) A kind of integral type too many levels pretreatment water tank
CN208757025U (en) A kind of novel biological engineering sewage-treatment plant
CN206508662U (en) A kind of plate-frame filtering device of use multistage filtering mode
CN105836909A (en) Arsenic and lead containing wastewater treatment device
CN110451693A (en) A kind of full-automatic multi-functional multipurpose energy-saving environment protection water correction plant
CN205907144U (en) Industrial sewage treatment system
CN109553257A (en) A kind of sludge treatment system and processing method
CN204310836U (en) A kind of fat separator device
CN215782081U (en) Prevent that residue from accumulational filter equipment for fertile production of liquid
CN215026336U (en) Oil tank with cleaning and pollution discharge functions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011

RJ01 Rejection of invention patent application after publication